CN2364395Y - Connection device for gas water heater - Google Patents

Connection device for gas water heater Download PDF

Info

Publication number
CN2364395Y
CN2364395Y CN 99200483 CN99200483U CN2364395Y CN 2364395 Y CN2364395 Y CN 2364395Y CN 99200483 CN99200483 CN 99200483 CN 99200483 U CN99200483 U CN 99200483U CN 2364395 Y CN2364395 Y CN 2364395Y
Authority
CN
China
Prior art keywords
water
valve
external
gas heater
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99200483
Other languages
Chinese (zh)
Inventor
扎维耶·拉斯克莱克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANDI COOKER CO Ltd BEIJING
Original Assignee
YANDI COOKER CO Ltd BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANDI COOKER CO Ltd BEIJING filed Critical YANDI COOKER CO Ltd BEIJING
Priority to CN 99200483 priority Critical patent/CN2364395Y/en
Application granted granted Critical
Publication of CN2364395Y publication Critical patent/CN2364395Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model relates to a connection device connected with a gas water heater and external connection pipelines of the connection device. The utility model comprises a connecting plate with 3 to 5 connecting holes. Three to five joints for external connection pipelines are respectively penetrated through the connecting holes to be fixed on the connecting plate, and the joints for external connection pipelines are connected with a water inlet valve for cold water, a water outlet valve for heating hot water, a water return valve for the heating hot water, an outlet pipe joint for bathing hot water, and a gas inlet valve which are connected with joints for external connection water and gas pipelines. When drainage pipelines and gas pipelines are under construction, the connection device, and the external connection gas and water pipelines, bathing facilities for hot water, and heating heat dissipation equipment which are connected with the water heater can be installed in advance. The utility model has the advantages of convenient installation and maintenance, no rework, and material saving.

Description

A kind of gas heater jockey
The utility model belongs to gas heater accessory field, particularly relates to a kind of jockey that connects gas heater and its external pipe.
In the prior art, the gas heater main body directly with external water inlet pipe, pick out water pipe and link to each other with external air inlet pipe.When construction, can't determine the accurate position of gas heater external pipe, the pipeline that leads to bath apparatus, hot water heating cooling system and other hot water facility from gas heater can not be installed.If gas heater just is installed when housing construction, because its volume is bigger, clashing and breaking easily in the work progress afterwards, influence is used.So habitual way is, by the time building decoration engineering finishes fully, before the resident is about to move in, gas heater and its external pipe are installed simultaneously again, promptly change already installed house feedwater piping, gas pipeline, pick out the external pipe of lateral from these pipelines, and connect gas heater, and then external equipments such as bath hot water facility and heating system are installed as gas heater.This just caused pipeline execute and fitting-out work repeat the construction, wasted material, the construction also comparatively the trouble.After the gas heater of this connected mode comes into operation, if fault needs repairing during machine, remove and install all very inconvenient again.
The purpose of this utility model provides a kind of gas heater jockey, so that need not to install simultaneously gas heater during the construction of pipelines such as the plumbing in building, combustion gas, and this gas heater jockey can be installed, the external gas pipeline, feedwater piping, hot water bathing facility, heating heat dissipation equipment and other hot water facility that link to each other with gas heater are installed then in advance.
The technical solution of the utility model is as follows:
A kind of gas heater jockey is characterized in that: comprise connecting plate, an external admitting pipe joint that has water inlet pipe connecting hole, outlet pipe connecting hole and an air inlet pipe connecting hole, pick out water pipe head, external air inlet pipe joint, pass the water inlet pipe connecting hole be fixed on the connecting plate and the water intaking valve that is connected with external admitting pipe joint, pass that the outlet pipe connecting hole is fixed on the connecting plate and with pick out outlet valve or titting water outlet that water pipe head is connected, pass the air inlet pipe connecting hole and be fixed on the connecting plate and the combustion gas intake valve that is connected with external air inlet pipe joint.
External admitting pipe joint on the described gas heater jockey has one, and picking out water pipe head has one, and water intaking valve and outlet valve respectively have one.
External admitting pipe joint on the described gas heater jockey has two, be respectively external cold water inlet joint and external heating hot water returning pipe joint, picking out water pipe head has two to be respectively external heating hot water titting water outlet and external bath hot water titting water outlet, described water intaking valve has two to be respectively cold water water intaking valve and heating hot water back-water valve (BWV), described outlet valve is the heating hot water outlet valve, and titting water outlet is the bath hot water titting water outlet.
Described combustion gas intake valve is the push rod valve, on combustion gas intake valve and the external air inlet pipe joint sealing gasket is arranged all.
Described water intaking valve and outlet valve are ball valve, water intaking valve, outlet valve, external admitting pipe joint and pick out sealing gasket is all arranged in the water pipe head.
Described connecting plate is a troughing plate.
On the described water intaking valve screen pack is arranged.
The utility model is achieved in that when building water supply pipeline, gas pipeline are installed, the gas heater jockey is fixed on the position of the gas heater that designs in advance with bolt, other the gas heater external pipe of health hot water Bathing apparatus, heating heat radiation facility and their pipeline being installed simultaneously and being picked out from feedwater piping and gas pipeline, the end of these pipelines is connected with external pipe joint on the connecting plate, and various external pipes of gas heater and gas heater jockey are connected.Because various corresponding valves are arranged on the gas heater jockey, so when gas heater not being installed, do not influence the feedwater piping in the building and the normal use of gas pipeline.When needing gas heater is installed,, and use bolting, corresponding valve on pipeline in the gas heater and the jockey and titting water outlet connection are got final product as long as it is hung on the jockey.When needing this gas heater of dismounting later on, can close corresponding valve on the jockey.
The utility model has the advantages that; When building water supply pipeline and gas pipeline engineering, need not to install gas heater, just the various external pipes that lead to bath apparatus, hot water heating cooling system and their pipeline and link to each other with gas heater can be installed in advance as long as this gas heater jockey is installed, the position is accurate.Bolt hole is arranged on the connecting plate,, be used for the hanging gas heater of connecting wall so that it is hung on the wall.Each water intaking valve that jockey on the gas heater comprises and outlet valve are ball valve, and the combustion gas intake valve is the push rod valve, so volume is little, difficult quilt collides, and does not influence later construction.Needn't change when gas heater is installed or already installed various pipelines when removing housing construction, not have the construction of repeating, save material, easy construction, operating efficiency improves.After the gas heater of this connected mode comes into operation, during machine, need not bleed off the external intrasystem water of water heater, remove and install all more convenient again if fault needs repairing.Screen pack is arranged on the water intaking valve, can stop the impurity in the water to enter gas heater, thereby improve the service life of gas heater.
Below in conjunction with accompanying drawing the utility model is described further:
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the structural representation of the utility model embodiment two;
Fig. 3 is the structural representation of the utility model embodiment three.
Embodiment one is for being used for being connected with the gas heater of heating function and the gas heater jockey of its external pipe, external admitting pipe joint 8 on the gas heater jockey and pick out water pipe head 10 and respectively have one all has sealing gasket 17 on these joints.Connecting plate is a troughing plate 1 as shown in Figure 1, and is stressed reasonable, and air inlet pipe connecting hole 2, water inlet pipe connecting hole 15 and outlet pipe connecting hole 16, several bolts hole 13 are arranged on it.Heating hot water back-water valve (BWV) 3 and heating hot water outlet valve 5 are ball valve, also has a metal filter screen 18 on the heating hot water back-water valve (BWV) 3, combustion gas intake valve 7 is the push rod valve, sealing gasket 17 is all arranged on these valves, one end of these valves is fixed on the connecting plate and with external heating hot water returning pipe joint 8, heating hot water titting water outlet 10 and the gas inlet pipe joint 12 of connecting plate opposite side by water inlet pipe connecting hole 15, outlet pipe connecting hole 16, air inlet pipe connecting hole 2 usefulness screws respectively and is connected, and constitutes this gas heater jockey.During the building water supply and drainage pipeline construction,, can fix this gas heater jockey on the wall or other place with bolt by bolt hole 13.Again the heating hot water return pipe that is connected with the heating heat dissipation equipment is received on the external admitting pipe joint 8, the heating hot water outlet pipe that is connected with the heating heat dissipation equipment is received picked out in the water pipe head 10.Pick out the external admission line of gas heater and the external admission line joint 12 of itself and gas heater is connected from the coal gas trunk line.When the gas heater main body is installed, the gas heater main body is hung on the connecting plate, and by the bolt hole bolting.One end of heating hot water back-water valve (BWV) 3, heating hot water outlet valve 5 and gas valve 7 respectively with gas heater of water for heating in heating hot water water return pipeline, heating hot water outlet pipeline fixedly connected with fuel gas pipeline, this gas heater can be used.
Embodiment two is for being used for connecting the gas heater that has output heating and bath hot water function and the gas heater jockey of its external pipe, has two external admitting pipe joints, two to pick out water pipe head and an external gas inlet pipe joint 12 on this gas heater jockey.In two external admitting pipe joints, one is external heating hot water returning pipe joint 8, and another is that 9, two of external cold water inlet joints pick out in the water pipe head, one is external heating hot water titting water outlet 10, and another is external bath hot water titting water outlet 11.Sealing gasket 17 is all arranged on these external connectors.Connecting plate is a troughing plate 20 as shown in Figure 2, and an air inlet pipe connecting hole 2, two water inlet pipe connecting holes 15, two outlet pipe connecting holes 16 and several bolts hole 13 are arranged on it.Various water valves on the gas heater jockey are ball valve, and a metal filter screen 18 is arranged on the heating hot water back-water valve (BWV) 3, and a plastic filtering net 19 is arranged on the cold water water intaking valve 4.The combustion gas intake valve is the push rod valve.Sealing gasket 17 is all arranged on these valves.Water intaking valve comprises heating hot water back-water valve (BWV) 3 and cold water water intaking valve 4, outlet valve is a heating hot water outlet valve 5, one end of above-mentioned these valves, bath hot water titting water outlet 6 and gas valve 7 is fixed on the connecting plate with screw by five connecting holes on the connecting plate respectively, and fixedly connected with external pipe joints such as external heating hot water returning pipe joint 8, external cold water inlet joint 9, external heating hot water titting water outlet 10, external bath hot water titting water outlet 11 and external gas kitchen pipe joints 12, constitute this gas heater jockey.During the building water supply and drainage pipeline construction,, can fix this gas heater jockey on the wall or other place with bolt by bolt hole 13.Again the heating hot water return pipe that is connected with the heating heat dissipation equipment is received on the external admitting pipe joint 8, the heating hot water outlet pipe that is connected with the heating heat dissipation equipment is received picked out in the water pipe head 10.Pick out the external admission line of gas heater and the external admission line joint 12 of itself and gas heater is connected from the coal gas trunk line.External pipe that leads to the health hot water Bathing apparatus and external bath hot water titting water outlet 11 are connected.Pick out the external cold water inlet of gas heater and it is received on the external cold water inlet joint 9 from feedwater piping.When the gas heater main body is installed, the gas heater main body is hung on the connecting plate, and by the bolt hole bolting.One end of heating hot water back-water valve (BWV) 3, cold water water intaking valve 4, heating hot water outlet valve 5, health hot water titting water outlet 6 and gas valve 7 is fixedlyed connected with the gas heater internal duct such as heating hot water water return pipeline, cold water inlet road, heating hot water outlet pipeline, bath hot water pipeline and fuel gas pipeline in the gas heater respectively, and this gas heater can be used.
The connecting plate of embodiment three is a simple troughing plate 14 as shown in Figure 3, various valves and with being connected of external pipe joint with embodiment two.Pipeline on the gas heater main body, external pipe are identical with embodiment two with the connection of gas heater jockey.

Claims (7)

1. gas heater jockey is characterized in that: comprise connecting plate, an external admitting pipe joint that has water inlet pipe connecting hole, outlet pipe connecting hole and an air inlet pipe connecting hole, pick out water pipe head, external air inlet pipe joint, pass the water inlet pipe connecting hole be fixed on the connecting plate and the water intaking valve that is connected with external admitting pipe joint, pass that the outlet pipe connecting hole is fixed on the connecting plate and with pick out outlet valve or titting water outlet that water pipe head is connected, pass the air inlet pipe connecting hole and be fixed on the connecting plate and the combustion gas intake valve that is connected with external air inlet pipe joint.
2. gas heater jockey as claimed in claim 1 is characterized in that: the external admitting pipe joint on the described gas heater jockey has one, and picking out water pipe head has one, and water intaking valve and outlet valve respectively have one.
3. gas heater jockey as claimed in claim 1, it is characterized in that: the external admitting pipe joint on the described gas heater jockey has two, be respectively external cold water inlet joint and external heating hot water returning pipe joint, picking out water pipe head has two to be respectively external heating hot water titting water outlet and external bath hot water titting water outlet, described water intaking valve has two to be respectively cold water water intaking valve and heating hot water back-water valve (BWV), described outlet valve is the heating hot water outlet valve, and titting water outlet is the bath hot water titting water outlet.
4. as claim 1,2 or 3 described gas heater jockeys, it is characterized in that: described combustion gas intake valve is the push rod valve, on combustion gas intake valve and the external air inlet pipe joint sealing gasket is arranged all.
5. as claim 1,2 or 3 described gas heater jockeys, it is characterized in that: described water intaking valve and outlet valve are ball valve, water intaking valve, outlet valve, external admitting pipe joint and pick out sealing gasket is all arranged in the water pipe head.
6. as claim 1,2 or 3 described gas heater jockeys, it is characterized in that; Described connecting plate is a troughing plate.
7. gas heater jockey as claimed in claim 1 is characterized in that: on the described water intaking valve screen pack is arranged.
CN 99200483 1999-01-13 1999-01-13 Connection device for gas water heater Expired - Fee Related CN2364395Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99200483 CN2364395Y (en) 1999-01-13 1999-01-13 Connection device for gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99200483 CN2364395Y (en) 1999-01-13 1999-01-13 Connection device for gas water heater

Publications (1)

Publication Number Publication Date
CN2364395Y true CN2364395Y (en) 2000-02-16

Family

ID=33996464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99200483 Expired - Fee Related CN2364395Y (en) 1999-01-13 1999-01-13 Connection device for gas water heater

Country Status (1)

Country Link
CN (1) CN2364395Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106369667A (en) * 2016-11-17 2017-02-01 上海卉金暖通工程有限公司 Connector installation module for wall-hanging stove
CN107131632A (en) * 2017-07-06 2017-09-05 苏州希霆热能技术有限公司 A kind of gas-heating water heater casing
CN110068147A (en) * 2019-04-25 2019-07-30 广东自助者安全科技有限公司 A kind of hot and cold water, gas connection pipe road and power supply line are without exposed gas heater system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106369667A (en) * 2016-11-17 2017-02-01 上海卉金暖通工程有限公司 Connector installation module for wall-hanging stove
CN107131632A (en) * 2017-07-06 2017-09-05 苏州希霆热能技术有限公司 A kind of gas-heating water heater casing
CN110068147A (en) * 2019-04-25 2019-07-30 广东自助者安全科技有限公司 A kind of hot and cold water, gas connection pipe road and power supply line are without exposed gas heater system

Similar Documents

Publication Publication Date Title
CN200975381Y (en) Ship hydraulic system swap oil unit
CN2364395Y (en) Connection device for gas water heater
CN112780956B (en) Automatic alarm leakage-proof device for household natural gas pipe
CN201866451U (en) Rapid water pipe connector
CN212842320U (en) Sewage source heat pump all-in-one machine
CN210531258U (en) Hydraulic oil tank heating device
CN2302495Y (en) Automatic cleaning device for heat exchanger
CN110398419B (en) Hydraulic test device for coiled pipe heat exchange module
CN209229837U (en) A kind of low temperature double stage heat pump unit
CN201327227Y (en) Interconnecting piece for internal and external pipelines of integrated solar water tank
CN204514056U (en) A kind of distributor being applied to industrial furnace cooling water
CN213300218U (en) Automatic air exhaust device for heat pipe network system
CN215860353U (en) Energy-saving device for heating nozzle of booster turboexpander
CN217813652U (en) Waterproof and dustproof smoke exhaust protection device for top of engine box body
CN215539014U (en) Drainage device for building heating and ventilation
CN2539131Y (en) Automatic descaling device for solar heat collecting pipe
CN2289935Y (en) Cone quick pipeline connector
CN220920283U (en) Online cleaning equipment for oil pipe rod
CN2219414Y (en) Multi-purpose fast convenient pipeline joint
CN2613719Y (en) Condensate correcting-distribuing device for central air conditioner
CN212005183U (en) Modularization sled dress device
CN204003364U (en) A kind of cooling device of air compressor
CN209502455U (en) A kind of heat-conducting oil furnace convection section coil pipe soot blower
CN218309993U (en) Heat-strengthening multiphase extraction device for repairing organic pollution site
CN221220655U (en) Air inlet filtering protection system of oilfield diesel generator set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee