CN221399795U - Beam-holding hanging basket hanging mechanism - Google Patents

Beam-holding hanging basket hanging mechanism Download PDF

Info

Publication number
CN221399795U
CN221399795U CN202323571221.8U CN202323571221U CN221399795U CN 221399795 U CN221399795 U CN 221399795U CN 202323571221 U CN202323571221 U CN 202323571221U CN 221399795 U CN221399795 U CN 221399795U
Authority
CN
China
Prior art keywords
clamp
holding
main beam
roof
flower frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323571221.8U
Other languages
Chinese (zh)
Inventor
王玉强
赵勇利
于志敏
朱寥寥
王冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Industrial Construction Group Co ltd
Original Assignee
Henan Industrial Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Industrial Construction Group Co ltd filed Critical Henan Industrial Construction Group Co ltd
Priority to CN202323571221.8U priority Critical patent/CN221399795U/en
Application granted granted Critical
Publication of CN221399795U publication Critical patent/CN221399795U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The application discloses a beam-holding type hanging basket hanging mechanism, which relates to the field of hanging basket hanging installation and comprises a main beam, wherein the main beam is horizontally arranged on a roof flower frame beam, a fixing component is arranged between the main beam and the roof flower frame beam and is used for fixing the main beam on the roof flower frame beam, a vertical center pillar is arranged on the main beam in a sliding manner, a pulley is arranged at the top end of the center pillar, a first steel wire rope is connected between two ends of the main beam, the first steel wire rope is lapped on the pulley, a second steel wire rope is fixedly connected between one end of the main beam, which is close to a roof, and a hanging basket component is arranged at the other end of the main beam. According to the application, the main beam is erected on the flower frame beam, so that the installation height of the main beam is effectively improved, and meanwhile, the main beam is limited on the flower frame beam through the fixing assembly, so that the overall stability of the mechanism is effectively improved.

Description

Beam-holding hanging basket hanging mechanism
Technical Field
The application relates to the field of hanging basket hanging installation, in particular to a beam hanging basket hanging mechanism.
Background
The hanging basket is a construction machine which can replace the traditional scaffold and acts on the construction engineering high-altitude operation such as curtain wall installation, outer wall cleaning, heat preservation construction and the like. When the hanging basket is installed, the hanging mechanism is erected on a building, and the hanging basket is connected with the overhanging platform through the steel wire rope to perform construction operation on the outer elevation of the building.
At present, the hanging basket installation mode generally balances the downward pressure generated by the construction of a hanging platform by adding a counterweight at the end part of a hanging mechanism, and the counterweight needs to be placed on a roof layer.
Therefore, the mode needs to occupy the roof for a long time, and further the construction of the roof and the decoration engineering is affected. If the conditions of tight construction period requirement and high quality requirement are met, the area of the outer wall glass curtain is large, and the construction period is long, the installation mode of the hanging basket inevitably has the condition of synchronous cross construction with roof engineering, and the total construction period is difficult to ensure, so that the construction progress is influenced.
Disclosure of utility model
The application provides an embracing beam type hanging basket hanging mechanism, which can meet the engineering construction safety requirement and does not influence the normal construction of roof engineering.
The application provides a beam hanging basket hanging mechanism, which adopts the following technical scheme:
The girder is horizontally arranged on a roof flower frame girder, a fixing component is arranged between the girder and the roof flower frame girder, the fixing component is used for fixing the girder on the roof flower frame girder, a vertical middle column is slidably arranged on the girder, a pulley is arranged at the top end of the middle column, a first steel wire rope is connected between two ends of the girder, and the first steel wire rope is lapped on the pulley;
and a second steel wire rope is fixedly connected between one end of the main beam, which is close to the roof, and the parapet, and a hanging basket assembly is arranged at the other end of the main beam.
Through adopting above-mentioned technical scheme, erect the girder on the flower frame roof beam, effectually promoted the installation height of girder, spacing on the flower frame roof beam to the girder through fixed subassembly simultaneously, effectually promoted the holistic stability of mechanism.
Preferably, the fixed subassembly is including the first card and the second card of embracing of setting up roofing flower frame roof beam both sides relatively, the girder sets up in the top of first card and second card of embracing, the bottom of first card and second card of embracing all is provided with the entablature, be provided with the entablature between first card upper portion and the second card upper portion of embracing, entablature and entablature butt respectively in the upper and lower both sides of roofing flower frame roof beam.
Through adopting above-mentioned technical scheme, first embracing the card and the second embraces the card and mutually support the left and right sides of roofing flower frame roof beam, and entablature mutually support, carry out the butt to the upper and lower both sides of roofing flower frame roof beam, and then fix the girder with on the flower frame roof beam, further promoted the stability of girder.
Preferably, the bottom of first embracing the card and the bottom of second embracing the card all is connected with sliding between the bottom beam, a plurality of through-holes have all been seted up in the bottom of first embracing the card, the bottom of second embracing the card and the both ends of bottom beam, all through setting up the bolt and nut fixed connection in the through-hole between first embracing the card and the bottom beam and between second embracing the card and the bottom beam.
Through adopting above-mentioned technical scheme, be convenient for to first embracing the card and the second embraces the position of card on the bottom end rail and adjust to be applicable to the roofing flower frame roof beam of different width, effectually promoted the holistic suitability of device.
Preferably, the first holding clamp comprises a first fixed vertical clamp and a first sliding vertical clamp, a plurality of through holes are formed in the first fixed vertical clamp and the first sliding vertical clamp in a penetrating manner, and the first fixed vertical clamp and the first sliding vertical clamp are fixedly connected through bolts and nuts arranged in the through holes;
The second holding clamp comprises a second fixed vertical clamp and a second sliding vertical clamp, a plurality of through holes are formed in the second fixed vertical clamp and the second sliding vertical clamp in a penetrating mode, and the second fixed vertical clamp and the second sliding vertical clamp are fixedly connected through bolts and nuts arranged in the through holes.
Through adopting above-mentioned technical scheme, first embracing the card and the second embraces the card and all can realize high regulation through adjusting the vertical card that slides, and then is applicable to the roofing flower frame roof beam of co-altitude, further hoisting device's suitability.
Preferably, a first jacking bolt is horizontally arranged on the first holding clamp, and a first top plate is fixedly arranged at one end, close to the roof flower frame beam, of the first jacking bolt.
Through adopting above-mentioned technical scheme, can be when being inconvenient for adjusting first embracing card and second embracing card, through first jack-up bolt and first roof, further promotion roofing flower frame roof beam and the stability between the fixed subassembly.
Preferably, the first top plate and the first tightening bolt are both provided with two.
By adopting the technical scheme, the stability of the first top plate is further improved.
Preferably, the second holding clamp is horizontally provided with side-shifting-resistant square steel, and one side of the side-shifting-resistant square steel is abutted to one side of the roof flower frame beam.
Through adopting above-mentioned technical scheme, effectually avoid taking place to move between roofing flower frame roof beam and the fixed subassembly.
Preferably, a second jacking bolt is vertically arranged on the lower cross beam, and a second top plate is fixedly arranged at one end, close to the roof flower frame beam, of the second jacking bolt.
Through adopting above-mentioned technical scheme, can be when being inconvenient for adjusting the height of first embracing card and second embracing card, through second jack-up bolt and second roof, further promote the stability between roofing flower frame roof beam and the fixed subassembly.
Preferably, the top of the first holding clamp and the second holding clamp are respectively and fixedly provided with a first sliding support and a second sliding support, the main beam is sequentially inserted into the first sliding support and the second sliding support, a plurality of through holes are horizontally and fixedly connected with the first sliding support and the second sliding support through bolts and nuts arranged in the through holes.
Through adopting above-mentioned technical scheme, be convenient for adjust the fixed position of girder, can adjust the girder and stretch out in the length of roofing flower frame roof beam.
Preferably, a plurality of through holes are horizontally and transversely formed between the main beam and the middle column, and the main beam and the middle column are fixedly connected through bolts and nuts arranged in the through holes.
Through adopting above-mentioned technical scheme, be convenient for be located the position control on the girder to the center pillar, effectively adjust the position of center pillar to different hanging flower basket subassemblies.
In summary, the present application includes at least one of the following beneficial technical effects:
1. The main beam is erected on the flower frame beam, so that the installation height of the main beam is effectively improved, and meanwhile, the main beam is limited on the flower frame beam through the fixing assembly, so that the overall stability of the mechanism is effectively improved;
2. The bottoms of the first clamp and the second clamp are in sliding connection with the lower cross beam, and are fixedly connected through bolts and nuts arranged in the through holes, so that the positions of the first clamp and the second clamp on the lower cross beam can be conveniently adjusted, the roof flower frame beams with different widths can be conveniently applied, and the overall applicability of the device is effectively improved;
3. By means of the first fixed vertical clamp, the first sliding vertical clamp, the second fixed vertical clamp and the second sliding vertical clamp, the first holding clamp and the second holding clamp can be adjusted to achieve height adjustment through the sliding vertical clamp, and therefore the roof flower frame beam is applicable to roof flower frame beams with different heights, and applicability of the device is further improved.
Drawings
FIG. 1 is a schematic view of an installation of a hanging basket hanging mechanism according to the present embodiment;
FIG. 2 is an isometric view of the overall structure of the hanging basket suspension mechanism according to the present embodiment;
FIG. 3 is an enlarged schematic view of the portion A of FIG. 2, mainly showing the structure of the first top plate;
FIG. 4 is an enlarged schematic view of the portion B of FIG. 2, mainly embodying the structure of the side-shift-resistant square steel;
fig. 5 is an enlarged schematic view of a portion C in fig. 2, mainly showing the structure of the second top plate.
Reference numerals: 1. roof flower frame beams; 2. parapet wall; 3. a main beam; 4. a fixing assembly; 41. the first clamp is arranged; 411. a first fixed vertical clamp; 412. the first sliding vertical clamp; 413. a first slip bracket; 42. the second holding clamp; 421. a second fixed vertical clamp; 422. the second sliding vertical clamp; 423. a second sliding bracket; 43. a lower cross beam; 44. an upper cross beam; 45. a first jack bolt; 46. a first top plate; 47. lateral movement resistant square steel; 48. a second jack bolt; 49. a second top plate; 5. a center column; 6. a pulley; 7. a first wire rope; 8. a second wire rope; 9. and a basket assembly.
Detailed Description
The present application will be described in further detail with reference to the accompanying drawings.
The embodiment of the application discloses a beam hanging basket hanging mechanism.
Embodiment one:
Referring to fig. 1, the beam-holding type hanging basket hanging mechanism comprises a main beam 3, wherein the main beam 3 is horizontally arranged on a roof flower frame beam 1, a fixing component 4 is arranged between the main beam 3 and the roof flower frame beam 1, the fixing component 4 is used for fixing the main beam 3 on the roof flower frame beam 1, a vertical middle column 5 is arranged on the main beam 3 in a sliding manner, a pulley 6 is arranged at the top end of the middle column 5, a first steel wire rope 7 is connected between two ends of the main beam 3, the first steel wire rope 7 is lapped on the pulley 6, a second steel wire rope 8 is fixedly connected between one end, close to a roof, of the main beam 3 and a parapet wall 2, and the hanging basket component 9 is arranged at the other end of the main beam 3.
Referring to fig. 2, the fixing assembly 4 includes a first holding clamp 41 and a second holding clamp 42 which are oppositely arranged at two sides of the roof flower frame beam 1, the main beam 3 is arranged at the tops of the first holding clamp 41 and the second holding clamp 42, the bottoms of the first holding clamp 41 and the second holding clamp 42 are both provided with a lower cross beam 43, an upper cross beam 44 is arranged between the upper part of the first holding clamp 41 and the upper part of the second holding clamp 42, and the upper cross beam 44 and the lower cross beam 43 are respectively abutted to the upper side and the lower side of the roof flower frame beam 1.
The left side and the right side of the roof flower frame beam 1 are abutted through the mutual matching of the first holding clamp 41 and the second holding clamp 42, the upper cross beam 44 and the lower cross beam 43 are mutually matched, the upper side and the lower side of the roof flower frame beam 1 are abutted, and then the main beam 3 is fixed on the flower frame beam.
It should be further noted that in this embodiment, the number of the upper cross beams 44 is two, and the upper cross beams 44 are relatively located at two sides of the fixing assembly 4, so that the lifting area of the whole lifting device and the top surface of the roof flower frame beam 1 can be effectively increased by arranging the upper cross beams 44, and further the stability of the whole lifting device can be effectively improved. And can also promote girder 3 for roofing flower frame roof beam 1's height, be convenient for the construction to curtain top fossil fragments and glass.
Referring to fig. 2 and 3, a first tightening bolt 45 is horizontally arranged on the first clamp 41, and a first top plate 46 is fixedly arranged at one end, close to the roof flower frame beam 1, of the first tightening bolt 45. Wherein in the present embodiment, the number of the first top plates 46 and the first jack bolts 45 is provided with two groups. The first top plate 46 is abutted against the side face of the roof flower frame beam 1 by adjusting the first tightening bolt 45, so that the connection between the integral hanging mechanism and the roof flower frame beam 1 is firmer.
Referring to fig. 2 and 4, the second clasping clamp 42 is horizontally provided with a side-shift-resisting square steel 47, and one side of the side-shift-resisting square steel 47 is abutted against one side of the roof flower frame beam 1. Through increasing the area of contact of device and roofing flower frame roof beam 1 side, and then increase the frictional force between device whole and the roofing flower frame roof beam 1, and then effectually played the effect of anti side and moved.
Referring to fig. 2 and 5, a second tightening bolt 48 is vertically disposed on the lower cross beam 43, and a second top plate 49 is fixedly disposed at one end of the second tightening bolt 48 near the roof flower frame beam 1. The second top plate 49 is abutted against the bottom surface of the roof flower frame beam 1 by adjusting the second tightening bolts 48, so that the connection between the integral hanging mechanism and the roof flower frame beam 1 is firmer.
In this embodiment, the basket assembly 9 may be a ZLP630 electric basket manufactured by Jiangsu Jishi Jiheng mechanical Limited, and according to the data provided by the manufacturer's specification, the 6m standard basket size is 6m×0.7m×1.2m, the basket (including the hoister and the cable) and the wire rope weight standard value are 6.3KN, the hanging girder 3 is selected to be ≡100×50×3 square steel, the wire rope specification is selected to be 6×37 wire rope, and the hanging girder 3 weight standard value is 0.178KN.
The implementation principle of the beam hanging basket hanging mechanism of the embodiment of the application is as follows: the fixing component 4 is clamped on the roof flower frame beam 1 through the first clamp 41, the second clamp 42, the upper cross beam 44 and the lower cross beam 43, so that the main beams 3 positioned on the first clamp 41 and the second clamp 42 are arranged on the roof flower frame beam 1;
The hanging basket assembly 9 is connected to one end of the main beam 3 positioned at the outer side of the roof flower frame beam 1, and one end of the main beam 3 positioned at the inner side of the roof flower frame beam 1 is connected with the parapet 2 through the second steel wire rope 8;
The connection between the fixing assembly 4 and the roof flower frame beam 1 is made tighter by adjusting the first and second jacking bolts 45 and 48.
Embodiment two:
Referring to fig. 2, the difference between the present embodiment and the first embodiment is that the bottoms of the first holding clamp 41 and the second holding clamp 42 are slidably connected with the lower beam 43, and a plurality of through holes are formed through the bottoms of the first holding clamp 41, the second holding clamp 42 and the two ends of the lower beam 43, and the first holding clamp 41 and the lower beam 43 and the second holding clamp 42 and the lower beam 43 are fixedly connected through bolts and nuts disposed in the through holes.
Through adjusting the position of first embracing card 41 and second embracing card 42 on lower beam 43 to through with bolt and nut threaded connection in corresponding through-hole, realize the fixed of first embracing card 41 and second embracing card 42, so that be applicable to the roofing flower frame roof beam 1 of different width, can effectually promote the holistic suitability of device.
Embodiment III:
referring to fig. 2, the difference between the present embodiment and the first embodiment is that the first holding card 41 includes a first fixed vertical card 411 and a first sliding vertical card 412, a plurality of through holes are formed on the first fixed vertical card 411 and the first sliding vertical card 412, and the first fixed vertical card 411 and the first sliding vertical card 412 are fixedly connected through bolts and nuts disposed in the through holes. The second holding card 42 comprises a second fixed vertical card 421 and a second sliding vertical card 422, a plurality of through holes are formed in the second fixed vertical card 421 and the second sliding vertical card 422 in a penetrating manner, and the second fixed vertical card 421 and the second sliding vertical card 422 are fixedly connected through bolts and nuts arranged in the through holes.
The first clamp 41 and the second clamp 42 can be adjusted in height by adjusting the sliding vertical clamp, the first clamp 41 and the second clamp 42 are fixed in the corresponding through holes by screw and nut threaded connection, and then the roof flower frame beam 1 with different heights is suitable for further improving the applicability of the device.
Embodiment four:
Referring to fig. 2, the difference between the present embodiment and the first embodiment is that the top of the first holding clamp 41 and the second holding clamp 42 are respectively and fixedly provided with a first sliding bracket 413 and a second sliding bracket 423, the main beam 3 is sequentially inserted into the first sliding bracket 413 and the second sliding bracket 423, a plurality of through holes are horizontally formed in the first sliding bracket 413, the second sliding bracket 423 and the main beam 3, and the main beam 3 is fixedly connected with the first sliding bracket 413 and the second sliding bracket 423 through bolts and nuts arranged in the through holes.
The position of the main beam 3 is convenient to adjust, and the position of the main beam 3 is fixed through the bolt and nut matching through holes.
Fifth embodiment:
Referring to fig. 2, the difference between the present embodiment and the first embodiment is that a plurality of through holes are horizontally provided between the main beam 3 and the center pillar 5, and the main beam 3 and the center pillar 5 are fixedly connected by bolts and nuts disposed in the through holes. The position of the middle column 5 can be adjusted according to different hanging basket parameters, and the middle column is fixed through bolts and nuts, so that the applicability of the device is further improved.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.

Claims (10)

1. An embrace beam-type hanging flower basket suspension mechanism, its characterized in that: the novel roof flower frame comprises a main beam (3), wherein the main beam (3) is horizontally arranged on a roof flower frame beam (1), a fixing component (4) is arranged between the main beam (3) and the roof flower frame beam (1), the fixing component (4) is used for fixing the main beam (3) on the roof flower frame beam (1), a vertical middle column (5) is arranged on the main beam (3) in a sliding manner, a pulley (6) is arranged at the top end of the middle column (5), a first steel wire rope (7) is connected between two ends of the main beam (3), and the first steel wire rope (7) is lapped on the pulley (6);
A second steel wire rope (8) is fixedly connected between one end, close to a roof, of the main beam (3) and the parapet (2), and a hanging basket assembly (9) is arranged at the other end of the main beam (3).
2. A beam-holding basket suspension mechanism according to claim 1, wherein: the fixing assembly (4) comprises a first holding clamp (41) and a second holding clamp (42) which are oppositely arranged on two sides of the roof flower frame beam (1), the main beam (3) is arranged at the top of the first holding clamp (41) and the top of the second holding clamp (42), lower cross beams (43) are arranged at the bottoms of the first holding clamp (41) and the second holding clamp (42), an upper cross beam (44) is arranged between the upper parts of the first holding clamp (41) and the upper parts of the second holding clamp (42), and the upper cross beam (44) and the lower cross beam (43) are respectively abutted to the upper side and the lower side of the roof flower frame beam (1).
3. A beam-holding basket suspension mechanism according to claim 2, wherein: the bottom of first embracing card (41) and second embracing card (42) all is connected with sliding between bottom crossbeam (43), a plurality of through-holes have all been seted up in the bottom of first embracing card (41), the bottom of second embracing card (42) and the both ends of bottom crossbeam (43), all through set up in the through-hole bolt nut fixed connection between first embracing card (41) and bottom crossbeam (43) and between second embracing card (42) and bottom crossbeam (43).
4. A beam-holding basket suspension mechanism according to claim 2, wherein: the first holding clamp (41) comprises a first fixed vertical clamp (411) and a first sliding vertical clamp (412), a plurality of through holes are formed in the first fixed vertical clamp (411) and the first sliding vertical clamp (412) in a penetrating mode, and the first fixed vertical clamp (411) and the first sliding vertical clamp (412) are fixedly connected through bolts and nuts arranged in the through holes;
The second holding clamp (42) comprises a second fixed vertical clamp (421) and a second sliding vertical clamp (422), a plurality of through holes are formed in the second fixed vertical clamp (421) and the second sliding vertical clamp (422) in a penetrating mode, and the second fixed vertical clamp (421) and the second sliding vertical clamp (422) are fixedly connected through bolts and nuts arranged in the through holes.
5. A beam-holding basket suspension mechanism according to claim 2, wherein: the first clamp (41) is horizontally provided with a first jacking bolt (45), and one end, close to the roof flower frame beam (1), of the first jacking bolt (45) is fixedly provided with a first top plate (46).
6. The beam-holding basket suspension mechanism of claim 5 wherein: the first top plate (46) and the first jacking bolts (45) are both provided with two.
7. The beam-holding basket suspension mechanism of claim 5 wherein: the second clamp (42) is horizontally provided with side-shifting-resistant square steel (47), and one side of the side-shifting-resistant square steel (47) is abutted to one side of the roof flower frame beam (1).
8. A beam-holding basket suspension mechanism according to claim 2, wherein: the lower cross beam (43) is vertically provided with a second jacking bolt (48), and one end, close to the roof flower frame beam (1), of the second jacking bolt (48) is fixedly provided with a second top plate (49).
9. A beam-holding basket suspension mechanism according to claim 2, wherein: the utility model discloses a portable electric power generation device, including first armful card (41) and second armful card (42), the top of both is fixed respectively and is provided with first support (413) and second support (423) that slide, girder (3) insert in proper order in first support (413) and second support (423) that slide, all horizontal on first support (413), second support (423) and the girder (3) that slide is run through and is offered a plurality of through-holes, through the bolt nut fixed connection that sets up in the through-hole between girder (3) and first support (413) and second support (423) that slide.
10. A beam-holding basket suspension mechanism according to claim 1, wherein: a plurality of through holes are horizontally and transversely formed between the main beam (3) and the middle column (5), and the main beam (3) and the middle column (5) are fixedly connected through bolts and nuts arranged in the through holes.
CN202323571221.8U 2023-12-26 2023-12-26 Beam-holding hanging basket hanging mechanism Active CN221399795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323571221.8U CN221399795U (en) 2023-12-26 2023-12-26 Beam-holding hanging basket hanging mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323571221.8U CN221399795U (en) 2023-12-26 2023-12-26 Beam-holding hanging basket hanging mechanism

Publications (1)

Publication Number Publication Date
CN221399795U true CN221399795U (en) 2024-07-23

Family

ID=91917229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323571221.8U Active CN221399795U (en) 2023-12-26 2023-12-26 Beam-holding hanging basket hanging mechanism

Country Status (1)

Country Link
CN (1) CN221399795U (en)

Similar Documents

Publication Publication Date Title
KR102127056B1 (en) Gondola device
CN110950216B (en) Elevator with telescopic car
CN214462706U (en) Device for quickly installing roof purlines
CN110702349A (en) Low-cycle repeated load test loading frame capable of being freely adjusted
CN221399795U (en) Beam-holding hanging basket hanging mechanism
CN211622509U (en) Scaffold for industrial and civil buildings
CN107299766B (en) Prefabricated sloping roof plate supporting system and construction method thereof
CN215167804U (en) Building electrical construction erection equipment
CN212271561U (en) Self-elevating elevator shaft construction operation platform
CN215626554U (en) Temporary slideway convenient to hoist and mount
CN201208688Y (en) Fixture for welding large-sized H section steel structural part
CN209442557U (en) The semi-automatic self-balance lifting device of bus duct vertical state temperature rise test
CN211769652U (en) Underbeam structure at bottom of elevator sedan-chair
CN206903246U (en) A kind of structure with oblique member for building
CN117735366A (en) Platform elevator curtain wall fixing structure and traction structure thereof
JPH0484731A (en) Effective flexual rigidity measuring apparatus for elevator guide rail
CN219753906U (en) Sliding type operation platform for slope curtain wall construction
CN213681696U (en) Bridge bearing
CN220264848U (en) Building internal construction elevator
CN214531851U (en) Hanging basket suspension device capable of adjusting length and preventing sliding
KR100641465B1 (en) Working scaffold system of elevator
CN214530227U (en) Supporting equipment for bridge engineering construction
CN220098251U (en) Auxiliary device for hoisting prefabricated vertical component
CN111764626B (en) Cantilever type scaffold
CN211365866U (en) Steel structure platform convenient for material conveying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant