CN2390288Y - Temporay hot-line connecting device for 10 KV overhead line - Google Patents

Temporay hot-line connecting device for 10 KV overhead line Download PDF

Info

Publication number
CN2390288Y
CN2390288Y CN 99215839 CN99215839U CN2390288Y CN 2390288 Y CN2390288 Y CN 2390288Y CN 99215839 CN99215839 CN 99215839 CN 99215839 U CN99215839 U CN 99215839U CN 2390288 Y CN2390288 Y CN 2390288Y
Authority
CN
China
Prior art keywords
interim
extension ladder
charged
subjected
termination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99215839
Other languages
Chinese (zh)
Inventor
钮心瑜
王秉祥
张殿举
佟岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QIQIHAR POWER MACHINERY PLANT INDUSTRY CORP OF HARBIN RAILWAY BUREAU
Original Assignee
QIQIHAR POWER MACHINERY PLANT INDUSTRY CORP OF HARBIN RAILWAY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QIQIHAR POWER MACHINERY PLANT INDUSTRY CORP OF HARBIN RAILWAY BUREAU filed Critical QIQIHAR POWER MACHINERY PLANT INDUSTRY CORP OF HARBIN RAILWAY BUREAU
Priority to CN 99215839 priority Critical patent/CN2390288Y/en
Application granted granted Critical
Publication of CN2390288Y publication Critical patent/CN2390288Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a temporary electrified wiring device for a 10KV overhead line. The utility model is characterized in that a rotary ladder hinged on an electric pole and a raising mechanism of a manual stepwise telescopic ladder are formed into a plane double-crank four-bar mechanism, and a telescopic ladder, a steel wire rope, a pulley block and a ratchet mechanism are formed into the raising mechanism of the manual stepwise telescopic ladder; a top rack provided with a high-voltage cable, an insulated tension pole, an AC phase electric receiving compensating mechanism and a B phase electric receiving compensating mechanism is spliced on the telescopic ladder, and a V-shaped electric receiving fork is provided with an elastic wire clamp and a wiring indicator board. The utility model can be used for safely and rapidly leading and flexibly disengaging from work at any point of a line under the condition of a 10KV overhead line which is electrified.

Description

The interim charged termination of 10kV overhead transmission line
The utility model belongs to high-tension overhead line with interim charged termination, the interim charged termination of particularly a kind of 10kV overhead transmission line.
Draw and withdraw from operation on high-tension overhead line, realizing flexibly charged connecing, so far still need special charged termination, its manual marching type extension ladder hoisting mechanism cooperation is subjected to electronic compensating mechanism, can realize connecing flexibly under the charged situation of high-tension line drawing with safety and withdraw from operation.It is investigated and inquiry still do not have the interim charged termination of this high pressure at present.
Task of the present utility model provides a kind of under the charged situation of 10kV overhead transmission line, circuit realize more arbitrarily safe and reliable, connect and draw and withdraw from the portable interim charged termination of manual type flexibly rapidly.Its manual marching type extension ladder hoisting mechanism cooperation is subjected to electronic compensating mechanism, can realize connecing flexibly under the charged situation of high-tension line drawing with safety and withdraw from operation.
The interim charged termination of the utility model 10kV overhead transmission line is characterized in that: two saws and the manual marching type extension ladder hoisting mechanism that are articulated on the electric post through anchor ear constitute plane double crank four-bar mechanism; Three-phase high-voltage cable, insulated tension pole are installed, be plugged on the extension ladder by the upper frame of electronic compensating mechanism.Extension ladder, steel wire rope, assembly pulley, ratchet mechanism constitute manual marching type extension ladder hoisting mechanism.AC is subjected to electronic compensating mechanism to adjust composite structure by the three-dimensional that plane crank four bars and the parallel axle of two axial lines constitute mutually; It is the arc adjuster of bi-directional synchronization that is made of fan-shaped flat tooth, articulated linkage, torsion spring that B is subjected to electronic compensating mechanism mutually.V-type is subjected to the electricity fork that elastic force wire clamp and connector name plate are installed.
The utility model has following advantage compared with the prior art:
Can be under the charged situation of 10kV overhead transmission line, circuit realize more arbitrarily safe and reliable, connect and draw and withdraw from operation flexibly rapidly; Portable, operation effectiveness is good, the efficient height, and manual working labour intensity is low.
The utility model provides with following drawings and Examples.
Fig. 1 is a front view of the present utility model.
Fig. 2 is an end view of the present utility model.
Fig. 3 is the front view of upper frame.
Fig. 4 is subjected to the cutaway view of electronic compensating mechanism mutually for AC.
Fig. 5 is subjected to the cutaway view of electronic compensating mechanism mutually for B.
The interim charged termination of the utility model 10kV overhead transmission line, two winding stair (2) 3/4 " the steel pipe weld assembly is articulated on the electric post (during as electric post buried depth 1.7m; two anchor ears are apart from ground 0.7m and 1.7m) through two anchor ears (4) with hex bolts; and constitute plane double crank four-bar mechanism with manual marching type extension ladder hoisting mechanism (12); form the revolution reciprocating motion, its structure is as shown in Figure 1.Extension ladder (11) aluminium section bar manufacturing, steel wire rope (3) assembly pulley (10), ratchet mechanism (1) are formed manual marching type extension ladder hoisting mechanism (12), can make extension ladder (11) along doing the stepping lifter motion perpendicular to the ground direction, as shown in Figure 2.Upper frame (9) aluminium section bar manufacturing, be plugged on the extension ladder (11), as shown in Figure 3, during lifting, can will be connected with high-tension cable (5) insulated tension pole (6), be subjected to electronic compensating mechanism (7) (8) to rise to the wiring desired height, wherein AC is subjected to electronic compensating mechanism (7) to make the three-dimensional of forming by plane crank four bars (7-1) aluminium section bar manufacturing and No. 45 steels of the parallel axle of two axial lines (7-2) mutually and adjusts composite structure, its movement locus is can be around rotation of two axles and reciprocating motion, realize the compensation adjustment function, its structure as shown in Figure 4.B is made by four hinge joint connecting rod (8-3) A3 steel plates that are welded with fan-shaped flat tooth (8-1) by electronic compensating mechanism (8) mutually, and same torsion spring (8-2) constitutes the arc adjuster of bi-directional synchronization, and its movement locus can be done big span reciprocating motion, and its structure as shown in Figure 5.V-type is subjected to the manufacturing of electricity fork (7-3) aluminium section bar, forms high-voltage connection and indication component with elastic force wire clamp (7-5), torsion spring (7-4), connector name plate (7-6), and its structure as shown in Figure 4.

Claims (5)

1, the interim charged termination of a kind of 10kV overhead transmission line is characterized in that:
A, two saws (2) that are articulated on the electric post through anchor ear (4) constitute plane double crank four-bar mechanism with manual marching type extension ladder hoisting mechanism (12);
B, three-phase high-voltage cable (5), insulated tension pole (6) are installed, be plugged on the extension ladder (11) by the upper frame (9) of electronic compensating mechanism (7) (8).
2, interim charged termination as claimed in claim 1 is characterized in that extension ladder (11), steel wire rope (3), assembly pulley (10), ratchet mechanism (1) constitute manual marching type extension ladder hoisting mechanism (12).
3, interim charged termination as claimed in claim 1 is characterized in that AC is subjected to electronic compensating mechanism (7) to adjust composite structure by the three-dimensional that plane crank four bars (7-1) and the parallel axle of two axial lines (7-2) constitute mutually.
4, interim charged termination as claimed in claim 1 is characterized in that it is the arc adjuster of bi-directional synchronization that is made of fan-shaped flat tooth (8-1), articulated linkage (8-3), torsion spring (8-2) that B is subjected to electronic compensating mechanism (8) mutually.
5, interim charged termination as claimed in claim 1 is characterized in that V-type is subjected to electricity fork (7-3) that elastic force wire clamp (7-5) and connector name plate (7-6) are installed.
CN 99215839 1999-07-05 1999-07-05 Temporay hot-line connecting device for 10 KV overhead line Expired - Fee Related CN2390288Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99215839 CN2390288Y (en) 1999-07-05 1999-07-05 Temporay hot-line connecting device for 10 KV overhead line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99215839 CN2390288Y (en) 1999-07-05 1999-07-05 Temporay hot-line connecting device for 10 KV overhead line

Publications (1)

Publication Number Publication Date
CN2390288Y true CN2390288Y (en) 2000-08-02

Family

ID=34007666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99215839 Expired - Fee Related CN2390288Y (en) 1999-07-05 1999-07-05 Temporay hot-line connecting device for 10 KV overhead line

Country Status (1)

Country Link
CN (1) CN2390288Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101752689B (en) * 2010-01-29 2011-11-02 河北省电力公司超高压输变电分公司 Ascent-free remote control overhead wire clamper
CN101771247B (en) * 2008-12-30 2012-03-28 上海市南电力工程有限公司 Tool for jointing temporary lead wire under live working on rainy day for distribution line and method thereof
CN104007294A (en) * 2014-06-06 2014-08-27 国家电网公司 Overhead line parameter measurement wiring device
CN105071307A (en) * 2015-07-30 2015-11-18 国网山东省电力公司菏泽供电公司 Device of auxiliary wire connection and method for connecting wire by using device
CN105785130A (en) * 2016-03-21 2016-07-20 国家电网公司 High-voltage line induced voltage and direct-current resistance measuring device
CN109742678A (en) * 2018-12-04 2019-05-10 国网浙江嘉善县供电有限公司 Hot line robot equipment on bar

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101771247B (en) * 2008-12-30 2012-03-28 上海市南电力工程有限公司 Tool for jointing temporary lead wire under live working on rainy day for distribution line and method thereof
CN101752689B (en) * 2010-01-29 2011-11-02 河北省电力公司超高压输变电分公司 Ascent-free remote control overhead wire clamper
CN104007294A (en) * 2014-06-06 2014-08-27 国家电网公司 Overhead line parameter measurement wiring device
CN104007294B (en) * 2014-06-06 2017-02-01 国家电网公司 Overhead line parameter measurement wiring device
CN105071307A (en) * 2015-07-30 2015-11-18 国网山东省电力公司菏泽供电公司 Device of auxiliary wire connection and method for connecting wire by using device
CN105785130A (en) * 2016-03-21 2016-07-20 国家电网公司 High-voltage line induced voltage and direct-current resistance measuring device
CN109742678A (en) * 2018-12-04 2019-05-10 国网浙江嘉善县供电有限公司 Hot line robot equipment on bar

Similar Documents

Publication Publication Date Title
CN113937665B (en) Cable tensioning device for overhead laying of cables based on electric power engineering
CN107689495A (en) A kind of earthing clamp of Portable angle continuously adjustabe
CN2390288Y (en) Temporay hot-line connecting device for 10 KV overhead line
CN207217815U (en) A kind of high-voltage power line conductive line end earthing clamp
CN205195155U (en) Insulating platform
CN212751639U (en) Pole cross arm lifting mechanism
CN203942204U (en) The live line working of a kind of 35kV supply line is carried line apparatus with insulation
CN205791238U (en) A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire
CN116605809A (en) Distribution network live working insulating elevator
CN103795003B (en) Line apparatus is carried in the insulation of 35kV supply line live line working
CN201149972Y (en) Equipotential operation curved ladder
CN2564530Y (en) Insulation lift platform
CN103151740B (en) Full-automatic tube type bus encircles machine in advance
CN210957578U (en) Special grounding ring clamp mounting tool for 10kV distribution network live working robot
CN204967142U (en) Join in marriage comprehensive electrified maintenance of net and carry lineman's utensil
CN209675822U (en) Overhead-groundwire lifter
CN207490440U (en) Multifunction lead promotion holds device
CN219554424U (en) Special tool for continuously replacing insulators at corners
CN106785942B (en) High-tension fuse operation protecting device and high-tension fuse protection against electric shock operational method
CN207069254U (en) 500kV ground wire assembly and disassembly servicing units
CN216649056U (en) Clamp for live replacement of single-iron cross arm linear cement pole single-string insulator
CN209981895U (en) Drainage plate maintenance robot for double-split high-voltage transmission conductors
CN112117708B (en) 10kV insulation cross arm wire installation pulley support
CN220376295U (en) Distribution network live working insulating elevator
CN210926868U (en) Auxiliary installation equipment for electric power engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee