CN2339663Y - Multifunction scaffold - Google Patents
Multifunction scaffold Download PDFInfo
- Publication number
- CN2339663Y CN2339663Y CN 97216583 CN97216583U CN2339663Y CN 2339663 Y CN2339663 Y CN 2339663Y CN 97216583 CN97216583 CN 97216583 CN 97216583 U CN97216583 U CN 97216583U CN 2339663 Y CN2339663 Y CN 2339663Y
- Authority
- CN
- China
- Prior art keywords
- main frame
- guide rail
- lifting support
- support
- rotatable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a scaffold apparatus for reinforced concrete structural high-rise building and super high-rise building construction, which is composed of a guide rail, a scaffold body, an attached support, and a braking device, wherein, the scaffold body is a single crossed structure which is erected by a main frame, a rod, a fastener, and the guide rail; the guide rail is a main limb of one side of the main frame; the attached support is composed of an anti-inclining lifting support, a rotary lifting support, a rotary fixing support; the anti-inclining lifting support and the rotary lifting support are successively connected with the main frame and the guide rail in sliding and matching through a guide frame; the rotary lifting fixing support the guide frame is connected with the rotary fixing support on the lower part of the main frame, and the main frame in a detachable double hinge shaft structure. The utility model has the advantages of wide application ranges, more functions, and good applicability.
Description
The utility model relates to a kind of scaffold device of reinforced concrete structure high level, construction of super highrise building.
In reinforced concrete structure high level, construction of super highrise building, extensively adopt adhering lifting formula scaffold.It is mainly by guide rail, support body, adhere to funtion parts such as supporting part and check mechanism and set up formation, present scaffold device, generally with guide rail by adhering to supporting part attached on the building, support body is by rod member, fastener is set up the monolithic construction that constitutes on bearing frame, check mechanism is installed in the top of guide rail suspension centre, the deficiencies in the prior art part mainly is: guide rail separates with support body, guide rail is non-rotatable stationary structure with adhering to supporting part, be subjected to the restriction of its structural relation, to the balcony in the building, the beam of encorbelmenting, wall, the construction of rod structure can't solve, single on the function, poor for applicability.In addition, support body, guide rail separation, both intensity and stability also can be affected, and poor stability can only be taked electric hoist equipment to carry out integral body and promote, the equipment complexity, the cost height, bothersome during installation fee, need professional's operation, lifting need take the man-hour of constructing.
The purpose of this utility model is to avoid weak point of the prior art, and provides a kind of applicability good, can satisfy the multi-functional climbing frame device of the balcony in the building structure, the beam of encorbelmenting, wall, rod structure construction.
Can take following technical scheme to realize purpose.Multi-functional climbing frame, still by guide rail, support body, adhere to supporting part and check mechanism etc. and partly assemble and constitute, but its support body is the single span formula structure of being set up by main frame and rod member, fastener and guide rail, and guide rail is the main limb of main frame one side; Adhere to supporting part and be made of anti-dumping lifting support, rotatable lifting support and rotatable fixed bearing, anti-dumping lifting support, rotatable lifting support are successively with leading truck and the sliding connection of main frame guide rail; Between rotatable lifting support and leading truck, be connected with detachable two hinge formula structures between the rotatable fixed bearing of main frame bottom and main frame.
The relative prior art of the technical program has following advantage and effect:
The scope of application is wide, and function is many, and rotatable attached support structure has solved the difficult problem of structure constructions such as the balcony in the building, the beam of encorbelmenting, wall, post, and applicability is good; Single span segmentation lifting is used very conveniently flexibly to be particularly suitable for the construction of rill water section, and promotes and do not take construction man-hour; But hand hoisting, equipment investment is few, does not need the professional; Rational in infrastructure, strengthened the intensity and the stability of support body, use saferly, can be used as professional instrument turnover and use.
In conjunction with the accompanying drawings, embodiment is described in further detail the content of the technical program.
Fig. 1 is a kind of structure and the user mode schematic diagram of multi-functional climbing frame;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is a kind of structural representation of the rotatable lifting support of multi-functional climbing frame;
Fig. 4 is the vertical view of Fig. 3.
Under the prerequisite that satisfies the said structure requirement, as for the integral body of multi-functional climbing frame, specific constructive form, the size that each funtion part reaches zero member, the connection between member, position relation etc. all can be according to using needs, take the circumstances into consideration to set, they are to the not influence of functional performance of multi-functional climbing frame.
Among the multi-functional climbing frame embodiment shown in the drawings, main frame is by triangular rack 1, saves 2 on the framework, middle joint 5, saves 9 assemblings down and constitute, and guide rail 4 leans on the main limb of building side for main frame; Support body is set up into the single span structure by such main frame routinely with rod member, fastener.The intensity and the stability of framework are improved.Adhere to supporting part and comprise anti-dumping lifting support 3, rotatable lifting support 8 and 10 3 parts of rotatable fixed bearing, they are arranged in order between main frame and building from top to bottom, and one side is attached on the building during use; Opposite side anti-dumping lifting support, rotatable lifting support be with leading truck 7 and the sliding connection of main frame guide rail, between rotatable lifting support and leading truck, be connected with detachable two hinge formula structures between the rotatable fixed bearing of main frame bottom and main frame.Like this, when needing, with hand hoisting, support body can slide up and down and move along anti-dumping lifting support, rotatable lifting support, is subjected to the constrained of its annexation again.
Check mechanism can adopt the catching device of existing structure or other form, is installed in corresponding position routinely.
Among the multi-functional climbing frame embodiment, leading truck 7 is mainly by vertical beam B, is installed on the vertical beam, constitutes with directive wheel C and the assembling of the connector A between vertical beam that main frame guide rail 4 is connected movingly.As shown in Figure 2.Between leading truck and bearing can be to fixedly connected, and also can be to removably connect, as: it with the anti-dumping lifting support between for fixedlying connected, be integral structure; It with rotatable lifting support between for detachable the connection.
Among the multi-functional climbing frame embodiment, detachable two hinge formula structures between rotatable lifting support and leading truck, between the rotatable fixed bearing of main frame bottom and main frame, by the upper and lower junction plate D that is arranged on each side, reach upper junction plate, the corresponding two groups of coaxial aperture E of lower connecting plate.Constitute.That is to say that on the rotatable lifting support, on the leading truck, equal correspondence is provided with upper and lower junction plate member on the rotatable fixed bearing, on the main frame; Every pair of junction plate member promptly all is provided with the hole of two groups of coaxial inner conductors on Dui Ying four junction plates, Kong Zhongyong bearing pin or screw element and so on connect, and constitutes detachable two hinge formula syndetons.It has two kinds of operating modes, i.e. two kinds of functions; When all assembling bearing pin in two pairs of group holes, both are connected to structural entity; Keep in a pair of group of hole bearing pin annexation, another when unloading lower bearing pin in the group hole, then both can relatively rotate around bearing pin, realize that the hinge formula connects.When needing, the rotatable lifting support of disengagement, rotatable fixed bearing are connected with building earlier, unload the bearing pin in certain a pair of group of hole again, just the bearing at rotatable two places, avoid structures such as the balcony in the building, the beam of encorbelmenting, wall, post, promote, adhere to by normal condition.
As long as can achieve the above object, possess the identical functions effect, leading truck, detachable two hinge formula structures also can adopt other form of structure to constitute.
The structure of accompanying drawing illustrated embodiment is the simplest, and combination property and result of use are good.
Claims (3)
1, a kind of multi-functional climbing frame that is used for building operations, by guide rail, support body, adhere to supporting part and check mechanism constitutes, it is characterized in that: support body is the single span formula structure of being set up by main frame and rod member, fastener and guide rail, and guide rail is the main limb of main frame one side; Adhering to supporting part is made of anti-dumping lifting support, rotatable lifting support and rotatable fixed bearing; Anti-dumping lifting support, rotatable lifting support are successively with leading truck and the sliding connection of main frame guide rail; Between rotatable lifting support and leading truck, be connected with detachable two hinge formula structures between the rotatable fixed bearing of main frame bottom and main frame.
2, multi-functional climbing frame as claimed in claim 1 is characterized in that: leading truck mainly by vertical beam and be installed on the vertical beam, with the directive wheel that the main frame guide rail is connected movingly, the connector assembling between vertical beam constitutes.
3, multi-functional climbing frame as claimed in claim 1 is characterized in that: detachable two hinge formula structures reach upper junction plate, the corresponding two groups of coaxial apertures formation of lower connecting plate by the upper and lower junction plate that is arranged on each side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 97216583 CN2339663Y (en) | 1997-05-15 | 1997-05-15 | Multifunction scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 97216583 CN2339663Y (en) | 1997-05-15 | 1997-05-15 | Multifunction scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2339663Y true CN2339663Y (en) | 1999-09-22 |
Family
ID=33933447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 97216583 Expired - Fee Related CN2339663Y (en) | 1997-05-15 | 1997-05-15 | Multifunction scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2339663Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108412187A (en) * | 2018-04-27 | 2018-08-17 | 上海建工四建集团有限公司 | A kind of superelevation connects the constructing device and construction method of body group tower frame structure |
-
1997
- 1997-05-15 CN CN 97216583 patent/CN2339663Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108412187A (en) * | 2018-04-27 | 2018-08-17 | 上海建工四建集团有限公司 | A kind of superelevation connects the constructing device and construction method of body group tower frame structure |
CN108412187B (en) * | 2018-04-27 | 2024-01-05 | 上海建工四建集团有限公司 | Construction device and construction method for outer frame structure of ultra-high conjoined group tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2339663Y (en) | Multifunction scaffold | |
CN111170183A (en) | Portable small-size pole of lying prone | |
CN101920913B (en) | Self-propelled wide-span tower crane | |
CN209906239U (en) | Tower crane base convenient to dismantle installation | |
CN209127938U (en) | A kind of Portable small-sized is lain prone bar | |
CN213837255U (en) | Spherical curtain wall structure | |
CN211923639U (en) | Reinforcing apparatus of external convenient to detach of ancient building | |
CN211851191U (en) | Protective net structure capable of being quickly disassembled and assembled | |
CN211769879U (en) | Sunken cab platform and tower crane provided with same | |
CN212358012U (en) | Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower | |
CN209687399U (en) | Structure air hose vertical ladder component | |
CN209011416U (en) | A kind of light pseudo-classic architecture roof wooden frame | |
CN218992971U (en) | Intelligent exhibition booth hanging structure for exhibition hall | |
CN213233795U (en) | Universal connection's high-rise modularization nodal connection structure | |
CN207844879U (en) | A kind of combined type end carriage connection structure | |
CN213898095U (en) | Working layer scaffold board of scaffold | |
CN2714525Y (en) | Telescopic assembling type crane jib | |
CN206260406U (en) | A kind of canopy film auxiliary installation device | |
CN218708744U (en) | Novel tower crane attaches wall fly leaf combination | |
CN208268706U (en) | A kind of pedestal and instrument erecting bed convenient for extension | |
CN212478495U (en) | Hanging rack turning plate device for building construction aluminum alloy climbing rack | |
CN220334613U (en) | Tower crane lower support | |
CN219280476U (en) | Light movable spliced bridge overhauling hanging basket | |
CN217106332U (en) | Annular packway structure | |
CN219916538U (en) | Building intelligent multi-system combined training device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |