CN221663452U - C-shaped hook for front pivot guy rope hanging basket - Google Patents

C-shaped hook for front pivot guy rope hanging basket Download PDF

Info

Publication number
CN221663452U
CN221663452U CN202321970894.8U CN202321970894U CN221663452U CN 221663452 U CN221663452 U CN 221663452U CN 202321970894 U CN202321970894 U CN 202321970894U CN 221663452 U CN221663452 U CN 221663452U
Authority
CN
China
Prior art keywords
hanging basket
connecting portion
front fulcrum
cable
pipe section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321970894.8U
Other languages
Chinese (zh)
Inventor
李元鸿
侯江
匡大然
赵毅
杨育文
谢次磊
胡能昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Railway Group Co ltd
Original Assignee
Yunnan Railway Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Railway Group Co ltd filed Critical Yunnan Railway Group Co ltd
Priority to CN202321970894.8U priority Critical patent/CN221663452U/en
Application granted granted Critical
Publication of CN221663452U publication Critical patent/CN221663452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本申请提供一种前支点牵索挂篮用C型挂钩,设置于斜拉桥主梁施工用前支点牵索挂篮的侧边。这种前支点牵索挂篮用C型挂钩包括依次设置的连接部、延伸部和滑轨部。连接部用于与前支点牵索挂篮固定。延伸部设置于连接部。滑轨部设置于延伸部背离连接部的一端,连接部和滑轨部设置于延伸部的同一侧。前支点牵索挂篮用C型挂钩还包括吊装部,吊装部设置在滑轨部朝向连接部的一侧。吊装部通过两个支撑板形成有穿孔,盖板焊接与两个支撑板朝向连接部的一端,盖板封闭穿孔朝向连接部的开口。这种前支点牵索挂篮用C型挂钩通过穿孔提高前支点牵索挂篮用C型挂钩的功能性。

The present application provides a C-type hook for a front fulcrum cable hanging basket, which is arranged on the side of a front fulcrum cable hanging basket for the main beam construction of a cable-stayed bridge. This C-type hook for a front fulcrum cable hanging basket includes a connecting portion, an extension portion and a slide rail portion which are arranged in sequence. The connecting portion is used to fix with the front fulcrum cable hanging basket. The extension portion is arranged at the connecting portion. The slide rail portion is arranged at one end of the extension portion away from the connecting portion, and the connecting portion and the slide rail portion are arranged on the same side of the extension portion. The C-type hook for a front fulcrum cable hanging basket also includes a hoisting portion, which is arranged on a side of the slide rail portion facing the connecting portion. The hoisting portion is formed with a perforation through two support plates, and a cover plate is welded to one end of the two support plates facing the connecting portion, and the cover plate closes the opening of the perforation facing the connecting portion. This C-type hook for a front fulcrum cable hanging basket improves the functionality of the C-type hook for a front fulcrum cable hanging basket through the perforation.

Description

前支点牵索挂篮用C型挂钩C-type hook for front support rope hanging basket

技术领域Technical Field

本申请涉及索塔结构领域,具体涉及一种前支点牵索挂篮用C型挂钩。The present application relates to the field of cable tower structures, and in particular to a C-type hook for a front support cable hanging basket.

背景技术Background Art

斜拉桥索塔塔肢在施工主梁时,需要使用前支点牵索挂篮和C型挂钩的配合实现施工区域的周期性前移,逐渐施工主梁各分段。When constructing the main beam of the cable-stayed bridge tower, it is necessary to use the cooperation of the front support cable hanging basket and the C-type hook to realize the periodic forward movement of the construction area and gradually construct the main beam sections.

C型挂钩设置在前支点牵索挂篮的侧部,主要用于导向前支点牵索挂篮的行走。但是C型挂钩的功能相对单一,作为施工主梁时整个施工结构中少有位于主梁上方的结构,仅仅导向前支点牵索挂篮的功能显然没有发挥出C型挂钩的空间优势。The C-type hook is set on the side of the front fulcrum cable hanging basket, mainly used to guide the movement of the front fulcrum cable hanging basket. However, the function of the C-type hook is relatively single. When it is used as a main beam in the construction, there are few structures located above the main beam in the entire construction structure. The function of only guiding the front fulcrum cable hanging basket obviously does not give full play to the spatial advantage of the C-type hook.

实用新型内容Utility Model Content

鉴于上述状况,有必要提供一种前支点牵索挂篮用C型挂钩,以扩展C型挂钩的功能。In view of the above situation, it is necessary to provide a C-type hook for a front fulcrum guy rope hanging basket to expand the function of the C-type hook.

本申请的实施例提供一种前支点牵索挂篮用C型挂钩,设置于斜拉桥主梁施工用前支点牵索挂篮的侧边。这种前支点牵索挂篮用C型挂钩包括依次设置:The embodiment of the present application provides a C-type hook for a front fulcrum cable hanging basket, which is arranged on the side of a front fulcrum cable hanging basket for the main beam construction of a cable-stayed bridge. The C-type hook for the front fulcrum cable hanging basket includes the following:

连接部,设置有多个连接孔,所述连接孔用于与所述前支点牵索挂篮固定;A connecting portion, provided with a plurality of connecting holes, wherein the connecting holes are used to be fixed to the front supporting point guy rope hanging basket;

延伸部,设置于所述连接部背离所述连接孔的一端,所述延伸部垂直于所述连接部延伸;An extension portion, disposed at an end of the connecting portion away from the connecting hole, the extension portion extending perpendicularly to the connecting portion;

滑轨部,设置于所述延伸部背离所述连接部的一端,所述滑轨部垂直于所述延伸部延伸,且所述连接部和所述滑轨部设置于所述延伸部的同一侧;A slide rail portion is arranged at one end of the extension portion away from the connecting portion, the slide rail portion extends perpendicularly to the extension portion, and the connecting portion and the slide rail portion are arranged on the same side of the extension portion;

所述前支点牵索挂篮用C型挂钩还包括吊装部,所述吊装部设置在所述滑轨部朝向所述连接部的一侧;The front fulcrum cable hanging basket C-type hook also includes a hoisting portion, and the hoisting portion is arranged on a side of the slide rail portion facing the connecting portion;

所述吊装部包括焊接底座、两个支撑板和盖板;The hoisting part includes a welding base, two support plates and a cover plate;

所述焊接底座与所述滑轨部焊接固定,两个所述支撑板间隔地焊接于所述焊接底座朝向所述连接部的一面了,在两个所述支撑板之间形成穿孔,所述盖板焊接与两个所述支撑板朝向连接部的一端,所述盖板封闭所述穿孔朝向所述连接部的开口。The welding base is welded and fixed to the slide rail portion, the two support plates are welded to a side of the welding base facing the connecting portion at intervals, a through hole is formed between the two support plates, the cover plate is welded to one end of the two support plates facing the connecting portion, and the cover plate closes the opening of the through hole facing the connecting portion.

这种前支点牵索挂篮用C型挂钩能够通过吊装部的穿孔实现牵拉索的连接。穿孔也可以用于安装安全吊篮以便斜拉桥主梁未成型前容置工具或操作人员。而盖板则可以用于调整吊装部的受力或者用于安装滚轮从而使得斜拉桥主梁成型后,前支点牵索挂篮用C型挂钩在斜拉桥主梁上行走。这种前支点牵索挂篮用C型挂钩灵活性强,便于斜拉桥主梁的快速施工。This C-type hook for the front fulcrum cable hanging basket can connect the traction cable through the perforation of the hoisting part. The perforation can also be used to install a safety hanging basket to accommodate tools or operators before the main beam of the cable-stayed bridge is formed. The cover plate can be used to adjust the force of the hoisting part or to install rollers so that the C-type hook for the front fulcrum cable hanging basket can walk on the main beam of the cable-stayed bridge after the main beam of the cable-stayed bridge is formed. This C-type hook for the front fulcrum cable hanging basket has strong flexibility and is convenient for the rapid construction of the main beam of the cable-stayed bridge.

在本申请的一些实施例中,前支点牵索挂篮用C型挂钩还包括适配件和安装螺栓。所述盖板朝向所述连接部的一端设置有安装螺纹孔,所述适配件设置有安装孔,所述安装螺栓穿过所述安装孔并与所述安装螺纹孔螺纹配合以连接所述适配件和所述盖板,所述适配件紧贴所述盖板设置。In some embodiments of the present application, the C-type hook for the front fulcrum rope hanging basket further includes an adapter and a mounting bolt. The cover plate is provided with a mounting threaded hole at one end facing the connecting portion, the adapter is provided with a mounting hole, the mounting bolt passes through the mounting hole and is threadedly matched with the mounting threaded hole to connect the adapter and the cover plate, and the adapter is arranged close to the cover plate.

这种前支点牵索挂篮用C型挂钩能够通过适配件来调整盖板受力,当需要安装牵拉索时,整个前支点牵索挂篮受到向外的拉力更强,则可以使用外厚内薄的适配件来适配吊装部的受力。而吊装部用于吊装安装吊篮时,整个前支点牵索挂篮受到向内的拉力更强,则可以使用外薄内厚的适配件来适配吊装部的受力。This type of front fulcrum guy rope hanging basket uses a C-shaped hook to adjust the cover plate force through an adapter. When the guy rope needs to be installed, the entire front fulcrum guy rope hanging basket is subjected to a stronger outward pulling force, and an adapter with a thick outer surface and a thin inner surface can be used to adapt the force of the lifting part. When the lifting part is used to hoist and install the hanging basket, the entire front fulcrum guy rope hanging basket is subjected to a stronger inward pulling force, and an adapter with a thin outer surface and a thick inner surface can be used to adapt the force of the lifting part.

在本申请的一些实施例中,所述适配件包括滚轮,所述滚轮用于在所述斜拉桥主梁上滚动。In some embodiments of the present application, the adapter includes a roller, and the roller is used to roll on the main beam of the cable-stayed bridge.

这种前支点牵索挂篮用C型挂钩通过适配件来添加滚轮,使得前支点牵索挂篮用C型挂钩具有能够带动前支点牵索挂篮在斜拉索主梁上行走的功能。The C-type hook for the front fulcrum cable hanging basket is provided with rollers through an adapter, so that the C-type hook for the front fulcrum cable hanging basket has the function of driving the front fulcrum cable hanging basket to walk on the inclined cable main beam.

在本申请的一些实施例中,所述吊装部还包括加强板,所述加强板垂直于所述支撑板,所述加强板焊接固定所述焊接底座和所述盖板。In some embodiments of the present application, the hoisting portion further includes a reinforcing plate, which is perpendicular to the supporting plate, and the reinforcing plate is welded to fix the welding base and the cover plate.

这种前支点牵索挂篮用C型挂钩能够通过加强板增加盖板和焊接底座的连接强度。The C-type hook used for the front fulcrum guy wire basket can increase the connection strength between the cover plate and the welded base through the reinforcement plate.

在本申请的一些实施例中,前支点牵索挂篮用C型挂钩还包括连接管。所述连接管包括第一管段、中间管段和第二管段。所述中间管段的直径大于所述第一管段和所述第二管段,所述第一管段插入所述连接部,所述第二管段用于插入所述前支点牵索挂篮,所述中间管段用于夹持于所述连接部和所述前支点牵索挂篮之间。In some embodiments of the present application, the C-type hook for the front fulcrum cable hanging basket further includes a connecting pipe. The connecting pipe includes a first pipe section, an intermediate pipe section, and a second pipe section. The diameter of the intermediate pipe section is larger than that of the first pipe section and the second pipe section. The first pipe section is inserted into the connecting portion, the second pipe section is used to be inserted into the front fulcrum cable hanging basket, and the intermediate pipe section is used to be clamped between the connecting portion and the front fulcrum cable hanging basket.

这种前支点牵索挂篮用C型挂钩能够通过连接管连接径向的螺栓以固定前支点牵索挂篮用C型挂钩和前支点牵索挂篮,径向的螺栓受到的剪切力更小,而且沿第一管段和第二管段的周向具有更多的空间连接螺栓,从而增加连接部与连接管的连接强度,以及前支点牵索挂篮与连接管的连接强度。The C-hook for the front fulcrum rope hanging basket can connect radial bolts through a connecting pipe to fix the C-hook for the front fulcrum rope hanging basket and the front fulcrum rope hanging basket. The radial bolts are subjected to less shear force, and there is more space for connecting bolts along the circumference of the first pipe section and the second pipe section, thereby increasing the connection strength between the connecting part and the connecting pipe, as well as the connection strength between the front fulcrum rope hanging basket and the connecting pipe.

在本申请的一些实施例中,所述第一管段设置有多个匹配孔,每个所述匹配孔处焊接有螺母,所述螺母用于固定螺栓穿过所述连接孔和所述匹配孔后与所述固定螺栓螺纹连接。In some embodiments of the present application, the first pipe segment is provided with a plurality of matching holes, and a nut is welded at each matching hole, and the nut is used for threaded connection with the fixing bolt after the fixing bolt passes through the connecting hole and the matching hole.

这种前支点牵索挂篮用C型挂钩通过固定螺栓配合螺母来固定连接管与连接部方便快捷且稳定。This front support point guy rope hanging basket uses a C-type hook to fix the connecting pipe and the connecting part through fixing bolts and nuts, which is convenient, fast and stable.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本申请的一个实施例中的斜拉桥主梁施工时的结构示意图。FIG1 is a schematic structural diagram of a cable-stayed bridge main beam during construction in one embodiment of the present application.

图2是本申请的一个实施例中的前支点牵索挂篮用C型挂钩的结构示意图。FIG. 2 is a schematic structural diagram of a C-type hook for a front fulcrum rope hanging basket in one embodiment of the present application.

图3是图2中A区域的局部放大图,图示实施例中适配件没有滚轮。FIG. 3 is a partial enlarged view of the area A in FIG. 2 , showing that the adapter in the illustrated embodiment has no roller.

图4是图2中A区域的局部放大图,图示实施例中适配件有滚轮。FIG. 4 is a partial enlarged view of the area A in FIG. 2 , and the adapter in the illustrated embodiment has a roller.

图5是本申请的一个实施例中的连接管的结构示意图。FIG. 5 is a schematic structural diagram of a connecting pipe in an embodiment of the present application.

主要元件符号说明Main component symbols

C型挂钩 010C-Hook 010

前前支点牵索挂篮 030Front fulcrum guy rope hanging basket 030

连接部 100Connecting part 100

延伸部 200Extension 200

滑轨部 300Slide rail 300

吊装部 400Hoisting Department 400

穿孔 401Piercing 401

焊接底座 410Welding base 410

支撑板 420Support plate 420

盖板 430Cover 430

适配件 440Adapter 440

滚轮 441Roller 441

安装螺栓 450Mounting bolts 450

加强板 460Reinforcement plate 460

连接管 500Connecting pipe 500

第一管段 510First pipe section 510

匹配孔 511Matching hole 511

中间管段 520Intermediate pipe section 520

第二管段 530Second pipe section 530

如下具体实施方式将结合上述附图进一步说明本申请。The following specific implementation methods will further illustrate the present application in conjunction with the above-mentioned drawings.

具体实施方式DETAILED DESCRIPTION

下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行描述,显然,所描述的实施例仅是本申请一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

需要说明的是,当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中设置的元件。当一个元件被认为是“设置在”另一个元件,它可以是直接设置在另一个元件上或者可能同时存在居中设置的元件。It should be noted that when an element is considered to be "connected" to another element, it may be directly connected to the other element or there may be a centrally disposed element at the same time. When an element is considered to be "disposed on" another element, it may be directly disposed on the other element or there may be a centrally disposed element at the same time.

除非另有定义,本文所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同。本文中在本申请的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本申请。本文所使用的术语“和/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used herein in the specification of the present application are only for the purpose of describing specific embodiments and are not intended to limit the present application. The term "and/or" used herein includes any and all combinations of one or more related listed items.

本申请的实施例提供一种前支点牵索挂篮用C型挂钩,设置于斜拉桥主梁施工用前支点牵索挂篮的侧边。这种前支点牵索挂篮用C型挂钩包括依次设置的连接部、延伸部和滑轨部。连接部设置有多个连接孔,所述连接孔用于与所述前支点牵索挂篮固定。延伸部设置于所述连接部背离所述连接孔的一端,所述延伸部垂直于所述连接部延伸。滑轨部设置于所述延伸部背离所述连接部的一端,所述滑轨部垂直于所述延伸部延伸,且所述连接部和所述滑轨部设置于所述延伸部的同一侧。所述前支点牵索挂篮用C型挂钩还包括吊装部,所述吊装部设置在所述滑轨部朝向所述连接部的一侧。所述吊装部包括焊接底座、两个支撑板和盖板。所述焊接底座与所述滑轨部焊接固定,两个所述支撑板间隔地焊接于所述焊接底座朝向所述连接部的一面了,在两个所述支撑板之间形成穿孔,所述盖板焊接与两个所述支撑板朝向连接部的一端,所述盖板封闭所述穿孔朝向所述连接部的开口。An embodiment of the present application provides a C-type hook for a front fulcrum cable hanging basket, which is arranged on the side of a front fulcrum cable hanging basket for the construction of a main beam of a cable-stayed bridge. This C-type hook for a front fulcrum cable hanging basket includes a connecting portion, an extension portion and a slide rail portion which are arranged in sequence. The connecting portion is provided with a plurality of connecting holes, and the connecting holes are used to be fixed to the front fulcrum cable hanging basket. The extension portion is arranged at one end of the connecting portion away from the connecting hole, and the extension portion extends perpendicular to the connecting portion. The slide rail portion is arranged at one end of the extension portion away from the connecting portion, and the slide rail portion extends perpendicular to the extension portion, and the connecting portion and the slide rail portion are arranged on the same side of the extension portion. The C-type hook for a front fulcrum cable hanging basket also includes a hoisting portion, and the hoisting portion is arranged on the side of the slide rail portion facing the connecting portion. The hoisting portion includes a welded base, two support plates and a cover plate. The welding base is welded and fixed to the slide rail portion, the two support plates are welded to a side of the welding base facing the connecting portion at intervals, a through hole is formed between the two support plates, the cover plate is welded to one end of the two support plates facing the connecting portion, and the cover plate closes the opening of the through hole facing the connecting portion.

这种前支点牵索挂篮用C型挂钩能够通过吊装部的穿孔实现牵拉索的连接。穿孔也可以用于安装安全吊篮以便斜拉桥主梁未成型前容置工具或操作人员。而盖板则可以用于调整吊装部的受力或者用于安装滚轮从而使得斜拉桥主梁成型后,前支点牵索挂篮用C型挂钩在斜拉桥主梁上行走。这种前支点牵索挂篮用C型挂钩灵活性强,便于斜拉桥主梁的快速施工。This C-type hook for the front fulcrum cable hanging basket can connect the traction cable through the perforation of the hoisting part. The perforation can also be used to install a safety hanging basket to accommodate tools or operators before the main beam of the cable-stayed bridge is formed. The cover plate can be used to adjust the force of the hoisting part or to install rollers so that the C-type hook for the front fulcrum cable hanging basket can walk on the main beam of the cable-stayed bridge after the main beam of the cable-stayed bridge is formed. This C-type hook for the front fulcrum cable hanging basket has strong flexibility and is convenient for the rapid construction of the main beam of the cable-stayed bridge.

下面结合附图,对本申请的实施例作进一步的说明。The embodiments of the present application are further described below in conjunction with the accompanying drawings.

请参阅图1至图5,本申请的实施例提供一种前支点牵索挂篮用C型挂钩010,设置于斜拉桥主梁施工用前支点牵索挂篮的侧边。这种前支点牵索挂篮用C型挂钩010包括依次设置:Referring to Figures 1 to 5, the embodiment of the present application provides a C-type hook 010 for a front fulcrum cable hanging basket, which is arranged on the side of a front fulcrum cable hanging basket for the main beam construction of a cable-stayed bridge. The C-type hook 010 for a front fulcrum cable hanging basket includes the following:

连接部100,设置有多个连接孔,所述连接孔用于与所述前支点牵索挂篮固定;The connecting part 100 is provided with a plurality of connecting holes, and the connecting holes are used to be fixed to the front supporting point guy rope hanging basket;

延伸部200,设置于所述连接部100背离所述连接孔的一端,所述延伸部200垂直于所述连接部100延伸;An extension portion 200 is disposed at one end of the connecting portion 100 away from the connecting hole, and the extension portion 200 extends perpendicularly to the connecting portion 100;

滑轨部300,设置于所述延伸部200背离所述连接部100的一端,所述滑轨部300垂直于所述延伸部200延伸,且所述连接部100和所述滑轨部300设置于所述延伸部200的同一侧;A slide rail portion 300 is disposed at one end of the extension portion 200 away from the connection portion 100 , the slide rail portion 300 extends perpendicularly to the extension portion 200 , and the connection portion 100 and the slide rail portion 300 are disposed on the same side of the extension portion 200 ;

所述前支点牵索挂篮用C型挂钩010还包括吊装部400,所述吊装部400设置在所述滑轨部300朝向所述连接部100的一侧;The front fulcrum rope hanging basket C-type hook 010 further includes a hoisting portion 400, and the hoisting portion 400 is arranged on a side of the slide rail portion 300 facing the connecting portion 100;

所述吊装部400包括焊接底座410、两个支撑板420和盖板430;The hoisting part 400 includes a welding base 410, two support plates 420 and a cover plate 430;

所述焊接底座410与所述滑轨部300焊接固定,两个所述支撑板420间隔地焊接于所述焊接底座410朝向所述连接部100的一面了,在两个所述支撑板420之间形成穿孔401,所述盖板430焊接与两个所述支撑板420朝向连接部100的一端,所述盖板430封闭所述穿孔401朝向所述连接部100的开口。The welding base 410 is welded and fixed to the slide rail portion 300, and the two support plates 420 are welded to the side of the welding base 410 facing the connecting portion 100 at intervals, and a through hole 401 is formed between the two support plates 420. The cover plate 430 is welded to one end of the two support plates 420 facing the connecting portion 100, and the cover plate 430 closes the opening of the through hole 401 facing the connecting portion 100.

这种前支点牵索挂篮用C型挂钩010能够通过吊装部400的穿孔401实现牵拉索的连接。穿孔401也可以用于安装安全吊篮以便斜拉桥主梁未成型前容置工具或操作人员。而盖板430则可以用于调整吊装部400的受力或者用于安装滚轮441从而使得斜拉桥主梁成型后,前支点牵索挂篮用C型挂钩010在斜拉桥主梁上行走。这种前支点牵索挂篮用C型挂钩010灵活性强,便于斜拉桥主梁的快速施工。The C-type hook 010 for the front fulcrum cable hanging basket can realize the connection of the traction cable through the through hole 401 of the hoisting part 400. The through hole 401 can also be used to install a safety hanging basket to accommodate tools or operators before the main beam of the cable-stayed bridge is formed. The cover plate 430 can be used to adjust the force of the hoisting part 400 or to install the roller 441 so that the C-type hook 010 for the front fulcrum cable hanging basket can walk on the main beam of the cable-stayed bridge after the main beam of the cable-stayed bridge is formed. The C-type hook 010 for the front fulcrum cable hanging basket has strong flexibility and is convenient for the rapid construction of the main beam of the cable-stayed bridge.

在本申请的一些实施例中,前支点牵索挂篮用C型挂钩010还包括适配件440和安装螺栓450。所述盖板430朝向所述连接部100的一端设置有安装螺纹孔,所述适配件440设置有安装孔,所述安装螺栓450穿过所述安装孔并与所述安装螺纹孔螺纹配合以连接所述适配件440和所述盖板430,所述适配件440紧贴所述盖板430设置。In some embodiments of the present application, the C-type hook 010 for the front fulcrum rope hanging basket further includes an adapter 440 and a mounting bolt 450. The cover plate 430 is provided with a mounting threaded hole at one end facing the connecting portion 100, the adapter 440 is provided with a mounting hole, the mounting bolt 450 passes through the mounting hole and is threadedly matched with the mounting threaded hole to connect the adapter 440 and the cover plate 430, and the adapter 440 is arranged close to the cover plate 430.

这种前支点牵索挂篮用C型挂钩010能够通过适配件440来调整盖板430受力,当需要安装牵拉索时,整个前支点牵索挂篮受到向外的拉力更强,则可以使用外厚内薄的适配件440来适配吊装部400的受力。而吊装部400用于吊装安装吊篮时,整个前支点牵索挂篮受到向内的拉力更强,则可以使用外薄内厚的适配件440来适配吊装部400的受力。This C-type hook 010 for the front fulcrum cable hanging basket can adjust the force of the cover plate 430 through the adapter 440. When the pulling rope needs to be installed, the entire front fulcrum cable hanging basket is subjected to a stronger outward pulling force, and the adapter 440 with a thick outer surface and a thin inner surface can be used to adapt the force of the hoisting part 400. When the hoisting part 400 is used to hang and install the hanging basket, the entire front fulcrum cable hanging basket is subjected to a stronger inward pulling force, and the adapter 440 with a thin outer surface and a thick inner surface can be used to adapt the force of the hoisting part 400.

在本申请的一些实施例中,所述适配件440包括滚轮441,所述滚轮441用于在所述斜拉桥主梁上滚动。In some embodiments of the present application, the adapter 440 includes a roller 441, and the roller 441 is used to roll on the main beam of the cable-stayed bridge.

这种前支点牵索挂篮用C型挂钩010通过适配件440来添加滚轮441,使得前支点牵索挂篮用C型挂钩010具有能够带动前支点牵索挂篮在斜拉索主梁上行走的功能。The C-type hook 010 for the front fulcrum cable hanging basket is added with a roller 441 through an adapter 440, so that the C-type hook 010 for the front fulcrum cable hanging basket has the function of driving the front fulcrum cable hanging basket to move on the inclined cable main beam.

在本申请的一些实施例中,所述吊装部400还包括加强板460,所述加强板460垂直于所述支撑板420,所述加强板460焊接固定所述焊接底座410和所述盖板430。In some embodiments of the present application, the hoisting portion 400 further includes a reinforcing plate 460 , which is perpendicular to the supporting plate 420 , and the reinforcing plate 460 is welded to fix the welding base 410 and the cover plate 430 .

这种前支点牵索挂篮用C型挂钩010能够通过加强板460增加盖板430和焊接底座410的连接强度。This front fulcrum rope hanging basket C-type hook 010 can increase the connection strength between the cover plate 430 and the welding base 410 through the reinforcement plate 460.

在本申请的一些实施例中,前支点牵索挂篮用C型挂钩010还包括连接管500。所述连接管500包括第一管段510、中间管段520和第二管段530。所述中间管段520的直径大于所述第一管段510和所述第二管段530,所述第一管段510插入所述连接部100,所述第二管段530用于插入所述前支点牵索挂篮,所述中间管段520用于夹持于所述连接部100和所述前支点牵索挂篮之间。In some embodiments of the present application, the C-type hook 010 for the front fulcrum cable hanging basket further includes a connecting pipe 500. The connecting pipe 500 includes a first pipe section 510, an intermediate pipe section 520, and a second pipe section 530. The diameter of the intermediate pipe section 520 is larger than that of the first pipe section 510 and the second pipe section 530. The first pipe section 510 is inserted into the connecting portion 100, the second pipe section 530 is used to be inserted into the front fulcrum cable hanging basket, and the intermediate pipe section 520 is used to be clamped between the connecting portion 100 and the front fulcrum cable hanging basket.

这种前支点牵索挂篮用C型挂钩010能够通过连接管500连接径向的螺栓以固定前支点牵索挂篮用C型挂钩010和前支点牵索挂篮,径向的螺栓受到的剪切力更小,而且沿第一管段510和第二管段530的周向具有更多的空间连接螺栓,从而增加连接部100与连接管500的连接强度,以及前支点牵索挂篮与连接管500的连接强度。This C-hook 010 for the front fulcrum cable hanging basket can be connected to radial bolts through the connecting pipe 500 to fix the C-hook 010 for the front fulcrum cable hanging basket and the front fulcrum cable hanging basket. The radial bolts are subjected to less shear force, and there is more space for connecting bolts along the circumference of the first pipe section 510 and the second pipe section 530, thereby increasing the connection strength between the connecting part 100 and the connecting pipe 500, as well as the connection strength between the front fulcrum cable hanging basket and the connecting pipe 500.

在本申请的一些实施例中,所述第一管段510设置有多个匹配孔511,每个所述匹配孔511处焊接有螺母,所述螺母用于固定螺栓穿过所述连接孔和所述匹配孔511后与所述固定螺栓螺纹连接。In some embodiments of the present application, the first pipe segment 510 is provided with a plurality of matching holes 511 , and a nut is welded at each matching hole 511 , and the nut is used for threaded connection with the fixing bolt after the fixing bolt passes through the connecting hole and the matching hole 511 .

这种前支点牵索挂篮用C型挂钩010通过固定螺栓配合螺母来固定连接管500与连接部100方便快捷且稳定。This front support point rope hanging basket uses a C-type hook 010 to fix the connecting pipe 500 and the connecting part 100 by fixing bolts and nuts, which is convenient, fast and stable.

另外,本领域技术人员还可在本申请精神内做其它变化,当然,这些依据本申请精神所做的变化,都应包含在本申请所公开的范围。In addition, those skilled in the art may also make other changes within the spirit of the present application. Of course, these changes made according to the spirit of the present application should be included in the scope disclosed in the present application.

Claims (6)

1.一种前支点牵索挂篮用C型挂钩,设置于斜拉桥主梁施工用前支点牵索挂篮的侧边,其特征在于,包括依次设置:1. A C-shaped hook for a front fulcrum cable hanging basket, arranged on the side of a front fulcrum cable hanging basket for the main beam construction of a cable-stayed bridge, characterized in that it comprises the following: 连接部,设置有多个连接孔,所述连接孔用于与所述前支点牵索挂篮固定;A connecting portion, provided with a plurality of connecting holes, wherein the connecting holes are used to be fixed to the front supporting point guy rope hanging basket; 延伸部,设置于所述连接部背离所述连接孔的一端,所述延伸部垂直于所述连接部延伸;An extension portion, disposed at an end of the connecting portion away from the connecting hole, the extension portion extending perpendicularly to the connecting portion; 滑轨部,设置于所述延伸部背离所述连接部的一端,所述滑轨部垂直于所述延伸部延伸,且所述连接部和所述滑轨部设置于所述延伸部的同一侧;A slide rail portion is arranged at one end of the extension portion away from the connecting portion, the slide rail portion extends perpendicularly to the extension portion, and the connecting portion and the slide rail portion are arranged on the same side of the extension portion; 所述前支点牵索挂篮用C型挂钩还包括吊装部,所述吊装部设置在所述滑轨部朝向所述连接部的一侧;The front fulcrum cable hanging basket C-type hook also includes a hoisting portion, and the hoisting portion is arranged on a side of the slide rail portion facing the connecting portion; 所述吊装部包括焊接底座、两个支撑板和盖板;The hoisting part includes a welding base, two support plates and a cover plate; 所述焊接底座与所述滑轨部焊接固定,两个所述支撑板间隔地焊接于所述焊接底座朝向所述连接部的一面了,在两个所述支撑板之间形成穿孔,所述盖板焊接与两个所述支撑板朝向连接部的一端,所述盖板封闭所述穿孔朝向所述连接部的开口。The welding base is welded and fixed to the slide rail portion, the two support plates are welded to a side of the welding base facing the connecting portion at intervals, a through hole is formed between the two support plates, the cover plate is welded to one end of the two support plates facing the connecting portion, and the cover plate closes the opening of the through hole facing the connecting portion. 2.如权利要求1所述的前支点牵索挂篮用C型挂钩,其特征在于,还包括适配件和安装螺栓;2. The C-type hook for the front fulcrum traction rope hanging basket according to claim 1, characterized in that it also includes an adapter and a mounting bolt; 所述盖板朝向所述连接部的一端设置有安装螺纹孔,所述适配件设置有安装孔,所述安装螺栓穿过所述安装孔并与所述安装螺纹孔螺纹配合以连接所述适配件和所述盖板,所述适配件紧贴所述盖板设置。The cover plate is provided with a mounting threaded hole at one end facing the connecting portion, the adapter is provided with a mounting hole, the mounting bolt passes through the mounting hole and is threadedly matched with the mounting threaded hole to connect the adapter and the cover plate, and the adapter is arranged tightly against the cover plate. 3.如权利要求2所述的前支点牵索挂篮用C型挂钩,其特征在于,所述适配件包括滚轮,所述滚轮用于在所述斜拉桥主梁上滚动。3. The C-type hook for the front fulcrum cable hanging basket as described in claim 2 is characterized in that the adapter includes a roller, and the roller is used to roll on the main beam of the cable-stayed bridge. 4.如权利要求3所述的前支点牵索挂篮用C型挂钩,其特征在于,所述吊装部还包括加强板,所述加强板垂直于所述支撑板,所述加强板焊接固定所述焊接底座和所述盖板。4. The C-type hook for the front fulcrum rope hanging basket as described in claim 3 is characterized in that the lifting part also includes a reinforcing plate, the reinforcing plate is perpendicular to the supporting plate, and the reinforcing plate is welded to fix the welding base and the cover plate. 5.如权利要求4所述的前支点牵索挂篮用C型挂钩,其特征在于,还包括连接管;5. The C-type hook for the front fulcrum rope hanging basket according to claim 4, characterized in that it also includes a connecting pipe; 所述连接管包括第一管段、中间管段和第二管段;The connecting pipe comprises a first pipe section, a middle pipe section and a second pipe section; 所述中间管段的直径大于所述第一管段和所述第二管段,所述第一管段插入所述连接部,所述第二管段用于插入所述前支点牵索挂篮,所述中间管段用于夹持于所述连接部和所述前支点牵索挂篮之间。The diameter of the middle pipe section is larger than that of the first pipe section and the second pipe section. The first pipe section is inserted into the connecting portion, the second pipe section is used to be inserted into the front supporting point cable hanging basket, and the middle pipe section is used to be clamped between the connecting portion and the front supporting point cable hanging basket. 6.如权利要求5所述的前支点牵索挂篮用C型挂钩,其特征在于,所述第一管段设置有多个匹配孔,每个所述匹配孔处焊接有螺母,所述螺母用于固定螺栓穿过所述连接孔和所述匹配孔后与所述固定螺栓螺纹连接。6. The C-type hook for the front fulcrum rope hanging basket as described in claim 5 is characterized in that the first pipe section is provided with a plurality of matching holes, a nut is welded at each matching hole, and the nut is used for fixing the bolt to pass through the connecting hole and the matching hole and then be threadedly connected with the fixing bolt.
CN202321970894.8U 2023-07-25 2023-07-25 C-shaped hook for front pivot guy rope hanging basket Active CN221663452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321970894.8U CN221663452U (en) 2023-07-25 2023-07-25 C-shaped hook for front pivot guy rope hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321970894.8U CN221663452U (en) 2023-07-25 2023-07-25 C-shaped hook for front pivot guy rope hanging basket

Publications (1)

Publication Number Publication Date
CN221663452U true CN221663452U (en) 2024-09-06

Family

ID=92574449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321970894.8U Active CN221663452U (en) 2023-07-25 2023-07-25 C-shaped hook for front pivot guy rope hanging basket

Country Status (1)

Country Link
CN (1) CN221663452U (en)

Similar Documents

Publication Publication Date Title
CN221663452U (en) C-shaped hook for front pivot guy rope hanging basket
CN207537885U (en) Anchoring Mechanism in the Stretching Stage of Stay Cables
CN202215040U (en) Telescopic adjustable temporary wire drawing device for transmission line pole/tower
CN115492388B (en) A construction method for facade cable membrane of huge external inclined cable back pull system
CN114412071B (en) Through beam type double-cable structure and tensioning method
CN204475874U (en) A kind of novel pre-stressed steel strand draw-gear
CN216891997U (en) Traction offset system of large-span bridge beam section
CN207794637U (en) A kind of Cast-in-situ Beam prestressed stretch-draw moulding bed
CN211947975U (en) Quick traction equipment for cable-stayed beam end winch
CN201010459Y (en) Flexible attaching device used for tower crane body
CN206712334U (en) Maintenance fixture
CN209244224U (en) An external scaffold cantilever I-beam with bolts to lock the oblique tie rods
CN212155393U (en) Lifting bolt
CN116553351A (en) Steel truss hoisting device and hoisting method
CN205367538U (en) Swing crane and A cabinet frame thereof
CN110011216B (en) Crossing frame
CN208362938U (en) Science of bridge building power transmission drawing anchor device
CN212200081U (en) Anchor box and steel pipe arch buckling and hanging device
CN223032941U (en) Limited space hoisting overhead anchor device
CN113417269A (en) Method for mounting rib plate of combined beam structure
CN207892337U (en) Assembled reinforcing ring at steel stack cable rope
CN210238306U (en) Large-span bridge steel box girder anchoring device
CN216190336U (en) Escalator truss segmentation hoisting accessory
CN222796225U (en) A device for removing a single parallel steel strand cable
CN214739878U (en) Structure is assembled to high-rise shear force wall large mould board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant