CN2549295Y - Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe - Google Patents

Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe Download PDF

Info

Publication number
CN2549295Y
CN2549295Y CN 02237410 CN02237410U CN2549295Y CN 2549295 Y CN2549295 Y CN 2549295Y CN 02237410 CN02237410 CN 02237410 CN 02237410 U CN02237410 U CN 02237410U CN 2549295 Y CN2549295 Y CN 2549295Y
Authority
CN
China
Prior art keywords
pipe
concrete
culvert pipe
pneumatic
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02237410
Other languages
Chinese (zh)
Inventor
王笑月
孙建松
徐峰
陈海波
于辉
王尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Construction Group Co Ltd
Original Assignee
Daqing Oilfield Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Construction Group Co Ltd filed Critical Daqing Oilfield Construction Group Co Ltd
Priority to CN 02237410 priority Critical patent/CN2549295Y/en
Application granted granted Critical
Publication of CN2549295Y publication Critical patent/CN2549295Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a horizontal operation of pneumatic hammer through prestressed concrete culvert pipe. The inside of a concrete pipe(1) forms a rubber sleeve and is penetrated with a steel pipe(3). Such construction technique of horizontal penetration solves the difficulty that the pneumatic concrete culvert pipe hammer cannot enter the concrete pipe, and can enable the GRUNDORAM-pneumatic concrete culvert pipe hammer to enter the concrete pipe so as to achieve multiple functions.

Description

The pneumatic rammer level is passed through prestressed concrete culvert pipe with great
(1) technical field:
The utility model belongs to the culvert pipe of the rivers of highway crossing, railway and narrow runner, particularly relates to the pneumatic rammer level and passes through prestressed concrete culvert pipe with great.
(2) background technique:
Pass through the culvert pipe of the rivers of small-sized narrow runner, culvert pipe is laid in construction after the draining of can damming, the culvert pipe of highway crossing, railway, and the construction of all need stopping transport, long in time limit, the operating expenses height, the construction back influences the quality on roadbed or road surface simultaneously.As adopt the concrete culvert pipe, when passing through, crack even damage after culvert pipe is stressed with the pneumatic rammer level.
(3) model utility content:
Technical problem to be solved in the utility model is at the problem that exists in the background technique, and provides a kind of pneumatic rammer level of utilizing mechanical execution to shorten the cycle to pass through prestressed concrete culvert pipe with great.
The invention for solving the technical problem can reach by following technical solution:: in the concrete pipe, constitute the rubber cushion cover and be installed with steel pipe.
During construction, steel pipe is added in employing in concrete pipe, bear the impulse force of hammer ram by steel pipe, shaking force and radial shear power that hammer ram is produced concrete pipe in the ramming of continuous long distance forward on the steel pipe of center, to reduce crackle, the SOL of the stressed generation of culvert pipe, guarantee that culvert pipe passes through, and reaches design standard.
The utility model is compared with the above-mentioned background technology can have following beneficial effect: the horizontal crossing construction technology of this kind, solve pneumatic punner-pipe hammer and can not ram the into difficult problem of concrete pipe, it can utilize the GRUNDORAM-pneumatic punner-pipe hammer to ram into steel pipe and concrete pipe, reaches the one-machine multifunction purposes.
(4) description of drawings:
Accompanying drawing is this culvert pipe configuration diagram.
(5) embodiment:
Below in conjunction with the drawings and specific embodiments will the utility model is described in further detail:
By shown in Figure 1: in concrete pipe 1, constitute rubber cushion cover 2 and be installed with steel pipe 3.
In such scheme, be convenient and install that the center steel pipe will be made more piece, every joint can intert a plurality of concrete pipe, between the steel pipe of every joint center with the Placement of socket joint.Available rubber plate or fine cordage are done cushion between steel pipe and concrete pipe, do cushion with fine cordage between the concrete pipe plane of structure.The center steel pipe both was connected with pneumatic punner-pipe hammer can carry out horizontal crossing construction.

Claims (1)

1, a kind of pneumatic rammer level that relates to is passed through prestressed concrete culvert pipe with great, contains concrete pipe (1), it is characterized in that: constitute rubber cushion cover (2) and be installed with steel pipe (3) in concrete pipe (1).
CN 02237410 2002-07-01 2002-07-01 Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe Expired - Fee Related CN2549295Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02237410 CN2549295Y (en) 2002-07-01 2002-07-01 Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02237410 CN2549295Y (en) 2002-07-01 2002-07-01 Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe

Publications (1)

Publication Number Publication Date
CN2549295Y true CN2549295Y (en) 2003-05-07

Family

ID=33711396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02237410 Expired - Fee Related CN2549295Y (en) 2002-07-01 2002-07-01 Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe

Country Status (1)

Country Link
CN (1) CN2549295Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494188A (en) * 2011-12-06 2012-06-13 上海广联建设发展有限公司 Pre-stressing device for rectangular pipe jacking pipe joints and construction method thereof
CN105888555A (en) * 2014-12-18 2016-08-24 周升风 Bundled type dive-hole hammer expanding drill and horizontal hole expanding construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494188A (en) * 2011-12-06 2012-06-13 上海广联建设发展有限公司 Pre-stressing device for rectangular pipe jacking pipe joints and construction method thereof
CN102494188B (en) * 2011-12-06 2015-08-12 上海广联建设发展有限公司 The prestressing apparatus of rectangular top pipe tube coupling and method of construction thereof
CN105888555A (en) * 2014-12-18 2016-08-24 周升风 Bundled type dive-hole hammer expanding drill and horizontal hole expanding construction method
CN105888555B (en) * 2014-12-18 2018-01-19 周升风 Cluster down-hole hammer reamer and horizontal reaming construction method

Similar Documents

Publication Publication Date Title
CN206486778U (en) A kind of asphalt pavement construction rammer compacter
CN206693007U (en) A kind of road construction rammer compacter
CN2549295Y (en) Horizontal operation of pneumatic hammer through prestressed concrete culvert pipe
CN205804058U (en) A kind of tamping tool clamping device
CN206267169U (en) A kind of split blade type prestressing force anchor slab
CN2841769Y (en) Compound pile cover
CN201496070U (en) Construction equipment of refuse filler gas-gathering well of refuse landfill site
CN215104799U (en) Town road bridge crack reinforced structure
CN201746132U (en) Vibration ore drawing machine
CN209307801U (en) A kind of railroad crossing mouth structure
CN202830664U (en) Plate-type ballastless track maintenance structure
CN2385097Y (en) Hinged column type wave energy converter
CN207244407U (en) The plate compactor of preposition pressure road subsidiary engine
CN202266073U (en) Steel tower rising structure of power transmission line
TW201204900A (en) Side floating track bed and application thereof
CN201671040U (en) Ramming equipment
CN201835228U (en) Bridge expansion joint structure
CN101935966A (en) Method for building maglev train rail by utilizing conventional railway
CN206781789U (en) A kind of concrete hard shoulder carrier
CN216075054U (en) Building construction presses device with ground pounding
CN201678943U (en) Comb-type expansion joint device with keys
CN205711984U (en) The cement sand and gravel slip casting of rich slurry is vibrated integration apparatus
CN100507155C (en) Portable assembling type steel structure temporary water dash device
CN219690476U (en) Foundation treatment device
CN219430424U (en) Integrated road transverse ditch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee