CN2605546Y - Vacuum electric-arc skull crucible - Google Patents

Vacuum electric-arc skull crucible Download PDF

Info

Publication number
CN2605546Y
CN2605546Y CN 03212019 CN03212019U CN2605546Y CN 2605546 Y CN2605546 Y CN 2605546Y CN 03212019 CN03212019 CN 03212019 CN 03212019 U CN03212019 U CN 03212019U CN 2605546 Y CN2605546 Y CN 2605546Y
Authority
CN
China
Prior art keywords
crucible
utility
model
vacuum
electrode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03212019
Other languages
Chinese (zh)
Inventor
王毓民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03212019 priority Critical patent/CN2605546Y/en
Application granted granted Critical
Publication of CN2605546Y publication Critical patent/CN2605546Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Crucibles And Fluidized-Bed Furnaces (AREA)

Abstract

The utility model relates to a vacuum arc skull furnace comprising a vacuum melting chamber, a crucible and an electrode tip is positioned inside the vacuum melting chamber; a charging hopper is arranged on the upside of the vacuum melting chamber, a discharge hole of the charging hopper is fixedly connected with an electrode rod with hollow structure; an auger conveyor is arranged inside the charging hopper and the hollow electrode rod; the lower end of the electrode rod is connected with a hollow electrode tip via a grip. The design of the utility model for the electrode rod and electrode tip is in a hollow structure, and the electrode rod and the electrode tip are connected with the discharge hole; the materials can be conveyed to the center of the crucible through the auger conveyor by utilizing the hollow electrode rod as the passage of materials, and the material can reach an ion area directly, therefore the utility model can reduce the diameter of the crucible and reduce heat radiation loss, and can prevent the molten metal surface in the crucible from being impacted by the materials, and avoid the splash of materials, so that the electric arc is stable. In addition, the structure of the utility model is more simple than the prior structure of skull crucible, furthermore, the utility model not only can be applicable for non-consumable vacuum skull crucible, but also can be applicable for consumable vacuum skull crucible.

Description

The vacuum arc skull crucible
Technical field
The utility model is a kind of new construction of vacuum arc skull crucible, and it is applicable to non-consumable formula vacuum arc skull crucible, also can be used in consumable formula vacuum arc skull crucible.
Background technology
In the non-consumable formula vacuum arc skull crucible in the middle of using now, outside electrode stem, promptly charging mechanism is vertical respectively with electrode or be obliquely installed above crucible by the adding approach of fusant material.This structure certainly will make the bore of crucible strengthen, and causes thermal radiation loss excessive and power consumption increases.In addition, above-mentioned charging mechanism because far away from crucible, so cause impact to metal melting liquid level in the crucible when reinforced, produces splash when reinforced, influence stablizing of electric arc.
Summary of the invention
The purpose of this utility model provides a kind of new structure of vacuum arc skull crucible, and it can overcome existing shortcoming in the prior art, reduces the heat loss of crucible, prevents the splash of material.
The purpose of this utility model is achieved in that it comprises the vacuum melting chamber, indoor crucible and the electrode tip of being equipped with of vacuum melting, it is characterized in that being equipped with above the working chamber charging hopper, the discharging opening of charging hopper is fixedlyed connected with the electrode stem of hollow structure, in charging hopper and hollow type electrode stem auger conveyor is housed, the lower end of electrode stem is connected with the hollow type electrode tip by a chuck.
The utility model is designed to hollow structure with electrode stem and electrode tip, be connected with the discharging opening of charging hopper, utilize the passage of hollow electrode bar as material, the utility model by auger conveyor material is delivered directly to the center of crucible, and can directes reach ion plasma, so can make the diameter of crucible reduce, reduce heat loss, simultaneously can prevent to add the impact of material, avoid the splash of motlten metal, make electric arc melting stable fusion liquid level in the crucible.Structure of the present utility model in addition is more simple in structure than original skull crucible, and not only can be applied to non-consumable formula vacuum cooling-shell furnace, also can be used for consumable formula vacuum cooling-shell furnace.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
The utility model is described in more detail below in conjunction with embodiment and accompanying drawing thereof.
As shown in Figure 1, the 9th, the vacuum melting chamber, at the indoor crucible 7 that is equipped with of vacuum melting, casting pattern 10, top at crucible is equipped with electrode assembly, electrode assembly includes hollow type cathode electrode bar 4, the upper end of electrode stem and charging hopper 1 are rigidly connected, the lower end of electrode stem is fixing with electrode tip 6 by a chuck 5, electrode tip is hollow structure too, electrode tip can be the non-consumable formula electrode that adopts high-melting point metal to make, it also can be the consumable formula electrode of making of smelting metal, for adjusting the position of ion plasma, be provided with rise fall of electrodes system 3, at the center of electrode stem auger conveyor 2 be housed, 11 of top is motor and transmission devices of auger conveyor.As seen from the figure, crucible in the present embodiment 7 adopts is the structure of casting type of going to the bottom, and has casting gate below it, and the crucible bottom 8 that is driven by cylinder is housed, and the bottom is provided with casting die 10, and it is installed on the trailer.

Claims (2)

1, vacuum arc skull crucible, it comprises the vacuum melting chamber, indoor crucible and the electrode tip of being equipped with of vacuum melting, it is characterized in that in the working chamber and a charging hopper is installed, the discharging opening of charging hopper is fixedlyed connected with the electrode stem of hollow structure, in charging hopper and hollow type electrode stem auger conveyor is housed, the lower end of electrode stem is connected with the hollow type electrode tip by a chuck.
2,, it is characterized in that its crucible bottom has casting gate, and the crucible bottom that is driven by cylinder is housed according to the said vacuum arc skull crucible of claim 1.
CN 03212019 2003-03-20 2003-03-20 Vacuum electric-arc skull crucible Expired - Fee Related CN2605546Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03212019 CN2605546Y (en) 2003-03-20 2003-03-20 Vacuum electric-arc skull crucible

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03212019 CN2605546Y (en) 2003-03-20 2003-03-20 Vacuum electric-arc skull crucible

Publications (1)

Publication Number Publication Date
CN2605546Y true CN2605546Y (en) 2004-03-03

Family

ID=34159320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03212019 Expired - Fee Related CN2605546Y (en) 2003-03-20 2003-03-20 Vacuum electric-arc skull crucible

Country Status (1)

Country Link
CN (1) CN2605546Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102679741A (en) * 2012-03-07 2012-09-19 宁夏三友环保设备制造有限公司 Conveying device for hollow electrode powder of calcium carbide furnace
CN102829637A (en) * 2012-08-14 2012-12-19 沈林彬 Moveable spiral conveying electrode for adding powder to center of electric furnace
CN105202908A (en) * 2015-11-03 2015-12-30 苏州市金翔钛设备有限公司 Vacuum consumable electrode arc furnace
CN106583677A (en) * 2017-01-25 2017-04-26 苏州振湖电炉有限公司 Vacuum skull furnace and working process thereof
CN107598113A (en) * 2017-10-23 2018-01-19 沈阳真空技术研究所 Skull crucible centrifugation systems

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102679741A (en) * 2012-03-07 2012-09-19 宁夏三友环保设备制造有限公司 Conveying device for hollow electrode powder of calcium carbide furnace
CN102829637A (en) * 2012-08-14 2012-12-19 沈林彬 Moveable spiral conveying electrode for adding powder to center of electric furnace
CN105202908A (en) * 2015-11-03 2015-12-30 苏州市金翔钛设备有限公司 Vacuum consumable electrode arc furnace
CN106583677A (en) * 2017-01-25 2017-04-26 苏州振湖电炉有限公司 Vacuum skull furnace and working process thereof
CN107598113A (en) * 2017-10-23 2018-01-19 沈阳真空技术研究所 Skull crucible centrifugation systems
CN107598113B (en) * 2017-10-23 2020-08-25 沈阳真空技术研究所有限公司 Centrifugal system of skull furnace

Similar Documents

Publication Publication Date Title
RU2226553C1 (en) Method and device for production of melted iron
CN2605546Y (en) Vacuum electric-arc skull crucible
CN109353808A (en) A kind of automatic charging device welding nut cap nut
CN110986613A (en) Slagging-off device of smelting furnace
WO2007070764A3 (en) Method for controlling foaming of slag in an electric arc furnace
CN106119894B (en) Aluminum electrolytic cell with height adjusting device arranged on side part of crust breaking cylinder
JPH06300449A (en) Dc arc furnace
CN201731757U (en) Environment-friendly, energy-saving and high-efficient aluminum alloy smelting furnace
CN209368337U (en) A kind of tilting feeds intake tin metallurgy electric furnace
CN209639495U (en) Continuous charging electric furnace arrangement for producing steel device
CN219956068U (en) Electrode position adjusting device of electric arc furnace
CN209326332U (en) A kind of semicontinuous vacuum induction casting furnace of industrial silicon
CN210431947U (en) Electrode clamping structure
JP2013052407A (en) Apparatus for supplying molten metal to die-casting machine, and method for supplying the molten metal
CN102758122A (en) Bearing block smelting process
CN212800121U (en) Discharge port regulating device of glass mosaic smelting furnace
CN207331020U (en) A kind of electroslag remelting cold start-up arc initiation device
RU101395U1 (en) DEVICE FOR PRODUCING POWDER OF REFROOMING MATERIAL
CN220788670U (en) Eccentric tapping mechanism for metal smelting
CN216513954U (en) Refining furnace with slag removal function
CN210548762U (en) Electrode tooling device
CN210004746U (en) Smelting device for semi-brittle corundum abrasives
CN210108015U (en) Novel preheating tower of aluminum alloy centralized melting furnace
CN210974840U (en) Efficient melting equipment for aluminum forging production
CN209753953U (en) Novel ingot casting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee