CN2548166Y CN 02217248 CN02217248U CN2548166Y CN 2548166 Y CN2548166 Y CN 2548166Y CN 02217248 CN02217248 CN 02217248 CN 02217248 U CN02217248 U CN 02217248U CN 2548166 Y CN2548166 Y CN 2548166Y
Authority
CN
China
Prior art keywords
grafting metal
grafting
metal bars
pairs
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02217248
Other languages
Chinese (zh)
Inventor
朱伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02217248 priority Critical patent/CN2548166Y/en
Application granted granted Critical
Publication of CN2548166Y publication Critical patent/CN2548166Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

The utility model discloses a table connecting terminal for the calibration of a three-phase ammeter, which comprises a shell body, six sliding blocks and six inlaying grafting metal bars. The terminals of the inlaying grafting metal bars are arranged toward lateral side in the middle of each inlaying grafting metal bar, a metal block is fixed on the junction of the middle of the internal surface of the upper edge of the shell body and the middle inlaying grafting metal bars, mutual insulating separated metal blocks are respectively fixed on the junction of the two ends of the external side of the lower end of the shell body and two pairs of inlaying grafting metal bars of two sides, a metal plate is respectively fixed on the bottom of the two pairs of inlaying grafting metal bars. When the springs on the inlaying grafting metal bars are relaxed, the terminals of the middle two inlaying grafting metal bars and the metal plates fixed on the two pairs of inlaying grafting metal bars of two sides are respectively touched with the corresponding metal blocks. So, when the table connecting terminal is adopted to check the three-phase ammeter, the manual short circuit connection isn't needed before checking the three-phase ammeter, the connecting wires of current short circuit aren't needed to disassembly when checking the three-phase ammeter, the calibration of the ammeter is very convenient.

Description

Three-phase kilowatt-hour meter verification meter-connecting wiring terminal
Technical field
The utility model relates to the auxiliary equipment on a kind of watt-hour meter checking table, specifically is used for the meter-connecting wiring terminal of verification three phase watt-hour meter on the watt-hour meter checking table.
Background technology
The meter-connecting wiring terminal that is used at present the verification three phase watt-hour meter on the watt-hour meter checking table generally comprises housing, six slide blocks and six roots of sensation grafting metal bar etc., and peg graft with needing the school watt-hour meter in the upper end of grafting metal bar, its lower end and electric current connection.Because carry out batch calibration during the checking table calibration, connection terminal is connected mutually, so certain connection terminal is during calibration, needs earlier the electric current wiring short circuit of grafting metal bar lower end is connected, and takes apart during calibration again, bothers very much.
Summary of the invention
Technical problem to be solved in the utility model is to provide and need not that the man-made short-circuit connects before a kind of calibration, need not to dismantle the three-phase kilowatt-hour meter verification meter-connecting wiring terminal of short circuit current wiring during calibration, and it makes the verification of three phase watt-hour meter become convenient.
For solving the problems of the technologies described above, three-phase kilowatt-hour meter verification of the present utility model comprises housing with meter-connecting wiring terminal, six slide blocks and six roots of sensation grafting metal bar, elasticity is connected in the respective slide after overlapping upper spring on the every grafting metal bar respectively, the terminals of grafting metal bar are located at the centre of the metal bar of respectively pegging graft towards the lateral, centre at the inside surface of described housing upper edge, its joint with middle two grafting metal bars is fixed with a derby, two ends at described housing lower end lateral surface, its joint with two pairs of grafting metal bars of both sides is fixed with the derby that mutually insulated separates respectively, the bottom of these two pairs of grafting metal bars is fixed with a sheet metal respectively, when the spring on the grafting metal bar was loose, fixing sheet metal touched with the respective metal piece respectively and lumps together on two pairs of grafting metal bars of terminals and both sides of middle two grafting metal bars.
Above-mentioned three-phase kilowatt-hour meter verification meter-connecting wiring terminal is at the two ends of described housing lower end lateral surface, respectively be fixed with a derby along the both sides, front and back of slide block.
Above-mentioned three-phase kilowatt-hour meter verification meter-connecting wiring terminal touches convex respectively being provided with of upside of the fixing sheet metal in the two pairs of metals grafting in inboard and the both sides rod bottom of middle two grafting metal bar terminals
The point.
Above-mentioned three-phase kilowatt-hour meter verification meter-connecting wiring terminal, cover is inserted a case in the lower end of described housing front side, and the lower end of described housing rear side then extends into a shutter downwards.
After adopting technique scheme, because the joint at two pairs of grafting metal bars of the two ends of housing upper edge inside surface and middle two electric current grafting metal bar joints, housing lower end lateral surface and both sides is fixed with derby respectively, when checking table is in non-calibration state, spring on the grafting metal bar is loose, the three pairs of electric current grafting metal bars by terminals or on it fixing sheet metal touch with a respective metal piece respectively and lump together the short circuit conducting.And when checking table was wanted calibration, by after inserting in the grafting metal bar, grafting metal bar, terminals, spring pressed down together with watt-hour meter, grafting metal bar and derby are thrown off, be in non-short circuit conducting state, therefore need not man-made short-circuit's connection or the wiring of dismounting short circuit current again, calibration is very convenient.Each fixes the current capacity that a derby can alleviate derby and sheet metal in the both sides, front and back of slide block.The contact that terminals inboard and sheet metal upper end upwards is convexly equipped with can guarantee good contact the between grafting metal bar and derby.In addition, three derbies are isosceles triangle and are distributed in the housing top and bottom, and the grafting metal bar of both sides can be substantially continuously be drawn close apart from ground and middle grafting metal bar, the needs of different specification size when adapting to calibration.
Description of drawings
Fig. 1 is a structure synoptic diagram of the present utility model;
Fig. 2 is the side view corresponding to Fig. 1;
Fig. 3 is a perspective view of the present utility model;
Fig. 4 is the upward view corresponding to Fig. 1.
Embodiment
As shown in the figure, the three-phase kilowatt-hour meter verification comprises housing 1, six slide blocks 2 and six roots of sensation grafting metal bars 3 with meter-connecting wiring terminal, slides in the groove that each slide block 2 is offered on housing 1 and by screw 10 location.Overlapping upper spring 4 back elasticity on the every grafting metal bar 3 respectively is connected in the respective slide 2.The terminals 5 of grafting metal bar 3 are located at the centre of the metal bar 3 of respectively pegging graft towards the lateral, the electric current external connection is fixed on the terminals 5 with screw 9.In the centre of the inside surface of housing 1 upper edge, the joint of itself and middle two grafting metal bars 3 is fixed with a derby 6, at the two ends of housing 1 lower end lateral surface, the joint of two pairs of grafting metal bars 3 of itself and both sides, respectively be fixed with a derby 6 in the both sides, front and back of slide block 2 with screw 10.The silver-plated copper billet of each derby 6 usefulness is made, and mutually insulated separately.Bottom at two pairs of grafting metal bars 3 of both sides is fixed with a sheet metal 11 respectively with screw 10.The peg graft convex respectively contact 7 that is provided with of upside of the fixing sheet metal 11 in excellent 3 bottoms of two pairs of metals in inboard and both sides of the terminals 5 of middle two grafting metal bars 3.When the spring on the grafting metal bar 34 was loose, the contact on contact on the terminals 5 and the sheet metal 11 was touched with derby 6 respectively and is lumped together.Cover is inserted a case 12 in the lower end of housing 1 front side, and the lower end of housing 1 rear side then extends into a shutter 13 downwards.That so just the lower end is exposed is partially enclosed, very convenient during verification operation.Whole watt-hour meter meter-connecting wiring terminal is fixed on the watt-hour meter checking table by mounting hole 8.

Claims (4)

1, three-phase kilowatt-hour meter verification meter-connecting wiring terminal, comprise housing, six slide blocks and six roots of sensation grafting metal bar, elasticity is connected in the corresponding described slide block after overlapping upper spring on the described every grafting metal bar respectively, the terminals of described grafting metal bar are located at the centre of each described grafting metal bar towards the lateral, centre at the inside surface of described housing upper edge, its joint with middle two described grafting metal bars is fixed with a derby, two ends at described housing lower end lateral surface, its joint with described two pairs of grafting metal bars of both sides is fixed with the derby that mutually insulated separates respectively, the bottom of these two pairs of grafting metal bars is fixed with a sheet metal respectively, when the spring on the described grafting metal bar was loose, fixing described sheet metal touched with corresponding described derby respectively and lumps together on two pairs of described grafting metal bars of described terminals and both sides of middle two described grafting metal bars.
2, three-phase kilowatt-hour meter verification meter-connecting wiring terminal as claimed in claim 1 is characterized in that, at the two ends of described housing lower end lateral surface, respectively be fixed with a derby along the both sides, front and back of described slide block.
3, three-phase kilowatt-hour meter verification meter-connecting wiring terminal as claimed in claim 1 or 2 is characterized in that, cover is inserted a case in the lower end of described housing front side, and the lower end of described housing rear side then extends into a shutter downwards.
4, three-phase kilowatt-hour meter verification meter-connecting wiring terminal as claimed in claim 1 or 2, it is characterized in that, in the convex respectively contact that is provided with of upside of the fixing described sheet metal in inboard and both sides two pairs of described metals grafting rods bottom of middle two described grafting metal bar terminals.
CN 02217248 2002-04-29 2002-04-29 Meter-connecting wiring terminal for calibrating three-phase electricity-meter Expired - Fee Related CN2548166Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02217248 CN2548166Y (en) 2002-04-29 2002-04-29 Meter-connecting wiring terminal for calibrating three-phase electricity-meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02217248 CN2548166Y (en) 2002-04-29 2002-04-29 Meter-connecting wiring terminal for calibrating three-phase electricity-meter

Publications (1)

Publication Number Publication Date
CN2548166Y true CN2548166Y (en) 2003-04-30

Family

ID=33696103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02217248 Expired - Fee Related CN2548166Y (en) 2002-04-29 2002-04-29 Meter-connecting wiring terminal for calibrating three-phase electricity-meter

Country Status (1)

Country Link
CN (1) CN2548166Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408602B (en) * 2008-10-30 2011-06-22 费杏宝 Automatic short circuit automatic connection apparatus of three-phase multifunctional electrical energy meter calibration stand
CN104020329A (en) * 2014-05-09 2014-09-03 国家电网公司 Electric meter box
CN115327468A (en) * 2022-08-03 2022-11-11 嵘顺仪器仪表(泗阳)有限公司 Intelligent electric energy meter calibration equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408602B (en) * 2008-10-30 2011-06-22 费杏宝 Automatic short circuit automatic connection apparatus of three-phase multifunctional electrical energy meter calibration stand
CN104020329A (en) * 2014-05-09 2014-09-03 国家电网公司 Electric meter box
CN104020329B (en) * 2014-05-09 2017-01-04 国家电网公司 Electric meter box
CN115327468A (en) * 2022-08-03 2022-11-11 嵘顺仪器仪表(泗阳)有限公司 Intelligent electric energy meter calibration equipment
CN115327468B (en) * 2022-08-03 2023-10-03 嵘顺仪器仪表(泗阳)有限公司 Intelligent ammeter check-out set

Similar Documents

Publication Publication Date Title
CN2874813Y (en) Electric connector
CN105006667B (en) Electric connector and its component
CN209133718U (en) Electroconductive elastic sheet, LED display module and LED display
CN2548166Y (en) Meter-connecting wiring terminal for calibrating three-phase electricity-meter
KR20170083204A (en) Busbar connectors for wiring the Watt hour meter and breaker and distribution board using the same
CN103515764B (en) Electric connector
CN101431193B (en) Connection terminal structure
CN205830156U (en) Flexible circuit board, adapter and battery signal sampling apparatus
CN101944694A (en) Power supply with replaceable plug
CN201060956Y (en) Connecting terminal for electrical appliance
CN2521625Y (en) Binding post for three-phase electric meter checking
CN104143737B (en) Switch mode current test type electrical connector
CN201717452U (en) Electric connector provided with earth wire short circuit mechanism
CN209844143U (en) Wall socket
CN107658608A (en) A kind of built-in electronic connector
CN107797053A (en) The monitoring unit of observation circuit breaker and the breaker including the monitoring unit
CN211350522U (en) Conductive loop contact connecting device
CN207474709U (en) A kind of monoblock type wire connection terminal
CN201927765U (en) Wire-inlet socket for standard function board of low-voltage draw-out type switchgear
CN207927020U (en) Circuit board connecting structure
CN201490393U (en) Card connector
CN206412298U (en) The bridging structure of binding post and breaker
CN207559130U (en) A kind of wire connection terminal
CN1125507C (en) Electric connector
CN201781159U (en) Power supply with replaceable plug

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee