CN2390866Y - Charging device of preheating device pipe in lime calcining system - Google Patents

Charging device of preheating device pipe in lime calcining system Download PDF

Info

Publication number
CN2390866Y
CN2390866Y CN 98214124 CN98214124U CN2390866Y CN 2390866 Y CN2390866 Y CN 2390866Y CN 98214124 CN98214124 CN 98214124 CN 98214124 U CN98214124 U CN 98214124U CN 2390866 Y CN2390866 Y CN 2390866Y
Authority
CN
China
Prior art keywords
steel pipe
lower box
utility
model
lime calcining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98214124
Other languages
Chinese (zh)
Inventor
吕海钰
戚天明
张捷
焦文斌
郭强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGXIN HEAVY MACHINERY CO
Original Assignee
ZHONGXIN HEAVY MACHINERY CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGXIN HEAVY MACHINERY CO filed Critical ZHONGXIN HEAVY MACHINERY CO
Priority to CN 98214124 priority Critical patent/CN2390866Y/en
Application granted granted Critical
Publication of CN2390866Y publication Critical patent/CN2390866Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model provides a charging device of a preheating device pipe in a lime calcining system. The utility model is characterized in that the upper end of a vertical device in the utility model is connected with a charging groove, and the lower end of the vertical device is connected with a lower box body in which a valve control mechanism composed of a guide rail and a trolley is arranged. The lower end face of a steel pipe is made into an oblique angle of 5 DEG, and the distance between the lower end face of the steel pipe and the trolley is 30 mm. The bottom surface of the lower box body is provided with an opening communicated with a preheating device. The utility model has the advantages of simple structure, light weight, no power consumption and simple and convenient operation and alters a complicated structure composed of a plurality of vibrating motors and a plurality of mechanical control mechanisms in the prior art.

Description

Preheater pipeline feeding device in the lime calcining system
The utility model relates to a kind of by inject the vertical pipeline feeding device of Wingdale in device, especially the lime calcining system of vertical pipeline injecting material in preheater.
At present in the prior art, Anshan Iron and Steel Company's first phase of construction has been introduced the vibration material feeding that injects Wingdale in the lime calcining system that German Claus Mafi company provides in preheater.Its mode of operation is: Wingdale enters the vibration charging chamber through the top charging tank, and the vibration charging chamber is for being symmetrically arranged, a cover job, and a cover is standby.Indoor at vibration charging, Wingdale is through the top feeder, and shutter door mechanism enters upper box, continues to fall into to a 2m again 3In the hopper, and then through the bottom feeder, shutter door mechanism enters lower box.Wingdale has just been finished the stroke in the vibration charging chamber like this, enters intermediate chute at last, in tremie pipe enters preheater.Vibration material feeding of the prior art, complex structure promptly has 4 mechanical handling mechanisms, 4 vibrating motors.Equipment very easily breaks down and vibration charging is finished on more than 20 meters platforms in long-term vibration work, and maintenance is extremely inconvenient, and current consumption is big, cost height, ton surplus whole installation weight reaches 10.
The purpose of this utility model is to change the weak point that prior art exists, and a kind of preheater pipeline feeding device of only using two direct blankings of vertical pipeline is provided.
The purpose of this utility model can be achieved through the following technical solutions: in the pipeline feeding device that is made of steel pipe, charging tank, lower box, gate controlling organization, connect charging tank in the upper end of steel pipe, connect lower box, in lower box, be provided with the gate controlling organization in the bottom of steel pipe.
The purpose of this utility model can further be achieved through the following technical solutions: the gate controlling organization is arranged in the lower box, is to be made of guide rail that is arranged on the lower box bottom surface and dolly.Steel pipe is provided with 2 at least, and its underpart should be inserted in the lower box, and should there be 5 ° oblique angle its lower surface, also requires at least 25 mm distance between the dolly of its lower surface and gate controlling organization.
The advantage that the utility model compared with prior art has is: (1) is simple in structure, only uses two direct blankings of vertical pipeline.(2) in light weight, saved many vibrating motors and a plurality of mechanical handling mechanism.(3) no power consumption is easy to maintenance, and is easy and simple to handle.
The utility model provides the following drawings: accompanying drawing 1 is the utility model structural representation.Accompanying drawing 2 is a gate controlling organization synoptic diagram.
Be described in further detail below in conjunction with drawings and Examples:
As shown in drawings, in the utility model, 2 vertical steel pipes (2) are set, diameter is at least 400 millimeters of Φ, and length is at least 4000 millimeters.In the upper end of steel pipe (2) 1 charging tank (1) is set, connect by flange between them, in the bottom of steel pipe (2) 1 lower box (3) is set, steel pipe (2) should insert in the lower box (3), connect between them and should seal tightly, and require to do 1.5 normal atmosphere leak detections, prevent in working order, because of contrary air-flow appears in gas leakage, influence is reinforced.Lower surface at steel pipe (2) is a discharge port, 5 ° of oblique angles that should be made into.Be provided with gate controlling organization (4) in lower box (3), gate controlling organization (4) is to be made of the guide rail on the bottom surface that is arranged on lower box (3) (6) and 2 dollies (5), and dolly (5) can be gone up operation at guide rail (6) separately.Play the effect of closing 2 steel pipes (2).The lower surface of dolly (5) and steel pipe (2) is that the distance between the discharge port should reach 30 millimeters at least, at the middle part, bottom surface of lower box (3) 1 opening is arranged, and can communicate with preheater.
Working process of the present utility model is: 2 steel pipes (2) that are used for blanking, one is used for work, one is used for standby, Wingdale is injected in 1 steel pipe (2) wherein by charging tank (1), and drop in the lower box (3), dolly (5) in the gate controlling organization (4) is pushed a side to, the lower surface of promptly opening steel pipe (2) is a discharge port, Wingdale can enter in the preheater from lower box (3) smoothly, when occurring in the steel pipe (2) just at work that material blocks and when obstructed, 1 standby steel pipe (2) in addition then, dolly (5) in the gate controlling organization (4) of lower end is pushed a side to, promptly open steel pipe (2) lower surface discharge port, Wingdale is injected in this standby steel pipe (2) by charging tank (1), fall into lower box (3) and enter in the preheater, steel pipe (2) lower surface is that discharge port is 5 ° of oblique angles, and with apart at least 25 millimeters in dolly (5), purpose is when closing this discharge port, avoids oversize material stuck at this discharge port place.

Claims (3)

1. preheater pipeline feeding device in the lime calcining system is made up of steel pipe, charging tank, lower box, gate controlling organization; It is characterized in that: in the upper end of steel pipe (2) charging tank (1) is set, lower box (3) is set, in lower box (3), be provided with gate controlling organization (4) in the bottom of steel pipe (2).
2. preheater pipeline feeding device in a kind of lime calcining according to claim 1 system, it is characterized in that: gate controlling organization (4) is to be made of guide rail (6) that is arranged on lower box (3) bottom surface and dolly (5).
3. preheater pipeline feeding device in a kind of lime calcining according to claim 1 system, it is characterized in that: steel pipe (2) is provided with 2 at least, and insert in the lower box (3) its underpart, the lower surface of steel pipe (2) is made into 5 ° oblique angle, between the dolly (5) of its lower surface and gate controlling organization (4) at least 25 mm distance should be arranged.
CN 98214124 1998-05-14 1998-05-14 Charging device of preheating device pipe in lime calcining system Expired - Fee Related CN2390866Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98214124 CN2390866Y (en) 1998-05-14 1998-05-14 Charging device of preheating device pipe in lime calcining system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98214124 CN2390866Y (en) 1998-05-14 1998-05-14 Charging device of preheating device pipe in lime calcining system

Publications (1)

Publication Number Publication Date
CN2390866Y true CN2390866Y (en) 2000-08-09

Family

ID=33967857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98214124 Expired - Fee Related CN2390866Y (en) 1998-05-14 1998-05-14 Charging device of preheating device pipe in lime calcining system

Country Status (1)

Country Link
CN (1) CN2390866Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103954408A (en) * 2014-03-31 2014-07-30 舞阳钢铁有限责任公司 Maintenance process for online fast leakage detection for air pre-heater
CN104169235A (en) * 2012-03-14 2014-11-26 三菱综合材料株式会社 Cement production device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104169235A (en) * 2012-03-14 2014-11-26 三菱综合材料株式会社 Cement production device
CN104169235B (en) * 2012-03-14 2016-05-25 三菱综合材料株式会社 device for producing cement
CN103954408A (en) * 2014-03-31 2014-07-30 舞阳钢铁有限责任公司 Maintenance process for online fast leakage detection for air pre-heater
CN103954408B (en) * 2014-03-31 2016-07-06 舞阳钢铁有限责任公司 A kind of maintenance craft of the online quick leak-checking of air preheater

Similar Documents

Publication Publication Date Title
CN201162938Y (en) Removable compressed natural gas feeder
CN2390866Y (en) Charging device of preheating device pipe in lime calcining system
CN207329830U (en) A kind of sandstone aggregate bulk machine
CN214300215U (en) Coal injection and blowing system of blast furnace
CN103884188B (en) A kind of semi-closed submerged arc furnace top charging appts
CN216470915U (en) Pneumatic conveying device with corner buffer structure
CN202429566U (en) Vibration discharging device
CN201186820Y (en) Detachable high sealing distributing valve
CN211552469U (en) Combined type airflow injection device suitable for powder materials
CN206965843U (en) Feeding device and the ball mill with the feeding device
CN208503496U (en) A kind of powder blanking threeway
CN104928153A (en) Piston type biogas fermentation device
CN107200328B (en) Carbon disulfide gasification reacting furnace automatic control feeding device and automatic control charging process
CN205471727U (en) Combined powder storehouse line formula extracting device
CN207210467U (en) Novel shaft furnace top discharging bin
CN206815145U (en) A kind of construction of the highway pulverized limestone laying apparatus
CN204727878U (en) Piston-type biogas fermentation device
CN218078353U (en) Vertical roller mill of slay water spray structure
CN206222343U (en) A kind of online lime stone is to powder system
CN203002455U (en) Movable metering feed hopper device
CN221138672U (en) Cone-shaped door closing mechanism
CN209588707U (en) A kind of radiation kiln feeding lock wind system
CN220690567U (en) Coal dust sampler for coal mill
CN217438088U (en) Vehicle-mounted independent full-automatic slurry sealing equipment
CN211469608U (en) Cover opening device for hopper top cover of hoisting compression garbage truck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee