CN2272550Y - Continuous water supply energy-saving boiled water - Google Patents

Continuous water supply energy-saving boiled water Download PDF

Info

Publication number
CN2272550Y
CN2272550Y CN 96222528 CN96222528U CN2272550Y CN 2272550 Y CN2272550 Y CN 2272550Y CN 96222528 CN96222528 CN 96222528 CN 96222528 U CN96222528 U CN 96222528U CN 2272550 Y CN2272550 Y CN 2272550Y
Authority
CN
China
Prior art keywords
water
hot water
water joint
section
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96222528
Other languages
Chinese (zh)
Inventor
岳志田
岳韶贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 96222528 priority Critical patent/CN2272550Y/en
Application granted granted Critical
Publication of CN2272550Y publication Critical patent/CN2272550Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model relates to an energy-saving tea boiler with continuous water supply, comprising a vertical boiler body. The utility model is characterized in that the boiler body is split into an upper preheating section, a middle hot water section and a lower boiled water section; the three sections form three independent water areas which are a warm water area, a hot water area and a boiler water area; the interior of the boiled water section is provided with a boiler container, a transverse water pipe, a throat pipe and a fire grate; the fire protection band is arranged between the lower part and the upper part of the fire grate; the exterior of the boiled water section is provided with a water supplement tank, a water supplement pipe, an air exhaust pipe, and a fire door; the interior of the water supplement tank is provided with a ball valve, etc; the exterior of the hot water section is provided with a water supplement pipe, an air exhaust pipe, etc; the interior of the preheating section is provided with a vertical pipe, an ash removing door ring and a dust settling chamber; the top of the preheating section is provided with an air exhaust pipe; the preheating section, the hot water section and the boiled water section are connected into a whole through connecting rings. The utility model has the advantages of continuous boiled water supply, high heat efficiency, sufficient combustion and energy saving.

Description

The energy-conservation drinking water boiler of continuous water supply
The utility model relates to the energy-conservation drinking water boiler of a kind of continuous water supply.
At present, though the drink tea stove that generally uses burning is more abundant, smoke medicining dust-removing effect is better, and its internal structure is simple, does not have the flue dust sedimentation device, is discontinuous supply boiling water, and its thermal efficiency and dust removing effects are all not good.
The purpose of this utility model be to provide a kind of can boiling water without interruption, thermal efficiency height, water supply and energy saving drinking water boiler more fully burns.
The purpose of this utility model is achieved in that the energy-conservation drinking water boiler of continuous water supply structurally mainly is made up of three parts: top is pre-thermal center, the middle part is the hot water joint, the bottom is the boiling water joint, and three joints form three independently waters, i.e. warm water territory, hot water territory and boiling water territories.In the boiling water joint, be provided with flue, horizontal water tube, trunnion, fire grate.Lower furnace portion and fire grate top are provided with the fire of being constructed by refractory material of defending and are with, improved the heat storage capacity in coal seam like this, thereby the abundant burning that helps burning, be provided with in water supply tank, filling pipe, blast pipe, fire door, the water supply tank outside the boiling water joint ball-cock assembly is housed, the water level of boiling water joint will be controlled by the ball-cock assembly in the water supply tank like this.In hot water joint, be provided with the rough dusting that dust chamber, fire tube, dust chamber are beneficial to flue gas, also increased heat exchange area simultaneously.Outer filling pipe, blast pipe, the ash door of being provided with of hot water joint.In pre-thermal center, be provided with impact tube, ash door circle and dust chamber, further improved dust removing effects so again, increased flue gas flow again simultaneously, strengthened the heat convection effect.Pre-thermal center peripheral hardware has water supply tank and ash door, and the top is provided with blast pipe, is provided with the covering of running water that ball-cock assembly is controlled pre-thermal center in the water supply tank.Pre-thermal center, hot water joint, boiling water joint are connected into as a whole by clamping ring, all each is linked into the top of pre-thermal center to the blast pipe of boiling water joint and hot water joint since the top of this section.The filling pipe of boiling water joint is to be connected on the water supply tank of boiling water joint by the top that hot water saves, and by ball-cock assembly control, is connected to the bottom of boiling water joint again by the bottom of water supply tank.The filling pipe of hot water joint is connected to the bottom of hot water joint by the top of pre-thermal center.Pre-thermal center top is equipped with water supply tank, is equipped with ball-cock assembly in the water supply tank and controls covering of running water; Water supply tank bottom filling pipe is connected to pre-thermal center bottom, and like this as long as the water level of boiling water joint descends, the control by ball-cock assembly joins the boiling water joint to hot water, warm water and running water successively, has realized the purpose of continuous water supply like this.Simultaneously,, increased heat transfer temperature difference like this, improved heat-transfer effect because moisturizing and flow of flue gas direction become adverse current.
Fire coal of the present utility model is added on the interior fire grate of boiling water joint, through reactions such as a series of destructive distillation, reduction, oxidations, be fully burned, high-temperature flue gas after the burning flows to the dust chamber of hot water joint through the trunnion of boiling water joint: then the fire tube of baffling in the superheated water joint enters the dust chamber of pre-thermal center, and baffling enters chimney by impact tube and is discharged in the air more at last.In the dust chamber of flue gas in pre-thermal center and hot water joint, because the repeatedly baffling of flue gas and sharply reducing of cigarette speed, the grit in the flue gas is deposited in the dust chamber bottom, thereby has played the smoke abatement and dust control effect under the double action of gravity and inertia.
Owing to adopt such scheme, the utility model is particularly used ball-cock assembly and is controlled the moisturizing in three waters and make it can boiling water without interruption; Because water inlet forms the temperature difference that adverse current has increased cigarette temperature and heated medium (water) with flue gas flow direction, strengthened heat-transfer effect simultaneously; The flue gas expansion chamber that is provided with in hot water joint and pre-thermal center has increased heat exchange area, has strengthened the heat exchange effect; Be provided with in boiling water joint bottom and defend the fire band, be beneficial to fuel and obtain more ignition heat, strengthened combustion, thereby improved the thermal efficiency, design thermal efficiency reaches more than 70%.Flue gas owing to the effect of inertia and gravity, has obtained the effect of smoke abatement and dust control in dust chamber, reduce smoke dust discharge concentration, and its cigarette point concentration of emission is less than 200mg/NM 3, lingemann blackness is less than 1 grade.Simultaneously, the utility model coal adaptability is strong, can be with available again anthracite of bituminous coal and moulded coal.
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
Fig. 1 is the utility model embodiment schematic appearance;
Fig. 2 is the utility model embodiment right side view;
Fig. 3 is the utility model embodiment rearview;
Fig. 4 is the utility model embodiment vertical view;
Fig. 5 is the A-A line cutaway view among Fig. 2;
Among the figure: 1. base, 2. blow-off pipe, 3. fire door, 4. clean-out opening, 5. water level meter, 6. clamping ring, 7. in shoot door, 8. boiling water joint blast pipe, 9. hot water joint blow-off pipe is 10. gone up shoot door, 11. flanges, 12. blast pipes, 13. hot water joint filling pipe, 14. thermometers, 15. outlet pipes, 16. hand holes, 17. the underseal ring, 18. furnace walls, 19. boiling water joint shell, end socket in the 20. boiling water joint, 21. hot water joint bottom (head), 22. hot water joint shell, 23. upper perforated plates, 24, pre-thermal center bottom (head), 25. impact tubes, 26. pre-thermal center covering head, 27. Henan thermal center shells, shoot door circle on 28., 29. fire tube, 30. lower perforated plates, 31. hot water joint wall of inner container, 32. middle shoot door circle, 33. boiling water joint upper sealing plate, 34. trunnions, 35. horizontal water tube, 36. fire door circles, 37. defend the fire band, 38. fire grate, 39. fire grate frame plates, 40. boiling water joint filling pipe, 41. water supply tank, 42. ball-cock assemblys, 43. water supply tank filling pipes, 44. water inlet, 45. gaps, 47. pre-thermal center filling pipes.
Referring to Fig. 1,2,3; The utility model embodiment mainly is made up of the pre-thermal center in top, middle part hot water joint and bottom boiling water joint: constitute flue by end socket 20 in furnace wall 18 and the boiling water joint in the boiling water joint, horizontal on the furnace wall 18 have several horizontal water tubes 35, be equipped with trunnion 34 on the end socket 20 in the boiling water joint, boiling water joint shell 19 is connected with flue with underseal ring 17 by boiling water joint upper sealing plate 33, fire door circle 36 respectively.Be built-in with several fire grate frame plates 39 in boiling water joint shell 19 bottoms, the bottom is equipped with base 1, is equipped with fire grate 38 on the fire grate frame plate 39.Be equipped with the fire of constructing by refractory material of defending under flue and between on the fire grate 38 and be with 37.Boiling water joint top, outside back is equipped with water supply tank 41, is equipped with the moisturizing that ball-cock assembly 42 is controlled the boiling water joint in it.Mend fire-box 41 and be connected with boiling water joint bottom by boiling water joint filling pipe 40, water supply tank filling pipe 43 links to each other with hot water joint top.The boiling water joint outside also is equipped with outlet pipe 15, blow-off pipe 2, hand hole 16, clean-out opening 4, water level meter 5, thermometer 14, fire door 3 and boiling water joint blast pipe 8.The exhaust 8 of boiling water joint is linked to each other with pre-thermal center covering head 26 by boiling water joint top, in order to the exhaust of boiling water joint.In the hot water joint, hot water joint wall of inner container 31 is connected to form dust chamber with lower perforated plate 30, and its bottom is linked to each other with hot water joint shell 22 bottoms by hot water joint seal ring 21.Hot water joint shell is connected with upper perforated plate in 22 tops, and upper perforated plate 23 is connected by fire tube 29 with lower perforated plate 30.Middle shoot door circle 32 is connected with hot water joint shell 22 with hot water joint wall of inner container 31 respectively.Be provided with hot water joint filling pipe 13 in hot water joint outer lower portion.Top is provided with hot water joint blast pipe 9, hot water joint filling pipe 13 links to each other with pre-thermal center top, hot water joint blast pipe 9 is connected on the pre-thermal center top pre-thermal center covering head 26, in order to the exhaust of hot water joint, and shoot door 7, hand hole 16 and clean-out opening 4 in also being provided with on the hot water joint in addition.Pre-thermal center be built-in with pre-thermal center bottom (head) 24, impact tube 25 and on shoot door circle 28.Pre-thermal center bottom (head) 24 bottoms are connected with pre-thermal center shell 27, and top and impact tube join.Between pre-thermal center bottom (head) 24 and upper perforated plate, form dust chamber, to play the dedusting effect.Pre-thermal center covering head 26 joins with pre-thermal center shell 27 and impact tube 25 respectively, the back upside is equipped with water supply tank 41 outside pre-thermal center, be equipped with ball-cock assembly 42 in it to control the moisturizing of pre-thermal center, water supply tank 41 bottoms are equipped with pre-thermal center filling pipe 46 and link to each other with pre-thermal center shell 27 bottoms.On pre-thermal center, also have blast pipe 12, clean-out opening 4 and last shoot door 10 simultaneously.Boiling water joint, hot water joint and pre-thermal center three joints are linked to be an integral body by clamping ring 6.
Source water enters water supply tank 41 on the pre-thermal center from water inlet 44, flow into pre-thermal center bottom by 42 controls of the ball-cock assembly in the case through pre-thermal center filling pipe 46, enter hot water joint bottom from pre-thermal center top by hot water joint filling pipe 43, enter the water supply tank 41 that boiling water saves from hot water joint top by water supply tank filling pipe 41 again, by 42 controls of case inner float ball valve, flow into boiling water joint bottom by boiling water joint filling pipe 40 again, as long as the water level of boiling water joint is fallen, just can cover water continuously automatically successively like this.
Fire coal joins on the coal seam of the fire grate 38 in the flue from fire door 3.Under the effect of red-hot layer, through a series of in heat up in a steamer, reactions such as reduction, oxidation are fully burned, high-temperature flue gas flows into the dust chamber that hot water saves by trunnion 34, and then baffling enters pre-thermal center dust chamber by fire tube 29, and baffling is entered by impact tube 25 in the air again.Because flue gas is sharply reducing of baffling and cigarette speed repeatedly, under the double action of gravity and inertia, make that grit is deposited in the dust chamber bottom in the flue gas, play the dedusting effect.
The main technical detail of the energy-conservation drinking water boiler of the utility model embodiment continuous water supply is as follows:
Specified output 1000kg/h
The rated operating pressure normal pressure
100 ℃ of specified leaving water temperatures
Grate area 0.503m 2
Heating surface area 7.387m 2
Design thermal efficiency 70%
Coal consumption 24kg/h
Adapt to coal II III class bituminous coal, anthracite, moulded coal
Dust exhausting concentration is less than 200mg/NM 3
Lingemann blackness is less than 1 grade

Claims (1)

1, the energy-conservation drinking water boiler of a kind of continuous water supply, it contains vertical body of heater, it is characterized in that: body of heater is divided into the pre-thermal center in top, middle part hot water joint, bottom boiling water joint; Three joints form three independently waters, i.e. warm water territory, hot water territory and boiling water territories;
Be provided with flue, horizontal water tube, trunnion, fire grate in the boiling water joint; Be provided with on fire grate bottom and fire grate top and defend the fire band; The boiling water joint is outer to be provided with water supply tank, filling pipe, blast pipe, fire door, and ball-cock assembly is housed in the water supply tank; Outer filling pipe, blast pipe, the ash door of being provided with of hot water joint;
Be provided with in the pre-thermal center: impact tube, ash door circle and dust chamber; Pre-thermal center has water supply tank and ash door outward; The top is provided with blast pipe, and ball-cock assembly is arranged in the water supply tank;
Pre-thermal center, hot water joint and boiling water joint connect into as a whole by clamping ring.
CN 96222528 1996-09-05 1996-09-05 Continuous water supply energy-saving boiled water Expired - Fee Related CN2272550Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96222528 CN2272550Y (en) 1996-09-05 1996-09-05 Continuous water supply energy-saving boiled water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96222528 CN2272550Y (en) 1996-09-05 1996-09-05 Continuous water supply energy-saving boiled water

Publications (1)

Publication Number Publication Date
CN2272550Y true CN2272550Y (en) 1998-01-14

Family

ID=33902053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96222528 Expired - Fee Related CN2272550Y (en) 1996-09-05 1996-09-05 Continuous water supply energy-saving boiled water

Country Status (1)

Country Link
CN (1) CN2272550Y (en)

Similar Documents

Publication Publication Date Title
CN2272550Y (en) Continuous water supply energy-saving boiled water
CN202013015U (en) Vertical half gas positive burning heating boiler
CN207661976U (en) Used oil heating stove
CN2540568Y (en) Gasification coal fired stove
CN2257895Y (en) Bidirectionally-burning vertical atmospheric pressure boiler
CN2286281Y (en) Vertical double-chamber combustion coal staggered water-tube boiler
CN2440158Y (en) Multipurpose stove
CN2270888Y (en) Boiler shell type fire barrel heating furnace
CN2204396Y (en) Vertical pressureless boiler
CN2159500Y (en) Multiple reverse running boiler with normal pressure
CN201034327Y (en) Household vertical coal boiler
CN2559889Y (en) Coal and gas integral clean combustion boiler
CN2264298Y (en) Hot air multifunctional boiler
CN2708168Y (en) Conical corrugated furnace boiler
CN2094006U (en) Vertical atmospheric water-heating boiler with double-deck grates
CN2167267Y (en) Vertical multi-purpose heat-pipe ambient pressure boiler
CN2290811Y (en) Multifunctional household stove
CN2373698Y (en) Domestic heating stove with double-firepot
CN2279553Y (en) 1.5 ton 0.7 Mpa vertical water pipe hand boiler
CN2226731Y (en) Verticle alternative combusion atmospheric boiler with hot water device
CN2228615Y (en) Heat-pipe type stove for warming
CN2333956Y (en) Vertical smoke-eliminating and dust-removing atmospheric boiler
CN2394162Y (en) Stove for boiling water
CN2566181Y (en) Smokeless positive and backfire gas boiler
CN2283212Y (en) Vertical combustion boiler with double water jacket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee