CN2232470Y - Premature dismantling column cap of small-sized premature dismantling body system - Google Patents

Premature dismantling column cap of small-sized premature dismantling body system Download PDF

Info

Publication number
CN2232470Y
CN2232470Y CN 95226592 CN95226592U CN2232470Y CN 2232470 Y CN2232470 Y CN 2232470Y CN 95226592 CN95226592 CN 95226592 CN 95226592 U CN95226592 U CN 95226592U CN 2232470 Y CN2232470 Y CN 2232470Y
Authority
CN
China
Prior art keywords
column cap
early
chapiter
beam seat
cap body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95226592
Other languages
Chinese (zh)
Inventor
樊昀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95226592 priority Critical patent/CN2232470Y/en
Application granted granted Critical
Publication of CN2232470Y publication Critical patent/CN2232470Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses the early-demounting chapiter of a small-sized early-demounting system, and the utility model is composed of a support plate, a chapiter body, a beam seat, an early-demounting bolt, etc. The support plate is welded on the chapiter body sheathed with the beam seat, the beam seat can move up and down along the chapiter body provided with a sliding chute, the beam seat is fixed on the chapiter body through the early-demounting bolt and the sliding chute, and the lower end of the chapiter body is connected with an adjusting screw rod and a sleeve pipe. The utility model has the advantages of simple structure, high strength, convenient assembly and disassembly and low cost; compared with traditional construction method, the utility model can raise form cycling speed by two to three times, and work efficiency can be raised by more than 1 times.

Description

Tear column cap the morning of small-sized early removing system open
The utility model relates to instrument for building, tears column cap especially a kind of morning of small-sized early removing system open.
The early-dismantling technology of architectural floor construction is one of nation-building portion key popularized project, and the early removing system of promoting can only be carried out the steel Bamboo Formwork of 70 series and early tear open at present, and existing 55 types of most of construction enterprises make up little punching block and then can't adopt.
The utility model purpose a kind ofly the small-sized early removing system of 55 types that aim at that the existing little punching block service efficiency of enterprise designs uses is early torn column cap open for improving with regard to providing.
The utility model purpose is implemented by following technical scheme:
Early tear column cap open, roll over column cap body, beam seat, morning formations such as bolt by gripper shoe.Gripper shoe is welded on the column cap body, beam seat is sleeved on the column cap body, can move up and down along the column cap body, beam seat is welded by shaped steel, have chute on the column cap body, beam seat is by early tearing bolt open and chute can be fixed on the column cap body, and column cap body lower end is associated with regulates screw mandrel and sleeve pipe, by regulating the height of screw mandrel and sleeve pipe adjustable support plate.
Tear that column cap is simple in structure, intensity is high, mounting or dismounting are convenient morning of the present utility model open, in construction, use have fast save time, laborsaving, cost is low, improve advantages such as work efficiency, compare with traditional job practices, can improve 2-3 times of form cycling rates, significantly reduce the input of steel form, work efficiency can improve more than 1 times.
Below in conjunction with accompanying drawing the utility model is elaborated.
Accompanying drawing is the utility model structural representation.
Tear open the morning of small-sized early removing system column cap by gripper shoe 1, column cap body 2, beam seat 3, early tear bolt 4 etc. open and constitute, gripper shoe 1 is welded on the column cap body 2, beam seat 3 is sleeved on the column cap body 2, can move up and down along column cap body 2, beam seat 3 is welded by shaped steel, have chute 7 on the column cap body 2, beam seat 3 is by early tearing bolt 4 open and chute 7 can be fixed on the column cap body 2, and the lower end of column cap body 2 is associated with regulates screw mandrel 6 and sleeve pipe 5.By regulating the height of screw mandrel 6 and sleeve pipe 5 adjustable support plates 1.
During construction, beam seat 3 is moved to column cap body chute 7 upper ends, tear fixedly beam seat 3 of bolt 4 mobile morning open.When early tearing open, knock and early tear bolt 4 open, fall beam seat 3, just dismountable brace summer and template support concrete by gripper shoe 1, treat to remove when concrete reaches certain intensity column cap.

Claims (2)

1, a kind of by gripper shoe (1), column cap body (2), tear beam seat (3), the morning of early tearing the small-sized early removing system of bolt formations such as (4) open column cap open, it is characterized in that: gripper shoe (1) is welded on the column cap body (2), can move up and down along column cap body (2), have chute (7) on the column cap body (2), beam seat (3) is by early tearing bolt (4) open and chute (7) is fixed on the column cap body (2), and column cap body (2) lower end is associated with regulates screw mandrel (6) and sleeve pipe (5).
2, tear column cap open the morning of small-sized early removing system according to claim 1, it is characterized in that: beam seat (3) is welded by shaped steel.
CN 95226592 1995-11-28 1995-11-28 Premature dismantling column cap of small-sized premature dismantling body system Expired - Fee Related CN2232470Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95226592 CN2232470Y (en) 1995-11-28 1995-11-28 Premature dismantling column cap of small-sized premature dismantling body system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95226592 CN2232470Y (en) 1995-11-28 1995-11-28 Premature dismantling column cap of small-sized premature dismantling body system

Publications (1)

Publication Number Publication Date
CN2232470Y true CN2232470Y (en) 1996-08-07

Family

ID=33872703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95226592 Expired - Fee Related CN2232470Y (en) 1995-11-28 1995-11-28 Premature dismantling column cap of small-sized premature dismantling body system

Country Status (1)

Country Link
CN (1) CN2232470Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787719A (en) * 2012-08-27 2012-11-21 泰博混凝土模板与支撑(陕西)有限公司 Formwork early removing mechanism and early removing formwork system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787719A (en) * 2012-08-27 2012-11-21 泰博混凝土模板与支撑(陕西)有限公司 Formwork early removing mechanism and early removing formwork system

Similar Documents

Publication Publication Date Title
CN200978519Y (en) Adjustable quick-dismantling top plate bracket
CN2232470Y (en) Premature dismantling column cap of small-sized premature dismantling body system
CN2251595Y (en) Building construction external hanging rack
CN200978518Y (en) Adjustable quick-dismantling beam bracket
CN2608614Y (en) Early disassembling fully suspended supporting bracket
CN2199266Y (en) Double T shaped lifting head for early stripping form
CN2282972Y (en) Cement precast floor slab short line mould
CN2293399Y (en) Hydraulic lever type bending machine for workpiece
CN2232954Y (en) Building slab quick dismounting pillar
CN2087539U (en) Movable hydraulic bed
CN2237085Y (en) Integrate lifting shuttlering of three shaft hinged telescopic lift pit shaft
CN212841612U (en) Interim strutting arrangement is used to waste incinerator feed inlet
CN218668695U (en) Wood formwork early-dismantling independent support reinforcing system
CN2856262Y (en) Support frame of formwork
CN2278030Y (en) Early dismounting strut for linking-board type shuttering
CN2433304Y (en) Pile machine vibratory hammer with fixture
CN2247064Y (en) Rear turning over device for steel rolling machine
CN220889627U (en) Early top support structure of tearing open of post-cast strip formwork
CN220954546U (en) High preassembly type climbing frame of security
CN2221628Y (en) Adjustable form shore
CN217266951U (en) Slip back face template of bowing
CN211874123U (en) Urban road engineering is with making an uproar protection rail that falls
CN214823387U (en) Desk carrier
CN213359378U (en) Aluminum mould board "two U hold in palm" connection support frock
CN2176397Y (en) Concrete formwork brace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee