CN2377493Y - Water temp. regulating device for gas water heater - Google Patents

Water temp. regulating device for gas water heater Download PDF

Info

Publication number
CN2377493Y
CN2377493Y CN 98216158 CN98216158U CN2377493Y CN 2377493 Y CN2377493 Y CN 2377493Y CN 98216158 CN98216158 CN 98216158 CN 98216158 U CN98216158 U CN 98216158U CN 2377493 Y CN2377493 Y CN 2377493Y
Authority
CN
China
Prior art keywords
water
heat exchanger
cold water
threeway
elastic thin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98216158
Other languages
Chinese (zh)
Inventor
舒本仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98216158 priority Critical patent/CN2377493Y/en
Application granted granted Critical
Publication of CN2377493Y publication Critical patent/CN2377493Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model belongs to a temperature regulator of a gas water heater, which is used for eliminating the phenomenon that after a water inlet valve of the water heater is midway closed, a blast of hot water is generated and then a blast of cold water flows out when the water inlet valve is opened again. The utility model is mainly composed of a three-way element, an elastic thin wall bag, and a container with adjustable volume. Cold water is storage into the elastic bag in normal bathing, after the water inlet valve is midway closed, the cold water in the bag is discharged to absorb the heat on an exchanger, and a blast of hot water can not generated. When the water inlet valve is opened again, the cold water firstly flows into the elastic bag, and then flows into the heat exchanger. Thus, a main burner has a period of time to heat the heat exchanger at the start, and consequently, the phenomenon of generate a blast of cold water flows out because of the fast flowing of the cold water can be avoided.

Description

Gas heater is stablized the water temperature device
The utility model relates to a kind of gas heater leaving water temperature control set for adjusting.
During shower, the water-flowing gas water heater leaving water temperature generally transfers to 40 to 45 degree Celsius, often in short-term water intaking valve is closed by (as soap time) midway, and then opens water intaking valve.Make the action of aqueous vapor interstage valve though water intaking valve closes to close, cut off source of the gas big fire is extinguished, the heat transfer sheet of heat exchanger, copper plumbing have been burnt to such an extent that have very high-temperature and have been stored certain heat energy.Because water intaking valve is closed, water in the heat exchanger copper plumbing stops going up mobile, heat transfer sheet, copper plumbing store these absorb the heat energy taken away by more flowing water and stop this section water that flows in the copper plumbing and make it become very boiling hot water with regard to having passed to, the water that this section is very boiling hot when opening water intaking valve is once more just squeezed by follow-up cold water and pushes away rapid outflow.Because burning once more of main burner also has little time the leading portion of follow-up cold water is heated to preference temperature when opening water intaking valve once more, thereby after flowing out boiling hot water, can flow out one section cold water again in short-term, flow out suitable warm water again.After measured, to 60 degree, and the temperature of the bigger boiling hot water of this section of gas heater of heating power sometimes even reach more than 70 degree Celsius at 55 degree Celsius for the temperature of the boiling hot water of this section of gas heater that heating power is less.The volume of the boiling hot water of this section is decided by the internal diameter and the length of heat exchanger position copper plumbing, generally about 100 milliliters to 140 milliliters.
It is investigated, when still not having at present gas heater and having solved this water outlet and when hot and ice-cold problem.People adopt the way of dodging usually in the practice, promptly open the water intaking valve forefathers again and leave the water outlet shower head, treat that leaving water temperature returns under the water outlet shower head after suitable.
The purpose of this utility model is to eliminate boiling hot water and the cold water that flows out when opening water intaking valve once more, and leaving water temperature is tended towards stability.
The purpose of this utility model is achieved in that
Behind heat control valve, aperture of serial connection is slightly little than the cold water pipe internal diameter on the cold water pipes before the heat exchanger, apopore axis and the vertical or obtuse-angulate threeway of inlet opening axis water inlet direction, at a port external volume adjustable elastic thin-wall capsule coaxial with the inlet opening, when water intaking valve is opened, because the threeway aperture is less, the cold water flow velocity is accelerated, direct current is in the elastic thin-wall capsule, the pressure of threeway place feed water flow oppose side wall is less even can form negative pressure and (generally do not form negative pressure, should keep minute-pressure zero-pressure at the most), have only low discharge cold water even do not have cold water to flow to heat exchanger.After the elastic thin-wall capsule fills the cold water that storage completely mixes up volume, the cold water that enters threeway all the orifice flow by the threeway sidewall to gas heater heat exchanger copper plumbing.When water intaking valve is closed, when main burner stopped working, the cold water that stores in the elastic thin-wall capsule was flowing to heat exchanger to absorb the heat energy that stores on heat transfer sheet, the copper plumbing and to continue to flow to shower head by the threeway areole under the effect of elastic contractile force.The water water temperature that has stopped flowing in the heat exchanger part copper water pipe when cold water that the interior cool water quantity that stores of elastic thin-wall capsule will be adjusted to storage has been arranged can be raised to the temperature several years (determining the concrete number of degrees by the heating power of concrete season and water heater) that only are lower than suitable bathing.When opening water intaking valve once more, though main burner takes fire immediately, heat transfer sheet, copper plumbing are not raised to very high temperature immediately and need a period of time to heat up, and just have the flowing water of enough heat transferred inside to make flowing water be warmed up to preference temperature then.In the heat transferred pipe of copper plumbing temperature rise period copper plumbing, be lower than the water that stops to flow in suitable bathing temperature several years.Because it is not to enter heat exchanger immediately, in a large number that water intaking valve is opened back cold water, but enter in the elastic thin-wall capsule immediately, in a large number earlier, have only a small amount of even do not have cold water to flow to heat exchanger, along with swelling of elastic thin-wall capsule, hydraulic pressure progressively raises in it, the cold water flow that flows to heat exchanger also progressively increases, when treating to fill again in the elastic thin-wall capsule into cold water, cold water just all flows in the heat exchanger, and heat exchanger heat transfer sheet, copper plumbing temperature also are raised to the degree that can make cold flow water become suitable bathing temperature at this moment.Flowing to heat exchanger cold water flow in this process increases process and adapts with the heat exchanger temperature-rise period, thereby when opening water intaking valve once more, does not just have one boiling hot water outflow, does not also have one cold water to flow out.Concerning the water heater of different brands, model, specification, the cool water quantity that should store is different, but concerning the water heater of a certain concrete brand, model, specification, after the cool water quantity that should store mixes up, under the situation of not changing season, do not need to readjust, therefore can't cause the trouble in the use.Even conversion season, can be positioned on water heater external owing to regulate turn-knob, and regulating also is easily.
On existing gas heater, set up the utility model device, can eliminate one boiling hot water and cold water of producing when opening water intaking valve once more midway, leaving water temperature is tended towards stability.
Concrete structure of the present utility model can be provided by following examples and accompanying drawing 1:
The left side of accompanying drawing 1 is the basic principle figure of various water-flowing gas water heaters, and the right half part that begins from threeway 13 is a structure principle chart of the present utility model.
Below in conjunction with details and the working condition of accompanying drawing 1 detailed description according to the concrete device that the utility model proposes.
Threeway 13 is installed on after the heat control valve 10, before the heat exchanger 25, on the threeway 13 right-hand member joints 15 an elastic thin-wall capsule 18 is housed, the elastic thin-wall capsule 18 outer containers 16 that are with are in order to regulate the degrees of expansion of control elastic thin-wall capsule 18, container 16 volumes can be regulated with external screw thread 21 rotations in the threeway 13 by the internal thread 22 of container 16 with turn-knob 19, and volume adjustable container 16 right-hand members have steam vent 17 to allow elastic thin-wall capsule 18 can be full of space in the container 16.The water inlet pipe 11 of threeway 13 is connected to the aperture of current direct current to elastic thin-wall capsule 18, outlet conduit 24 is connected to the sidewall orifice passage 23 that becomes 90 to 120 degree angles with the current direction angle of cut, and the aperture in the duct 12,23 of threeway 13 is less than 1~2 millimeter in water inlet pipe 11, outlet pipe 24 apertures.
The operation principle that the utility model is stablized leaving water temperature is as follows:
The process that the utility model is stablized leaving water temperature as shown in Figure 2, each symbol implication is in the accompanying drawing:
t 0---open water intaking valve constantly
t 1---operate as normal is constantly
t 2---the water intaking valve close moment
t 3---elastic thin-wall capsule inner storing water has been arranged constantly
t 4---water intaking valve is opened constantly once more
t 5---operate as normal is constantly once more
T 1---heat exchanger normal working temperature value
Q 1---flow to heat exchanger cold water flow value during steady operation
Q 2---flow to thin-walled capsule maximum cold current value
V---elastic thin-wall capsule stores the cool water quantity maximum
T 2---suitable leaving water temperature value
After water heater lighting valve 5 was opened, kept burning day and night little fiery 2 promptly lighted.After opening water intaking valve, cold water one tunnel enters in the aqueous vapor interstage valve, and water pressure pushing rubber diaphragm 9 is opened aqueous vapor interstage valve combustion gas valve port 4, and combustion gas enters in the main burner 3, big fire burns, big fire is heated to the leaving water temperature T that cold flow water can be warming up to suitable bathing with heat exchanger from cold conditions 2Temperature T 1Be to need a period of time t 0~t 1.At time t 0~t 1In the section, another road cold water process heat control valve 10 flows to the threeway 13 in the utility model when cold water enters the aqueous vapor interstage valve, by the less passage 12 of threeway 13 internal orifice dimensions, add in the flow speed and direction elastic thin-wall capsule 18; thin-walled capsule 18 swells gradually; because container 16 right-hand members have steam vent 17, thereby the elastic thin-wall capsule can will be full of in the container 16.Under water-filling situation not, rotate right-hand member turn-knob 19 and can make container 16 move left and right to regulate the storage cold water volume in the elastic thin-wall capsule 18.Pass through passage 12 to elastic thin-wall capsule 18 water-filling initial periods at cold water, because flow velocity height, the pressure of flowing water offside cinclides 23 is very low even be zero, thereby the cold water flow that flows to heat exchanger 25 during this period of time is very little even be zero, and this and 3 big fire burns starting stages of main burner can not be with big flow temperature of cold water rises to suitable bathing temperature T 2Adapt.Elastic thin-wall capsule 18 interior cold water increase along with filling into, elastic force progressively increases, hydraulic pressure raises gradually in the elastic thin-wall capsule, the pressure of offside cinclides 23 raises gradually in the passage 12, the cold water flow that flows to heat exchanger 25 by passage 23 increases gradually, when elastic thin-wall capsule 18 expand into when being full of container 16, reach maximum moisture storage capacity V, no longer including cold water flows to, the flow velocity of passage 14 inner cold waters is zero, the water that comes in the passage 12 all enters heat exchanger 25 by passage 23, and this moment, heat exchanger 25 was heated to normal working temperature T by big fire 1, water heater enters steady operation process t 1~t 2
As bathing t midway 2After constantly closing water intaking valve 8, the aqueous vapor interstage valve is closed combustion gas valve port 4 immediately, and the main burner big fire is extinguished immediately.Owing to increased the utility model device, the water that can not cause in the heat exchanger of closing of water intaking valve 8 stops to flow immediately, at moment t 2~t 3Between, the cold water that stores in the elastic thin-wall capsule 18 continues to flow to heat exchanger 25 by passage 14,23 under the effect of elastic force, absorb the heat energy that stores on heat exchanger copper plumbing 25, the heat transfer sheet 26 and also flow out, until t 3Cold water in the elastic thin-wall capsule 18 drains, rests on the temperature several years that heat exchanger water pipe 25 interior water water temperature Bao Te are lower than suitable bathing constantly.Through a period of time t that stops using 2~t 4, work as t 4After constantly opening water intaking valve 8 once more, aqueous vapor interstage valve combustion gas valve port 4 is opened once more, and main burner 3 burns once more, and cold water is by the fast once more flow speed and direction elastic thin-wall capsule 18 in aperture 12 simultaneously.Same last time t 0The process of constantly opening behind the water intaking valve 8 is the same, and the cold water flow that flows to heat exchanger 25 from side opening 23 allows 25 section of the having times of heat exchanger heat up very little even be zero for the previous period.Along with elastic thin-wall capsule 18 inner storing water amounts increase, duct 14 inner cold water flow velocitys slow down gradually, oppose side wall pressure raises, the cold water flow that passing hole channel 23 flows to heat exchanger 25 increases gradually, the process that this process and main burner 3 burning back heat transfer sheets 26, heat exchanger 25 temperature raise adapts, and makes the suitable bathing temperature T that is lower than that stops in the heat exchanger 25 2Several years the warm water water temperature that is warmed up to suitable bathing flow out, rather than one boiling hot water neither be lower than T 2The water in several years flows out.Through t 4~t 5Period, after elastic thin-wall capsule 18 was full of container 16, the cold water of water inlet pipe 11 all flowed to heat exchanger 25 by passage 23, and heat transfer sheet 26, heat exchanger 25 also have been raised to normal working temperature T at this moment 1, follow-up cold water can be heated to preference temperature T 2Flowed out.

Claims (3)

1, gas heater is stablized the leaving water temperature device, this device serial connection is characterized in that being made up of a threeway (13), an elastic thin-wall capsule (18), an adjustable container (16) and the turn-knob (19) of volume after various water-flowing gas water heater heat control valves, before the heat exchanger.
2, require 1 described device according to power, it is characterized in that threeway (13) be serially connected with heat exchanger water inlet pipe (24) before, heat control valve (10) afterwards; The inner axis that leads to the duct (23) of heat exchanger (25) of threeway (13) becomes 90 degree~120 degree angles with the axis of the duct that flows to elastic thin-wall capsule (18) (12), the aperture of hole (23), (12) is less than threeway (13) water inlet pipe (11), outlet pipe (24) aperture.
3, device according to claim 1 is characterized in that elastic thin-wall capsule (18) is connected on the joint (15) of threeway (13), and is in the container (16) that there is steam vent (17) container (16) end.
CN 98216158 1998-06-20 1998-06-20 Water temp. regulating device for gas water heater Expired - Fee Related CN2377493Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98216158 CN2377493Y (en) 1998-06-20 1998-06-20 Water temp. regulating device for gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98216158 CN2377493Y (en) 1998-06-20 1998-06-20 Water temp. regulating device for gas water heater

Publications (1)

Publication Number Publication Date
CN2377493Y true CN2377493Y (en) 2000-05-10

Family

ID=33969203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98216158 Expired - Fee Related CN2377493Y (en) 1998-06-20 1998-06-20 Water temp. regulating device for gas water heater

Country Status (1)

Country Link
CN (1) CN2377493Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323462A (en) * 2018-11-08 2019-02-12 无锡欧枫科技有限公司 A kind of feed water heater and its application method of the flexible transfiguration water tank of band
CN109363547A (en) * 2018-11-21 2019-02-22 张凯 A kind of water-saving apparatus for shower bath

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323462A (en) * 2018-11-08 2019-02-12 无锡欧枫科技有限公司 A kind of feed water heater and its application method of the flexible transfiguration water tank of band
CN109323462B (en) * 2018-11-08 2023-10-24 无锡欧枫科技有限公司 Water supply heating device with elastic variable-volume water tank and use method thereof
CN109363547A (en) * 2018-11-21 2019-02-22 张凯 A kind of water-saving apparatus for shower bath

Similar Documents

Publication Publication Date Title
CN101711330B (en) Hot water supplying system
CN105972814A (en) Wall-mounted gas furnace and water supplementing control method, control device and control system
US4251028A (en) Energy recovery system for boiler and domestic water
CN2377493Y (en) Water temp. regulating device for gas water heater
CN111457598A (en) Electric water heater and control method thereof
US2789575A (en) Valve
CN201184686Y (en) Instant-heating water-storing type electric water heater
JPH02223768A (en) Heat pump type hot water supply equipment
CN207945725U (en) Energy and water saving type hot water supply system
CN206669027U (en) A kind of water saving loop apparatus based on self-supporting temperature-sensing valve
CN215983238U (en) Solar heat pump hot water system
KR101464690B1 (en) Small inverter electric boiler
CN212619370U (en) Electric water heater
CN2342302Y (en) Hot water remover for gas water heater
CN109612109B (en) Cold water recovery type hot water system and cold water recovery method
CN1844778A (en) Instant-heating gas water heater
CN203413830U (en) Heatable water outlet system for gas water heater
CN208882567U (en) A kind of uniform stainless steel insulated water tank of heat energy distribution
CN2238402Y (en) Temp. controller for gas-fired water heater
RU2110017C1 (en) Combined heating system with solar hot water supply unit
CN100501265C (en) New type heating drinking water apparatus
CN2335108Y (en) Adjustable constant temp. output cold/hot water mixer
CN215951754U (en) Gas water heater
CN213362831U (en) Heating power pond subassembly and contain its gas heater
CN218179230U (en) Gas wall-mounted furnace provided with sleeve heat exchanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee