CN2594297Y - Permeable road surface composite files and composite structure bodies - Google Patents
Permeable road surface composite files and composite structure bodies Download PDFInfo
- Publication number
- CN2594297Y CN2594297Y CN 03211052 CN03211052U CN2594297Y CN 2594297 Y CN2594297 Y CN 2594297Y CN 03211052 CN03211052 CN 03211052 CN 03211052 U CN03211052 U CN 03211052U CN 2594297 Y CN2594297 Y CN 2594297Y
- Authority
- CN
- China
- Prior art keywords
- utility
- model
- water permeable
- top layer
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to a water permeable road surface composite brick and a composite structure body. The utility model is mainly composed of a surface layer and a water permeable base layer, wherein the surface layer uses thermosetting resin as base material, and a sticking structure layer with water permeable gaps is made of curing agent, additive agent and skeletal material. The water permeable base layer is tightly appressed with the surface layer, and a road bed is below the lower surface of the water permeable base layer. Each technical index of the utility model is superior to that of the existing cement color brick, and the utility model has the characteristics water permeable and ventilating functions. The burden of underground drainage is lightened, groundwater resource is supplemented, moisture is kept, temperature is reduced, weather is regulated, and the ecological environment of urban areas is improved. The utility model can use waste as raw material, and the paving and the molding of the utility model can be completed on site. The patterns and the colors of the utility model are rich, and the road surface is smooth. The utility model can be used on the surfaces of various footpaths and exercise yards in urban areas.
Description
The utility model relates to the porous pavement composite brick and the permeable complex structure body on making People's Bank of China road surface.
Present many cities and towns People's Bank of China road surfacing cement azulejo, promptly the surface of cement frog brick is coated with and carries out the wear resistant resin layer, and road surface rain, the snow day walking of laying this azulejo are more sliding; Because permeable, gas permeability is relatively poor, and surface temperature is increased, city " heat island phenomenon " is more obvious; The easy ponding in road surface particularly concentrates rainfall more to strengthen the draining burden of urban sewage pipeline season; Pattern and color dullness, the planeness on road surface is not ideal.
Task of the present utility model is: overcome the defective that above-mentioned cement azulejo is done the People's Bank of China road surface, a kind of permeable composite brick and permeable complex structure body that is used for the People's Bank of China road surface is provided, make to the utlity model has good water-permeable and air permeable function.
The utility model mainly is made of top layer, porous base course and is combined into one, the direct making in the scene.The top layer mainly is to be base-material with the thermosetting resin, adds curing compound, additive and aggregate and makes the sticking deck with permeable space, and being close to the top layer is porous base course, is roadbed below this basic unit.During on-the-spot making, the cementing agent and the aggregate of thermosetting resin base-material, curing compound, additive preparation mixed, the mixture that stirs is moved in the mould of different pattern and be laid on the porous base course, hot pressing then, health get final product.The pattern-free road surface can directly be laid to whole complex structure body.
When roadbed out-of-flatness or road conditions are relatively poor, can between porous base course and roadbed, dose fine sand as filtering matting layer.
The utility model is compared with the cement azulejo that existing people's walking along the street is laid has following advantage:
1, technical indicator: thickness is that the coefficient of permeability on the permeable top layer of 30mm is that compressive strength is greater than 120kg/cm more than the 2mm/s
2, flexibility is greater than 45kg/cm
2, technical indicator is higher than the cement azulejo far away;
2, permeable speed is fast, prevents the rainy day surface gathered water, alleviates water draining burden down, by quick infiltration, can replenish the cities and towns groundwater resources, keep soil moisture and temperature, be beneficial to the ecological homeostasis, be specially adapted to the drought and water shortage area and improve surface humidity and additional underground water;
3, good water permeability has increased the ventilative area of urban water-through greatly, regulates urban climate, helps alleviating city " heat island phenomenon ", improves the ecological environment in city;
4, can utilize a large amount of refuses as raw material, mat formation, the moulding scene finishes, pattern, color are abundant, evenness of road surface.
5, the utility model can be applicable to cities and towns, the walking along the street of people from residential quarter, park, city square, pedestrian street, urban water-through tree well and various People's Bank of China road surface and activity space.
Be described specifically in conjunction with embodiment of the present utility model below by accompanying drawing.
Accompanying drawing is a structure layer schematic diagram of the present utility model.
Referring to accompanying drawing, this composite brick and complex structure body comprise top layer 1, porous base course 2 and roadbed 4, top layer 1 is combined into one with following porous base course 2, below the porous base course 2 is roadbed 4, can dose fine sand between porous base course 2 and the roadbed and do to filter matting layer 3, this fine sand layer thickness is about 50mm-100mm.Top layer 1 is to make base-material with thermosetting resin, add curing compound, additive and aggregate and make permeable top layer, curing compound can be selected amine such as modified amine, amino resins, acid anhydrides etc. for use, additive is selected zinc salicylate-isopropylamine for use, top layer 1 thickness is designed to 15mm-50mm according to the road surface compressive strength, the top layer aggregate adopts nature and regenerate building stones, slag, cullet, waste ceramic, damaged tire particle, and the thickness of porous base course 2 is about 80mm-200mm.
Claims (4)
1, porous pavement composite brick and complex structure body, it is characterized in that it mainly is made of top layer [1], porous base course [2] and is combined into one, top layer [1] mainly is to be base-material with the thermosetting resin, add curing compound, additive and aggregate and make sticking deck with permeable space, be close to top layer [1] and be porous base course [2], this basic unit [2] is following to be roadbed [4].
2,, it is characterized in that between porous base course [2] and roadbed [4], dosing fine sand and make to filter matting layer [3] according to described porous pavement composite brick of claim 1 and complex structure body.
3, according to claim 1 or 2 described porous pavement composite brick and complex structure bodies, it is characterized in that said top layer [1] aggregate adopts nature and regenerate building stones, slag, cullet, waste ceramic, damaged tire particle, top layer [1] thickness is 15mm-50mm, and porous base course [2] thickness is 80mm-200mm.
4,, it is characterized in that said top layer [1] additive selects zinc salicylate-isopropylamine for use according to claim 1 or 2 or 3 described porous pavement composite brick and complex structure bodies.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03211052 CN2594297Y (en) | 2003-01-17 | 2003-01-17 | Permeable road surface composite files and composite structure bodies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03211052 CN2594297Y (en) | 2003-01-17 | 2003-01-17 | Permeable road surface composite files and composite structure bodies |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2594297Y true CN2594297Y (en) | 2003-12-24 |
Family
ID=33754233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03211052 Expired - Fee Related CN2594297Y (en) | 2003-01-17 | 2003-01-17 | Permeable road surface composite files and composite structure bodies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2594297Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008043271A1 (en) * | 2006-09-30 | 2008-04-17 | Beijing Rechsand Science & Technology Group Co., Ltd. | Composite water permeable brick and composition for producing the same |
CN103290753A (en) * | 2013-05-28 | 2013-09-11 | 深圳海龙建筑制品有限公司 | Nano-composite environment-friendly water permeable brick and production method thereof |
CN109650777A (en) * | 2018-12-29 | 2019-04-19 | 佛山生态海绵城市科技发展有限公司 | A kind of composite water permeable brick and preparation method thereof |
CN110304863A (en) * | 2019-05-22 | 2019-10-08 | 开化县锦新建筑材料有限公司 | A kind of Ceramic Composite water-permeable brick |
CN115417621A (en) * | 2022-08-11 | 2022-12-02 | 中国电建集团西北勘测设计研究院有限公司 | Method for preparing water permeable brick by using waste rubber and construction waste and application of water permeable brick |
-
2003
- 2003-01-17 CN CN 03211052 patent/CN2594297Y/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008043271A1 (en) * | 2006-09-30 | 2008-04-17 | Beijing Rechsand Science & Technology Group Co., Ltd. | Composite water permeable brick and composition for producing the same |
CN101528630A (en) * | 2006-09-30 | 2009-09-09 | 北京仁创科技集团有限公司 | Composite water permeable brick and composition for producing the same |
CN1966861B (en) * | 2006-09-30 | 2012-03-28 | 北京仁创科技集团有限公司 | Composite water permeable brick |
CN103103904A (en) * | 2006-09-30 | 2013-05-15 | 北京仁创科技集团有限公司 | Composite water permeable brick and mixture for manufacturing surface layer of same |
CN103103904B (en) * | 2006-09-30 | 2015-11-04 | 北京仁创科技集团有限公司 | Composite water permeable brick and the compound for making composite water permeable brick top layer |
CN103290753A (en) * | 2013-05-28 | 2013-09-11 | 深圳海龙建筑制品有限公司 | Nano-composite environment-friendly water permeable brick and production method thereof |
CN109650777A (en) * | 2018-12-29 | 2019-04-19 | 佛山生态海绵城市科技发展有限公司 | A kind of composite water permeable brick and preparation method thereof |
CN110304863A (en) * | 2019-05-22 | 2019-10-08 | 开化县锦新建筑材料有限公司 | A kind of Ceramic Composite water-permeable brick |
CN115417621A (en) * | 2022-08-11 | 2022-12-02 | 中国电建集团西北勘测设计研究院有限公司 | Method for preparing water permeable brick by using waste rubber and construction waste and application of water permeable brick |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200981968Y (en) | Water permeability footway | |
CN207277119U (en) | A kind of colorful water permeable concrete pavement structure | |
CN103806356A (en) | Decorative concrete floor structure and manufacturing method thereof | |
CN103145394B (en) | Preparation method of cement-sand composite water permeable brick | |
CN202482730U (en) | Permeable brick | |
CN110041005A (en) | A kind of pervious concrete reinforcing agent and preparation method thereof and construction technology | |
CN207362616U (en) | A kind of paving structure of water-permeable brick | |
CN201232150Y (en) | Moisture-keeping ecological brick | |
CN112030654A (en) | Exposed aggregate pervious concrete construction method for water environment treatment | |
CN2594297Y (en) | Permeable road surface composite files and composite structure bodies | |
CN207244376U (en) | A kind of creepage concrete compression-resistance pavement structure | |
CN105967729A (en) | Novel pavement water-permeable composite material and preparation method thereof | |
CN107794822B (en) | Permeable pavement based on sponge city idea | |
CN106431124B (en) | Water-retaining water-permeable concrete prepared from construction waste and preparation method thereof | |
CN111549603A (en) | Pavement considering water load coupling and construction method thereof | |
CN206521660U (en) | A kind of porous pavement is mated formation plate and porous pavement paving structure | |
CN2719015Y (en) | Permeable tree pit composite brick | |
CN205295868U (en) | Combination concrete road surface | |
CN203346758U (en) | Pervious sidewalk structure | |
CN108019006A (en) | A kind of exterior stair structure with permeable granite pedal | |
CN205387654U (en) | Structure of mating formation of permeating water | |
CN210194383U (en) | Road surface structure of colored runway | |
CN2534222Y (en) | Cement broken stone porous paving tiles | |
CN208038967U (en) | Cavernous body water pervious function brick | |
CN112878132A (en) | Community permeable pavement paving method for sponge city |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |