CN2368146Y - Controller and control-cabinet integrated on-load tap-changing switch - Google Patents

Controller and control-cabinet integrated on-load tap-changing switch Download PDF

Info

Publication number
CN2368146Y
CN2368146Y CN 99206168 CN99206168U CN2368146Y CN 2368146 Y CN2368146 Y CN 2368146Y CN 99206168 CN99206168 CN 99206168 CN 99206168 U CN99206168 U CN 99206168U CN 2368146 Y CN2368146 Y CN 2368146Y
Authority
CN
China
Prior art keywords
control
cabinet
controller
load tap
operation controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99206168
Other languages
Chinese (zh)
Inventor
王凤清
王继忠
王继成
Original Assignee
王凤清
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王凤清 filed Critical 王凤清
Priority to CN 99206168 priority Critical patent/CN2368146Y/en
Application granted granted Critical
Publication of CN2368146Y publication Critical patent/CN2368146Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model relates to an on-load tap-changing switch integrating a controller and a control cabinet into integration, which is composed of an operation controller 1 and a control executing cabinet 2, wherein, the operation controller is fixed on a front panel 4 of the control executing cabinet 2. The operation controller of the utility model has high integration level so as to have small volume, and the operation controller is fixed with the control executing cabinet into integration so as to be convenient for operators to operate, particularly convenient for debugging persons to operate; when the operators or debugging persons operate the operation controller, the operators or debugging persons can see and hear operating conditions in the executing cabinet. The utility model omits the connection when the on-load tap-changing switch integrating a controller and a control cabinet into integration is installed on site, and reduces failures caused by the connection.

Description

Controller and control cubicle are the on load tap changer of one
The utility model belongs to the integrally-built improvement of dry-type transformer on load tap changer.
Cabinet is carried out in the control of existing on load tap changer and operation control all is two bodies, the centre is connected by cable, make operating personnel can not in operation control, hear and see the action situation in the control execution cabinet, and controller also needs the scene to be connected with control cubicle, also brought trouble for installation personnel.Can not to be that the integrated degree of changing into of operation control is low, volume is big for the main cause of one cause for both.
The purpose of this utility model is that a kind of controller of development and control cubicle are the on load tap changer of one, and the operation control volume of this tap switch is very little, and institute is installed as one so that carry out cabinet with control.
Operation control of the present utility model is installed in control and carries out on the front panel of cabinet, makes operation control and control carry out cabinet and is connected as a single entity.Operation control is installed in to control on the both sides panel of carrying out cabinet and also belongs to protection category of the present utility model.
The utility model is because the integrated degree of operation control is very high, and institute and then can be connected as a single entity the panel that cabinet is carried out in operation control and control so that its volume dwindles greatly.Personnel's easy to use operation has especially made things convenient for commissioning staff's operation, also is convenient to transportation, has saved on-the-spot installation and has connected, and has reduced to connect the fault that causes.
Fig. 1 is an overall structure schematic diagram of the present invention, and Fig. 2 is the structural representation of embodiment two.
Embodiment one: present embodiment is made up of operation control 1, control execution cabinet 2, and operation control 1 is fixed on control and carries out on the front panel 3 of cabinet 2.
Embodiment two: the operation control 1 of present embodiment is fixed on control and carries out on the side panel 4 of cabinet 2.

Claims (2)

1, controller and control cubicle are the on load tap changer of one, and it is made up of operation control (1), control execution cabinet (2), it is characterized in that operation control (1) is fixed on control and carries out on the front panel (3) of cabinet (2).
2, controller according to claim 1 and control cubicle are the on load tap changer of one, it is characterized in that operation control (1) is fixed on control and carries out on the side panel (4) of cabinet (2).
CN 99206168 1999-03-23 1999-03-23 Controller and control-cabinet integrated on-load tap-changing switch Expired - Fee Related CN2368146Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99206168 CN2368146Y (en) 1999-03-23 1999-03-23 Controller and control-cabinet integrated on-load tap-changing switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99206168 CN2368146Y (en) 1999-03-23 1999-03-23 Controller and control-cabinet integrated on-load tap-changing switch

Publications (1)

Publication Number Publication Date
CN2368146Y true CN2368146Y (en) 2000-03-08

Family

ID=34000532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99206168 Expired - Fee Related CN2368146Y (en) 1999-03-23 1999-03-23 Controller and control-cabinet integrated on-load tap-changing switch

Country Status (1)

Country Link
CN (1) CN2368146Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102814662A (en) * 2012-08-31 2012-12-12 太仓市旭冉机械有限公司 Machining equipment with embedded control panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102814662A (en) * 2012-08-31 2012-12-12 太仓市旭冉机械有限公司 Machining equipment with embedded control panel

Similar Documents

Publication Publication Date Title
CN204558958U (en) A kind of outdoor high-voltage ring main unit
CN202772839U (en) Oil pumping machine frequency conversion remote transmission control cabinet
CN207257398U (en) Intelligent charging spot with repair and maintenance device
CN2847611Y (en) Drawer type reactive power automatic compensation power box
CN202260606U (en) Uninterrupted power supply
CN203086234U (en) Total-station automatic throw-in equipment of emergency power supply
CN2368146Y (en) Controller and control-cabinet integrated on-load tap-changing switch
CN203536830U (en) Vehicle-mounted mobile power transformation trolley
CN216056456U (en) Intelligent control type commercial power complementary power generation system
CN201435619Y (en) Automatic transfer switch for triple power supplies
CN211127297U (en) AC/DC screen power supply circuit
CN204425038U (en) A kind of power distribution automation detection and control terminal
CN207265513U (en) A kind of outdoor ring main unit
CN201267038Y (en) Intelligent illumination power-saving device
CN202651661U (en) Hollowed type portable insulation stool of transformer substation
CN206515681U (en) A kind of intelligent solar electric power facility information display
CN204755367U (en) Fire control double fan intelligent control device
CN202652169U (en) Switching value simulating apparatus for control protection system
CN221125523U (en) Power supply controller suitable for medium and small-sized LED display screen
CN202939888U (en) Template for demonstrating functions of leakage protector
CN208544185U (en) A kind of power supply vehicle of meet an emergency based on new energy battery modules
CN208904419U (en) A kind of detachable centralized control ring network cabinet of secondary side
CN220253943U (en) Intelligent prefabricated cabin type transformer substation
CN215681815U (en) A control system that converges for energy storage battery system
CN208401306U (en) A kind of high-low voltage electric power distribution cabinet having repair apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee