CN2573646Y - Rock drill - Google Patents
Rock drill Download PDFInfo
- Publication number
- CN2573646Y CN2573646Y CN 02264528 CN02264528U CN2573646Y CN 2573646 Y CN2573646 Y CN 2573646Y CN 02264528 CN02264528 CN 02264528 CN 02264528 U CN02264528 U CN 02264528U CN 2573646 Y CN2573646 Y CN 2573646Y
- Authority
- CN
- China
- Prior art keywords
- drill
- drill steel
- casing
- bore bit
- slip ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a rock drill, which is provided with a machine shell. The inner part of the machine shell is provided with at least three impact mechanisms side by side. The inner part of a plugging hole of a drill tail of the front end of each impact mechanism is respectively provided with a drill rod with a drill head. The drill heads of two contiguous drill rods are in front and back staggered arrangement in a drilling direction. The backward rotation of each drill rod uses an outer backward rotating device. The tail end of each drill rod is glidingly sheathed with a drill rotating gear. Each drill rotating gear is provided with a transmission sleeve with an inner hexagonal hole matched with each drill rod. Each transmission sleeve of each drill rotating gear is arranged in the machine shell by a bearing and the drill rotating gears on two contiguous drill rods are in front and back staggered arrangement. The rock drill of the utility model uses the impact mechanisms in parallel. The axial lines of the impact mechanisms and the center lines of the drill rods are on the same straight line and thus mechanism performance is good and the structure is simple and compact. A plurality of body connecting holes can be drilled out at one time. Using the rock drill of the utility model can drill body connecting holes with good guiding performance and high work efficiency. The utility model has wide application and can be suitable for the modern requirements of high speed and high efficiency.
Description
Technical field
The utility model relates to a kind of winning equipment, particularly a kind of exploitation rock rock drilling machinery.
Background technology
In the prior art, application number as the applicant's application is 011272236, publication number is the Chinese patent of CN1336269A, a kind of hammer drill is disclosed, it is provided with casing, be provided with the beater mechanism of taking back rotation mechanism in the casing, the bit shank of beater mechanism front end inserts in the hole the drill steel of band bore bit is installed, the casing rear portion is provided with water inlet and flushing machine, the front end of beater mechanism is connected with the drill steel that is no less than three band bore bits side by side, the setting of staggering before and after on drilling direction of bore bit on adjacent two drill steels, the afterbody of every drill steel all is installed in different beater mechanism front ends respectively, the front end of beater mechanism is a strip, it can impact a plurality of bit shank rear end faces simultaneously, the beater mechanism rear portion be one big, whole shock machine constitutes T shape.It is that a kind of hammer drill that utilizes gets out siamesed port on the ore body section, by siamesed port the periphery of the rock that will exploit is separated effective rock drilling machinery from whole ore body, the weak point of its existence is: owing to be that what to adopt is T shape impactor, its volume is bigger, and structure is complicated.
Summary of the invention
The technical problems to be solved in the utility model is at the deficiencies in the prior art, has proposed a kind of hammer drill of compact conformation, and it can disposablely get out many siamesed ports.
The technical problems to be solved in the utility model is achieved through the following technical solutions, a kind of hammer drill, it is provided with casing, be arranged side by side in the casing and be no less than three beater mechanisms, the bit shank of each beater mechanism front end inserts in the hole and all is separately installed with the drill steel of band bore bit, the casing rear portion is provided with water inlet and flushing machine, the setting of staggering before and after on drilling direction of bore bit on adjacent two drill steels, be characterized in: outer slewing equipment is adopted in the revolution of drill steel, outer slewing equipment is arranged in the casing of beater mechanism front end, described outer slewing equipment adopts the gear train of the hydraulic motor drive that is arranged in the casing to constitute, the tail end of every drill steel all slip cap be equipped with and change the pricker gear, change the pricker gear and be provided with the drive sleeve that has interior hexagonal hole that matches with drill steel, the drive sleeve of changeing the pricker gear is installed in the casing by bearing, the setting of staggering before and after the pricker commentaries on classics gear on adjacent two drill steels.
The technical problems to be solved in the utility model can also be achieved through the following technical solutions, all be provided with the location convex shoulder at every drill steel near the bore bit place, location convex shoulder on every drill steel at grade, between drill steel convex shoulder and bore bit, be provided with the location slip ring of slip cap on drill steel, described location slip ring is to be enclosed within tubular body on the drill steel by a row to be connected to each other and to form, junction between every adjacent tubular body is inlaid with the primary alloy bore bit on the end face of bore bit, also be provided with the short slip ring of slip cap on drill steel between the bore bit of every long drill steel and location slip ring.
The technical problems to be solved in the utility model can also be achieved through the following technical solutions, and beater mechanism adopts hydraulic-driven or pneumatic actuation.
The technical problems to be solved in the utility model can also be achieved through the following technical solutions, and the afterbody of casing is provided with shared water supply hole and shared air vent or oil supplying hole.
The technical problems to be solved in the utility model can also be achieved through the following technical solutions, after rig gets out a round, during second round that continue to bore links to each other, parallel in order to ensure with first round is at the other guiding device that also is installed with side by side of one of them drill steel of both sides portion.
The technical problems to be solved in the utility model can also be achieved through the following technical solutions, and described guiding device comprises a guide ring of fixedlying connected with the location slip ring, is equipped with in the guide ring and drill steel guide peg side by side.
The technical problems to be solved in the utility model can also be achieved through the following technical solutions, described guiding device comprises the guide pad that is arranged on slip ring edge, location and is filled in the interior ways of edge hole that links to each other that described ways is provided with the gathering sill that is slidingly matched with guide pad.After having bored a round, in the edge hole of drilling bore hole, be filled with ways, at the edge that guide pad is installed in the location slip ring.When boring second round, guide pad advances along ways, plays the effect of guiding.
The utility model compared with prior art, be arranged side by side a plurality of beater mechanisms in the casing, the front end of each beater mechanism all is connected with the drill steel of band bore bit, and outer slewing equipment is adopted in the revolution of drill steel, and described outer slewing equipment adopts the gear train of the hydraulic motor drive that is arranged in the casing to constitute.Hammer drill of the present utility model adopts beater mechanism arranged side by side, the axis of beater mechanism and drill steel center line are on same straight line, thereby mechanical property is good, simple and compact for structure, can disposablely get out many siamesed ports, utilize rock drilling machine drill siamesed port of the present utility model, guidance quality is good, high efficiency.It is of many uses, can adapt to high-speed, the high efficiency requirement of modernization.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is that the A-A of Fig. 1 is to the sectional structure schematic diagram.
Fig. 3 is a kind of embodiment schematic diagram of guiding device.
Fig. 4 is that the B-B of Fig. 3 is to sectional view.
Fig. 5 is a kind of embodiment schematic diagram that adds of guiding device.
Fig. 6 is that the C-C of Fig. 5 is to sectional view.
The specific embodiment
Embodiment one, a kind of hammer drill, it is provided with casing 11, nine beater mechanisms 10 have been arranged side by side in the casing 11, all be separately installed with the drill steel 6 of band bore bit 2 in the bit shank patchhole 9 of each beater mechanism front end, casing 11 rear portions are provided with the flushing water inlet, the setting of staggering before and after on drilling direction of bore bit on adjacent two drill steels, outer slewing equipment is adopted in the revolution of drill steel, outer slewing equipment is arranged in the casing 11 of beater mechanism 10 front ends, described outer slewing equipment adopts the gear train of hydraulic motor 12 drives that are arranged in the casing to constitute, the tail end of every drill steel all slip cap be equipped with and change pricker gear 8, change pricker gear 8 and be provided with the drive sleeve that has interior hexagonal hole that matches with drill steel, the drive sleeve of changeing pricker gear 8 is installed in the casing 11 by bearing 7, pricker on adjacent two drill steels changes settings of staggering of gear 8 front and back, and the commentaries on classics pricker gear on every two drill steels separately is by an idler gear drive.All be provided with location convex shoulder 5 at every drill steel near the bore bit place, location convex shoulder 5 on every drill steel at grade, between drill steel convex shoulder 5 and bore bit 2, be provided with the location slip ring 4 of slip cap on drill steel, described location slip ring 4 is to be enclosed within tubular body on the drill steel by a row to be connected to each other and to form, junction between every adjacent tubular body is inlaid with primary alloy bore bit 1 on the end face of bore bit, also be provided with the short slip ring 3 of slip cap on drill steel between the bore bit of every long drill steel and location slip ring.Take out of outside the hole owing to will rely on bore bit will locate slip ring after boring finishes, be threaded so can only adopt between bore bit and the drill steel.The size of drill bit diameter is relevant with the character of rock, when rock is hard, in order to allow the location slip ring pass through smoothly, should select the bigger bore bit of diameter, the every adjacent hole of drilling bore hole crosses one another, when the bore bit of hysteresis creeps into, and the cavity that its both sides have leading bore bit to get out, therefore the resistance that creeps into is little, so the drill bit diameter that lags behind can be designed as bigger slightly than leading bore bit.The bore bit that lags behind can adopt post profile of tooth bore bit, turriform bore bit or bull bit; When rock is softer, broken easily, can adopt the less bore bit of diameter, the hole that get out this moment does not intersect, and a little partition wall is arranged between adjacent boring, because rock is softer, under the impact of bore bit, be easy to shatterly, its location primary alloy on slip ring just can be washed residual partition wall open.The front portion of drill steel is provided with corrugated thread, so that installation bore bit, the a bit of drill steel in the back of screw thread is processed into smooth cylinder, so that be slidingly matched with location slip ring formation, be provided with the shank collar that promotion location slip ring advances in cylindrical back, because bore bit requires to be staggeredly arranged, so drill steel length has two kinds of specifications, for each stress point stress balance when promoting the location slip ring, the shank collar that requires each drill steel is in same plane, mechanical balance in order to withdraw from, the afterbody of front-seat bore bit is equipped with short slip ring.The anterior construction of drill steel also can be taked the extension bar scheme, needs to make one section short drill steel this moment, and the tailing screw flight of short drill steel cooperates with branch sleeve, and the front end screw thread of short drill steel is connected with bore bit, and the cylinder that matches with the location slip ring is arranged on the short drill steel.Utilize branch sleeve to replace the shank collar that promotes the location slip ring.The centre of drill steel and afterbody are to be made by the rock-drill steel of hexagonal hollow, the afterbody shank collar is the same with common drill steel, but bit shank is longer, is to be staggered because change the pricker gear, this is because the distance between the adjacent drill steel is very near, is staggeredly arranged in order to make full use of the confined space.Beater mechanism adopts hydraulic-driven or pneumatic actuation.After rig got out a round, during second round that continue to bore links to each other, parallel in order to ensure with first round was at the other guiding device that also is installed with side by side of one of them drill steel of both sides portion.Described guiding device comprises a guide ring 14 of fixedlying connected with location slip ring 4, is equipped with in the guide ring 14 and drill steel guide peg 13 side by side.The afterbody of casing is provided with shared water supply hole and shared air vent or oil supplying hole.
Embodiment two, and described guiding device comprises the guide pad 15 that is arranged on slip ring edge, location and be filled in the interior ways 16 of edge hole that links to each other that described ways 16 is provided with the gathering sill 17 that is slidingly matched with guide pad.After having bored a round, in the edge hole of drilling bore hole, be filled with ways, at the edge that guide pad is installed in the location slip ring.When boring second round, guide pad advances along ways, plays the effect of guiding.Hammer drill of the present utility model, the drill steel that has beater mechanism is arranged side by side together, and its mode in parallel can adopt many drill steels in one line, is linear distribution, can beat rectilinear siamesed port by this device; Also can adopt the curved arrangement of many drill steels, adopt this device can get curved siamesed port along design.
Claims (7)
1. hammer drill, it is provided with casing (11), be arranged side by side in the casing (11) and be no less than three beater mechanisms (10), all be separately installed with the drill steel (6) of band bore bit (2) in the bit shank patchhole (9) of each beater mechanism (10) front end, casing (11) rear portion is provided with water inlet and flushing machine, the setting of staggering before and after on drilling direction of bore bit on adjacent two drill steels, it is characterized in that: outer slewing equipment is adopted in the revolution of drill steel (6), outer slewing equipment is arranged in the casing (11) of beater mechanism (10) front end, described outer slewing equipment adopts the gear train of motor (12) drive that is arranged in the casing (11) to constitute, the tail end of every drill steel (6) all slip cap be equipped with and change pricker gear (8), change pricker gear (8) and be provided with the drive sleeve that has interior hexagonal hole that matches with drill steel (6), the drive sleeve of changeing pricker gear (8) is installed in the casing (11) by bearing (7), the setting of staggering before and after the pricker commentaries on classics gear (8) on adjacent two drill steels.
2. hammer drill according to claim 1, it is characterized in that: all be provided with location convex shoulder (5) near the bore bit place at every drill steel, location convex shoulder (5) on every drill steel at grade, between drill steel convex shoulder (5) and bore bit (2), be provided with the location slip ring (4) of slip cap on drill steel, described location slip ring (4) is to be enclosed within tubular body on the drill steel by a row to be connected to each other and to form, junction between every adjacent tubular body is inlaid with primary alloy bore bit (1) on the end face of bore bit, also be provided with the short slip ring (3) of slip cap on drill steel between the bore bit of every long drill steel and location slip ring (4).
3. hammer drill according to claim 1 is characterized in that: beater mechanism adopts hydraulic-driven or pneumatic actuation.
4. hammer drill according to claim 1 is characterized in that: the afterbody of casing is provided with shared water supply hole and shared air vent or oil supplying hole.
5. hammer drill according to claim 1 is characterized in that: at the other guiding device that also is installed with side by side of one of them drill steel of both sides portion.
6. hammer drill according to claim 5 is characterized in that: described guiding device comprises a guide ring (14) of fixedlying connected with location slip ring (4), is equipped with in the guide ring (14) and drill steel guide peg (13) side by side.
7. hammer drill according to claim 5, it is characterized in that: described guiding device comprises the guide pad (15) that is arranged on slip ring (4) edge, location and is filled in the interior ways (16) of edge hole that links to each other, the gathering sill (17) that described ways (16) is provided with and guide pad (15) is slidingly matched.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02264528 CN2573646Y (en) | 2002-09-18 | 2002-09-18 | Rock drill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02264528 CN2573646Y (en) | 2002-09-18 | 2002-09-18 | Rock drill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2573646Y true CN2573646Y (en) | 2003-09-17 |
Family
ID=33730726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02264528 Expired - Fee Related CN2573646Y (en) | 2002-09-18 | 2002-09-18 | Rock drill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2573646Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108049813A (en) * | 2018-01-17 | 2018-05-18 | 湖南湘首智能科技有限公司 | A kind of punching press is with turning round the underwater drill power head device combined and method of work |
CN109025794A (en) * | 2017-06-01 | 2018-12-18 | 辛卫 | A kind of rock drill |
CN111140181A (en) * | 2020-03-21 | 2020-05-12 | 山东源运通矿山装备科技有限公司 | Drill rod connecting drill tail |
-
2002
- 2002-09-18 CN CN 02264528 patent/CN2573646Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025794A (en) * | 2017-06-01 | 2018-12-18 | 辛卫 | A kind of rock drill |
CN109025794B (en) * | 2017-06-01 | 2019-12-03 | 温岭腾科电子有限公司 | A kind of rock drill |
CN108049813A (en) * | 2018-01-17 | 2018-05-18 | 湖南湘首智能科技有限公司 | A kind of punching press is with turning round the underwater drill power head device combined and method of work |
CN108049813B (en) * | 2018-01-17 | 2024-03-15 | 湘潭大学 | Stamping and rotation combined power head device of underwater drilling machine and working method |
CN111140181A (en) * | 2020-03-21 | 2020-05-12 | 山东源运通矿山装备科技有限公司 | Drill rod connecting drill tail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101657603B (en) | Drilling head for reborinq a stuck valve | |
CN207829807U (en) | The multi-rod drill bit structure of drill carriage | |
CA2550801C (en) | Drilling equipment | |
CN87103385A (en) | Borehole drill construction | |
CN107605402B (en) | The broken soft seam flexibility internal control spin orientation drilling system of underground coal mine and drilling method | |
CN102561951A (en) | Double-stage and double-speed well drilling tool | |
AU2011224885A1 (en) | A rock drill bit, a drilling assembly and a method for percussive rock drilling | |
CN107558930A (en) | A kind of PDC impact head drill bits with pre-impact effect | |
CN2573646Y (en) | Rock drill | |
CN210195667U (en) | Novel drill bit with protective drill | |
CN109083601B (en) | Lateral telescopic pipe-following drilling tool | |
CN112112575B (en) | Garrulous soft coal seam airtight coring bit suitable for ground drilling | |
CN207406277U (en) | A kind of PDC- impact head drill bits with pre-impact effect | |
CN203022669U (en) | Drilling system for taking core while drilling | |
CN2580084Y (en) | Down-the-hole rock drill | |
US20070137895A1 (en) | Percussion drill bit with V-shaped splines | |
CN208473711U (en) | A kind of vortex pulse shock drill bit | |
KR100772301B1 (en) | Easy hydaulic drifter system for tunnel | |
CN208203133U (en) | A kind of rotary digging cutter barrel brill | |
CN2846702Y (en) | Combined broaching bit for mine | |
CN216197905U (en) | Mine geological exploration drilling rod | |
CN2625559Y (en) | PDC reaming drill | |
EP1175547A1 (en) | Percussion drilling apparatus and drilling tube | |
CN1218532A (en) | Removable guide member for guiding drill string components in drill hole | |
CN201292769Y (en) | Well drilling reaming traction tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |