CN2216103Y - Adjustable cantilever beam - Google Patents

Adjustable cantilever beam Download PDF

Info

Publication number
CN2216103Y
CN2216103Y CN 94223759 CN94223759U CN2216103Y CN 2216103 Y CN2216103 Y CN 2216103Y CN 94223759 CN94223759 CN 94223759 CN 94223759 U CN94223759 U CN 94223759U CN 2216103 Y CN2216103 Y CN 2216103Y
Authority
CN
China
Prior art keywords
rod
guide
telescopic
cantilever
semi girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94223759
Other languages
Chinese (zh)
Inventor
戴红妹
仇铭华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bierte New Construction Tech Research Inst Beijing
Original Assignee
Bierte New Construction Tech Research Inst Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bierte New Construction Tech Research Inst Beijing filed Critical Bierte New Construction Tech Research Inst Beijing
Priority to CN 94223759 priority Critical patent/CN2216103Y/en
Application granted granted Critical
Publication of CN2216103Y publication Critical patent/CN2216103Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a telescopic cantilever beam of a building falsework, which is composed of a cantilever beam, a cantilever bracket, a telescopic beam and a telescopic bracket. A telescopic rod of the telescopic bracket is provided with a plurality of telescopic holes. The top part of an oblique steel tube of the cantilever bracket is provided with a locating hole. The distance between an adjustable screw rod and an upright post can be adjusted after locating pins are inserted into the locating hole and different adjustable holes in the telescopic rod. The height of a top board can be adjusted through a nut and the adjustable screw rod to support the telescopic beam. One end of a movable beam guide sleeve of the telescopic beam is fixed to a movable beam, the other end of the movable beam guide sleeve is buckled on the cantilever beam to shift the telescopic beam. The telescopic cantilever beam formed in the method can fetch up the surplus of any matching mould. Thus large funds and rolled steels of building sections can be saved.

Description

Adjustable cantilever beam
The utility model relates to a kind of beam of building scaffold.
Early removing system is in the building operations industry, and especially more and more universal being much accounted of in the highrise building field shows that it is shortening duty cycle, saves the superiority of aspects such as construction cost.Existing its standard specification of early removing system and series of products, and the planar dimension in the building is diversified, joining will inevitably run in the mould at early removing system always has certain unnecessary amount can not adopt standard parts in addition at the standard form edge, for this reason, when setting up template, need to set up a semi girder to supply the edge that the master die plate-girder can not set foot at the edge.But the mould surplus of joining of each building is not the same, even the mould surplus of joining of each level also can not be the same in the same building thing, for this reason, the construction of each building of founding a capital will be equipped with the semi girder of different size, these semi girders are after using once, because of off size suitable can not fully the application, consequently can cause suitable overstocking and waste probably.
The purpose of this utility model is to provide a kind of semi girder that can regulate length, can regulate the needs that its length satisfies different surpluses in joining the mould margin range as required arbitrarily.The constructor no longer needs each semi girder of considering the preparation different size.Both be very easy to and just do not used the person, also can save substantial contribution and steel.
The utility model is done in such a way that promptly after adopting the shortest semi girder of one section existing length, increases by one section extensible canopy, sets up an expansion bracket with support extensible canopy, both fit adjustment on the cantilever shalving of existing semi girder.The sub-fraction of extensible canopy be one with the identical walking beam of original semi girder cross sectional shape, and most of length is the guide pin bushing and the guide rod that can stretch.Movable guide pin bushing just in time fastens the back of semi girder, carries out smoothly flexible as guide rail.Expansion bracket is the prolongation of cantilever shalving, regulate fixing with alignment pin, make the top of expansion bracket just in time be in the below of walking beam, because the expansion link of expansion bracket tilts, so different and different apart from regulated quantity between the top of expansion link and the walking beam, adjusting screw(rod) is equipped with on the expansion bracket top for this reason, is fixed with top board on the adjusting screw(rod), and the height that the mat swivel nut is regulated top board makes it just in time to withstand walking beam to support walking beam usefulness.
The utility model compared with the prior art, its advantage is:
1. the semi girder of the alternative various sizes of the utility model is suitable for the various mould surpluses of joining.
2. can be repeatedly used, for unit in charge of construction saves great deal of steel and fund.
Description of drawings:
Fig. 1 is a general assembly drawing of the present utility model
Fig. 2 is fixing semi girder figure
Fig. 3 is that the A of Fig. 2 is to diagrammatic sketch
Fig. 4 is extensible canopy figure of the present utility model
Fig. 5 is Fig. 4 A-A sectional view
Fig. 6 is expansion bracket figure of the present utility model
Embodiment
Embodiment of the present utility model adopts one section semi girder (3) that existing length is the shortest, be fixed on the cantilever shalving (4), the upper end of semi girder (3) hangs on the column cap (1), the lower end withstands on the column (2) by being welded in the following cantilever shalving holder (5) of cantilever shalving (4), the outside at semi girder (3) increases by one section extensible canopy, increases by an expansion bracket on the last top of cantilever shalving (4) to support extensible canopy (11).
Extensible canopy is formed expansion bracket and is made up of expansion link (6), adjusting screw(rod) (7), screw rod guide pin bushing (8), nut (9) and top board (10) by walking beam, movable guide pin bushing (12), guide rod (13), the two sides of semi girder respectively have a guide hole (18), bottom righthand side is fixed the guide rod seat (14) of a band guide hole (18) in semi girder, three guide holes (18) are concentric with guide rod (13), and its aperture is slightly larger than the diameter of guide rod (13).
Expansion link 5 inserts in the oblique steel pipe of cantilever shalving, several adjustment holes (16) are arranged on the expansion link (5), cantilever shalving (4) the tiltedly top of steel pipe has a locating hole (19), with a certain adjustment hole (16) of oblique steel pipe of alignment pin (15) insertion cantilever shalving (4) and expansion link (5), can determine the length of expansion bracket emersion.The top of expansion link (5) is welded with screw rod guide pin bushing (8), adjusting screw(rod) (7) screws on nut (9) and inserts screw rod guide pin bushing (8), swivel nut (9), adjusting screw(rod) (7) can move up and down, make the top board (10) that places on the adjusting screw(rod) (7) hold walking beam (11), make walking beam (11) position stability.The lower end of adjusting screw(rod) (7) is inserted with cottor pin (7) and breaks away from screw rod guide pin bushing (8) to prevent adjusting screw(rod) (7).
One end of walking beam (11) is fixed with movable guide pin bushing (12), for guaranteeing that walking beam (11) and movable guide pin bushing (12) can keep same plane with semi girder all the time, walking beam (11) one face down bondings have one with movable guide pin bushing (12) parallel guide rod (13), guide rod (13) inserts in the guide hole (18) of semi girder (3) one sides and guide rod seat (14), and movable guide pin bushing (12) is closely buckled in the upper end of semi girder (3).Translation walking beam (11), walking beam (11) is changing with the spacing of semi girder (3), the spacing of its change is the adjustable extent of the utility model Adjustable cantilever beam, and also in other words, the use length range of movable guide pin bushing (12) is the adjustable range of adjustable semi girder.
The setting of walking beam is to remedy to join the mould surplus, thus when extensible canopy is adjusted to longest distance, the distance at its outer end and column cap center, promptly the maximum total length of the adjustable semi girder length that is slightly smaller than the shortest master die plate-girder gets final product dealing with various requirements.

Claims (4)

1, a kind of Adjustable cantilever beam is made up of cantilever shalving and semi girder, and semi girder is fixed on the cantilever shalving, and the upper end hangs on the column cap, and the lower end is characterized in that also having an expansion bracket and an extensible canopy by the cantilever shalving jacking posture in standing (qigong) post that is welded in the cantilever shalving bottom:
(1) expansion bracket is made up of expansion link (6), adjusting screw(rod) (7), screw rod guide pin bushing (8), nut (9), top board (10) and cottor pin (17), and several adjustment holes (16) are arranged on the expansion link (6);
(2) extensible canopy is by walking beam (11), and movable guide pin bushing (12) and guide rod (13) are formed;
(3) semi girder (3) each side have a guide hole (18), bottom righthand side is fixed with a guide rod seat (14) in the beam, and a guide hole (18) is also arranged on the guide rod seat (14);
(4) expansion link (6) inserts in the oblique steel pipe of cantilever shalving (4), insert the locating hole (19) and the expansion link (6) of oblique steel pipe with alignment pin (15) and go up a certain adjustment hole (16), to regulate the flexible distance of expansion link, screw rod guide pin bushing (8) is welded in the top of expansion link (6), nut (9) screws in adjusting screw(rod) (7) back and inserts in the screw rod guide pin bushing (8), swivel nut (9) can make the top board (10) that is welded on the adjusting screw(rod) (7) move up and down, upwards until withstanding walking beam (11);
(5) end of movable guide pin bushing (12) is fixed on the walking beam (11), the other end is buckled in the semi girder top, guide rod (13) one ends are fixed on a side of walking beam (11), the other end is inserted in the guide hole (18) on semi girder (3) one sides and the guide rod seat, translation walking beam (11) is to change the total length of Adjustable cantilever beam.
2, Adjustable cantilever beam according to claim 1, it holds the cottor pin (17) that the lower end that is characterised in that adjusting screw(rod) (7) is inserted with slip-off preventing.
3, Adjustable cantilever beam according to claim 1 is characterized in that the guide hole (18) of guide hole (18) on the guide rod seat (14) and semi girder (3) both sides is concentric with guide rod (13), and its aperture is a bit larger tham the external diameter of guide rod (13).
4, Adjustable cantilever beam according to claim 1 is characterized in that extensible canopy (11) when being adjusted to longest distance, and in the heart distance in its outer end and the column cap is slightly smaller than the length of the shortest master die plate-girder.
CN 94223759 1994-10-19 1994-10-19 Adjustable cantilever beam Expired - Fee Related CN2216103Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94223759 CN2216103Y (en) 1994-10-19 1994-10-19 Adjustable cantilever beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94223759 CN2216103Y (en) 1994-10-19 1994-10-19 Adjustable cantilever beam

Publications (1)

Publication Number Publication Date
CN2216103Y true CN2216103Y (en) 1995-12-27

Family

ID=33837364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94223759 Expired - Fee Related CN2216103Y (en) 1994-10-19 1994-10-19 Adjustable cantilever beam

Country Status (1)

Country Link
CN (1) CN2216103Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1967121B (en) * 2005-11-16 2010-04-21 烟台鲁宝钢管有限责任公司 Expansion rebuilding method for ring furnace
CN102583152A (en) * 2012-02-16 2012-07-18 毛坤龙 Suspension beam
CN104755681A (en) * 2012-09-07 2015-07-01 福姆700私人有限公司 A panel support bracket
CN106760572A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 Predetermined level component quickly positions adjustment frock and method with composite beam junction
CN108252409A (en) * 2016-12-29 2018-07-06 中冶宝钢技术服务有限公司 A kind of method of steel construction full wafer lifting steel column

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1967121B (en) * 2005-11-16 2010-04-21 烟台鲁宝钢管有限责任公司 Expansion rebuilding method for ring furnace
CN102583152A (en) * 2012-02-16 2012-07-18 毛坤龙 Suspension beam
CN104755681A (en) * 2012-09-07 2015-07-01 福姆700私人有限公司 A panel support bracket
CN104755681B (en) * 2012-09-07 2017-12-05 福姆700私人有限公司 Panel support bracket
CN106760572A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 Predetermined level component quickly positions adjustment frock and method with composite beam junction
CN108252409A (en) * 2016-12-29 2018-07-06 中冶宝钢技术服务有限公司 A kind of method of steel construction full wafer lifting steel column

Similar Documents

Publication Publication Date Title
CN212078733U (en) Multi-size assembling space truss construction jig frame
CN2216103Y (en) Adjustable cantilever beam
CN112049465A (en) Support structure for large-span truss and construction method thereof
US4102096A (en) Leg brace assembly for adjustable shoring apparatus
CN210195192U (en) Scaffold frame that construction was used
CN212384891U (en) Accurate adjustable steel truss assembles bed-jig
CN206635662U (en) A kind of cast-in-place concrete bridge flange plate mould plate supporting device
CN206616692U (en) A kind of adjustable building truss structure
CN215520129U (en) Template support structure for building construction
EP0098962A1 (en) Erecting scaffold for shutterings for circular structures of concrete or the like
CN203821839U (en) Integral bearing platform template for construction
CN217558237U (en) Special measuring ladder stand for shield tunnel
CN206801112U (en) A kind of stage canopy
CN212428192U (en) Supporting structure for large-span truss
CN2495795Y (en) Height-adjustable ladder
CN112537422A (en) Erection method of ship building folding hanging ladder
CN213410968U (en) Positioner that rack welding production used
CN212897647U (en) Intelligent steel bar positioning and deviation rectifying device for reinforced concrete structure
CN214090992U (en) Adjustable jacking under beam slab under quick detach braced system is detained to dish
CN219909917U (en) Detachable steel pipe scaffold wall connecting device for constructional engineering
CN218175600U (en) Suspension frame for welding arch rib segments
CN214785927U (en) Practical pipe gallery inner wall integral shaping template
CN213464224U (en) Drawing workbench special for hand drawing of indoor design
CN214887118U (en) Supporting device for tunnel steel arch frame
CN218623223U (en) Staircase operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee