CN2538907Y - Engineering plastic building shuttering - Google Patents

Engineering plastic building shuttering Download PDF

Info

Publication number
CN2538907Y
CN2538907Y CN 02220712 CN02220712U CN2538907Y CN 2538907 Y CN2538907 Y CN 2538907Y CN 02220712 CN02220712 CN 02220712 CN 02220712 U CN02220712 U CN 02220712U CN 2538907 Y CN2538907 Y CN 2538907Y
Authority
CN
China
Prior art keywords
engineering plastics
construction formwork
backboard
plastics construction
supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02220712
Other languages
Chinese (zh)
Inventor
周维新
田建宁
戴平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02220712 priority Critical patent/CN2538907Y/en
Application granted granted Critical
Publication of CN2538907Y publication Critical patent/CN2538907Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an engineering plastic construction formwork, belonging to technical field of construction mould structure improvement, which comprises a face plate, a backboard, supports and reinforcement ribs. The face plate is vertically connected with the backboard by the supports and the reinforcement ribs are arranged inside the face plate between the supports. The utility model is made integrally by extrusion molding of engineering plastic, and has the advantages of smooth surface, good performance of demould, convenient and safe splicing, assembly and disassembly of the formwork, low consumption of time and labour, high working efficiency, small specific gravity, light weight, light and handy transportation, lifting, handling and construction, low labor intensity, long service life, low price and good performance of reutilization.

Description

The engineering plastics construction formwork
Technical field
The utility model belongs to the building template class, relates to architectural template structure and improves technical field.
Technical background
In the civil engineering of construction work, during pouring concrete in-situ member (column, crossbeam, shear wall, plane, arc beam, circular arc shell end face etc.), previous a large amount of wooden templates that adopt.In the epoch of " with steel for wood ", the steel template is about to withdraw from the historical stage of building popular after 20 years.Nearest 2 years, get steel template generation then be multilayer (being generally 11 layers) woodwork plate and bamboo offset plate, especially at present general extensively a large amount of wooden template of using, this is falling back of a kind of history, particularly to the abundant China of the forest reserves, the moisture regain of the wooden template of this use undoubtedly and China's " environmental protection, energy-conservation " policy run counter to.Apply raw material be easy to get, cheap, proportion is little, in light weight, demolding performace good, long service life, light and handy, convenient, fast, the safe engineering plastics construction formwork of construction are a kind of trends of history." to mould Dai Gang, to mould Dai Mu " is to carry out " preserve the ecological environment, protect forest resources " this fundamental state policy conscientiously, and the offspring's that benefits the nation and the people, benefits future generations a strong behave is a revolution on building circle, is historical progress, is developing direction.
Summary of the invention
The technical problems to be solved in the utility model is as how moulding Dai Gang, the engineering plastics construction formwork that to mould Dai Mu, provide that a kind of reasonable in design, production technology are feasible, its rigidity and intensity can satisfy civil engineering requirement in the construction work.
This project plastic building template is made of panel, backboard, support and reinforcing rib.Panel and backboard are by supporting vertical the connection, and the panel inboard is a reinforcing rib between support, and the appropriate location on support and backboard is provided with some grooves, so that with fastener regular worker engineering plastics construction formwork.Backboard has two kinds, and a kind of is backboard and two back cords that support the composition primary load bearing, and another kind is backboard and two stiffening girders that support the secondary loads of composition.Backboard depends on the circumstances for the relative position and the parallelism (or gradient) of panel.The supported amount n of every engineering plastics construction formwork is equal to or greater than 4, must be by the one or more back cord of forming by two supports and backboard, and reinforcing rib is not essential, i.e. N 〉=0.Above-mentioned engineering plastics construction formwork is turned over turnback K time by AA ' or BB ' for axis, or K (K=1,2,3,4 of unidirectional in the horizontal direction or two-way successively parallelism splicing ... natural number) can obtain the engineering plastics construction formwork series of all size.Also can be with the engineering plastics construction formwork at its symmetrical center line place, arbitrarily angled to panel one side or toward back plate one side doubling, can form the external corner engineering plastics construction formwork or the inner corner trim engineering plastics construction formwork of various angles.Bend to the circular arc that radius is R to panel one side or backboard one side, can form the circular arc engineering plastics construction formwork of various radius of curvature R.The engineering plastics construction formwork is in transverse plane splicing or when vertically splicing, and only needs stupefied on the limit of adjacent two engineering plastics building blocks (back cord at the edge) groove with screw rod or fastener is fixed gets final product.
The utility model engineering plastics building form removal performance is good, can improve the quality and the finish of building member; Splicing installing/dismounting between the template is convenient, safety, saving of work and time, increase work efficiency; Template proportion is little, in light weight, and transportation, lifting, carrying, construction lightly can reduce labor intensity; The template long service life, cheap recyclable again utilization again.
Description of drawings
Fig. 1 is the utility model engineering plastics construction formwork section structure schematic diagram;
Fig. 2 is for being made the 900mm * 50mm serial component section structure schematic diagram of elementary cell combination by some engineering plastics construction formworks;
Fig. 3 is the transverse plane splicing schematic diagram of the utility model engineering plastics construction formwork;
Fig. 4 is laterally vertical (composition external corner) splicing schematic diagram of the utility model engineering plastics construction formwork;
Fig. 5 is 90 degree internal corner formwork schematic diagrames;
Fig. 6 is 90 degree external corner template schematic diagrames.
In Fig. 1, the 1-panel, working face or load face and are connected (3) Yi Bian vertically connect; The 2-backboard, a mask Or bearing-surface, and being connected (3) another side and vertically connecting, backboard (2) has two kinds: a kind of backboard (2a) and support (3) The back cord that forms primary load bearing, another kind of backboard (2b) and support (3) form the buttress brace of secondary load; 3-supports, and is used for Vertical panel (1) and the backboard (2) of connecting; The 4-reinforcement, on panel (1) medial surface between support (3) it Between; The 5-groove, 6 * R1.2 arranges in the appropriate location of supporting (3) and backboard (2), is used for fastener (6) with two Template is fastening, when 6 * R1.2 groove splices or vertically splices for the template transverse plane, reinforces adjacent two moulds with screw rod or fastener The usefulness of edges of boards stupefied (outermost two back cords of template) location. The R1.2 groove of back cord support both sides apart from the distance of back cord bottom line is Half of back cord width. See Fig. 3 and shown in Figure 4. Above-mentioned panel (1), backboard (2), support (3), reinforcement (4) four is an integral body, and by the integral extrusion forming material, profile length is Set arbitrarily artificially. Build at engineering plastics The quantity n of support (3) 〉=4 in the template; The quantity N of reinforcement (4) 〉=0; Backboard (2b) is with respect to panel (1) Position and the depth of parallelism (or gradient) depend on the circumstances; Section each several part physical dimension depends on the circumstances.
Fig. 2 presses the repeatedly symmetrical upset 180 of AA ' or BB ' axis for the utility model engineering plastic architectural template is made elementary cell Degree and must become the plastic formwork section bar section struction figure of 900mm * 50mm size specifies and sees the specific embodiment.
Fig. 3 is the utility model engineering plastic architectural template transverse plane splicing schematic diagram. The A-engineering plastic architectural template; The B-engineering plastic architectural template, the 6-fastener. In Fig. 3, with fastener (6) that the parallel card that joins with template B of template A is firm, Salient point on the fastener (6) is just on support (3) groove (5) in the embedded template, the panel that makes template A and template B with Locate on the horizontal plane.
Fig. 4 is laterally vertical splicing schematic diagram of the utility model engineering plastic architectural template, the A-engineering plastic architectural template, The B-engineering plastic architectural template, the 6-fastener. In Fig. 4, use fastener (6) with template A and template B vertical connection card jail, Salient point on the fastener (6) just embeds in the support (3) and backboard (2) groove (5) in the B template in the A template, makes Template A becomes plumbness with template B, forms external corner.
Fig. 5 is the engineering plastics construction formwork schematic diagram of 90 degree inner corner trim shapes, is that panel is made two orthogonal panels, and two vertical panel angles are inner corner trim (90 degree).
Fig. 6 is the engineering plastics construction formwork schematic diagram of 90 degree external corner shapes, is that panel is made two orthogonal panels, and two vertical panel angles are external corner (90 degree).
The specific embodiment
With Fig. 2 is example, and the engineering plastics construction formwork elementary cell among Fig. 2 is with shown in Figure 1, and the basic size of its elementary cell is as follows:
The distance L of AA '-BB ' 1=100 millimeters
Back cord height H=50 millimeter, width b=35 millimeter;
Stiffening girder height h=25 millimeter, width B=65 millimeter
Support number n=5
Reinforcing rib N=0
Be turned into parallelism number of times K=8 (wherein once to the distortion of 15 millimeters of right translations with once to 50 millimeters distortion of left) with above-mentioned engineering plastics construction formwork elementary cell.
In sum, L as shown in Figure 2 be 900mm * 50mm engineering plastics construction formwork cross-section structure as can be seen: it is to be integral by 9 elementary unit groups, is extruded into section bar by integral body, and the length of section bar can artificially be set arbitrarily.In actual applications, can cut out arbitrarily in the vertical as required and be cut into suitable length, settle at one go, need not to resemble polylith splicing at the scene multilayer woodwork plate or the steel form, saving of work and time.Can cut out in the horizontal and be cut into the width that conforms to all size that modulus (generally being mould with 50mm) requires (this example can cut out be cut into width be respectively 50,100,150,200,250,300,350,400,450,500,550,600,650,700,750,800,850,900 totally 14 kinds of specification width) the engineering plastics construction formwork of matched moulds and the engineering plastics construction formwork of 8 kinds of non-Mould Breadth degree (35,135,235,335,435,535,635,735), and the horizontally-spliced big plane of forming any width of the template of all size.Obviously, it more can satisfy the column of rectangular cross section of all size and the instructions for use of crossbeam.
In actual use the of the present utility model, splicing of its transverse plane or vertical splicing are by bolt or reinforce the limit of adjacent two Plastic-steel form boards with fastener stupefied (it is stupefied that the back cord of every template outermost both sides is called the limit, it is stupefied that the middle arbitrary back cord of template all might become the limit) promptly accuse and finish, during form removal bolt or fastener taken off and get final product, very convenient, safety, saving of work and time, reduce labor intensity, shorten the engineering time.

Claims (6)

1, a kind of engineering plastics construction formwork, it is characterized in that it is made of panel (1), backboard (2), support (3) and reinforcing rib (4), (3) are vertical to be connected panel (1) by supporting with backboard (2), the side is reinforcing rib (4) between supporting between (3) within the panel (1), supports (3) and backboard (2) and is provided with groove (5).
2, according to the described engineering plastics construction formwork of claim 1, it is characterized in that backboard (2) has two kinds, the back cord of primary load bearing is formed in a kind of backboard (2a) and two supports (3), and the stiffening girder of secondary load is formed in another kind of backboard (2b) and two supports (3).
3, engineering plastics construction formwork according to claim 1 is characterized in that the quantity that supports (3) is equal to or greater than 4, the back cord that must have one or more to be made up of two supports (3) and backboard (2a); Reinforcing rib (4) quantity can be zero or greater than zero integer.
4, according to the described engineering plastics construction formwork of claim 1, it is characterized in that the engineering plastics construction formwork is turned over turnback K time by AA ' or BB ' for axis, or successively in the horizontal direction, K (K=1,2,3,4 of unidirectional or two-way parallelism splicing ... natural number) can obtain the engineering plastics construction formwork series of all size.
5, engineering plastics construction formwork according to claim 1, it is characterized in that the engineering plastics construction formwork at its symmetrical center line place, arbitrarily angled to panel (1) one side or toward back plate (2) one side doublings, can form the external corner engineering plastics construction formwork or the inner corner trim engineering plastics construction formwork of various angles; Bend to the circular arc that radius is R to panel (1) one side or backboard (2) one sides, can form the circular arc engineering plastics construction formwork of various radius of curvature R.
6, engineering plastics construction formwork according to claim 1, it is characterized in that the engineering plastics construction formwork in transverse plane splicing or when vertically splicing, only need to locate with screw rod or fastener is fixed gets final product at the stupefied groove in the limit of adjacent two engineering plastics construction formworks (5).
CN 02220712 2002-05-22 2002-05-22 Engineering plastic building shuttering Expired - Fee Related CN2538907Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02220712 CN2538907Y (en) 2002-05-22 2002-05-22 Engineering plastic building shuttering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02220712 CN2538907Y (en) 2002-05-22 2002-05-22 Engineering plastic building shuttering

Publications (1)

Publication Number Publication Date
CN2538907Y true CN2538907Y (en) 2003-03-05

Family

ID=33698955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02220712 Expired - Fee Related CN2538907Y (en) 2002-05-22 2002-05-22 Engineering plastic building shuttering

Country Status (1)

Country Link
CN (1) CN2538907Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852012A (en) * 2010-06-25 2010-10-06 山西惠丰型材有限公司 Plastic exposed concrete building template
CN102061805A (en) * 2010-11-22 2011-05-18 王亚运 Plastic building template system
CN102345384A (en) * 2010-08-02 2012-02-08 王亚运 End adapting template
CN102720349A (en) * 2011-03-29 2012-10-10 中国二十冶集团有限公司 Disposable template and formwork method for backfill foundation rapid formwork
CN104264979A (en) * 2012-06-26 2015-01-07 江苏省电力公司常州供电公司 Plastic building template of front cantilever beam
CN108049629A (en) * 2018-02-07 2018-05-18 中天建设集团有限公司 A kind of new big section square column formwork system and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852012A (en) * 2010-06-25 2010-10-06 山西惠丰型材有限公司 Plastic exposed concrete building template
CN102345384A (en) * 2010-08-02 2012-02-08 王亚运 End adapting template
CN102345384B (en) * 2010-08-02 2013-10-30 王亚运 End adapting template
CN102061805A (en) * 2010-11-22 2011-05-18 王亚运 Plastic building template system
CN102061805B (en) * 2010-11-22 2012-12-05 王亚运 Plastic building template system
CN102720349A (en) * 2011-03-29 2012-10-10 中国二十冶集团有限公司 Disposable template and formwork method for backfill foundation rapid formwork
CN104264979A (en) * 2012-06-26 2015-01-07 江苏省电力公司常州供电公司 Plastic building template of front cantilever beam
CN108049629A (en) * 2018-02-07 2018-05-18 中天建设集团有限公司 A kind of new big section square column formwork system and method

Similar Documents

Publication Publication Date Title
CN209954908U (en) Template that prefabricated wallboard of assembled concrete was used
CN2538907Y (en) Engineering plastic building shuttering
CN215760417U (en) Aluminum alloy easy-to-disassemble formwork for building
CN210002852U (en) Novel template for combined use of aluminum wood
CN2801961Y (en) Assembly wood plastic composite building forming board
CN204781920U (en) Constructional steel board of moulding
CN112343343B (en) 3D printing method for concrete special-shaped web-free reinforced beam
CN104763146B (en) Novel corner template system
CN204456831U (en) A kind of reinforcement construction formwork
CN113266147A (en) BIM-based special-shaped column tool type wood formwork rapid construction process
CN112482637A (en) GRC disassembly-free template for pouring concrete beam plate
CN111852004A (en) A pin-connected panel regularization mould for concrete antithetical couplet square reticulated shell
CN2841800Y (en) Lightweight is exempted from the close rib template of detachment bed die
CN111706005A (en) Integrated reinforcing steel bar formwork-free cast-in-place concrete beam
CN220146222U (en) Contact net is mould for basis
CN216949001U (en) Prefabricated steel construction concrete roof for building
CN2326667Y (en) Light disposable building moulding-shell
CN2304714Y (en) Assembled steel frame coating formwork
CN212336707U (en) Assembled novel building template
CN220598159U (en) Guard bar template
CN219190624U (en) Storage precast beam formwork system
CN213352836U (en) Steel-wood mixing mold for concrete prefabricated part
CN104652805A (en) Reinforced building formwork
CN203420472U (en) Circular arc formwork sectional material for modeling of pillar type column and formwork thereof
CN113954216B (en) Steel die-aluminum die building process for bridge prefabricated part

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee