CN2487871Y - 一种油气运移聚集模拟实验装置 - Google Patents
一种油气运移聚集模拟实验装置 Download PDFInfo
- Publication number
- CN2487871Y CN2487871Y CN01264262U CN01264262U CN2487871Y CN 2487871 Y CN2487871 Y CN 2487871Y CN 01264262 U CN01264262 U CN 01264262U CN 01264262 U CN01264262 U CN 01264262U CN 2487871 Y CN2487871 Y CN 2487871Y
- Authority
- CN
- China
- Prior art keywords
- insulating box
- rock core
- operated valve
- pneumatic operated
- core fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
一种油气运移聚集模拟实验装置,涉及一种油气运移聚集实验装置,包括恒温箱(1A)、高压微流量泵、压力传感器、三相计量装置和气动阀,恒温箱(1A)中设置有岩芯夹持器和热电偶,其特征是新增加一个恒温箱(1B),恒温箱(1B)中设置有岩芯夹持器和热电偶,恒温箱(1B)中的岩芯夹持器一端和恒温箱(1A)中的岩芯夹持器相连接,另一端通过活塞容器和气动阀与高压微流量泵出口连接,恒温箱(1A)内的岩芯夹持器一端与恒温箱(1B)的岩芯夹持器连接,另一端通过活塞容器和气动阀与高压微流量泵进口连接,工控机与恒温箱(1A)、恒温箱(1B)、高压微流量泵、压力传感器、热电偶、三相计量装置、气动阀相连。该装置可以提高实验的自动化程度,操作更加简便。
Description
技术领域
本实用新型涉及一种石油地质领域的一种实验装置,尤其是一种油气运移聚集模拟实验装置。
背景技术
目前,油气运移和聚集是石油地质中最重要的研究内容,但也是最薄弱的环节,为解决这一难题,许多人设计了模拟实验装置。但是现有的这些实验装置都具有自动化程度低,设计过于简单,无法形成循环流动,难以更好地模拟地层的温度压力条件下,地层多孔介质中油气运移和聚集过程以及流体--岩石相互作用过程,例如热对流作用下油气运移和聚集及流体--岩石相互作用过程等等。因此,根据这些实验装置得出的实验结论可信度不高。
发明内容
本实用新型的目的是提供一种自动化程度高,温度、压力能够达到所模拟地层条件,可实现循环流动,操作简便,精度高,维护方便,能真正模拟地层温度压力条件下多孔介质中油气运移和聚集以及流体--岩石相互作用的实验装置。
本实用新型的技术方案是:油气运移聚集模拟实验装置,包括恒温箱(1A)、高压微流量泵、压力传感器、三相计量装置和气动阀,恒温箱(1A)中设置有岩芯夹持器和热电偶以及压力传感器,其特征是新增加一个恒温箱(1B),恒温箱(1B)中设置有岩芯夹持器和热电偶以及压力传感器,恒温箱(1B)中的岩芯夹持器一端通过阀门及换热器与恒温箱(1A)中的岩芯夹持器相连接,另一端通过活塞容器和气动阀与高压微流量泵出口连接,恒温箱(1A)内的岩芯夹持器一端通过阀门及热交换器与恒温箱(1B)的岩芯夹持器连接,另一端通过活塞容器和气动阀与高压微流量泵进口连接,工控机与恒温箱(1A)、恒温箱(1B)、高压微流量泵、压力传感器、热电偶、三相计量装置、气动阀相连。
所述高压微流量泵的出口与气动阀(2A)连接,该气动阀的一端连接一个活塞容器(3A),另一端连接一个活塞容器(3B)和气动阀(2B),气动阀(2B)与高压微流量泵的进口相连接,活塞容器(3A)和活塞容器(3B)的另一端之间并联两个气动阀(2C、2D),气动阀(2C)和恒温箱(1A)中的岩芯夹持器连接,气动阀(2D)和恒温箱(1B)中的岩芯夹持器连接。
本实用新型的效果是:由于新增加一个恒温箱(1B),恒温箱(1B)中设置有岩芯夹持器和热电偶,恒温箱(1B)中的岩芯夹持器一端和恒温箱(1A)中的岩芯夹持器相连接,另一端通过活塞容器和气动阀与高压微流量泵出口连接,恒温箱(1A)内的岩芯夹持器一端与恒温箱(1B)的岩芯夹持器连接,另一端通过活塞容器和气动阀与高压微流量泵进口连接。这样工作时,就可以实现高压循环流动,从几千米的地下采的岩芯就放在岩芯夹持器内,岩芯夹持器放置在恒温箱内,恒温箱可调节温度,从而实现岩芯的高温。这样在工作过程中,就可以基本模拟几千米地下岩芯的真实温度、压力情况,可以更好地研究地下油气运移与聚集过程,以及流体--岩石相互作用过程,尤其是热对流作用下的油气运移和聚集过程。由于工控机与恒温箱(1A)、恒温箱(1B)、高压微流量泵、压力传感器、热电偶、三相计量装置、气动阀相连,就可以采集各部件的温度、压力及其他数据,同时可通过工控机内程序向这些部件发出操作指令,自动控制实验过程,从而提高实验装置的自动化程度,操作更加简便。
下面结合附图和实施例对本实用新型做进一步的说明。
图面说明
附图是本实用新型的结构示意图。
具体实施方式
如图所示,油气运移聚集模拟实验装置,包括恒温箱1A、高压微流量泵4、压力传感器5A、5B、5C、5D、5E,三相计量装置6和气动阀,恒温箱1A中设置有岩芯夹持器7A和热电偶8A,新增加一个恒温箱1B,恒温箱1B中设置有岩芯夹持器7B和热电偶8B,恒温箱1B中的岩芯夹持器7B一端和恒温箱1A中的岩芯夹持器7A相连接,另一端通过活塞容器和气动阀与高压微流量泵4出口4B连接,恒温箱1A内的岩芯夹持器7A一端与恒温箱1B的岩芯夹持器7B连接,另一端通过活塞容器和气动阀与高压微流量泵4进口4A连接,工控机9与恒温箱1A、恒温箱1B、高压微流量泵4、压力传感器,热电偶8A、8B,三相计量装置6、气动阀相连,10为手动阀,11为回压调节阀。
高压微流量泵的出口4B与气动阀2A连接,该气动阀2A的一端连接一个活塞容器3A,另一端连接一个活塞容器3B和气动阀2B,气动阀2B与高压微流量泵的进口4A相连接,活塞容器3A和活塞容器3B的另一端之间并联两个气动阀2C、2D,气动阀2C和恒温箱1A中的岩芯夹持器7A连接,气动阀2D和恒温箱1B中的岩芯夹持器8A连接。
开始实验时,将实验流体从手动阀10处注入系统,然后关闭手动阀10,开动高压微流量泵4,流体从泵左侧开始,经过2A、3A、2D,进入恒温箱1B,岩芯夹持器7B,然后流出进入恒温箱1A,岩芯夹持器7A,经岩芯夹持器7A出口,流回2C,经3B、2B流回高压微流量泵,如此反复循环,直到达到所需时间。循环结束后,打开回压调节阀11,进行油气水三相计量。
Claims (2)
1、一种油气运移聚集模拟实验装置,包括恒温箱(1A)、高压微流量泵、压力传感器、三相计量装置和气动阀,恒温箱(1A)中设置有岩芯夹持器和热电偶以及压力传感器,其特征是新增加一个恒温箱(1B),恒温箱(1B)中设置有岩芯夹持器和热电偶以及压力传感器,恒温箱(1B)中的岩芯夹持器一端通过阀门及换热器与恒温箱(1A)中的岩芯夹持器相连接,另一端通过活塞容器和气动阀与高压微流量泵出口连接,恒温箱(1A)内的岩芯夹持器一端通过阀门及热交换器与恒温箱(1B)的岩芯夹持器连接,另一端通过活塞容器和气动阀与高压微流量泵进口连接,工控机与恒温箱(1A)、恒温箱(1B)、高压微流量泵、压力传感器、热电偶、三相计量装置、气动阀相连。
2、根据权利要求1所述的油气运移聚集模拟实验装置,其特征是高压微流量泵的出口与气动阀(2A)连接,该气动阀的一端连接一个活塞容器(3A),另一端连接一个活塞容器(3B)和气动阀(2B),气动阀(2B)与高压微流量泵的进口相连接,活塞容器(3A)和活塞容器(3B)的另一端之间并联两个气动阀(2C、2D),气动阀(2C)和恒温箱(1A)中的岩芯夹持器连接,气动阀(2D)和恒温箱(1B)中的岩芯夹持器连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN01264262U CN2487871Y (zh) | 2001-09-29 | 2001-09-29 | 一种油气运移聚集模拟实验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN01264262U CN2487871Y (zh) | 2001-09-29 | 2001-09-29 | 一种油气运移聚集模拟实验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2487871Y true CN2487871Y (zh) | 2002-04-24 |
Family
ID=33671600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN01264262U Expired - Fee Related CN2487871Y (zh) | 2001-09-29 | 2001-09-29 | 一种油气运移聚集模拟实验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2487871Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808614A (zh) * | 2012-08-21 | 2012-12-05 | 中国石油天然气股份有限公司 | 油气运移物理模拟装置和油气运移实验方法 |
CN106124735A (zh) * | 2016-07-21 | 2016-11-16 | 张军龙 | 自生自储向斜构造盆地水溶气运移模拟装置 |
-
2001
- 2001-09-29 CN CN01264262U patent/CN2487871Y/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808614A (zh) * | 2012-08-21 | 2012-12-05 | 中国石油天然气股份有限公司 | 油气运移物理模拟装置和油气运移实验方法 |
CN102808614B (zh) * | 2012-08-21 | 2015-11-18 | 中国石油天然气股份有限公司 | 油气运移物理模拟装置和油气运移实验方法 |
CN106124735A (zh) * | 2016-07-21 | 2016-11-16 | 张军龙 | 自生自储向斜构造盆地水溶气运移模拟装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10794180B2 (en) | Mineshaft-stratum fracture coupled flowing simulation experiment device and method | |
Wang et al. | Optimization design of hydraulic parameters for supercritical CO2 fracturing in unconventional gas reservoir | |
CN105952424B (zh) | 一种超临界水驱油模拟装置及方法 | |
CN109577945B (zh) | 一种低渗-超低渗油藏窜流通道判别的实验装置与方法 | |
CN109630084A (zh) | 一种脉动载荷暂堵压裂模拟装置与方法 | |
CN202451142U (zh) | 一种井下环境模拟装置 | |
CN103075147A (zh) | 一种井下环境模拟装置及方法 | |
CN206256908U (zh) | 一种井筒与地层裂缝耦合流动模拟实验装置 | |
Hadgu et al. | Coupled reservoir-wellbore simulation of geothermal reservoir behavior | |
CN103867176A (zh) | 一种模拟多组分流体吞吐热采的实验装置 | |
CN2487871Y (zh) | 一种油气运移聚集模拟实验装置 | |
CN201794580U (zh) | 一种钻井液用高温高压堵漏模拟试验装置 | |
CN113756784B (zh) | 一种模拟油藏形成演化过程的实验装置及方法 | |
Li et al. | Compressed air energy storage in aquifers: basic principles, considerable factors, and improvement approaches | |
CN205607978U (zh) | 一种缝洞型油藏注气示踪剂响应曲线测试实验装置 | |
CN103485753B (zh) | 底水稠油油藏蒸汽驱二维比例物理模拟装置及其使用方法 | |
Oballa et al. | Aspects of discretized wellbore modelling coupled to compositional/thermal simulation | |
Cheng et al. | A new technology of 3D scaled physical simulation for high-pressure and high-temperature steam injection recovery | |
CN102384970A (zh) | 一种轻质原油循环注气低温氧化实验方法及装置 | |
CN205558899U (zh) | 套管井电缆泵抽式地层取样器 | |
CN110905457B (zh) | Co2气驱井筒结垢的模拟装置和方法 | |
Gasbarri et al. | A dynamic plunger lift model for gas wells | |
CN1126859C (zh) | 油气生成、运移和聚集模拟实验装置 | |
CN103195401A (zh) | 地层条件下煤储层增产改造实验装置 | |
CN204877410U (zh) | 超稠油油藏蒸汽、氮气、降粘剂复合吞吐实验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |