CN221597167U - Power equipment electric wire netting capital construction carries on platform - Google Patents

Power equipment electric wire netting capital construction carries on platform Download PDF

Info

Publication number
CN221597167U
CN221597167U CN202322840489.0U CN202322840489U CN221597167U CN 221597167 U CN221597167 U CN 221597167U CN 202322840489 U CN202322840489 U CN 202322840489U CN 221597167 U CN221597167 U CN 221597167U
Authority
CN
China
Prior art keywords
mounting
column
groove
bearing plate
fixing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322840489.0U
Other languages
Chinese (zh)
Inventor
吴家欣
耿志刚
艾一
翟红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Heilongjiang Electric Power Co Ltd Harbin Power Supply Co
State Grid Corp of China SGCC
Original Assignee
State Grid Heilongjiang Electric Power Co Ltd Harbin Power Supply Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Heilongjiang Electric Power Co Ltd Harbin Power Supply Co, State Grid Corp of China SGCC filed Critical State Grid Heilongjiang Electric Power Co Ltd Harbin Power Supply Co
Priority to CN202322840489.0U priority Critical patent/CN221597167U/en
Application granted granted Critical
Publication of CN221597167U publication Critical patent/CN221597167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casings For Electric Apparatus (AREA)

Abstract

The utility model relates to the technical field of power equipment installation, and discloses a power equipment power grid foundation construction carrying platform which comprises an installation mechanism, wherein the installation mechanism comprises a bearing plate, a supporting rod is fixedly installed at the top of the bearing plate, a through groove is formed in the front face of the supporting rod, a first threaded hole is formed in the bottom of the inner wall of the through groove, a connecting plate is fixedly installed at the back face of the supporting rod, an adjusting rod is connected with internal threads of the connecting plate, a fixing frame is installed in the through groove, and a fixing plate is fixedly installed at the back face of the fixing frame. This power equipment carrying platform for electric wire netting capital construction, when the mount joint bracing piece in, rotate the regulation pole even with fixed plate fixed connection's mount and run through the inslot and remove, make screw hole one and screw hole two's position corresponding, reach and adjust butt joint screw hole one and screw hole two to the mount, the effect of easy to assemble equipment body.

Description

Power equipment electric wire netting capital construction carries on platform
Technical Field
The utility model relates to the technical field of power equipment installation, in particular to a power equipment power grid foundation construction carrying platform.
Background
The power grid infrastructure project is a power grid construction project which takes the expansion of power transmission and distribution capacity as a main target according to a certain project rule program and a certain amount of investment amount to finish new construction, extension and the like. In grid infrastructure, more and more bulky power equipment needs to be installed outdoors, for example: the transformer is required to be installed on outdoor power equipment by using a beating platform.
According to the electric power equipment carrying platform for power grid infrastructure disclosed in China patent publication No. CN 114059754B, the device comprises a bearing assembly and a enclasping unit. The bearing assembly is used for being horizontally arranged among the fixing rods so as to bear power equipment. The clamping units are arranged in a plurality, and each clamping unit is used for being arranged in one-to-one correspondence with each fixing rod; each enclasping unit comprises a first enclasping clamp, a second enclasping clamp, a telescopic structure and a connecting rod; the first holding clamp is arranged above the second holding clamp; the telescopic structures are at least two, and each telescopic structure is respectively connected with the first holding clamp and the second holding clamp along the vertical direction; the connecting rod is connected with the first holding clamp and the bearing assembly respectively. The power equipment power grid foundation construction mounting platform changes the former anchor ear mode, can ensure convenient adjustment of the power equipment at any time in the power grid foundation construction process, saves time and labor, and is simple to operate and high in practicability.
The device can make power equipment be convenient for adjust after the installation through structural component, and is more laborsaving, but at the in-process of reality installation, the staff is when installing power equipment butt joint to the embankment platform, and the screw hole is not good to dock, and is more laborious when docking the screw hole to power equipment and embankment platform.
Disclosure of utility model
Aiming at the technical defects, the utility model provides a power equipment power grid foundation construction carrying platform, which solves the problems that when the existing staff butt-joints the power equipment on the carrying platform, threaded holes are not well butted, and the power equipment and the carrying platform are hard to butt-joint the threaded holes.
In order to solve the technical problems, the utility model provides the following technical scheme:
The utility model provides a power equipment electric wire netting capital construction carries on platform, includes installation mechanism, the outside of installation mechanism is provided with supporting mechanism.
The installation mechanism comprises a bearing plate, a supporting rod is fixedly installed at the top of the bearing plate, a penetrating groove is formed in the front of the supporting rod, a first threaded hole is formed in the bottom of the inner wall of the penetrating groove, a connecting plate is fixedly installed at the back of the supporting rod, an adjusting rod is connected with internal threads of the connecting plate, a fixing frame is installed in the penetrating groove, a fixing plate is fixedly installed at the back of the fixing frame, a second threaded hole is formed in the top of the fixing frame, an equipment body is arranged at the top of the fixing frame, and an installation assembly is arranged at the top of the bearing plate.
The supporting mechanism comprises a supporting column, an adjusting column is arranged in the supporting column, a first limiting hole is formed in the outer surface of the supporting column, and a limiting column is arranged in the first limiting hole.
Preferably, the mounting assembly comprises a mounting groove, and a mounting frame is clamped in the mounting groove.
Preferably, one end of the adjusting rod is arranged on the back surface of the fixed plate, and a rotary handle is arranged on the back surface of the adjusting rod.
Preferably, a fixing bolt is arranged in the first threaded hole, and the top of the fixing bolt penetrates through the bearing plate and extends to the interiors of the first threaded hole and the second threaded hole.
Preferably, a plurality of mounting grooves are formed in the top of the bearing plate.
Preferably, the adjusting column is arranged at the bottom of the bearing plate, and a limiting hole II is formed in the outer surface of the adjusting column.
Preferably, the limiting column penetrates through the limiting hole and extends to the inside of the adjusting column.
Compared with the prior art, the utility model has the following beneficial effects:
According to the utility model, when the fixing frame is clamped into the supporting rod, the front surface of the adjusting rod can prop against the fixing plate, even if the fixing frame fixedly connected with the fixing plate moves in the through groove, the positions of the first threaded hole and the second threaded hole are corresponding, the supporting rod and the fixing frame can be fixed and limited by using the fixing bolt after the positions are corresponding, the equipment body is installed on the top of the bearing plate, and the effects of adjusting the fixing frame and butting the first threaded hole and the second threaded hole are achieved, so that the equipment body is convenient to install.
The second, the utility model adjusts the post to install in the support column, support and fix the bearing plate, offer the first spacing hole in the surface of the support column, when can be installed the apparatus body, when needing to adjust the height, stretch the adjusting post, run through spacing hole and extend to the spacing Kong Erna offered on the surface of the adjusting post at the same time through spacing post, adjust the height position to the carrying platform, can adjust the high effect while achieving to install the apparatus body.
Drawings
FIG. 1 is a schematic perspective view of a structural mounting mechanism of the present utility model;
FIG. 2 is a bottom perspective view of the structure of the present utility model;
FIG. 3 is a schematic perspective view of a structural load-bearing plate according to the present utility model;
FIG. 4 is a perspective view of a structural brace of the present utility model;
fig. 5 is a schematic cross-sectional view of a structural brace of the present utility model.
Wherein: 1. a mounting mechanism; 101. a carrying plate; 102. a support rod; 103. a through groove; 104. a first threaded hole; 105. a connecting plate; 106. an adjusting rod; 107. a fixing frame; 108. a fixing plate; 109. an equipment body; 2. a support mechanism; 201. a support column; 202. an adjusting column; 203. a first limiting hole; 204. a limit column; 3. a mounting assembly; 301. a mounting groove; 302. a mounting frame; 4. a fixing bolt; 5. and a limiting hole II.
Detailed Description
The following detailed description of the utility model will be given with reference to the accompanying drawings.
Referring to fig. 1-5, a power grid infrastructure platform for electric power equipment includes a mounting mechanism 1, and a supporting mechanism 2 is disposed outside the mounting mechanism 1.
The installation mechanism 1 comprises a bearing plate 101, a supporting rod 102 is fixedly installed at the top of the bearing plate 101, a through groove 103 is formed in the front of the supporting rod 102, a first threaded hole 104 is formed in the bottom of the inner wall of the through groove 103, a connecting plate 105 is fixedly installed at the back of the supporting rod 102, an adjusting rod 106 is connected with the inner threads of the connecting plate 105, a fixing frame 107 is installed in the through groove 103, a fixing plate 108 is fixedly installed at the back of the fixing frame 107, a second threaded hole is formed in the top of the fixing frame 107, an equipment body 109 is arranged at the top of the fixing frame 107, and an installation assembly 3 is arranged at the top of the bearing plate 101.
Through the technical scheme, when the electric equipment is installed, the supporting rod 102 is installed at the top of the bearing plate 101, the penetrating groove 103 formed in the front face of the supporting rod 102 enables the supporting rod 102 to form an L shape, the fixing frame 107 is fixedly installed at the bottom of the equipment body 109, the fixing frame 107 can be clamped into the supporting rod 102 through the penetrating groove 103, at the moment, the first threaded hole 104 formed in the inner wall of the penetrating groove 103 on the supporting rod 102 and the second threaded hole formed in the top of the fixing frame 107 are required to be in butt joint, the equipment body 109 is installed, the adjusting rod 106 is connected with the internal threads of the connecting plate 105 installed at the back face of the supporting rod 102, the fixing plate 108 is fixedly installed at the back face of the fixing frame 107, when the fixing frame 107 is clamped into the supporting rod 102, the front face of the adjusting rod 106 abuts against the fixing plate 108, the fixing frame 107 which is fixedly connected with the fixing plate 108 moves in the penetrating groove 103 even if the fixing frame 107 rotates, the positions of the first threaded hole 104 corresponds to the second threaded hole, and the fixing frame 107 can be fixedly limited by using the fixing bolt 4 after the fixing supporting rod 102 and the fixing frame 107, the equipment body 109 is installed at the top of the bearing plate 101, the effect of adjusting the butt joint of the threaded hole 104 and the threaded hole second threaded hole is achieved, and the effect of conveniently installing the equipment body 109 is achieved.
The supporting mechanism 2 comprises a supporting column 201, an adjusting column 202 is arranged in the supporting column 201, a first limiting hole 203 is formed in the outer surface of the supporting column 201, and a limiting column 204 is arranged in the first limiting hole 203.
Through the above technical scheme, the adjusting column 202 is fixedly installed at the bottom of the bearing plate 101, the adjusting column 202 is installed in the supporting column 201, the bearing plate 101 is supported and fixed, the first limiting holes 203 are formed in the outer surface of the supporting column 201, when the equipment body 109 is installed, and the height is required to be adjusted, the adjusting column 202 is stretched, the second limiting holes 5 formed in the outer surface of the adjusting column 202 are penetrated through the first limiting holes 203 through the limiting columns 204, the height is adjusted to the carrying platform, and the effect of adjusting the height when the equipment body 109 is installed is achieved.
Specifically, the mounting assembly 3 includes a mounting groove 301, and a mounting frame 302 is clamped inside the mounting groove 301.
Through the above technical scheme, a plurality of mounting grooves 301 are formed in the top of the bearing plate 101, so that the mounting frame 302 can be mounted in the mounting grooves 301, and a plurality of electric devices can be mounted on the bearing plate 101 at the same time.
Specifically, one end of the adjusting lever 106 is disposed on the back surface of the fixing plate 108, and the back surface of the adjusting lever 106 is provided with a rotating handle.
Through the above technical scheme for adjust pole 106 threaded connection in connecting plate 105, adjust pole 106 one end setting is in the inside of running through groove 103, and the other end setting is outside, can rotate the pole 106 and extrude the removal to mount 107 through the rotation handle of rotating the outside one end installation of adjusting pole 106, makes the mount 107 adjust the position in the bracing piece 102, makes things convenient for the position of butt joint screw hole one 104 and screw hole two.
Specifically, the first threaded hole 104 is provided with a fixing bolt 4, and the top of the fixing bolt 4 penetrates through the bearing plate 101 and extends into the first threaded hole 104 and the second threaded hole.
Through the above technical scheme, the fixing bolt 4 penetrates from the bottom of the bearing plate 101 to the first threaded hole 104, and then penetrates into the second threaded hole aligned with the first threaded hole 104, so that the fixing bolt 4 fixes the fixing frame 107 on the bearing plate 101, and the equipment body 109 is installed.
Specifically, a plurality of mounting grooves 301 are provided, and a plurality of mounting grooves 301 are formed on the top of the carrier plate 101.
Through the above technical scheme, a plurality of mounting grooves 301 are formed in the bearing plate 101, and the mounting grooves can be mounted on a plurality of mounting frames 302 to mount other power equipment on the bearing plate 101.
Specifically, the adjusting column 202 is installed at the bottom of the bearing plate 101, and the second limiting hole 5 is formed on the outer surface of the adjusting column 202.
Through the above technical scheme, the support column 201 and the adjusting column 202 are supported at the bottom of the bearing plate 101, and the first limiting hole 203 and the second limiting holes 5 are formed in the outer surfaces of the support column 201 and the adjusting column 202, so that the first limiting hole 203 and the second limiting hole 5 can be used for limiting and fixing when the adjusting column 202 is pulled up, and the limiting column 204 is inserted into the first limiting hole 203 and the second limiting hole 5.
Specifically, the limiting post 204 penetrates the limiting hole one 203 and extends into the adjusting post 202.
Through the above technical scheme, the limiting post 204 penetrates through the first limiting hole 203 on the outer surface of the supporting post 201 and extends into the second limiting hole 5 in the adjusting post 202.
Although particular embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations may be made therein without departing from the principles and spirit thereof, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a power equipment electric wire netting capital construction carries on platform, includes installation mechanism (1), its characterized in that: the outside of the mounting mechanism (1) is provided with a supporting mechanism (2);
The mounting mechanism (1) comprises a bearing plate (101), a supporting rod (102) is fixedly mounted at the top of the bearing plate (101), a through groove (103) is formed in the front face of the supporting rod (102), a first threaded hole (104) is formed in the bottom of the inner wall of the through groove (103), a connecting plate (105) is fixedly mounted at the back face of the supporting rod (102), an adjusting rod (106) is connected with internal threads of the connecting plate (105), a fixing frame (107) is mounted in the through groove (103), a fixing plate (108) is fixedly mounted at the back face of the fixing frame (107), a second threaded hole is formed in the top of the fixing frame (107), an equipment body (109) is arranged at the top of the fixing frame (107), and a mounting assembly (3) is arranged at the top of the bearing plate (101);
The supporting mechanism (2) comprises a supporting column (201), an adjusting column (202) is arranged in the supporting column (201), a first limiting hole (203) is formed in the outer surface of the supporting column (201), and a limiting column (204) is arranged in the first limiting hole (203).
2. The electrical equipment grid infrastructure mounting platform of claim 1, wherein: the mounting assembly (3) comprises a mounting groove (301), and a mounting rack (302) is clamped in the mounting groove (301).
3. The electrical equipment grid infrastructure mounting platform of claim 1, wherein: one end of the adjusting rod (106) is arranged on the back surface of the fixed plate (108), and a rotating handle is arranged on the back surface of the adjusting rod (106).
4. The electrical equipment grid infrastructure mounting platform of claim 1, wherein: the inside of screw hole one (104) is provided with fixing bolt (4), the top of fixing bolt (4) runs through loading board (101) and extends to screw hole one (104) and screw hole two's inside.
5. The electrical equipment grid infrastructure mounting platform of claim 2, wherein: the mounting grooves (301) are formed in a plurality, and the mounting grooves (301) are formed in the top of the bearing plate (101).
6. The electrical equipment grid infrastructure mounting platform of claim 1, wherein: the adjusting column (202) is arranged at the bottom of the bearing plate (101), and a limiting hole II (5) is formed in the outer surface of the adjusting column (202).
7. The electrical equipment grid infrastructure mounting platform of claim 1, wherein: the limiting column (204) penetrates through the limiting hole I (203) and extends to the inside of the adjusting column (202).
CN202322840489.0U 2023-10-23 2023-10-23 Power equipment electric wire netting capital construction carries on platform Active CN221597167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322840489.0U CN221597167U (en) 2023-10-23 2023-10-23 Power equipment electric wire netting capital construction carries on platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322840489.0U CN221597167U (en) 2023-10-23 2023-10-23 Power equipment electric wire netting capital construction carries on platform

Publications (1)

Publication Number Publication Date
CN221597167U true CN221597167U (en) 2024-08-23

Family

ID=92396438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322840489.0U Active CN221597167U (en) 2023-10-23 2023-10-23 Power equipment electric wire netting capital construction carries on platform

Country Status (1)

Country Link
CN (1) CN221597167U (en)

Similar Documents

Publication Publication Date Title
CN211037882U (en) Garden building support frame
CN221597167U (en) Power equipment electric wire netting capital construction carries on platform
CN210007655U (en) adjustable base of solar support
CN214466669U (en) Adjustable water pipe hanger
CN216195505U (en) A novel fossil fragments for building engineering
CN216076412U (en) Steel stand straightness deviation of hanging down handles part
CN220210341U (en) Photovoltaic panel installing support
CN214618217U (en) Electromechanical device installs and uses a gallows
CN220173630U (en) Novel adjustable cabinet base for data center
CN218233763U (en) Energy-saving and environment-friendly steel structure bracket
CN220822989U (en) Photovoltaic installation equipment
CN214123372U (en) Concatenation formula LED screen support
CN220814448U (en) Building curtain wall with adjustable
CN220186725U (en) Surrounding type lamplight frame for exhibition
CN219384577U (en) Tower crane attaches wall structure
CN219992829U (en) Curtain wall mounting structure
CN220601114U (en) Water level detector's of hydraulic engineering flood prevention installing support
CN218275800U (en) Make things convenient for interim mounting bracket of electric power facility of dismouting
CN216904199U (en) Adjustable fixing device for bus duct
CN220754259U (en) Cable testing bridge antidetonation support convenient to dismantle
CN219060847U (en) Wall-attached support with multiple attachment forms for climbing frame
CN219697548U (en) Symmetrical telescopic solar photovoltaic bracket
CN221625776U (en) Main shaft jacking device of wind driven generator
CN220692768U (en) Grid line slot fixing support
CN221629025U (en) Pipeline fixing device for building engineering