CN2420626Y - Gas supply device for gas meter central administration - Google Patents
Gas supply device for gas meter central administration Download PDFInfo
- Publication number
- CN2420626Y CN2420626Y CN 00235147 CN00235147U CN2420626Y CN 2420626 Y CN2420626 Y CN 2420626Y CN 00235147 CN00235147 CN 00235147 CN 00235147 U CN00235147 U CN 00235147U CN 2420626 Y CN2420626 Y CN 2420626Y
- Authority
- CN
- China
- Prior art keywords
- gas
- fuel gas
- gas supply
- flow dividing
- substrate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Measuring Volume Flow (AREA)
Abstract
The utility model belongs to a device for supplying and metering pipeline gases. The utility model is provided with a base plate or a box body which is provided with a gas supplying main pipe which is closed on the head and is provided with a plurality of flow dividing openings on the pipe wall; meanwhile, the base plate or the box body is provided with a plurality of gas meters corresponding to the flow dividing openings; the flow dividing openings and the inlets of the corresponding gas meters are connected via a flow dividing pipe and a flow dividing valve, so that a channel for supplying and metering gases is formed. The inlets of the gas meters are used for installing special pipelines leading to users. The device of the utility model allows the gas meters to be in centralized management, avoids various defects of dispersed meter reading, has simple structure and easy implementation and is particularly favorable for the reconstruction of original old pipelines.
Description
The utility model relates to a kind of gas pipeline and carries feedway, particularly a kind of pipe air-supply device that is used for the gas meter, flow meter centralized management.
Current, the pipe gas that the city dweller uses, gauging table as coal gas, liquefied gas, natural gas etc., the problem that can not manage concentratedly of ubiquity all adopts single tube to carry their now, and gauging table disperses to be installed in every family, bring many difficulties to administrative authority, under the particularly present increasing situation of skyscraper, bring trouble for the work of checking meter, also influence user's rest and safety.It is one of method that solves the centralized management of gas-liquid gauging table that the multiple path co-pipe of Chinese patent 98108131.2 is carried feed system, has brought hope for administrative authority and user.
The purpose of this utility model provides and a kind ofly is different from the aforementioned tube pipeline conveying system, and a kind of feeder that is used for the gas meter, flow meter centralized management simple in structure, easy to implement.
The technical solution of the utility model is as follows:
This feeder that is used for the gas meter, flow meter centralized management, comprise substrate or casing, be installed in the fuel gas supply person in charge, valve and gas meter on substrate or the casing, special character is: the fuel gas supply of installing on substrate or casing is responsible for, its head sealing has several diffluence pass on the pipe sidewall; Discharging is installed on substrate or casing several gas meters, and the import of each gauging table is corresponding with the fuel gas supply person in charge's a diffluence pass; Between the diffluence pass that fuel gas supply is responsible for and the import of its corresponding gas meter, install and be connected with an isocon and by-pass valve, they are fused form the split channel of several fuel gas supplies and metering; Each gas meter has an outlet, leads to user's pipe special when installing and using in this outlet.The fuel gas supply of this feeder is responsible for, and can be mounted in the independent tubes of a head sealing on substrate or the casing, also can be the pipeline of the parallel connection of several head sealings.
This feeder that is used for the gas meter, flow meter centralized management, can not only solve gas meter, flow meter and install the problem that a place uses concentratedly, it is very convenient to manage, the various drawbacks of having avoided dispersion to check meter, simultaneously, because it is simple in structure, components and parts are conventional device and instrument, thereby easy to implement, be particularly advantageous in the transformation of original old piping system.
The utility model is described in further detail below by drawings and Examples:
Fig. 1 is an embodiment synoptic diagram of the present utility model;
Fig. 2 is that the B of Fig. 1 is to view;
Fig. 3 is embodiment 2 synoptic diagram of the present utility model;
Fig. 4 is embodiment 3 synoptic diagram of the present utility model;
Embodiment 1: consult Fig. 1, Fig. 2, one casing 2 is arranged, there is glass door 21 in its front, on the base plate 22 in the casing 2, the fuel gas supply that is horizontally installed with a head sealing by pipe clamp 23 is responsible for 1, and this supply person in charge 1 the other end has a total valve 4, when installing and using, the gas source pipeline is connected in this termination, has eight diffluence pass 11 on this supply person in charge 1 the downside tube wall; Eight cover gas meters 6 are gas measurement table commonly used, and their are arranged and are installed in fuel gas supply and are responsible on the base plate 22 of casing 2 of 1 below; Supply with and be responsible for eight diffluence pass 11 of 1, by isocon 3 and import 61--corresponding be connected of by-pass valve 5 with each gas meter 6, thereby the split channel that forms eight fuel gas supplies and measure; Each gas meter 6 has an outlet 62, the pipe special that when installing and using, leads to the user in order to connection, this example is supplied coal gas for the user who installs to eight floor rooms, therefore can use the PAP 7 of bending arbitrarily to be connected with gas meter outlet 62, its other end directly leads to required floor user, and the centre need not increase interface unit.
Embodiment 2: consult Fig. 3, a substrate 2 ' on one group of fuel gas supply that is combined by two discharge pipes up and down be installed be responsible for 1 ', their head sealing, tail end be communicated in one and be equipped with total valve 4 ', when installing and using, this tail end is connected the gas source pipeline; Up and down two row's fuel gas supplies be responsible for 1 ' the downside tube wall respectively have four diffluence pass 11 ', they lower substrate 2 ' on correspondence be equipped with two row and every row's quadruplet gas meter 6 ', gas meter 6 ' import 61 ' be responsible for 1 with corresponding fuel gas supply ' diffluence pass 11 ' between, by isocon 3 ' and by-pass valve 5 ' they are connected in one the split channel that forms eight fuel gas supplies and measure; Each gas meter 6 ' have outlet 62 ', when installing and using, in order to connection lead to user's pipe special 7 ', with embodiment 1, repeat no more.
Embodiment 3: consult Fig. 4, the present embodiment scheme comprises fuel gas supply be responsible for 1 ", substrate 2 " and gas meter 6 "; and above-mentioned two embodiment differences are: fuel gas supply is responsible for the central authorities of 1 " vertically being installed in substrate 2 ", its head sealing upwards, the both sides tube wall respectively has three diffluence pass 11 "; Be responsible for 1 at fuel gas supply on " both sides substrate 2 ", three cover gas meters 6 respectively are installed "; The diffluence pass 11 of the import 61 of gas meter 6 " " " and fuel gas supply be responsible for 1 " "--correspondence, and is connected by isocon 3 " with by-pass valve 5 ", form the split channel that six fuel gas supplies also measure; Gas meter 6 " outlet 62 " can be installed the pipe special that leads to each user.
Claims (2)
1, a kind of feeder that is used for the gas meter, flow meter centralized management, comprise a substrate or casing (2), the fuel gas supply that is installed on substrate or the casing is responsible for (1), valve (4), (5) and gas meter (6), it is characterized in that: substrate (2 ') (fuel gas supply is installed on 2 ") or the casing (2) is responsible for (1); its head sealing, the pipe side has several diffluence pass (11); Several gas meters (6) are discharged and installed in (2) on substrate or casing, and the import of each gauging table (61) and the fuel gas supply person in charge's difference head piece (a 11) position is corresponding; Between the fuel gas supply person in charge's (1) the diffluence pass (11) and the import (61) of its corresponding gas meter (6), an isocon (3) and by-pass valve (5) are installed, they are connected in one, form the combustion gas split channel of several fuel gas supplies and metering; Each gas meter has an outlet (62), is used to install the pipe special that leads to the user.
2, feeder according to claim 1 is characterized in that: fuel gas supply is responsible for (1), (1 '), (1 ") is one section independently pipeline or several sections pipeline combinations arranged side by side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00235147 CN2420626Y (en) | 2000-05-19 | 2000-05-19 | Gas supply device for gas meter central administration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00235147 CN2420626Y (en) | 2000-05-19 | 2000-05-19 | Gas supply device for gas meter central administration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2420626Y true CN2420626Y (en) | 2001-02-21 |
Family
ID=33597032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00235147 Expired - Fee Related CN2420626Y (en) | 2000-05-19 | 2000-05-19 | Gas supply device for gas meter central administration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2420626Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110220566A (en) * | 2019-07-18 | 2019-09-10 | 彭臣 | A kind of gas intelligent open air electricity box and teletransmission control system |
-
2000
- 2000-05-19 CN CN 00235147 patent/CN2420626Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110220566A (en) * | 2019-07-18 | 2019-09-10 | 彭臣 | A kind of gas intelligent open air electricity box and teletransmission control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2241809A1 (en) | Tank pressurization system for air seeder | |
CN2420626Y (en) | Gas supply device for gas meter central administration | |
EP0987526A3 (en) | Adaptable gas meter | |
CN215807927U (en) | Integrated metering pressure regulating box | |
KR910012677A (en) | Gas consumption measuring device | |
CN214435739U (en) | Multi-head central oxygen inhalation device | |
CN206126916U (en) | Desk -top ultrafiltration purifier | |
CN217082205U (en) | Gas ground pressure regulating box | |
CN100472194C (en) | Pressure regulator static characteristic detection system | |
CN2329953Y (en) | Adapter coupling tube for mounting meter | |
CN2329945Y (en) | Single joint meter for pipeline devliering system | |
CN111074973A (en) | Integrated power unit | |
CN2354110Y (en) | Multi-way concentrated gas-quality-monitoring flow meter | |
CN2329952Y (en) | Combined water-meter for multi-way common pipeline water supplying | |
CN205715933U (en) | The touch faucet of one kind of multiple water outlets | |
CN218637050U (en) | Gas mixing device | |
CN205187862U (en) | Modular plate -type ozone generator | |
CN2420625Y (en) | Disc type combined water meter | |
CN116202033A (en) | Multifunctional gas diffusing device | |
CN2366663Y (en) | Multi-way joint for multi-way pipeline transportation system | |
CN211816617U (en) | Integrated power unit | |
CN216559050U (en) | Wading product leads to water and adds standard testboard | |
CN213959511U (en) | High-low voltage power transmission transformer cabinet | |
CN218281294U (en) | Automatic gas distribution device for high-precision gas | |
CN208536387U (en) | A kind of integrated form inlet channel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |