CN2620186Y - Device for drying raw coal by boiler smoke - Google Patents

Device for drying raw coal by boiler smoke Download PDF

Info

Publication number
CN2620186Y
CN2620186Y CN 03213257 CN03213257U CN2620186Y CN 2620186 Y CN2620186 Y CN 2620186Y CN 03213257 CN03213257 CN 03213257 CN 03213257 U CN03213257 U CN 03213257U CN 2620186 Y CN2620186 Y CN 2620186Y
Authority
CN
China
Prior art keywords
boiler
exhaust gas
boiler exhaust
run coal
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03213257
Other languages
Chinese (zh)
Inventor
史学家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03213257 priority Critical patent/CN2620186Y/en
Application granted granted Critical
Publication of CN2620186Y publication Critical patent/CN2620186Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a device for drying run coal by utilizing boiler exhaust-smoke, which comprises a closed run coal bin(2) which is connected with a boiler(1), and is characterized in that: the closed run coal bin(2)is provided with a boiler exhaust smoke inlet(3); the boiler exhaustsmoke inlet(3)is connected with an exhaust port of the boiler(1)through a flue gas pipe; the closed run coal bin(2)also is provided with a boiler exhaust-smoke outlet(5); and the boiler exhaustsmoke outlet(5)also is connected with a flue gas pipe, and is connected with a blower. The biggest differences is that the high-temperature flue gas generating from the boiler can be entered into the run coal bin, the run coal in the run coal bin can be dried by the heat of the flue gas. Due to the oxygen content in the flue gas, the self-ignition phenomenon of the run coal in the run coal bin caused by partial overheating in an environment with enough oxygen can be avoided, so the safety factor is high. After being dried, the run coal in the run coal bin is entered into the boiler for being burnt through a coaling device, thereby the shortcoming that the run coat has moisture can be overcome, the work efficiency of the boiler is improved.

Description

Can utilize boiler exhaust gas that raw coal is carried out dry device
Technical field:
The utility model relates to a kind of device that can carry out drying to the raw coal in the run coal bin, and especially a kind of boiler exhaust gas that utilizes carries out dry device to raw coal.
Background technology:
Existing boiler combustion system generally all is provided with run coal bin, and raw coal enters the boiler internal combustion through the coal supply device, and the flue gas that the burning back produces causes chimney by blower fan again and discharges.Because existing raw coal not through any dry processing, contains than juicy in the raw coal in run coal bin.Its disadvantage is as follows: one. and be unfavorable for raw coal combustion, even raw coal caught fire difficulty takes place; Two. moisture becomes heat absorption into steam, has reduced the ignition temperature of raw coal, thereby has reduced the efficient of boiler; Three. the steam that is become by moisture will increase the volume of flue gas, and the load of blower fan is increased, and promptly strengthen blower fan power consumption, waste energy; Four. moisture will make the low temperature heating surface of whole boiler combustion system that corrosion phenomenon takes place easily, reduce the service life of boiler combustion system; Five. moisture will make the coal dust bonding, cause run coal bin coal spout, coal supply device to stop up easily, influence normal coal supply.And if any traditional heater (devices such as electrothermal tube, microwave radiation) is set in run coal bin, not only expend the energy, also make raw coal easily since in the environment of oxygen abundance hot-spot and, exist great potential safety hazard in the run coal bin internal combustion.
Summary of the invention:
The utility model is in order to solve in the prior art existing being difficult to raw coal in the run coal bin to be carried out dry technical problem, provides a kind of energy savings, utilized boiler exhaust gas that safety coefficient is high that raw coal is carried out dry device.
Technical solution of the present utility model is: a kind of boiler exhaust gas that utilizes carries out dry device to raw coal, be provided with the airtight run coal bin 2 that joins with boiler 1, on airtight run coal bin 2, be provided with boiler exhaust gas import 3, the exhaust opening 4 of boiler exhaust gas import 3 and boiler 1 joins by gas flue, on airtight run coal bin 2, also be provided with boiler exhaust gas outlet 5, also be connected to gas flue with boiler exhaust gas outlet 5, in gas flue, be connected to blower fan.
The described blower fan that is connected in gas flue is to be connected to boiler exhaust gas pressure fan 7 in the gas flue 6 between the exhaust opening 4 of boiler exhaust gas import 3 and boiler 1.
Described in gas flue, be connected to blower fan be with the gas flue 8 of boiler exhaust gas outlet 5 in be connected to boiler exhaust gas induced-draught fan 9.
Described in gas flue, be connected to blower fan be connected in the gas flue 6 between the exhaust opening 4 of boiler exhaust gas import 3 and boiler 1 boiler exhaust gas pressure fan 7 and with the gas flue 8 of boiler exhaust gas outlet 5 in be connected to boiler exhaust gas induced-draught fan 9.
Be connected to deduster 10 in the boiler exhaust gas of airtight run coal bin 2 outlet 6 gas flues that join 8, be connected to coal dust storage device 11 between airtight run coal bin 2 and the deduster 10.
Gas flue 6 between the exhaust opening 4 of boiler exhaust gas pressure fan 7 and boiler 1 joins with chimney population baffle plate 12.
The utility model is compared with prior art, and the difference of its maximum is exactly that the high-temperature flue gas that boiler can be produced feeds in the run coal bin, utilizes the heat in the flue gas that the raw coal in the run coal bin is carried out drying.Because the oxygen content in the flue gas is low, can avoid raw coal in the environment of oxygen abundance hot-spot and in run coal bin the phenomenon of spontaneous combustion the safety coefficient height takes place.Raw coal in the run coal bin enters boiler combustion by stoker after drying again, fully reduce the moisture in the raw coal, can overcome and contain the existing shortcoming of moisture in the raw coal, improved the ignition temperature of raw coal, then improve the efficient of boiler, can save a large amount of fire coals; Simultaneously, flue gas volume can reduce because steam reduces, and has reduced the load of blower fan, and the power consumption of blower fan is reduced, and then can save a large amount of electric energy; Whole boiler combustion system also can be avoided phenomenons such as burn into obstruction, and reliability is improved.
Description of drawings:
Fig. 1 is the schematic diagram of the utility model embodiment.
The specific embodiment:
Below in conjunction with the description of drawings specific embodiment of the present utility model.As shown in Figure 1: the utility model embodiment is provided with the airtight run coal bin 2 that joins by coal supply device 13 and boiler 1.Airtight run coal bin 2 promptly is added with capping 14 on run coal bin, capping 14 is provided with anti-explosion safety door 15 and run coal bin entrance door 16, and anti-explosion safety door 17, run coal bin entrance door 16 sealing parts all are provided with sealing ring, in case when work boiler exhaust gas reveal.On airtight run coal bin 2, be provided with boiler exhaust gas import 3, the exhaust opening 4 of boiler exhaust gas import 3 and boiler 1 joins by gas flue, on airtight run coal bin 2, also be provided with boiler exhaust gas outlet 5, also be connected to gas flue with boiler exhaust gas outlet 5, be connected to blower fan in gas flue, whole exhaust gases passes all should be in air-tight state.Can in the gas flue 6 between the exhaust opening 4 of boiler exhaust gas import 3 and boiler 1, be connected to boiler exhaust gas pressure fan 7, also can with the gas flue 8 of boiler exhaust gas outlet 5 in be connected to boiler exhaust gas induced-draught fan 9, not only be connected in the gas flue 6 between the exhaust opening 4 of boiler exhaust gas import 3 and boiler 1 boiler exhaust gas pressure fan 7 but also with the gas flue 8 of boiler exhaust gas outlet 5 in be connected to boiler exhaust gas induced-draught fan 9, form balanced draft.Discharge in order to prevent coal ash, can export in 6 gas flues that join 8 at boiler exhaust gas and be connected to deduster 10 (coal dust classifier) with airtight run coal bin 2, be connected to coal dust storage device 11 between airtight run coal bin 2 and the deduster 10, make through the coal dust that deduster 10 is produced and get back in the airtight run coal bin 2.Gas flue 6 between the exhaust opening 4 of boiler exhaust gas pressure fan 7 and boiler 1 joins with chimney inlet baffle 12, can distribute boiler exhaust gas.
Can be during work with gas flue 8, the other end of chimney inlet baffle 12 and chimney 17 join, when need be to raw coal dry, regulate the flue gas that leads to chimney 17 with chimney inlet baffle 12, at this moment, by boiler exhaust gas pressure fan 7 and (or) boiler exhaust gas induced-draught fan 9 delivers to the part boiler exhaust gas in the airtight run coal bin 2 by gas flue 6, boiler exhaust gas import 3, the boiler exhaust gas of high temperature carries out heat drying to the raw coal in the run coal bin 2, then, boiler exhaust gas enters chimney 17 discharges by boiler exhaust gas outlet 5, gas flue 8; Another part boiler exhaust gas enters chimney 17 by chimney inlet baffle 12 and discharges.If when not needing that raw coal carried out drying, blower fan quits work, boiler exhaust gas enters chimney 17 by chimney inlet baffle 12 fully and discharges.

Claims (6)

1. one kind can be utilized boiler exhaust gas that raw coal is carried out dry device, be provided with the airtight run coal bin (2) that joins with boiler (1), it is characterized in that: on airtight run coal bin (2), be provided with boiler exhaust gas import (3), the exhaust opening (4) of boiler exhaust gas import (3) and boiler (1) joins by gas flue, on airtight run coal bin (2), also be provided with boiler exhaust gas outlet (5), also be connected to gas flue with boiler exhaust gas outlet (5), in gas flue, be connected to blower fan.
2. the boiler exhaust gas that utilizes according to claim 1 carries out dry device to raw coal, it is characterized in that: the described blower fan that is connected in gas flue is to be connected to boiler exhaust gas pressure fan (7) in the gas flue (6) between the exhaust opening (4) of boiler exhaust gas import (3) and boiler (1).
3. the boiler exhaust gas that utilizes according to claim 1 carries out dry device to raw coal, it is characterized in that: described in gas flue, be connected to blower fan be with the gas flue (8) of boiler exhaust gas outlet (5) in be connected to boiler exhaust gas induced-draught fan (9).
4. the boiler exhaust gas that utilizes according to claim 1 carries out dry device to raw coal, it is characterized in that: the described blower fan that is connected in gas flue is to be connected to boiler exhaust gas pressure fan (7) in the gas flue (6) between the exhaust opening (4) of boiler exhaust gas import (3) and boiler (1) and to export in the gas flue (8) of (5) with boiler exhaust gas to be connected to boiler exhaust gas induced-draught fan (9).
5. according to claim 1 or 2 or the 3 or 4 described boiler exhaust gas that utilize raw coal is carried out dry device, it is characterized in that: be connected to deduster (10) in the gas flue (8) that joins with the boiler exhaust gas of airtight run coal bin (2) outlet (6), be connected to coal dust storage device (11) between airtight run coal bin (2) and the deduster (10).
6. according to claim 1 or 2 or the 3 or 4 described boiler exhaust gas that utilize raw coal is carried out dry device, it is characterized in that: the gas flue (6) between the exhaust opening (4) of boiler exhaust gas pressure fan (7) and boiler (1) joins with chimney inlet baffle (12).
CN 03213257 2003-05-21 2003-05-21 Device for drying raw coal by boiler smoke Expired - Fee Related CN2620186Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03213257 CN2620186Y (en) 2003-05-21 2003-05-21 Device for drying raw coal by boiler smoke

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03213257 CN2620186Y (en) 2003-05-21 2003-05-21 Device for drying raw coal by boiler smoke

Publications (1)

Publication Number Publication Date
CN2620186Y true CN2620186Y (en) 2004-06-09

Family

ID=34242262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03213257 Expired - Fee Related CN2620186Y (en) 2003-05-21 2003-05-21 Device for drying raw coal by boiler smoke

Country Status (1)

Country Link
CN (1) CN2620186Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893370A (en) * 2010-07-07 2010-11-24 华北电力大学(保定) System adopting high concentration CO2 flue gas as coal dust drying medium in boiler
CN102155744A (en) * 2010-12-22 2011-08-17 上海锅炉厂有限公司 System for pre-drying coal with high water content by utilizing residual heat of boiler gas
CN102759118A (en) * 2011-04-29 2012-10-31 中国电力工程顾问集团华北电力设计院工程有限公司 Lignite drum smoke pre-drying power generation integrated system and process
CN102788346A (en) * 2012-07-27 2012-11-21 濮阳县飞达炉料有限公司 Improved boiler system
CN103688121A (en) * 2011-07-19 2014-03-26 巴布考克日立株式会社 Drying conveyer, and thermal electric power generation system provided with same
CN103925606A (en) * 2014-04-04 2014-07-16 西安西热锅炉环保工程有限公司 High-moisture lignite medium-speed coal mill pulverizing system heating primary air through coal gas burning
CN110079352A (en) * 2019-05-10 2019-08-02 中国科学院青岛生物能源与过程研究所 A kind of pulverized coal pyrolysis coal is dry and expects encapsulation technique
CN110285441A (en) * 2019-07-06 2019-09-27 黄林 A kind of boiler system with residual heat collection function

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893370A (en) * 2010-07-07 2010-11-24 华北电力大学(保定) System adopting high concentration CO2 flue gas as coal dust drying medium in boiler
CN101893370B (en) * 2010-07-07 2012-05-30 华北电力大学(保定) System adopting high concentration CO2 flue gas as coal dust drying medium in boiler
CN102155744A (en) * 2010-12-22 2011-08-17 上海锅炉厂有限公司 System for pre-drying coal with high water content by utilizing residual heat of boiler gas
CN102155744B (en) * 2010-12-22 2012-11-14 上海锅炉厂有限公司 System for pre-drying coal with high water content by utilizing residual heat of boiler gas
CN102759118A (en) * 2011-04-29 2012-10-31 中国电力工程顾问集团华北电力设计院工程有限公司 Lignite drum smoke pre-drying power generation integrated system and process
CN103688121A (en) * 2011-07-19 2014-03-26 巴布考克日立株式会社 Drying conveyer, and thermal electric power generation system provided with same
CN102788346A (en) * 2012-07-27 2012-11-21 濮阳县飞达炉料有限公司 Improved boiler system
CN102788346B (en) * 2012-07-27 2015-02-04 濮阳县飞达炉料有限公司 Improved boiler system
CN103925606A (en) * 2014-04-04 2014-07-16 西安西热锅炉环保工程有限公司 High-moisture lignite medium-speed coal mill pulverizing system heating primary air through coal gas burning
CN110079352A (en) * 2019-05-10 2019-08-02 中国科学院青岛生物能源与过程研究所 A kind of pulverized coal pyrolysis coal is dry and expects encapsulation technique
CN110285441A (en) * 2019-07-06 2019-09-27 黄林 A kind of boiler system with residual heat collection function
CN110285441B (en) * 2019-07-06 2021-05-28 黄林 Boiler system with waste heat collecting function

Similar Documents

Publication Publication Date Title
CN2620186Y (en) Device for drying raw coal by boiler smoke
CN102563858B (en) Complementary combustion device for low temperature waste heat power generation
CN105042576A (en) Efficient combustion device and method with biomass serving as fuel
CN2802304Y (en) Multi-stage coal-fired energy-saving high-efficient energy-saving stove
CN216558205U (en) Low-NOx-emission hot blast stove system of carbon drying device
CN210398934U (en) Incinerator with drying section adopting hearth smoke to dry fuel
CN201074836Y (en) Automatically oxygen-feeding energy-saving recirculated air stove
CN107166428A (en) A kind of grate firing boiler flue gas oxygen content control system based on flue gas recirculation
CN208998096U (en) Hot-blast stove
CN102607286A (en) Molten salt furnace afterheat power-generation and combustion comprehensive utilizing system
CN201407639Y (en) Phase-change furnace for burning pulverized coal
CN207279689U (en) A kind of grate firing boiler flue gas oxygen content control system based on flue gas recirculation
CN205939672U (en) Improve energy -saving pot stove of intake air temperature
CN2756956Y (en) Coal burning gas water heating boiler
CN2315487Y (en) Atmospheric vertical boiler with screw chimney
CN2767895Y (en) Intelligently controlled household boiler adapted to multiple fuels
CN212512387U (en) Active carbon combustion energy storage device
CN216869219U (en) Energy-saving and environment-friendly shuttle kiln
CN202757467U (en) System for comprehensively utilizing waste heat of salt melting furnace for power generation and combustion
CN203718754U (en) Dual-purpose horizontal boiler capable of burning biomass powder and fire coal
CN109737596B (en) Composite combustion fluidized bed type double-hearth
CN114111314B (en) Low NOx emission's charcoal material drying device hot-blast furnace system
CN203478212U (en) Energy-saving combined combustion boiler
CN216844648U (en) Biomass wood chip combustor
CN201285161Y (en) Biomass fuel vacuum phase transition energy-saving horizontal boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee