CN2318263Y - 拼装组合式沉筒 - Google Patents

拼装组合式沉筒 Download PDF

Info

Publication number
CN2318263Y
CN2318263Y CN 97250582 CN97250582U CN2318263Y CN 2318263 Y CN2318263 Y CN 2318263Y CN 97250582 CN97250582 CN 97250582 CN 97250582 U CN97250582 U CN 97250582U CN 2318263 Y CN2318263 Y CN 2318263Y
Authority
CN
China
Prior art keywords
tube
bent plate
structure ring
heavy tube
assembly combined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97250582
Other languages
English (en)
Inventor
肖俊义
张岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97250582 priority Critical patent/CN2318263Y/zh
Application granted granted Critical
Publication of CN2318263Y publication Critical patent/CN2318263Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

一种拼装组合式沉筒,是以钢筋为骨架,与水泥、砾石、砂和水搅拌浇筑成为一体的筒形预制构件,其筒形预制构件是由一层一层短筒形的结构环上下轴向重叠而成,短筒形的结构环又是由一段一段的曲板构件或角板构件或曲板构件和角板构件围合连接而成。其优点是结构简单合理、操作方便、安全可靠,避免土体塌陷,减少人身伤亡事故。在地下建筑工程施工中,可抵抗土体的侧压力,适用于化粪池、农业挖井和煤矿竖井和地下市政工程施工。

Description

拼装组合式沉筒
本实用新型涉及一种地下建筑工程开槽支护土壁的组合式构件。
随着我国建筑事业的不断发展,各种地下管线的敷设工程越来越多,尤其在旧城改造过程中,由于施工现场狭窄,在条件不许可的情况下,采用传统开槽方式施工,事必出现交通堵塞,城市环境受到很大影响。在市政公用管线施工采用顶管工艺虽可减少开槽施工,但工作坑的开挖却经常遇到土质松散、地下水位高等弊端。另外在楼房化粪池施工中也同样出现槽坑过大、过深不宜成槽,或占地太大的弊端。若用惯用的开槽支护四壁的方法进行实施,该方法需耗费大量的人力和木材,并极易造成塌方和人身伤亡事故。为此,城市建设管理部门极为重视,曾多次提出要求,必须采取有效措施尽快予以解决。
本实用新型的目的是提供一种拼装组合式沉筒,为确保在地下工程施工中安全支护土槽四壁,避免土体塌陷和人身伤亡事故的发生。
本实用新型的技术方案是这样的:拼装组合式沉筒,是以钢筋为骨架,与水泥、砾石、砂和水搅拌浇筑成为一体的筒形预制构件,其特征如下:
筒形预制构件是由一段一段短筒形的结构环上下轴向层叠而成。
短筒形的结构环可以是由一段一段的曲板构件围合连接成圆筒或椭圆筒形状。
短筒形的结构环也可以是由一段一段的角板构件围合连接成方筒形状。
短筒形的结构环还可以是由一段一段的曲板构件和角板构件围合连接而成较大的筒形。曲板构件的曲率半径R可根据设计要求确定。
上述曲板构件和角板构件的两端一端是V形凸榫,另一端是V形凹槽,两构件之间榫接。
上述曲板构件和角板构件靠近连接端的侧面有吊耳,由螺栓穿过吊耳将两相邻构件予以紧固连接。
本实用新型的优点是:结构简单合理、操作方便、安全可靠、避免土体塌陷,减少人身伤亡事故。在地下建筑工程施工中,可抵抗土体的侧压力,可在房建工程化粪池、农业挖井、煤矿竖井和地下市政工程等范围采用。
图1是结构环的组装结构示意图。
图2是图1的侧视图。
图3是图1的俯视图。
图4是曲板构件形状示意图。
图5是图4的俯视图。
图6是图4的侧视图。
图7是角板构件形状示意图。
图8是图7的俯视图。
图9是图7的侧视图。
图10是本实用新型拼装组合式沉筒的示意图。
以下结合实例的附图说明本实用新型实施之方式:
根据施工图所确定的沉筒位置放线,其沉筒的大小和埋设深度,均按设计要求实施。在施工中严格按施工工艺和操作规程进行施工,其步骤如下:
1、按设计确定沉筒位置后,将地面整平,其结构环位置应予测量,使地平面在同一高程上。
2、用钢丝绳拴在吊装耳环3上,将曲板构件1和角板构件2拼装组合成所需形状,然后用螺栓4穿过吊装耳环3将相邻构件紧固连接,形成一个结构环5。
3、将结构环内土体分层挖出,当土体弃出的同时,结构环在自重作用下,随之均匀地渐渐下沉。
4、当结构环的上平面降至接近地面时,停止弃土。按前一程序将第二个结构环重叠其上,用螺栓进行紧固连接。上下两结构环应保持与地面垂直状态。
5、再将结构环内的土体继续分层弃土,此时结构环又开始均匀地渐渐下沉。就这样一个循环接一个循环地施工作业,直至达到设计规定的埋深高程为止,即在土层中形成一个符合设计要求的沉筒。
6、沉筒形成后,有关沉筒底部、结构环之间是否需要勾缝、防水等,均按设计要求进行处理。

Claims (6)

1、一种拼装组合式沉筒,是以钢筋为骨架,与水泥、砾石、砂和水搅拌浇筑成为一体的筒形预制构件,其特征如下:
筒形预制构件是由一段一段短筒形的结构环上下轴向层叠而成。
2、根据权利要求1所述的拼装组合式沉筒,其特征在于:所述短筒形的结构环是由一段一段的曲板构件围合连接而成圆筒形或椭圆筒形。
3、根据权利要求1所述的拼装组合式沉筒,其特征在于:所述短筒形的结构环是由一段一段的角板构件围合连接而成方筒形。
4、根据权利要求1所述的拼装组合式沉筒,其特征在于:所述短筒形的结构环是由一段一段的曲板构件和角板构件围合连接而成。
5、根据权利要求1或2、3、4所述的拼装组合式沉筒,其特征在于:所述曲板构件和角板构件的两端一端是V形凸榫,另一端是V形凹槽。
6、根据权利要求1或2、3、4所述的拼装组合式沉筒,其特征在于:所述曲板构件和角板构件靠近连接端的侧面有吊耳,由螺栓穿过吊耳将两相邻构件予以紧固连接。
CN 97250582 1997-08-08 1997-08-08 拼装组合式沉筒 Expired - Fee Related CN2318263Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97250582 CN2318263Y (zh) 1997-08-08 1997-08-08 拼装组合式沉筒

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97250582 CN2318263Y (zh) 1997-08-08 1997-08-08 拼装组合式沉筒

Publications (1)

Publication Number Publication Date
CN2318263Y true CN2318263Y (zh) 1999-05-12

Family

ID=33957116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97250582 Expired - Fee Related CN2318263Y (zh) 1997-08-08 1997-08-08 拼装组合式沉筒

Country Status (1)

Country Link
CN (1) CN2318263Y (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535515A (zh) * 2012-01-19 2012-07-04 北京隆科兴非开挖工程有限公司 工作井的支护装置和支护方法
CN102561393A (zh) * 2012-03-06 2012-07-11 长乐杭辉日用品有限公司 拼装式地下构建物及其建造方法
CN106193119A (zh) * 2016-08-01 2016-12-07 福州市第三建筑工程公司 一种圆形地下构筑物及其分层分段逆作业施工方法
CN111332955A (zh) * 2019-11-20 2020-06-26 中国铁建重工集团股份有限公司 筒体吊装设备

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535515A (zh) * 2012-01-19 2012-07-04 北京隆科兴非开挖工程有限公司 工作井的支护装置和支护方法
CN102535515B (zh) * 2012-01-19 2014-03-19 聂树军 工作井的支护装置和支护方法
CN102561393A (zh) * 2012-03-06 2012-07-11 长乐杭辉日用品有限公司 拼装式地下构建物及其建造方法
CN102561393B (zh) * 2012-03-06 2014-05-14 长乐杭辉日用品有限公司 拼装式地下构建物及其建造方法
CN106193119A (zh) * 2016-08-01 2016-12-07 福州市第三建筑工程公司 一种圆形地下构筑物及其分层分段逆作业施工方法
CN106193119B (zh) * 2016-08-01 2018-04-03 福州市第三建筑工程公司 一种圆形地下构筑物及其分层分段逆作业施工方法
CN111332955A (zh) * 2019-11-20 2020-06-26 中国铁建重工集团股份有限公司 筒体吊装设备

Similar Documents

Publication Publication Date Title
Viggiani et al. Piles and pile foundations
CN100564700C (zh) 格构式钢柱塔吊基础座的施工方法
CN102434717B (zh) 工字钢顶管工作坑的施工方法
CN111778793B (zh) 一种空洞塌陷防治结构及施工方法
CN111851588A (zh) 一种顶管井结构及其施工方法
CN1058312C (zh) 一种大型建筑物的基础托换方法
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN2318263Y (zh) 拼装组合式沉筒
CN104005414B (zh) 大直径钢筋混凝土灌注桩支撑立柱的施工方法
CN212294747U (zh) 一种顶管井结构
CN100554597C (zh) 一种钻孔护壁封底和制做大直径空心砼桩的方法
CN109972644B (zh) 顶推用沉井装置及其施工方法
CN215715515U (zh) 不良地质条件下市政管网施工支护一体化结构
CN210216473U (zh) 用于边坡治理的抗滑桩
CN201162229Y (zh) 抗浮地坑结构
CN110552702B (zh) 一种拼装波纹钢板地下综合管廊的暗挖施工方法
CN106988337A (zh) 一种用于减小条形浅基础房屋不均匀沉降的加固方法
CN208907218U (zh) 一种跨越并保护地下管线的空箱海堤结构
CN201268857Y (zh) 清土铲
CN106049516A (zh) 波纹钢围堰挖孔空心桩及其制作工艺
Gispert Prefabricated foundations for housing applied to room modules
CN1320215C (zh) 高填方区地基桩的制作方法
CN211873033U (zh) 一种地下工程的地坑支护结构
CN213836719U (zh) 一种拼接预制根键式掏挖类基础
CN110258621B (zh) 便于快速施工的装配式挡土墙

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee