CN2332089Y - Vertical cable laying support - Google Patents

Vertical cable laying support Download PDF

Info

Publication number
CN2332089Y
CN2332089Y CN 98237468 CN98237468U CN2332089Y CN 2332089 Y CN2332089 Y CN 2332089Y CN 98237468 CN98237468 CN 98237468 CN 98237468 U CN98237468 U CN 98237468U CN 2332089 Y CN2332089 Y CN 2332089Y
Authority
CN
China
Prior art keywords
shrouding
cable
cable bearing
shape
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98237468
Other languages
Chinese (zh)
Inventor
郝英男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98237468 priority Critical patent/CN2332089Y/en
Application granted granted Critical
Publication of CN2332089Y publication Critical patent/CN2332089Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model relates to a vertical cable laying support, which is composed of a set of cable support frames arranged vertically in parallel, a left and a right sealing plates and a front and a back sealing plates. The height of every cable support frame corresponds to the height of the floor with the cable support frame, and a definite is formed between every two cable support frames. The cable support frames are composed of two U-shaped upright beams and a plurality of n-shaped transverse supporting plates, and both ends of the n-shaped transverse supporting plates are respectively fixed in the grooves of the two U-shaped upright beams. The n-shaped transverse supporting plates are provided with cable buckle through holes, and the left and the right sealing plates and the front and the back sealing plates are arranged after cables are vertically arranged and bound. The utility model solves the problem of the service life of the technical characteristic of a carrier influenced by the self weight of the cables, and the vertical cable laying support has convenient maintenance.

Description

Vertical cable laying frame
The utility model relates to a kind of cable laying frame, particularly relates to a kind of cable laying frame of cabling vertically.
Along with improving constantly of industrial and agricultural production, science and technology development and living standards of the people, all types of industries, agricultural increase sharply with the construction of building, intelligent building and high-rise.These buildings increase rapidly to the instructions for use of electric power, illumination, household electrical appliance, control automatically, computer network, telephone communication network, information transmission network etc.For satisfying above-mentioned functions, transport vehicle quantity such as various leads, cable, optical cable must be fitted increase mutually.Laying these transport vehicles at present usually adopts traditional ply-yarn drill exposed installation, wears that protection tube lays or cable testing bridge lays.There is following problem in this transport vehicle laying method in vertically carrier lays:
1, because the deadweight of transport vehicle (as cable) is sagging, not only influences the technical performance of carrier, and reduced the useful life of transport vehicle; 2, adopt traditional laying method time-consuming, and easily cause carrier protection mechanical damage; 3, maintenance and maintenance are inconvenient; 4, it is big etc. to take effective building usable floor area.These problems are that world today's building trade is difficult to the comprehensive problem that solves always.
The purpose of this utility model is at the problems referred to above.Provide a kind of and make that transport vehicle lays, maintenance and easy to maintenance, particularly can solve because of the transport vehicle deadweight influence the carrier technique characteristic and useful life problem vertical cable laying frame.
The purpose of this utility model adopts following technical proposals to realize, that is:
Vertical cable laying frame, and cable bearing support, left side shrouding, right side shrouding, preceding shrouding and back shrouding that be arranged arranged side by side by one group are formed.
One group side by side and the quantity of the cable bearing support that be arranged in parallel and the floor number of building adapt, the story height that the height of each cable bearing support and this frame are in adapts, and between per 2 cable bearing supports certain distance is arranged.
The cable bearing support is made up of 2 shape vertical beams and a plurality of  shape horizontal support plate, and insert respectively in the groove of 2 shape vertical beams at the two ends of a plurality of  shape horizontal support plates, and is connected with the side plate of 2 shape vertical beams with screw respectively.Between per 2  shape horizontal support plates certain distance is arranged.On 2 main support plates of each  shape horizontal support plate a plurality of cableties through holes are arranged all.
The left and right side shrouding is separately positioned on one group side by side and the both sides of the cable bearing support that be arranged in parallel, and by screw on corresponding with it shape vertical beam.Between per 2 adjacent cable bearing supports, forward and backward shrouding is set respectively, forward and backward shrouding respectively by screw on 2 corresponding with it shape vertical beams.
In order to keep the spacing between adjacent 2 shape vertical beams, between per 2 adjacent shape vertical beams, the supporting gusset can be set, the quantity of supporting gusset can be decided according to building floor height of a house height.The two ends of supporting gusset are separately fixed on 2 adjacent shape vertical beams.
For left and right shrouding and forward and backward shrouding can be stuck on the shape vertical beam better, be provided with the parallel clamp of side plate at the two ends of left and right shrouding and front and back shrouding with shape vertical beam.
Left and right shrouding can be a whole shrouding, also can be made up of the little shrouding of a plurality of vertical settings.
Being arranged on the forward and backward shrouding on per 2 shape vertical beams, can be a whole shrouding, also can be made up of the little shrouding of a plurality of vertical settings.
The shape vertical beam of cable bearing support,  shape horizontal support plate, preceding shrouding, back shrouding, left side shrouding, right side shrouding, available steel plate, galvanized sheet, aluminium sheet are made, also available injection molding.
 shape horizontal support plate can be the transverse slat of 2 independent band cableties through holes, and the two ends of these 2 blocks of plates are separately fixed on the side plate of 2 shape vertical beams, also can be the transverse slat of a band cableties through hole.
The laying method of vertical cable laying frame:
1, press cable distribution figure, the combined process pipeline is determined the optimal path of cable bearing support, and along this path, is reserved with reserved opening on each floor plate of building, and pre-buried channel-section steel is arranged on the reserved opening;
2, according to the number of floor levels and the practical wiring needs of building, determine the quantity of cable bearing support, according to the height of each floor of building, determine the height of each cable bearing support;
3, the cable bearing support is installed by basic unit and is begun to finish to top layer, and arranged side by side, the vertically setting of all cable bearing supports leaves a determining deviation (conducting carrier for wiring, maintenance cable etc. uses) between per 2 cable bearing supports.On the vertical beam of per 2 cable bearing supports, be fixed with a plurality of supporting gussets, wherein with reserved opening on contacted that supporting gusset of pre-buried channel-section steel be connected with this pre-buried channel-section steel solid welding or be screwed together;
4, connect cable.Connect cable and can also can draw cable by drawing cable in the basic unit by under the top layer.After cable arrangements puts in place, with the cable banding mechanism that the cable bundle is solid on the main support plate of  shape horizontal support plate, just allow to connect down the root cable then, till being covered with the required cable that lays on 2 main support plates with  shape horizontal support plate, on second cable bearing support, lay cable again, by that analogy.The cable banding mechanism is made up of cableties and strapping, and the nylon double buckle is arranged on the strapping, and strapping passes the strapping through hole of cableties front end.After cableties through hole on the main support plate of  shape horizontal support plate is inserted in the cableties rear end, revolve and turn 90 degrees, cableties are stuck, and can not deviate from from the hole, strapping are wrapped on the cable again, and the nylon double buckle on the strapping just pins mutually.
5, cable arrangements good after, load onto cover plate, refill left and right side shrouding and forward and backward shrouding.
The utility model thoroughly solved because of cable deadweight influence the carrier technique characteristic and useful life short problem, and install, check, maintenance is very convenient.In addition, it is little to use the utility model also to have an effective usable floor area of the building of taking, advantages such as small investment.
Fig. 1 is the assembling schematic diagram of a kind of embodiment of the present utility model, Fig. 2 is a cable branching bolster structure schematic diagram, Fig. 3 is the section schematic diagram of a kind of embodiment of vertical laying cable rack, Fig. 4 is that forward and backward side seal board and forward and backward shrouding scheme of installation, Fig. 5 are  shape horizontal support plate structure schematic diagrames, and Fig. 6 and Fig. 7 are supporting rib plate structure schematic diagrames.
The drawing reference numeral explanation:
1 for shape vertical beam, 2 for  shape horizontal support plate, 3 for the left side shrouding, 4 for the right side shrouding, 5 for preceding shrouding, 6 for the back shrouding, 7 for the cableties through hole, 8 for cableties, 9 for cable, 10 for strapping, 11 for groove, 12 for screw, 13 be main support plate, 14 for side plate, 15 for the supporting gusset, 16 for reserved opening, 17 for pre-buried channel-section steel, 18 for the right angle connecting lever, 19 for clamp, 20 for cable bearing support, 21 for upper cover plate.
The utility model is described in further detail (building with 18 floors is an example) below in conjunction with accompanying drawing.
Vertical cable laying frame, by 18 side by side and the cable bearing support 20 that be arranged in parallel, a plurality of left sides shrouding 3, a plurality of right sides shrouding 4, a plurality of before shrouding 5, a plurality of backs shrouding 6 form, the height of 18 cable bearing supports, height with 18 floors adapts respectively, and the spacing between per 2 cable bearing supports is 20cm.
The cable bearing support is made up of 2 shape vertical beams 1 and 3  shape horizontal support plates 2.Insert respectively in the groove 11 of shape vertical beam 1 at the two ends of  shape horizontal support plate 2, and use screw 12 that 2 main support plates 13 of  shape horizontal support plate 2 are fixedlyed connected with 2 side plates 14 of shape vertical beam 1 respectively.A plurality of cableties through holes 7 are arranged on main support plate 13.
For firm between the of per 2 cable bearing supports shape vertical beam 1, be provided with upper and lower 2 the supporting gussets 15, the supporting gusset 15 two ends be separately fixed on 2 shape vertical beams 1.
With 18 cable bearing supports 20 arranged side by side and be arranged in parallel, pass through the reserved opening 16 of corresponding floor with it respectively, the lower support gusset 15 of shape vertical beam 1 is connected with pre-buried channel-section steel 17 solid weldings at reserved opening 16 places.Then by designing requirement wiring, be about to cableties 8 follower heads and insert cableties through hole 7 on the main support plate 13, revolve turn 90 degrees after, again with the strapping on the cableties 8 10 on cable 9, tightly wrap, and the nylon double buckle on the strapping 10 be hooked on together.Behind the intact cable of cloth, left side shrouding 3, right side shrouding 4, preceding shrouding 5 and back shrouding 6 are installed, and upper cover plate 21.The two ends of left side shrouding 3, right side shrouding 4 are screwed respectively on the shape vertical beam 1 of vertical cable laying frame and arranged on left and right sides.For firm, on the right angle, two ends of left and right side shrouding connecting lever 18, be fixed with the clamp 19 parallel with right angle connecting lever 18.Clamp 19 is stuck on the side plate 14 of shape vertical beam 1.Between per 2 shape vertical beams 1, be screwed go forward shrouding 5 and back shrouding 6 at last.Equally, on preceding shrouding 5 and back shrouding 6, clamp 19 is arranged all for firm.
 shape horizontal support plate 2 can be 2 main support plates 13 that be arranged in parallel,
 shape horizontal support plate 2 also can be a monoblock master support plate 13.

Claims (4)

1, vertical cable laying frame, comprise by one group of cable bearing support (20), a plurality of left sides shroudings (3), a plurality of right sides shroudings (4), a plurality of preceding shrouding (5) and a plurality of backs shrouding (6) of the reserved opening (16) of each the floor plate that passes through building respectively, it is characterized in that:
A, described one group of cable bearing support (20), be one group arranged side by side, and the vertical cable bearing support (20) that is provided with, the height of each cable bearing support (20), adapt with the story height of the present building of this support, at regular intervals between per 2 cable bearing supports (20) that vertically are provided with;
B, cable bearing support (20), form by 2 shape vertical beams (1) and a plurality of  shape horizontal support plates (2), the two ends of a plurality of  shape horizontal support plates (2), insert respectively in the groove (11) of 2 shape vertical beams (1), the two ends of 2 main support plates (13) of each  shape horizontal support plate (2), be separately fixed on 2 side plates (14) of 2 shape vertical beams, a plurality of cableties through holes (7) are arranged on the main support plate (13);
C, in 2 sides of the cable bearing support (20) that is positioned at each floor, load onto left side shrouding (3), right side shrouding (4) respectively, the right angle connecting lever (18) at shrouding (3) two ends, left side, on 2 shape vertical beams (1) of the cable bearing support (20) on the left of being separately fixed at, the right angle connecting lever (18) at right side shrouding (4) two ends is separately fixed on 2 shape vertical beams (1) of cable bearing support (20) on right side;
D, be positioned at each floor, load onto preceding shrouding (6) and back shrouding (6) between per 2 adjacent cable bearing supports (20), before shrouding (5) be fixed on the shape vertical beam (1) of front of 2 adjacent cable bearing supports (20), back shrouding (6) is fixed on the shape vertical beam (1) of back of 2 adjacent cable bearing supports (20).
2, vertical cable laying frame according to claim 1 is characterized in that being respectively arranged with clamp (19) on described left side shrouding (3), right side shrouding (4), preceding shrouding (5) and back shrouding (6).
3, vertical cable laying frame according to claim 1 and 2 is characterized in that being fixed with supporting gusset (15) on the shape vertical beam (1) of per 2 adjacent cable bearing supports (20).
4, vertical cable laying frame according to claim 1 is characterized in that described  shape horizontal support plate (2), can be 2 transverse slats that have cableties through hole (7) that be arranged in parallel, also can be the transverse slat of a monoblock band cableties through hole.
CN 98237468 1998-04-29 1998-04-29 Vertical cable laying support Expired - Fee Related CN2332089Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98237468 CN2332089Y (en) 1998-04-29 1998-04-29 Vertical cable laying support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98237468 CN2332089Y (en) 1998-04-29 1998-04-29 Vertical cable laying support

Publications (1)

Publication Number Publication Date
CN2332089Y true CN2332089Y (en) 1999-08-04

Family

ID=33985277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98237468 Expired - Fee Related CN2332089Y (en) 1998-04-29 1998-04-29 Vertical cable laying support

Country Status (1)

Country Link
CN (1) CN2332089Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111470374A (en) * 2020-04-17 2020-07-31 中国一冶集团有限公司 Wire laying and conveying method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111470374A (en) * 2020-04-17 2020-07-31 中国一冶集团有限公司 Wire laying and conveying method

Similar Documents

Publication Publication Date Title
CN212012042U (en) Connection structure of machine room bridge hanging device
CN2332089Y (en) Vertical cable laying support
CN1129219C (en) Combined vertical electrical cable layer and its laying method
CN2325901Y (en) Combination type vertical cable laying apparatus
CN105782581A (en) Novel bundling-free slot type secondary cable bracket
CN105576574A (en) Rack and secondary equipment prefabricating cabin employing same
CN204887814U (en) High space utilizes preceding wiring rack of type
CN2822073Y (en) Combined wiring frame
CN220401893U (en) Distribution frame for building engineering
CN214626180U (en) Vertical slot type crane span structure of light current cable
CN217741187U (en) Cabling rack for cable laying
CN201467597U (en) Electric cubicle pre-wiring tool
CN217307099U (en) Underframe interlayer wiring structure and prefabricated cabin underframe applying same
CN220190402U (en) Cabling rack
CN201556854U (en) Cable distribution box of low-pressure cabinet
CN215870688U (en) Double-loop power transmission tower
CN216700723U (en) Section bar for machine cabinet frame
CN221056719U (en) Optical fiber communication wiring frame easy to lay wires
CN212659918U (en) A creel stand for communication cable
CN212808730U (en) Optical fiber channel elbow convenient to disassemble and assemble
CN216075850U (en) Double-deck fossil fragments furred ceiling installation device
CN216819326U (en) High-strength prefabricated cable bridge
CN2701133Y (en) A low-voltage power distributing cabinet
CN220570245U (en) Weak current wiring frame of machine room
CN107294023A (en) Chute and its communication apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee