CN2366703Y - Integrated industrial boiler for gas generation and combustion - Google Patents
Integrated industrial boiler for gas generation and combustion Download PDFInfo
- Publication number
- CN2366703Y CN2366703Y CN 99204014 CN99204014U CN2366703Y CN 2366703 Y CN2366703 Y CN 2366703Y CN 99204014 CN99204014 CN 99204014 CN 99204014 U CN99204014 U CN 99204014U CN 2366703 Y CN2366703 Y CN 2366703Y
- Authority
- CN
- China
- Prior art keywords
- boiler
- coal gas
- industrial boiler
- fairlead
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Combustion Of Fluid Fuel (AREA)
Abstract
The utility model relates to an integrated industrial boiler for full gas generation and combustion, which is composed of a gas generator, an industrial boiler, a jet pump type burner and a support bracket. The utility model is characterized in that the jet pump type burner is composed of a gas eduction tube and a high pressure air input tube; the support bracket is composed of a base and a bracket; due to the adoption of the jet pump type burner, the gas generator and the industrial boiler are joined up to form integration. The utility model has the advantages that the cost is low because coal gangue or inferior coal is used as raw material; full gas is generated in the gas generator for burning in the industrial boiler without environmental pollution, so the requirement of environmental protection is fully met; the utility model is an ideal environmental protection type industrial boiler which is worthy for countrywide generalization.
Description
The utility model relates to a kind of have full coal gas generation burning hot water or steam Industrial Boiler.
At present in the prior art, colm gas generator (patent No. ZL95200649.9), be only limited in the supporting use of Industrial Stoves, application is narrower, and the application on Industrial Boiler also belongs to blank, the coal gas of general gas fired-boiler burning, advance outside all needing, and gas price costliness, the general user holds and dares not accept, and that coal-burning boiler is compared with the gas fired-boiler price on cost of material is low, but the coal-burning boiler contaminated environment is more serious, particularly almost order and ban use of coal-burning boiler, generally be difficult to reach environmental requirement in big or middle city.
The purpose of this utility model provides a kind of full coal gas generation combustion integrative Industrial Boiler, realize that gas generator and Industrial Boiler are integrated, raw material adopts gangue or colm conversion to help gas-fired, narrow to overcome original gas generator application, fill up the blank of gas generator on Industrial Boiler is used, and gas fired-boiler fuel price costliness, the coal-burning boiler contaminated environment is serious, does not reach the deficiency of environmental requirement.
The technical solution of the utility model is: it is made up of gas generator, hot water or steam Industrial Boiler, jet pump formula burner, support.Jet pump formula burner is made up of coal gas fairlead, pressure-air input pipe.The coal gas fairlead is a zigzag thbe, the pressure-air input pipe is a right-angle elbow pipe, one right angle ejection end has reducing, the other end is welded with flange, the right-angle elbow pipe necking end is the concentric matched in clearance of level in coal gas fairlead port of export pipe, air input pipe input upper pipes outer wall cooperates solid welding with coal gas fairlead port of export sidewall circular hole, in coal gas fairlead arrival end outer wall and the gas generator water leg, the outer wall circular hole cooperates solid welding, coal gas fairlead port of export outer wall cooperates solid welding with the boiler side walls circular hole of boiler furnace flue inlet corresponding position, outlet of coal gas fairlead and boiler furnace flue inlet matched in clearance, boiler one side outer wall between boiler side walls and the front tube sheet has lighting-up tuyere, and lighting-up tuyere cooperates with lighting door.Support is made up of base, carriage, and base is the ship shape seat, carriage and solid welding above the base, and carriage cooperates with the boiler furnace bottom.
The utility model compared with the prior art, because design has jet pump formula burner, gas generator and hot water or steam Industrial Boiler are coupled together, combine together, its advantage is: with gangue or colm is raw material, and cost is low, and coal produces full gas heating water or steam combustion of industrial boiler in gas generator, avoid environmental pollution, reached environmental requirement.
Description of drawings:
Fig. 1 is full coal gas generation combustion integrative Industrial Boiler structural front view.
Fig. 2 is full coal gas generation combustion integrative Industrial Boiler structure vertical view.
Provide the utility model most preferred embodiment below in conjunction with accompanying drawing: it is made up of gas generator 1 (patent No. ZL95200649.9), horizontal (vertical) hot water or steam Industrial Boiler 2, jet pump formula burner, support.Jet pump formula burner is that Q235-A4mm steel plate, pressure-air input pipe 4 materials are 20 by coal gas fairlead 3 materials
#Seamless steel pipe is formed.Coal gas fairlead 3 is a zigzag thbe, pressure-air input pipe 4 is a right-angle elbow pipe, one right angle ejection end has reducing, it is Q235-A that the other end is welded with flange 5 materials, the right-angle elbow pipe necking end is the concentric matched in clearance of level in coal gas fairlead 3 port of export pipes, pressure-air input pipe 4 input upper pipes outer walls cooperate solid welding with coal gas fairlead 3 port of export sidewall circular holes, in coal gas fairlead 3 arrival end outer walls and the gas generator water leg 6, the outer wall circular hole cooperates solid welding, coal gas fairlead 3 port of export outer walls cooperate solid welding with boiler side walls 8 circular holes of horizontal (vertical) hot water or steam Industrial Boiler 2 flues 7 inlet corresponding positions, 3 outlets of coal gas fairlead and horizontal (vertical) hot water or steam Industrial Boiler 2 flues 7 inlet matched in clearance, the gap is 30~50mm, have lighting-up tuyere 10 to cooperate with lighting door 11 at horizontal (vertical) hot water or steam Industrial Boiler 2 sidewalls 8 with horizontal (vertical) hot water or steam Industrial Boiler 2 one side outer walls between the front tube sheet 9, support is by base 12 channel-section steels, carriage 13 steel plates are formed.Base 12 is the ship shape seat, carriage 13 and solid welding above the base 12, and carriage 13 cooperates with the boiler furnace bottom.During use, pressure-air input pipe 4 one end flanges 5 are connected with the pressure-air generating means, coal drops in the gas generator 1 from gas generator 1 double belljar formula coal feeding hole 14, air and water vapour are supplied with by gas generator 1 bottom inlet, form full coal gas in gas generator 1 upper furnace space, pressure-air is by 4 inputs of pressure-air input pipe, spray in reducing place, form negative pressure, the full coal gas that gas generator 1 upper furnace space is formed is drawn out to coal gas fairlead 3 ports of export, open 11 coal gas of lighting door, the coal gas of burning enters in the flue 7 by flue 7 inlets and heating smoke pipe 15 outer media in each smoke pipe 15.
Claims (3)
1, full coal gas generation combustion integrative Industrial Boiler, it is characterized in that: it is by gas generator, Industrial Boiler, jet pump formula burner, support is formed, jet pump formula burner is by the coal gas fairlead, the pressure-air input pipe is formed, pressure-air input pipe one right angle ejection end has reducing, the other end is welded with flange, the right-angle elbow pipe necking end is the concentric matched in clearance of level in coal gas fairlead port of export pipe, air input pipe input upper pipes outer wall cooperates solid welding with coal gas fairlead port of export sidewall circular hole, in coal gas fairlead arrival end outer wall and the gas generator water leg, the outer wall circular hole cooperates solid welding, coal gas fairlead port of export outer wall cooperates solid welding with the boiler side walls circular hole of boiler furnace flue inlet corresponding position, outlet of coal gas fairlead and boiler furnace flue inlet matched in clearance, boiler one side outer wall between boiler side walls and the front tube sheet has lighting-up tuyere, and lighting-up tuyere cooperates with lighting door.
2, full coal gas generation combustion integrative Industrial Boiler as claimed in claim 1, it is characterized in that: Industrial Boiler is horizontal (vertical) hot water and steam boiler.
3, as claim 1,2 described full coal gas generation combustion integrative Industrial Boilers, it is characterized in that: the outlet of coal gas fairlead is 30-50mm with boiler furnace flue inlet fit clearance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99204014 CN2366703Y (en) | 1999-02-15 | 1999-02-15 | Integrated industrial boiler for gas generation and combustion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99204014 CN2366703Y (en) | 1999-02-15 | 1999-02-15 | Integrated industrial boiler for gas generation and combustion |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2366703Y true CN2366703Y (en) | 2000-03-01 |
Family
ID=33998944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 99204014 Expired - Fee Related CN2366703Y (en) | 1999-02-15 | 1999-02-15 | Integrated industrial boiler for gas generation and combustion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2366703Y (en) |
-
1999
- 1999-02-15 CN CN 99204014 patent/CN2366703Y/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102644911A (en) | Vertical coal dust corner tube boiler | |
CN202902245U (en) | Upright-type coal powder corner-tube boiler | |
CN2366703Y (en) | Integrated industrial boiler for gas generation and combustion | |
CN202561725U (en) | Energy-saving and environment-protection boiler | |
CN203203006U (en) | Upright pulverized coal corner tube type boiler | |
CN103032864A (en) | Vertical coal powder corner tube boiler | |
CN203203007U (en) | Upright pulverized coal corner tube type boiler | |
CN103134036A (en) | Vertical type modular coal water slurry corner tube boiler | |
CN103062747A (en) | Vertical type coal dust corner tube boiler | |
CN203203009U (en) | Vertical modularized coal water slurry corner tube boiler | |
CN2131017Y (en) | Boiler | |
CN206648287U (en) | A kind of energy-saving, environmental protection boiler of Utilizing Energy Sources in Reason | |
CN108266755A (en) | Automatically control the energy-saving cooking of air output | |
CN201363889Y (en) | High-efficiency smokeless dust-removing and energy-saving heating stove | |
CN219083382U (en) | Double-layer water tank combustion furnace | |
CN216409299U (en) | Efficient boiler for heating | |
CN201149282Y (en) | High efficiency and energy saving coal stove | |
CN2296484Y (en) | Vapour and water two purpose boiler | |
CN100422635C (en) | Energy-saving environment-friendly gasification boiler | |
CN219141086U (en) | High-efficiency combustion furnace | |
CN211876351U (en) | Methanol boiler | |
CN201293453Y (en) | Twice re-burning ambient pressure water boiler | |
CN203203008U (en) | Upright pulverized coal corner tube type boiler | |
CN201206890Y (en) | Combined smoke abatement and coal-saving boiler | |
CN201836861U (en) | Environment-friendly energy-saving wine-making steam boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |