CN2626598Y - Absorption tower for sulfur dioxide of sintered fumes - Google Patents

Absorption tower for sulfur dioxide of sintered fumes Download PDF

Info

Publication number
CN2626598Y
CN2626598Y CN 03251103 CN03251103U CN2626598Y CN 2626598 Y CN2626598 Y CN 2626598Y CN 03251103 CN03251103 CN 03251103 CN 03251103 U CN03251103 U CN 03251103U CN 2626598 Y CN2626598 Y CN 2626598Y
Authority
CN
China
Prior art keywords
flue
tower body
absorption tower
tower
sintering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03251103
Other languages
Chinese (zh)
Inventor
童必炎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03251103 priority Critical patent/CN2626598Y/en
Application granted granted Critical
Publication of CN2626598Y publication Critical patent/CN2626598Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

A sintering fume-gas sulfur dioxide absorption tower comprises a tower body (1), an atomization fan (2), a flue (3), and an internal body (9) arranged inside the tower body (1). The flue (3) is made of glass steel. The internal body (9) inside the tower body (1) is made of glass steel, stainless steel or plastic. The utility model has the advantages of long service life, no damage of tower body, no corrosion of the flue (3) made of stainless steel, less repair and maintenance, improved production efficiency, and reduced production cost.

Description

The sintering gas flue gas sulfuric dioxide absorption tower
Technical field: the utility model relates to the environmental protection field, relates to the sinter fume field of waste treatment in particular.
Background technology: at present, the tower body 1 that is used for the equipment on sintering gas flue gas sulfuric dioxide absorption tower is to adopt the granite of individual layer to make mostly, after using for a long time,, make tower body expansion capacity easy to leak, breakage even collapse because the flue gas in the flue is subjected to the effect of air blast to produce the big pressure of tool; The flue 3 of this equipment adopts steel pipe manufacturing mostly, on steel pipe, be enclosed with anticorrosive coat and plastic tube, and when matching with tower body 1 with the flue 3 of steel pipe manufacturing, flue 3 comes off easily with tower body 1, more fatal is after using for a long time, and flue can be corroded, must with a large amount of time to this equipment place under repair, thereby reduced the production efficiency of enterprise, stop production to overhaul causes production cost to be increased greatly.
Technology contents: the purpose of this utility model is exactly a kind of sintering gas flue gas sulfuric dioxide absorption tower that provides at above-mentioned deficiency, it needn't with a large amount of time to this equipment place under repair, thereby reduced the time between overhauls(TBO), improve the service life of production efficiency and equipment, also reduced the production cost of enterprise.The sinter fume sulfur trioxide absorption, comprise tower body 1, sprayization fan 2 and flue 3, on tower body 1, have maintenance 4, sprayization fan water inlet 5, limewash water inlet 6, overfall 7 and sintering gas flue gas sulfuric dioxide import 8, sintering gas flue gas sulfuric dioxide import 8 communicates with flue 3, sprayization fan 2 is fixed on and is positioned at sprayization fan water inlet 5 places in the tower body 1, is lined with inner bag 9 in the inside of tower body 1.Flue 3 adopts fiberglass to make.The inner bag 9 that is lined with in tower body 1 inside adopts fiberglass, stainless steel or plastic production.Advantage of the present utility model is that it is that granite is made that the tower body 1 of this equipment adopts outer wall, and inner bag 9 is that the bilayer of fiberglass is made, even use for a long time, tower body can be not damaged; The flue 3 of this equipment adopts fiberglass to make, fiberglass can better be cooperated with the Hua Gangyan of tower body 1 outer wall, can not come off, even use for a long time, the flue of making of fiberglass can not be corroded yet, just needn't with a large amount of time to this equipment place under repair, thereby reduced the time between overhauls(TBO), improve the service life of production efficiency and equipment, also reduced the production cost of enterprise.
Description of drawings: accompanying drawing 1 is a structural representation of the present utility model
The specific embodiment: at first use mylar 198#, epoxy resin or phenolic resins with the inner levelling in existing sintering gas flue gas sulfuric dioxide absorption tower, again near pre-buried dragging and squeezing glass fiber reinforced plastics support column on the internal face of levelling, make the fiberglass inner bag with glass fabric and mylar 198#, epoxy resin or phenolic resins at last, its wall thickness 5-20mm is advisable, wind speed amount and north and south temperature difference according to the blower fan compression change, and suit measures to local conditions.Flue 3 adopts fiberglass to make fully, then flue 3 is connected with the sintering gas flue gas sulfuric dioxide import 8 of tower body 1, again flue 3 outer walls and the sintering gas flue gas sulfuric dioxide of tower body 1 advance 8 interfaces that are connected with glass fabric alternate with mylar 198#, epoxy resin or phenolic resins coat the 3-5 layer, get final product to prevent its interface gas leakage.

Claims (3)

1, sintering gas flue gas sulfuric dioxide absorption tower, comprise tower body (1), sprayization fan (2) and flue (3), on tower body (1), have access hole (4), sprayization fan water inlet (5), limewash water inlet (6), overfall (7) and sintering gas flue gas sulfuric dioxide import (8), sintering gas flue gas sulfuric dioxide import (8) communicates with flue (3), sprayization fan (2) is fixed on and is positioned at sprayization fan water inlet (5) in the tower body (1) and locates, and it is characterized in that being lined with inner bag (9) in the inside of tower body (1).
2, sintering gas flue gas sulfuric dioxide according to claim 1 absorption tower is characterized in that flue (3) adopts fiberglass to make.
3, sintering gas flue gas sulfuric dioxide according to claim 1 and 2 absorption tower is characterized in that the inner bag (9) that is lined with in tower body (1) inside adopts fiberglass, stainless steel or plastic production.
CN 03251103 2003-04-29 2003-04-29 Absorption tower for sulfur dioxide of sintered fumes Expired - Fee Related CN2626598Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03251103 CN2626598Y (en) 2003-04-29 2003-04-29 Absorption tower for sulfur dioxide of sintered fumes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03251103 CN2626598Y (en) 2003-04-29 2003-04-29 Absorption tower for sulfur dioxide of sintered fumes

Publications (1)

Publication Number Publication Date
CN2626598Y true CN2626598Y (en) 2004-07-21

Family

ID=34253018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03251103 Expired - Fee Related CN2626598Y (en) 2003-04-29 2003-04-29 Absorption tower for sulfur dioxide of sintered fumes

Country Status (1)

Country Link
CN (1) CN2626598Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102451615A (en) * 2010-10-20 2012-05-16 宝山钢铁股份有限公司 Glass fiber reinforced plastic flue gas jetting pipe used in desulphurization technology, and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102451615A (en) * 2010-10-20 2012-05-16 宝山钢铁股份有限公司 Glass fiber reinforced plastic flue gas jetting pipe used in desulphurization technology, and manufacturing method thereof
CN102451615B (en) * 2010-10-20 2013-11-20 宝山钢铁股份有限公司 Glass fiber reinforced plastic flue gas jetting pipe used in desulphurization technology, and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN201459902U (en) Rotational moulding inspection well
CN2626598Y (en) Absorption tower for sulfur dioxide of sintered fumes
CN202543014U (en) Integral type septic tank with high-pressure-resistance intensive wave peak structural wall
CN2771389Y (en) Direct-insertion type concrete crack grouting nozzle
CN203161300U (en) Gland heater multistage water seal device
CN102141466A (en) Boundary simulation device and method for thin-walled cylindrical shell structure experiment
CN206018670U (en) One kind is used for sectional formula chimney glass reinforced plastic inner cylinder body attachment means
CN202298873U (en) Novel GRP (glass-reinforced plastic) drainage inspection well
CN201078538Y (en) Pipe length regulating device for vacuum fluid absorbing vehicle
CN202901564U (en) Corrosion-resistant concrete composite pipeline
CN206318988U (en) A kind of marsh-gas fermentation tank
CN207088150U (en) One kind being capable of the water-saving steam-cured pond of concrete tubular pile
CN207207037U (en) A kind of plastic pipe spraying cooler
CN201028158Y (en) HDPE double-wall corrugated pipe with fabrication hole on exterior wall
CN201037712Y (en) Water tank of solar water heater
CN2693762Y (en) Glass reinforced plastic biomass pool
CN201760217U (en) Glass fiber reinforced plastic impact type leaching absorption tower
CN201159551Y (en) Open geothermal energy utilization device
CN203862108U (en) High-temperature-resistant desulfurization tower
CN208859203U (en) A kind of gas pipeline choke device
CN203257425U (en) Tunnel daylighting and ventilation integrated device
CN207661234U (en) A kind of glass fiber reinforced plastic sand-inclusion pipeline of improved structure
CN202273201U (en) Throatless measuring flume for U-shaped prefabricated reinforced concrete canal
CN210321866U (en) Socket type underground heat-preservation water meter box
CN203100468U (en) Liquefying device used in steam of solidifying chamber

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee