CN2344436Y - Wall-building machine by using reverse circulation spoiling water-jetting method - Google Patents
Wall-building machine by using reverse circulation spoiling water-jetting method Download PDFInfo
- Publication number
- CN2344436Y CN2344436Y CN 98242010 CN98242010U CN2344436Y CN 2344436 Y CN2344436 Y CN 2344436Y CN 98242010 CN98242010 CN 98242010 CN 98242010 U CN98242010 U CN 98242010U CN 2344436 Y CN2344436 Y CN 2344436Y
- Authority
- CN
- China
- Prior art keywords
- machine
- water
- utility
- shaping device
- slag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model relates to the improvement of a wall-building machine using a water-jetting method to build underground continuous anti-seepage walls, comprising a hole building machine, a concrete casting machine and a concrete stirring machine, and meanwhile, the utility model is added with a slag discharging machine. The center of the lower part of a former is provided with a slag sucking pipe which is connected with the slag discharging machine. Water and slag mixture is continually sucked out by the slag discharging machine through the slag sucking pipe to form an integrally underground thin groove hole, and then underground concrete is cast. Compared with the original wall-building machine using the water-jetting method, the utility model has wide application for stratums and geologies and can build the anti-seepage walls in rubble and gravel soil whose grain diameter is less than 80 mm, the effective anti-seepage thickness of the utility model reaches 100%, and meanwhile, the utility model has simple construction and fast speed and has the actions of reducing the labor intensity and raising the work efficiency.
Description
The utility model belongs to engineering construction field of mechanical technique such as water conservancy, civil engineering, relates to a kind of wall telephone of making that is used to build underground concrete, specifically a kind of improvement of water injection process for building wall machine.
Existing domestic and international impervious wall to the dyke seepage control project generally adopts Churn drill, dashes the methods such as awl, sheet pile, perfusion of grabbing, the shortcoming that these facility ubiquity speed are slow, construction is complicated, cost is high.Fujian Inst. of Water Conservancy and Hydroelectric Sciences is through long-term scientific research and development, succeeded in developing " water jetting is built underground concrete continuous impervious wall technology " in 1986, and declare " water injection process for building wall machine " patent to Patent Office of the People's Republic of China, in 1992 power of patenting (patent No. ZL89213927.7).But, this adopts the direct circulation method of slagging tap because making wall telephone, promptly the soil layer formation water and soil mixture by water under high pressure and former destruction overflows, so this machine only is applicable to stratum such as closely knit clay, lam, mud, sand and medium coarse sand, be not suitable for the levee foundation absorbent formation that contains big particle diameter cobble, gravel, therefore its suitable geological conditions is narrow, and the scope of application is limited.
The purpose of this utility model is to be suitable for the problem that geological conditions is narrow, the scope of application is limited and the water injection process for building wall machine that provides a kind of anti-circulation to slag tap at existing water injection process for building wall machine.It is applicable to building the underground concrete continuous impervious wall of thin-walled (more than the 22cm) in the various geo-logical terrain structures that contain cobble, gravel below the 80mm.
The main mechanical of water injection process for building wall machine includes borer, concrete casting machine, concrete mixer etc., and shaping device is installed on the borer, makes freely falling body after being mentioned by hoist engine, pounds into ground damage layer soil property.The strong stream of going out by the water-blaster on the shaping device impacts soil layer, destroys its structure, and ground is overflowed in the water and soil mixing, so constantly move at thin-walled slotted eye of underground formation, and then by concrete casting machine perfusion concrete, thus the formation underground impervious wall.
The anti-circulation water injection process for building wall machine of slagging tap is to improve to form on the basis of original water injection process for building wall machine, it also includes borer, concrete casting machine, concrete mixer, shaping device is installed on the borer, increase a slag extractor simultaneously, the centre of shaping device bottom is equipped with dreg inhaling pipe, and this dreg inhaling pipe links to each other with described slag extractor.After ruined like this soil layer and water under high pressure form the grain slag mixture, by the continuous sucking-off of dreg inhaling pipe, by shaping device edge of a knife finishing border, can form a complete underground thin slotted eye, and then build underground concrete again by slag extractor.
Characteristics of the present utility model are to use jetting pore-creating, slag tap and the slurry strengthened wall pore-forming with anti-circulation in thin-walled (more than the 22cm) slotted eye.Owing on original basis of making wall telephone, increased slag extractor and dreg inhaling pipe, can the following cobble of sucking-off diameter 80mm, the slag that mixes of gravel and water, therefore this machine is compared with original water injection process for building wall machine, and it is wide to adapt to stratum geology scope, and effectively antiseepage thickness reaches 100%.Construction simultaneously is simple, speed is fast, the effect that has reducing labor intensity and improve work efficiency.
Describe structure of the present utility model in detail below in conjunction with accompanying drawing.
Fig. 1 is the slag tap structural representation of water injection process for building wall machine of this anti-circulation.
Fig. 2 is the structure sectional view of shaping device.
Fig. 3 is the lateral view of shaping device.
Description of drawings:
Fig. 1: 201---borer 202---concrete casting machine
203---concrete mixer 204---slag extractor
The 205---shaping device
Fig. 2: 1---lifting earrings 2---lifting plate
Water steel pipe pipe tooth under the 3---dreg inhaling pipe 4---
Water steel pipe 6---side direction nozzle under the 5---
7---weighted plate 8---knife rest
9---nozzle 10---one bolt M16 * 55
The 11----end colludes bolt 12---bolt M16 * 40
3---dreg inhaling pipe flange 4---steel cable clamp
15---wire rope 16---side panel
As shown in Figure 1, borer 201, concrete casting machine 202, concrete mixer 203 places on the same walking track with slag extractor 204, and the press water of being supplied with by water pump arrives shaping device 205 on the borer by hydraulic pipeline, forms the water jets under high pressure jet and destroys earth formation.Water and soil mixes in slotted eye.The water and soil mixed liquor by slag extractor by the dreg inhaling pipe sucking-off on the shaping device.Shaping device pumps under hoist engine is handled, and further destroys the stratum and repairs hole wall, and drilling depth gradually causes the rectangle slotted eye of specification.Subsequent by concrete casting machine and concrete mixer carry out straight pipe type under water concrete build.Owing to adopt two preface methods constructions, make 1# earlier, 3#, the single sequence number concrete of 5#...... frid after concrete initial set in one to two day hole, reproduces 2#, 4#, the two sequence number concrete frids of 6#.......Single, double thus sequence number concrete frid links into an integrated entity securely, forms underground concrete continuous impervious wall.
Claims (2)
1. anti-circulation water injection process for building wall machine of slagging tap, include borer, concrete casting machine, concrete mixer, they are installed on the same walking track, shaping device is installed on the borer, it is characterized in that on described walking track, also having a slag extractor, the centre of shaping device bottom is equipped with dreg inhaling pipe, and this dreg inhaling pipe links to each other with described slag extractor.
2. the anti-circulation according to claim 1 water injection process for building wall machine of slagging tap, it is characterized in that the edge of a knife on the described shaping device is trapezoidal shape, two following water steel pipes link to each other with one section transverse tube respectively, link respectively under the transverse tube quaternate nozzle is arranged, the dreg inhaling pipe mouth of pipe is positioned at the central authorities of the edge of a knife of shaping device bottom, and shaping device top is equipped with the flange of counterweight in the opposite side of dreg inhaling pipe simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98242010 CN2344436Y (en) | 1998-09-24 | 1998-09-24 | Wall-building machine by using reverse circulation spoiling water-jetting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98242010 CN2344436Y (en) | 1998-09-24 | 1998-09-24 | Wall-building machine by using reverse circulation spoiling water-jetting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2344436Y true CN2344436Y (en) | 1999-10-20 |
Family
ID=33988657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 98242010 Expired - Fee Related CN2344436Y (en) | 1998-09-24 | 1998-09-24 | Wall-building machine by using reverse circulation spoiling water-jetting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2344436Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592576A (en) * | 2016-12-11 | 2017-04-26 | 福建省水利水电科学研究院 | Water jetting wall building device and wall building method |
CN111021337A (en) * | 2019-12-03 | 2020-04-17 | 中国水电基础局有限公司 | Construction process for water-jetting concrete anti-seepage wall |
-
1998
- 1998-09-24 CN CN 98242010 patent/CN2344436Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592576A (en) * | 2016-12-11 | 2017-04-26 | 福建省水利水电科学研究院 | Water jetting wall building device and wall building method |
CN106592576B (en) * | 2016-12-11 | 2018-05-11 | 福建省水利水电科学研究院 | Water injection process for building wall device and wall constructing method |
CN111021337A (en) * | 2019-12-03 | 2020-04-17 | 中国水电基础局有限公司 | Construction process for water-jetting concrete anti-seepage wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110359467A (en) | A kind of construction method that base pit engineering high-pressure rotary jet grouting pile is reinforced | |
WO2008061415A1 (en) | A hydraulic sliding insertion panel and its using method | |
CN108547641A (en) | The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel | |
CN100510281C (en) | Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank | |
CN106006785B (en) | Water diversion and dirt flushing type urban central landscape park water quality treatment system and method | |
CN108661073A (en) | A kind of barrier wall structure and its construction method | |
CN110374068A (en) | A kind of sluice force reduction pool bottom draining hole construction method preventing blocking | |
CN205116247U (en) | Water conservancy is towards heavy well construction equipment | |
CN1462827A (en) | Construction for making piles and tools | |
CN102235008B (en) | Engineering pile deviation preventing structure of soft soil foundation and pretreatment method | |
CN2344436Y (en) | Wall-building machine by using reverse circulation spoiling water-jetting method | |
CN107956228A (en) | A kind of seabed twists imbibition pressure control system | |
CN201406681Y (en) | Pre-reinforcement processing device of mixed hydraulic reclamation soft soil foundation | |
CN110185051A (en) | Deep narrow excavation water discharge method | |
CN215410517U (en) | Single-well double-line pipe jacking well | |
CN103866787A (en) | Process for constructing impervious concrete wall by using open excavation and inverted construction method | |
CN207660013U (en) | A kind of seabed strand imbibition pressure control system | |
CN108005080A (en) | T-shaped wall+prestressing anchor support body systems approach | |
CN209277088U (en) | Square tube column water-break well and assembling type steel structure water-break system | |
CN112962534A (en) | Large-area dredging dredger fill foundation structure and treatment method thereof | |
CN207144814U (en) | A kind of rig external member of detachable mud pit | |
CN210473153U (en) | Novel water and soil conservation desilting basin | |
CN2522604Y (en) | Plate-hammer-type chisel bit | |
CN203583515U (en) | Deep special-shaped underground diaphragm wall | |
CN219012545U (en) | Be suitable for highway bridge drilling bored concrete pile construction with mud cyclic utilization device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |