CN2407234Y - Boiler for steaming or boiling water - Google Patents

Boiler for steaming or boiling water Download PDF

Info

Publication number
CN2407234Y
CN2407234Y CN 99241464 CN99241464U CN2407234Y CN 2407234 Y CN2407234 Y CN 2407234Y CN 99241464 CN99241464 CN 99241464 CN 99241464 U CN99241464 U CN 99241464U CN 2407234 Y CN2407234 Y CN 2407234Y
Authority
CN
China
Prior art keywords
water cavity
boiler
flue gas
temperature flue
gas chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99241464
Other languages
Chinese (zh)
Inventor
朱家平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99241464 priority Critical patent/CN2407234Y/en
Application granted granted Critical
Publication of CN2407234Y publication Critical patent/CN2407234Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model relates to a boiler for steaming or boiling water, comprising an upper and a lower water cavity shell bodies which are connected into integration, a boiler chamber arranged in the lower water cavity, a water cooling wall pipe, a boiler door, an annular high-temperature flue arranged in the upper water cavity, a hand hole, a flue, a man hole, and a chimney. A high temperature fume chamber is arranged in the upper water cavity by the utility model and is removed from dust through the hand hole, so the heat exchange surface is enlarged, the heat exchange efficiency is improved, the scale formation zone formed by the dead water in the background art is eliminated, and a fume chamber bottom plate is used as one part of the boiler shell to form a high-temperature zone can not influence the service life of the boiler, etc. The utility model has the advantages of high thermal efficiency, large generated steam quantity, long service life, etc.

Description

A kind of steam, boiling water boiler for dual purpose
The utility model belongs to a kind of steam, boiling water ordinary-pressure boiler for both.Be particularly suitable for brewery for steam wine dipper for steam and for daily life domestic water is provided, with vapour etc.
At present, general little brewery is used to steam wine and provides drinking water to the worker, the boiler of usefulness vapour, water such as have a bath mainly comprises upper and lower water cavity, be located at down and be with the burner hearth (also claiming flue) of grate and fire door in the water cavity and be located at the burner hearth internal upper part and the L type water screen tube of annular setting, the flue that between upper and lower water cavity, also is provided with an annular high-temperature flue gas chamber and this smoke chamber is communicated with burner hearth, and the chimney that is connected with the ring smoke chamber, the housing of whole boiler then is made up of the base plate of upper and lower water cavity shell and high-temperature flue gas chamber." wine brewing boiler " that " east, Zi Gong gas apparatus company " produces promptly belongs to this type of boiler.Though this boiler has overcome the big disadvantage of general direct-fired civil boiler smoke discharge amount, has also improved the thermal efficiency to a certain extent.But because the annular high-temperature flue gas chamber of this boiler is to be welded in down on the shell on water chamber top, its annular base plate directly contacts with air and becomes a part of boiler shell, and the while is offered ash output opening on this ring flat-plate; Upper water cavity housing then seat makes a formation narrower hydrostatic (stagnant water) exchange area hot in nature between the outer ring surface of upper water cavity lower housing portion and high-temperature flue gas chamber on the extended surface of this annular base plate.Carry out heat exchange, both influenced boiler thermal output, make the chimney emission temperature too high because the annular high-temperature flue gas chamber of this boiler only has three faces to contact with water; Yin Gaowen and make high-temperature flue gas chamber annular bottom plate easy burn-out again as the boiler shell some; The existence of inner lead (slough) has not only reduced the heat exchanger effectiveness in this district, and, the water in this district becomes easy fouling district because of can not freely circulating, also have influence on the raising of the thermal efficiency, thereby such boiler exists high-temperature flue gas chamber set-up mode and position unreasonable, the Natural Circulation of water is relatively poor between the upper and lower water cavity, easy fouling in slough and easy-clear have not all influenced the further raising of boiler thermal output and the defectives such as life-span of boiler.
It is unreasonable with the high-temperature flue gas chamber set-up mode and the position that overcome background technology and exist that the purpose of this utility model provides a kind of steam, boiling water boiler for dual purpose, and the Natural Circulation of water is relatively poor between the upper and lower water cavity, easy fouling in slough and disadvantage such as easy-clear not; Reach and enlarge high-temperature flue gas chamber heat exchange area, the thermal efficiency and the gas production of raising boiler, the purposes such as service life that prolong high-temperature flue gas chamber and boiler shell.
Solution of the present utility model is: on basis of background technology annular high-temperature flue gas chamber changed and be located in the upper water cavity body, be connected with the upper water cavity housing with gusset and realize deashing by hand hole or hand hole; Upper and lower water cavity shell then directly links into an integrated entity and forms boiler shell, make simultaneously water in the upper and lower water cavity by annular high-temperature flue gas chamber the Nei Huan district and the outer ring surface by annular high-temperature flue gas chamber and passage between bottom and the upper water cavity inwall and following water cavity between two of formation follow passage naturally, both eliminated the slough, overcome the problem of easy fouling again, thereby realized its purpose.Therefore, the utility model comprises upper and lower water cavity, be located at down and be with the burner hearth of grate and fire door in the water cavity and be located at the burner hearth internal upper part and the double L water screen tube of annular setting, annular high-temperature flue gas chamber and the flue that this smoke chamber is communicated with burner hearth, the chimney that is connected with the high-temperature flue gas chamber and be located at manhole, steam (vapor) outlet on the upper water cavity housing, the boiling water outlet; Key is that annular high-temperature flue gas chamber is located in the upper water cavity, and its outer ring surface is provided with 1~4 hand hole; Annular high-temperature flue gas chamber is fastenedly connected with the upper water cavity housing by hand hole or hand hole stiffened panel, and upper and lower water cavity then directly welds and strikes up partnership and constitute the housing of boiler.The described chimney that is connected with the high-temperature flue gas chamber both can be located at the upper water cavity outside and be connected with the outer ring surface of annular high-temperature flue gas chamber, also can be located at upper water cavity body top and pass this water cavity to be connected with the inner ring surface of high-temperature flue gas chamber.
The utility model is owing to be located at annular high-temperature flue gas chamber in the upper water cavity body, and integral body all is dipped in and carries out heat exchange in the water with it during work, thereby has improved effectively the efficient of heat exchange and the life-span of high-temperature flue gas chamber; In addition, after annular high-temperature flue gas chamber is located in the upper water cavity body, make and form a water stream channel between the outer ring surface of upper water cavity body shell and smoke chamber and the annular bottom plate, directly be communicated with following water cavity, thereby both eliminated the easy fouling of stagnant water district, make again to form inside and outside two circulation canals when working between the upper and lower water cavity, this improves the efficient of heat exchange again to a certain extent; Whole boiler compared with background technology and can be improved steam production about 10%.After the base plate of annular high-temperature flue gas chamber was not re-used as the part of boiler shell, just there was not special high-temperature region in boiler shell, from and service life of having improved whole boiler effectively.Therefore, the utlity model has the high-temperature flue gas chamber and be provided with rationally, enlarged heat exchange area, improved the thermal efficiency and the steam production of boiler effectively, prolonged the characteristics such as service life of high-temperature flue gas chamber and boiler shell.
Accompanying drawing and description of drawings
Fig. 1 is the utility model structural representation (an A-A view);
Fig. 2 is the vertical view (B-B view) of Fig. 1.
Among the figure: 1. fire door, 2. hand hole (ash removing opening), 3. annular high-temperature flue gas chamber, 4. water level meter, 5. boiler shell, 6. steam (vapor) outlet seat hole, 7. manhole, 8. upper water cavity, 9, the chimney seat hole, 10. ash removing opening, 11. flues, 12. times water chambers, 13.L the type water screen tube, 14. burner hearths, 15. grates, 16. water inlet and blowdown base hole, 17. bases, the outlet of 18. boiling water
Embodiment 1
Accompanying drawing 1,2 is the present embodiment accompanying drawing.Present embodiment is an example with the boiler that produces the 0.3T/h quantity of steam: body of heater height overall 2840mm, following water cavity 12 external diameter Φ 1000mm, high 1300mm; Stove hall 14 internal diameter Φ 900mm, high 1100mm, water screen tube 13 is two-layer, 20 of internal layer water screen tubes, all are provided with by international 3087-82 standard by outer 28; Upper water cavity 8 external diameter Φ 1510mm, the high 860mm of main cavity, the conical ring plate hight 40mm that is connected with following water cavity 12, upper end cover height 360mm; Annular high-temperature flue gas chamber 3 external diameter Φ 1400mm, internal diameter Φ 880mm, high 300mm, hand hole 2 present embodiments are established 4, diameter is Φ 133mm, high-temperature flue gas chamber 3 is promptly fixing with the housing welding of upper water cavity 8 by 4 hand holes 2, and its position is not less than 20mm degree of being with the narrow spacing of annular high-temperature flue gas chamber 3 bottom outer rims and upper water cavity 8 inwalls; Adopt two-way minute steam valve with steam (vapor) outlet seat hole 6 matching used stop valve present embodiments, make steam (vapor) outlet be in normally open, safe in utilization, reliable to guarantee it.Whole boiler shell and burner hearth 14, annular high-temperature flue gas chamber 3, hand hole 2 and flue 11 etc. all adopt the thick boiler plate weldering of 5mm knot to form.All the other are all same with background technology.
Embodiment 2
Present embodiment is located at inner ring surface with the interface of chimney and high-temperature flue gas chamber 3, and whole chimney passes in the upper water cavity 8 and passed by the upper end lid, and the outer ring surface relative with the inner ring surface interface established a hand hole 2 in order to the chimney deashing.All the other are all same with enforcement 1.

Claims (2)

1, a kind of steam, boiling water boiler for dual purpose, comprise upper and lower water cavity, be located at down and be with the burner hearth of grate and fire door in the water cavity and be located at the burner hearth internal upper part and the double L type water screen tube of annular setting, annular high-temperature flue gas chamber and the flue that this smoke chamber is communicated with burner hearth, the chimney that is connected with the high-temperature flue gas chamber, and be located at manhole, steam (vapor) outlet on the upper water cavity housing, boiling water outlet; It is characterized in that annular high-temperature flue gas chamber is located in the upper water cavity, its outer ring surface is provided with 1~4 hand hole; Annular high-temperature flue gas chamber is fastenedly connected with the upper water cavity housing by hand hole or hand hole stiffened panel, and upper and lower water cavity then directly welds and strikes up partnership and constitute the housing of boiler.
2, by the described steam of claim 1, boiling water boiler for dual purpose, it is characterized in that the described chimney that is connected with the high-temperature flue gas chamber both can be located at the external side of upper water cavity and be connected with the outer ring surface of annular high-temperature flue gas chamber, also can be located at upper water cavity body top and pass this water cavity and be connected with the inner ring surface of high-temperature flue gas chamber.
CN 99241464 1999-11-02 1999-11-02 Boiler for steaming or boiling water Expired - Fee Related CN2407234Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99241464 CN2407234Y (en) 1999-11-02 1999-11-02 Boiler for steaming or boiling water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99241464 CN2407234Y (en) 1999-11-02 1999-11-02 Boiler for steaming or boiling water

Publications (1)

Publication Number Publication Date
CN2407234Y true CN2407234Y (en) 2000-11-22

Family

ID=34028320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99241464 Expired - Fee Related CN2407234Y (en) 1999-11-02 1999-11-02 Boiler for steaming or boiling water

Country Status (1)

Country Link
CN (1) CN2407234Y (en)

Similar Documents

Publication Publication Date Title
CN204084860U (en) A kind of exhaust heat recovery structure of condensing gas wall hanging stove
CN207262407U (en) One kind is exempted to use the low nitrogen condensed type combustion gas steam boiler of formality
CN2407234Y (en) Boiler for steaming or boiling water
CN209147056U (en) The low-nitrogen discharged top blast boiler of full premix combustion
CN208588082U (en) Effective energy-saving vertical boiler
CN2417425Y (en) Full water and horizontal type ambient pressure hot water boiler using gas fuel
CN105132269B (en) A kind of efficient energy-saving steam alcoholic equipment
CN208074925U (en) Automatic steam boiler
CN208567108U (en) A kind of vertical three-pass boiler
CN2427788Y (en) Wortex flow and Gas/water type heat exchanger
CN220453723U (en) Mute waste heat recovery commercial oil gas stove
CN220453722U (en) Mute waste heat recovery commercial oil gas double-stove
CN220453721U (en) Silent waste heat recovery oil gas single stove
CN2436870Y (en) Direct combustion type vapour and water boiler
CN210512172U (en) Dual-purpose full-condensing alcohol-based heating water heater
CN216480907U (en) Boiler with water-cooled wall
CN211695008U (en) Furnace with down flue pipe
CN219083382U (en) Double-layer water tank combustion furnace
CN217131520U (en) Full premix jet-type hot water boiler
CN2605520Y (en) Vertical domestic heating stove capable of sufficient combustion
CN209371856U (en) A kind of waste heat boiler device for recycling heat
CN2436871Y (en) High-efficiency water-boiling boiler
CN2212171Y (en) Water tube type double layer grate multifunction boiling water stove
CN208751035U (en) Condensing premixes heat exchanger entirely
CN2456103Y (en) Downward combusting boil for steaming and water heating

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee