CN2568695Y - Dual-tube type bag structure - Google Patents

Dual-tube type bag structure Download PDF

Info

Publication number
CN2568695Y
CN2568695Y CN 02266617 CN02266617U CN2568695Y CN 2568695 Y CN2568695 Y CN 2568695Y CN 02266617 CN02266617 CN 02266617 CN 02266617 U CN02266617 U CN 02266617U CN 2568695 Y CN2568695 Y CN 2568695Y
Authority
CN
China
Prior art keywords
plate
steel
sac
capsule bag
steel cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02266617
Other languages
Chinese (zh)
Inventor
刘千伟
张冠军
乔宗昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN 02266617 priority Critical patent/CN2568695Y/en
Application granted granted Critical
Publication of CN2568695Y publication Critical patent/CN2568695Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a dual-tube type bag structure device, which belongs to the technical field of the tunnel engineering and mainly comprises a grouting pipe, a cross baffle plate, an exhaust branch pipe, an exhaust manifold, a sac, an annular keeper plate of steel, an annular rubber seal plate, a steel cage plate, a steel skirt plate and a bolt washer, wherein, the grouting pipe and the exhaust manifold are fixed at the central design position of the steel cage plate by electric welding; the bottom of the grouting pipe is provided with the cross baffle plate; the bottom of the exhaust manifold is fixed with the exhaust branch pipe together, wherein, the bottom is connected with the steel cage plate; the lower part of the steel cage plate is provided with the annular keeper plate of steel; the upper part of the steel cage plate is respectively provided with the annular rubber seal plate, the sac, the steel skirt plate and the annular press plate, and after the annular rubber seal plate, the sac, the steel skirt plate and the annular press plate are fixedly connected by the bolt washer, the sac is formed. The utility model realizes that the pile foundation sac discharges the superfluous water and air in the sac when pressing and injecting the mortar, and therefore, the problem that the superfluous water and air in the sac can not be discharged while in sac grouting; the mortar can completely fill the sac, which avoids or reduces that the close fitting of the pipe segment and the pile foundation sac can not form due to the larger void caused by mortar shrinkage.

Description

Double hose capsule bag constructions device
Technical field
The utility model relates to a seed capsules bag constructions device, particularly a kind of double hose capsule bag constructions device belongs to the construction of tunnel technical field.
Background technology
The pipeline section foundation construction is the immersed tunnelling method tunnel, particularly one of difficult problem of immersed tunnelling method constructing tunnel.From the development of immersed tunnelling method tunnel basis construction technology, the pipeline section foundation construction method is broadly divided into first shop method and shop, back method.Elder generation's shop method comprises shop method and the pile foundation method of scraping; Back shop method comprises sand-blast, presses sand method, mud jacking, sand replacement method and filling capsule method etc.Pile foundation method in the method for wherein first shop is mainly used in the soft foundation substratum, back-silt area, river etc. can make pipeline section produce the occasion of differential settlement by force, or the tunnel that builds up uses the back to make the occasion of grittiness basis liquefaction because of vibration.Pile foundation construction at first will consider how to make the plan-position of stake, stake top mark height to meet design requirement under water, makes closely connected the coincideing in bottom of stake top and pipeline section.Usually adopt more having: underwater concrete power transmission method, mortar capsule bag power transmission method and adjustable stake top method.Wherein mortar capsule bag power transmission method is exactly between pipeline section bottom and stake top the capsule bag to be set, and is padded through the cement injection mortar, makes all pile foundations energy simultaneously stressed.The effect of capsule bag is vital in this job practices, and this tunnel, Taide, the court of a feudal ruler of Sweden just adopts the method to carry out the pipeline section foundation construction.By literature search: the construction of this Taide immersed tube tunnel of the Sweden court of a feudal ruler of mentioning in " catalogue of immersed tube tunnel and archives material ": " ... tunnel maximum subsidence great majority occur in early days, and scope is between 40mm~50mm.Abutment wall and top have tiny crack to take place, and cathodic protection was once repaiied once again, the direct about 10mm of depression after the sinking; After the backfill, depression increases to 20mm (the about 50KN/m of the overload of backfill 2) ... "Include immersed tube tunnel report (P159 page or leaf) in 1997 in " world's immersed tube technology " (second phase) international tunnel association.By analysis, occurring certain sinkage behind the constructing tunnel may be relevant with the following deficiency and the defective of this job practices: 1. the capsule bag adopts nylon to make, and it is bigger that it prolongs the rate of expanding, and influence the even filling of the interior mortar of capsule bag.2. the consistency of mortar value height that is pressed in the bag, shrinkage factor is big.After mortar is full of the capsule bag, because fixed contraction is difficult to guarantee capsule bag and pipeline section closely connected joining of bottom.3. in the capsule bag during pressure injection mortar, unnecessary water, gas can not be discharged simultaneously in the bag, causes mortar filling fully densely and full capsule bag.Add the fixed contraction of mortar, more increased the gap of capsule bag and pipeline section bottom.
Summary of the invention
The purpose of this utility model is to provide a kind of double hose capsule bag constructions device that is used for immersed tunnelling method tunnel pile foundation, it is at the deficiencies in the prior art and defective, can get rid of unnecessary water and air in the bag, make the interior mortar of capsule bag obtain even filling, guarantee capsule bag and pipeline section closely connected joining of bottom.The technical solution of the utility model is achieved in that mainly and comprises: Grouting Pipe, the cross baffle plate, exhaust branch pipe, exhaust main, the capsule bag, the annular keeper plate of steel, the ring-shaped rubber seal plate, the steel cage plate, the steel skirtboard, bolt washer, its connected mode is: Grouting Pipe, exhaust main electricity consumption solid welding fixes on the center design attitude of steel cage plate, in the bottom of Grouting Pipe the cross baffle plate is set, exhaust main is fixed together at the bottom and the exhaust branch pipe that are connected with the steel cage plate, exhaust branch pipe is 120 ° of steel pipes by three and forms, exhaust branch pipe is close to the steel cage plate, and mouth of pipe direction in the bag has 30 ° of grooves.In steel cage plate bottom belt keeper plate of steel is set, is respectively equipped with ring-shaped rubber seal plate, capsule bag, steel skirtboard and annular pressing plate, after the usefulness bolt washer is fixedly connected, be made into the capsule bag of energy filling mortar on steel cage plate top.
On steel cage plate and steel skirtboard, weld dowel, weld together with pipeline section base plate reinforcing bar again, after vacuumizing in the capsule bag, the capsule bag is adsorbed under the base plate, and flat with the base plate face, fix with the case and bag band at last.
Foundation trench dredge dig finish with pile foundation construction waterborne after, carry out pile sinking inspection of quality, stake position and stake top mark high measurement, under water revise a stake top mark height, finally confirm the pipeline section sinking.
After the pipeline section sinking is in place, is positioned at the vertical jack in free end position with two and regulates the pipeline section position and carry out the capsule bag again and be pressed into mortar construction.At first open the steam vent valve, under effect of water pressure, empty G﹠W in the bag is discharged outside the bag, and valve-off connects Grouting Pipe and grouting pump then, when the mud jacking amount reaches, at the inferior air valve of opening, treat that pore is emerged to close the method for holding one's breath and slurry valve after the underflow, treat that at last slurries condense after, flange, ball valve are removed, and grouting port and exhaust opening are sealed with steel plate.
It is gentle that the utility model has been realized pile foundation capsule bag limit pressure injection mortar, water unnecessary in the bag is discharged on the limit, solved the problem that capsule bag slip casting can not be got rid of water and air unnecessary in the bag, make the mortar of pressure injection in the capsule bag even, full and closely knit, mortar can be filled with the capsule bag fully, avoid or reduced to form the closely connected of pipeline section and pile foundation capsule bag, satisfy the designing requirement of pile foundation by power transmission of capsule bag and pipeline section bottom close proximity because of staying bigger space after the mortar contraction.
Description of drawings
Fig. 1 the utility model structural representation vertical view
Fig. 2 the utility model structural representation lateral view
Fig. 3 the utility model scheme of installation in pipeline section
The specific embodiment
As Fig. 1, Fig. 2, shown in Figure 3, the utility model mainly comprises: Grouting Pipe 1, cross baffle plate 2, exhaust branch pipe 3, exhaust main 4, capsule bag 5, annular keeper plate of steel 6, ring-shaped rubber seal plate 7, steel cage plate 8, steel skirtboard 9, bolt washer 10, its connected mode is: Grouting Pipe 1, exhaust main 4 electricity consumption solid weldings fix on the center design attitude of steel cage plate 8, in the bottom of Grouting Pipe 1 cross baffle plate 2 is set, exhaust main 4 is fixed together in bottom that is connected with steel cage plate 8 and exhaust branch pipe 3, the keeper plate of steel 6 that goes in ring is set in steel cage plate 8 bottoms, be respectively equipped with ring-shaped rubber seal plate 7 on steel cage plate 8 tops, capsule bag 5, steel skirtboard 9 and annular pressing plate 6, with bolt washer 10 fixedly connected after, make the encystation bag.
Exhaust branch pipe 3 is 120 ° of steel pipes by three and forms, and exhaust branch pipe 3 is close to steel cage plate 8, and mouth of pipe direction in the bag has 30 ° of grooves.
Welding dowel 11 is fixed together with pipeline section base plate reinforcing bar again on steel cage plate 8 and steel skirtboard 9.
After vacuumizing in the capsule bag, the capsule bag is adsorbed under the base plate, and flat with the base plate face, fix with the case and bag band at last.

Claims (4)

1, a kind of double hose capsule bag constructions device, mainly comprise: Grouting Pipe (1), cross baffle plate (2), exhaust branch pipe (3), exhaust main (4), capsule bag (5), annular keeper plate of steel (6), ring-shaped rubber seal plate (7), steel cage plate (8), steel skirtboard (9), bolt washer (10), it is characterized in that its connected mode is: Grouting Pipe (1), exhaust main (4) electricity consumption solid welding fixes on the center design attitude of steel cage plate (8), in the bottom of Grouting Pipe (1) cross baffle plate (2) is set, exhaust main (4) is fixed together in bottom that is connected with steel cage plate (8) and exhaust branch pipe (3), in steel cage plate (8) bottom belt keeper plate of steel (6) is set, be respectively equipped with ring-shaped rubber seal plate (7) on steel cage plate (8) top, capsule bag (5), steel skirtboard (9) and annular pressing plate (6), with bolt washer (10) fixedly connected after, make the encystation bag.
2, this double hose capsule bag constructions device according to claim 1 is characterized in that exhaust branch pipe (3) is 120 ° of steel pipes by three and forms, and exhaust branch pipe (3) is close to steel cage plate (8), and mouth of pipe direction in the bag has 30 ° of grooves.
3, this double hose capsule bag constructions device according to claim 1 is characterized in that going up welding dowel (11) at steel cage plate (8) and steel skirtboard (9), is fixed together with pipeline section base plate reinforcing bar again.
4, this double hose capsule bag constructions device according to claim 1 after it is characterized in that vacuumizing in the capsule bag, is adsorbed on the capsule bag under the base plate, and flat with the base plate face, fixes with the case and bag band at last.
CN 02266617 2002-08-27 2002-08-27 Dual-tube type bag structure Expired - Fee Related CN2568695Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02266617 CN2568695Y (en) 2002-08-27 2002-08-27 Dual-tube type bag structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02266617 CN2568695Y (en) 2002-08-27 2002-08-27 Dual-tube type bag structure

Publications (1)

Publication Number Publication Date
CN2568695Y true CN2568695Y (en) 2003-08-27

Family

ID=33732391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02266617 Expired - Fee Related CN2568695Y (en) 2002-08-27 2002-08-27 Dual-tube type bag structure

Country Status (1)

Country Link
CN (1) CN2568695Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162254A (en) * 2010-07-30 2011-08-24 江苏道达海上风电工程科技有限公司 Device and method for reinforcing foundation by using curing agent in barrel-shaped base
CN105862939A (en) * 2016-05-10 2016-08-17 上海交通大学 Full-scale model test platform for sand filling of foundation of immersed tube tunnel
CN110896646A (en) * 2018-12-25 2020-03-20 高永光 Pile bottom grouting cavity and using method thereof, cast-in-place pile body and construction method thereof
US11401674B2 (en) 2018-12-25 2022-08-02 Yunfei Gao Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162254A (en) * 2010-07-30 2011-08-24 江苏道达海上风电工程科技有限公司 Device and method for reinforcing foundation by using curing agent in barrel-shaped base
CN102162254B (en) * 2010-07-30 2015-09-16 江苏道达海上风电工程科技有限公司 Curing agent foundation reinforced device in bucket foundation and its reinforcement means
CN105862939A (en) * 2016-05-10 2016-08-17 上海交通大学 Full-scale model test platform for sand filling of foundation of immersed tube tunnel
CN105862939B (en) * 2016-05-10 2019-02-22 上海交通大学 Immersed tube tunnel basis fills sand equal proportion model test platform
CN110896646A (en) * 2018-12-25 2020-03-20 高永光 Pile bottom grouting cavity and using method thereof, cast-in-place pile body and construction method thereof
US11401674B2 (en) 2018-12-25 2022-08-02 Yunfei Gao Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same

Similar Documents

Publication Publication Date Title
CN105887806A (en) Assembled type underground diaphragm wall and construction method thereof
CN100455731C (en) Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN201358456Y (en) Plastic sleeve concrete pile
CN104988915A (en) Prefabrication and installation method of detachable steel protection tube device and underwater connection beam
CN103276728B (en) A kind of method that pile crown is repaired and reinforced
CN207597376U (en) Tidal Flat Reclamation blowing-filling sludge burning into sand layer foundation reinforcing structure
CN203145029U (en) Plugging structure for deep foundation pit dewatering well
CN208844378U (en) A kind of novel mixed Irish bridge structure
CN2568695Y (en) Dual-tube type bag structure
CN201330400Y (en) Lapping type combined steel plate cofferdam
CN102518129B (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN206800379U (en) Grouting behind shaft or drift lining pre-stress hollow square pile
CN113028139B (en) Combined type connector of rain and sewage pipe and construction method
CN210151776U (en) Structure of balance weight type retaining wall
CN210504069U (en) High environmental suitability assembled groove jar
CN209854750U (en) Depressurization well in foundation pit with strong water stopping performance
CN206874998U (en) The overall corrugated steel pipe of clamping hoop type tube coupling joint connection
CN1195132C (en) Pipeline sinking process for use in tunnel foundation construction
CN203960881U (en) The inner pressure-bearing dewatering well of foundation ditch steel sleeve flange connecting apparatus
CN206428692U (en) A kind of multitube grouting device of two-tube compound club-footed pile machine
CN206014892U (en) A kind of large-sized biogas system
CN219931035U (en) Precipitation well Feng Jing
CN217601487U (en) Dredging well plugging construction node
CN216765829U (en) Novel vibroflotation gravel pile structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee