CN2687227Y - Precast floorslab beam bottom-sealing device - Google Patents

Precast floorslab beam bottom-sealing device Download PDF

Info

Publication number
CN2687227Y
CN2687227Y CN 200420001421 CN200420001421U CN2687227Y CN 2687227 Y CN2687227 Y CN 2687227Y CN 200420001421 CN200420001421 CN 200420001421 CN 200420001421 U CN200420001421 U CN 200420001421U CN 2687227 Y CN2687227 Y CN 2687227Y
Authority
CN
China
Prior art keywords
precasting
perforation
template die
precasting floor
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420001421
Other languages
Chinese (zh)
Inventor
尹衍樑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruentex Engineering and Construction Co Ltd
Original Assignee
Ruentex Engineering and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruentex Engineering and Construction Co Ltd filed Critical Ruentex Engineering and Construction Co Ltd
Priority to CN 200420001421 priority Critical patent/CN2687227Y/en
Application granted granted Critical
Publication of CN2687227Y publication Critical patent/CN2687227Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a precast floorslab beam bottom-sealing device, comprising two precast floorslabs forming a gap as large as beam position, a square formwork arranged between the gap of the two precast floorslabs to seal the gap bottom, a sealing body arranged between the formwork and the two precast floorslabs, a transverse rod arranged below the formwork, a supporting upper rod arranged above the gap of the two precast floorslabs corresponding to the transverse rod, and a connector that passes through the transverse rod, the formwork, the sealing body, and the supporting upper rod to make the transverse rod lean tightly against the supporting upper rod and to make the formwork press the sealing body to close contact the precast floorslabs. With the fixed connector, the supporting upper rod and the transverse rod make the formwork and the sealing body close contact the precast floorslabs. Therefore, a support rod does not need to be arranged, and the leakage of the cement mortar is avoided.

Description

Precasting floor joist position bottom closing device
Technical field
The utility model relates to a kind of precasting floor joist position back cover structure, relates in particular to a kind ofly can not cause construction site operation inconvenience, and can avoid the precasting floor joist position bottom closing device of cement mortar spill and leakage.
Background technology
Present reduction and convenience for the building operations time, pre-casting method has become one of building construction method that widely uses, because pre-casting method is that beam, post and the floor that prior precasting is good directly is transported to assembled on site, grouted solid gets final product, therefore the site operation activity duration can significantly be saved, in the place that the floor level is had relatively high expectations, also can utilize the level of precasting floor to require to reach the problem of the horizontal accuracy deficiency of the floor of avoiding site operation in advance.
Tradition precasting floor is when applying, mostly be that the precasting floor is seated on the support cylinder, again with the beam body of space, the interval concrete perfusion between two precasting floors with the making building, mostly traditional method is to be provided with template die in the bottom, interval of two precasting floors, this template die then is to utilize support bar to be supported, mostly this support bar is upright and is located at down on the first floor plate, but this way not only can cause in upright be provided with in the support bar floor movable construction worker's inconvenience, and if support bar upright establish apply bad, also can cause template die can't seal space, interval between two precasting floors, when causing the cement mortar perfusion, the gap location that can be joined by template die and precasting floor produces spill and leakage, even the problem that drops of template.
The utility model content
In order to overcome weak point of the prior art,
Main purpose of the present utility model is to provide a kind of can not cause construction site operation inconvenience, and can avoid the precasting floor joist position bottom closing device of cement mortar spill and leakage.
In order to reach above-mentioned utility model purpose, the utility model system takes following technological means to be reached, and precasting floor joist wherein provided by the utility model position bottom closing device includes:
Two precasting floors are formed with the space, interval of beam position size between the precasting floor;
Template die is square body, and the gap, interval that is arranged between the precasting floor is sealed to incite somebody to action bottom, space, interval, and it is provided with the perforation in relative precasting floor interbody spacer space;
Seal is arranged between template die and the precasting floor, and it is provided with the perforation with respect to the template die perforation;
Cross bar is arranged on the template die below, can be provided with the perforation with respect to the template die perforation on it;
Support upper boom, be arranged at the top, space, interval that is arranged on the precasting floor with respect to cross bar, can be provided with perforation on it with respect to the template die perforation;
Connector, the perforation that runs through cross bar, template die, seal and support upper boom to be will support upper boom and cross bar is close to mutually, force template die to oppress seal simultaneously and the precasting floor connects airtight.
By fixing of connector, make support upper boom and cross bar template die and seal can be adjacent to the precasting floor closely, so do not need to be provided with support bar, also do not have the problem generation that cement mortar is leaked.
Description of drawings
Fig. 1 is the sectional drawing that the utility model and precasting floor are made up.
Fig. 2 is the lateral view that the utility model and precasting floor are made up.
Fig. 3 is the upward view that the utility model and precasting floor are made up.
Fig. 4 is through the made beam body of the utility model and the sectional view of precasting floor.
Fig. 5 is the sectional drawing that another embodiment of the utility model and precasting floor are made up.
Fig. 6 is the sectional view of made beam body of another embodiment of the utility model and precasting floor.
The specific embodiment
Please extremely shown in Figure 3 referring to Fig. 1, precasting floor joist of the present utility model position bottom closing device includes:
Two precasting floors 10 are formed with the space, interval 11 of beam position size between the precasting floor 10;
Template die 20 is square body, and sentence the sealing of 11 bottoms, space, interval in the space, interval 11 that is arranged on 10 on precasting floor, and it is provided with the perforation 21 in relative precasting floor 10 interbody spacer spaces 11;
Seal 30 is arranged between template die 20 and the precasting floor 10, and it is provided with the perforation 31 with respect to template die 20 perforation 21;
Cross bar 40 is arranged on template die 20 belows, can be provided with the perforation 41 with respect to template die 20 perforation 21 on it;
Support upper boom 50, be arranged at 11 tops, space, interval that are arranged on precasting floor 10 with respect to cross bar 40, can be provided with perforation 51 on it with respect to template die 20 perforation 21;
Connector 60, the perforation 41,21,31,51 that runs through cross bar 40, template die 20, seal 30 and support upper boom 50 forces template die 20 compressing seals 30 and precasting floor 10 to connect airtight will support upper boom 50 and cross bar 40 is close to mutually simultaneously.
The employed connector 60 of present embodiment is a rope body, this rope body can be article such as iron wire, the rope made of hemp, and this rope body is directly walked around and is supported upper boom 50 and cross bar 40 so that both are close to mutually, and seal 30 can be soft sealing materials such as rubber, flexible plastic, silica gel.
The utility model is when using, at first seal 30 is arranged on the interval space 11 of precasting floor 10 lower ends with 10 on sealing precasting floor, again template die 20 is arranged on seal 30 downsides with fixing seal body 30, utilize cross bar 40 to be arranged on template die 20 belows, run through cross bar 40 from lower to upper by connector 60, template die 20, the perforation 41 of seal 30 and support upper boom 50,21,31,51, and tie up to be located at and support on the upper boom 50 so that support upper boom 50 is close mutually with cross bar 40, and then compressing template die 20, force template die 20 compressing seals 30 with after connecting airtight with precasting floor 10 simultaneously, can be by space, the interval 11 top concrete perfusions of 10 on precasting floor to form the beam body of 10 on precasting floor.
Please referring to shown in Fig. 1,4, treat that concrete is stiff after, after rigid connector 60 cut off, get final product after removing cross bar 40, template die 20, seal 30 and supporting upper boom 50.
Please referring to shown in Fig. 5,6, connector 60 can also be the combination of bolt and nut, and to support upper boom 50 close mutually with cross bar 40 to force whereby, and then compressing template die 20, force template die 20 compressing seals 30 to connect airtight with precasting floor 10 simultaneously, it is same as the previously described embodiments to apply mode.

Claims (5)

1, a kind of precasting floor joist position bottom closing device is characterized in that, includes:
Two precasting floors, the precasting floor between be formed with the space, interval of beam position size;
Template die is square body, and the gap, interval that is arranged between the precasting floor is sealed to incite somebody to action bottom, space, interval, and it is provided with the perforation in relative precasting floor interbody spacer space;
Seal is arranged between template die and the precasting floor, and it is provided with the perforation with respect to the template die perforation;
Cross bar is arranged on the template die below, can be provided with the perforation with respect to the template die perforation on it;
Support upper boom, be arranged at the top, space, interval that is arranged on the precasting floor with respect to cross bar, can be provided with perforation on it with respect to the template die perforation;
Connector, the perforation that runs through cross bar, template die, seal and support upper boom to be will support upper boom and cross bar is close to mutually, force template die to oppress seal simultaneously and the precasting floor connects airtight.
2, precasting floor joist according to claim 1 position bottom closing device is characterized in that, this connector is the rope body.
3, precasting floor joist according to claim 2 position bottom closing device is characterized in that this rope body is an iron wire.
4, precasting floor joist according to claim 2 position bottom closing device is characterized in that this rope body is the rope made of hemp.
5, precasting floor joist according to claim 1 position bottom closing device is characterized in that this connector is bolt and nut.
CN 200420001421 2004-02-02 2004-02-02 Precast floorslab beam bottom-sealing device Expired - Lifetime CN2687227Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420001421 CN2687227Y (en) 2004-02-02 2004-02-02 Precast floorslab beam bottom-sealing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420001421 CN2687227Y (en) 2004-02-02 2004-02-02 Precast floorslab beam bottom-sealing device

Publications (1)

Publication Number Publication Date
CN2687227Y true CN2687227Y (en) 2005-03-23

Family

ID=34667461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420001421 Expired - Lifetime CN2687227Y (en) 2004-02-02 2004-02-02 Precast floorslab beam bottom-sealing device

Country Status (1)

Country Link
CN (1) CN2687227Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193340A (en) * 2016-08-26 2016-12-07 杭州江润科技有限公司 Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
US10145130B1 (en) 2017-09-08 2018-12-04 Ruentex Engineering & Construction Co., Ltd. Sealing structure for the bottom of a beam space between precast panels
CN109487954A (en) * 2017-09-11 2019-03-19 润弘精密工程事业股份有限公司 The method for applying multiple beams engaging one another
US10808393B2 (en) 2017-09-11 2020-10-20 Ruentex Construction & Engineering Co., Ltd. Method for forming a plurality of beams connected in series

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193340A (en) * 2016-08-26 2016-12-07 杭州江润科技有限公司 Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
US10145130B1 (en) 2017-09-08 2018-12-04 Ruentex Engineering & Construction Co., Ltd. Sealing structure for the bottom of a beam space between precast panels
CN109487954A (en) * 2017-09-11 2019-03-19 润弘精密工程事业股份有限公司 The method for applying multiple beams engaging one another
US10808393B2 (en) 2017-09-11 2020-10-20 Ruentex Construction & Engineering Co., Ltd. Method for forming a plurality of beams connected in series

Similar Documents

Publication Publication Date Title
CN108797847B (en) Assembled steel frame infilled wall structure system and construction method thereof
CN1112484C (en) Prestressed underground continuous Wall
CN111364364A (en) Construction method for cast-in-place prestressed concrete continuous box girder
CN1974931A (en) Box type baseboard prestress concrete variable cross-section box girder bridge and construction method thereof
CN2687227Y (en) Precast floorslab beam bottom-sealing device
CN102367653A (en) Support structure for large-span continuous beam construction
CN2861328Y (en) Subsectional embedded structure of concrete steel column in reverse construction engineering
CN2809021Y (en) Prestressed counterforce system device in compression resistant static test of large tonnage foundation pile
CN101057038A (en) Hollow prestressed concrete (HPC) girder and spliced hollow prestressed concrete girder (S-HPC) bridge construction method
CN1974930A (en) Baseboard cable horizontal arrangement prestress concrete variable cross-section box girder bridge and construction method thereof
CN2683763Y (en) Beam position bottom closing device of precasting floorslab
CN1730855A (en) Novel embedded part for vibration isolation bearing and mounting method thereof
CN1590665A (en) Connecting structure of building external wall board and on site pouring concrete floor board and its connecting method
CN2835393Y (en) Quick-building beam column frame
CN209686249U (en) A kind of longitudinal prestressing stretching end anchor device structure
CN1247869C (en) Rigid bottom plate less reinforced concrete water pond and its construction method
CN2668738Y (en) Plate column structure with transverse bearing structure
CN200952217Y (en) Concrete support
CN2583234Y (en) On site pouring reinforced concrete hollow cavity shearing wall
CN112030706A (en) Prefabricated bridge pier and capping beam connecting system for assembled beam bridge and construction method of prefabricated bridge pier and capping beam connecting system
CN1059485C (en) Large longitudinal prestressed rectangular pool without expansion seam
CN112359978A (en) Connecting node of prefabricated module and cast-in-place structure and construction method
CN2625496Y (en) Structure of adding floor and elevator in multistoried building
CN1423022A (en) Building wall in-situ assembling construction method
CN2771349Y (en) Reinforced concrete spliced floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Expiration termination date: 20140202

Granted publication date: 20050323