CN221338305U - Double-deck various steel composite air conditioner tuber pipe bridge cut-off flange assembly jig - Google Patents

Double-deck various steel composite air conditioner tuber pipe bridge cut-off flange assembly jig Download PDF

Info

Publication number
CN221338305U
CN221338305U CN202322774853.8U CN202322774853U CN221338305U CN 221338305 U CN221338305 U CN 221338305U CN 202322774853 U CN202322774853 U CN 202322774853U CN 221338305 U CN221338305 U CN 221338305U
Authority
CN
China
Prior art keywords
fixedly connected
block
movable
fixed plate
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322774853.8U
Other languages
Chinese (zh)
Inventor
杨高泽
张馨丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tianyu Kunjian Air Conditioning Equipment Co ltd
Original Assignee
Sichuan Tianyu Kunjian Air Conditioning Equipment Co ltd
Filing date
Publication date
Application filed by Sichuan Tianyu Kunjian Air Conditioning Equipment Co ltd filed Critical Sichuan Tianyu Kunjian Air Conditioning Equipment Co ltd
Application granted granted Critical
Publication of CN221338305U publication Critical patent/CN221338305U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a double-layer color steel composite air conditioner air pipe bridge-cut-off flange assembly fixture which comprises a fixed plate and a spring, wherein one side of the fixed plate is fixedly connected with a fixed groove, the top end of one side of the fixed plate is fixedly connected with a top plate, one side of the bottom end of the top plate is fixedly connected with a fixed frame, a first adjusting rod transversely penetrates through the inside of the fixed frame, one side of the first adjusting rod is fixedly connected with a handle, and one side of the fixed plate is provided with a first movable block. This double-deck various steel composite air conditioner tuber pipe bridge cut-off flange assembly jig is through being provided with parts such as first regulation pole, revolves and twists the handle, can drive the second movable block and remove, can drive the adapter sleeve at top when the second movable block removes at the outside activity of first guide bar to be convenient for drive the kicking block and the regulating block of bottom and remove, thereby make the position when installing between the flange more direction, accurate, solved the problem of being inconvenient for the direction and adjusting the position when assembling.

Description

Double-deck various steel composite air conditioner tuber pipe bridge cut-off flange assembly jig
Technical Field
The utility model relates to the technical field of air duct flange clamps, in particular to an assembly clamp for an air duct bridge-cut-off flange of a double-layer color steel composite air conditioner.
Background
The double-layer color steel composite air conditioner air pipe is installed by using flanges in the installation process, so that the whole air conditioner air pipe is sealed, and an auxiliary assembly fixture is needed during installation.
According to the design of wind pipe flange anchor clamps in the past, only have the function of centre gripping location to its flange, but at the in-process of actual centre gripping, still need consider the position accuracy when its assembly, be inconvenient for the direction and adjust, lead to inapplicability.
At present, a novel assembly fixture for an air pipe bridge-cut-off flange of a double-layer color steel composite air conditioner is provided to solve the problems.
Disclosure of utility model
The utility model aims to provide an assembly fixture for an air pipe bridge-cut-off flange of a double-layer color steel composite air conditioner, which solves the problem that the position of the air pipe bridge-cut-off flange is inconvenient to guide and adjust during assembly in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a double-deck various steel complex air conditioner tuber pipe bridge cut-off flange assembly jig, includes fixed plate and spring, one side fixedly connected with fixed slot of fixed plate, the top fixedly connected with roof of fixed plate one side, one side fixedly connected with mount of roof bottom, the inside of mount transversely runs through and is provided with first regulation pole, one side fixedly connected with handle of first regulation pole, one side of fixed plate is provided with first movable block, one side fixedly connected with spring of first movable block, the inside of spring is provided with the dead lever, the inside of fixed plate one side is provided with the reservation groove, one side fixedly connected with first guide bar of first movable block, one side of mount is provided with the movable groove, the outside of first regulation pole has cup jointed the second movable block, the bottom fixedly connected with kicking block of second movable block, the bottom of kicking block is provided with the regulating block, the inside of regulating block vertically runs through and is provided with the second regulation pole, the top fixedly connected with adapter sleeve of second movable block.
Preferably, the connecting sleeve is sleeved on the outer part of the first guide rod and can move, an external thread is arranged on the outer part of the first adjusting rod, and the first guide rod is embedded in the movable groove and can move.
Preferably, one side of the spring is fixedly connected with one side of the fixed plate, four groups of springs are arranged, and the springs are distributed on one side of the fixed plate at equal intervals.
Preferably, the fixing rod is embedded in the reserved groove and movable, and the first movable block is sleeved outside the first adjusting rod.
Preferably, the top end of the adjusting block is fixedly connected with a second guide rod, the top end of the second guide rod longitudinally penetrates through the inside of the top block, and the second guide rod is movable in the inside of the top block.
Preferably, the top end of the second adjusting rod is embedded in the bottom end of the top block and is rotatable, and external threads are arranged on the outer portion of the second adjusting rod.
Compared with the prior art, the utility model has the beneficial effects that: the double-layer color steel composite air conditioner air pipe bridge-cut-off flange assembly fixture not only realizes that the fixture is more convenient to guide and accurate in flange installation, but also realizes that the fixture is convenient to be quickly installed on the flange for fixation, and the flange is quickly clamped and fixed;
(1) The first adjusting rod, the handle, the fixing frame, the movable groove, the top plate, the connecting sleeve and the first guide rod are arranged, the handle is screwed by the first movable block, the second movable block can be driven to move, and when the second movable block moves, the connecting sleeve at the top can be driven to move outside the first guide rod, so that the top block and the adjusting block at the bottom can be conveniently driven to move, and the position between the flanges can be more guided and accurate;
(2) By the aid of the spring, the reserved groove, the fixing rod and the first movable block, when the air duct is installed, the first movable block is moved to one side according to the thickness of the air duct flange by means of the elasticity of the spring, and at the moment, the fixing rod can move in the reserved groove, so that the flange at the bottom can be clamped and fixed by the aid of the first movable block, and the air duct flange is faster and more convenient to install;
(3) Through being provided with kicking block, regulating block, second regulation pole, second movable block, second guide bar, place the flange between kicking block and regulating block, screw the second and adjust the pole, can drive the regulating block and upwards move, the second guide bar can move about in the inside of kicking block simultaneously to make more convenient, stable when the centre gripping.
Drawings
FIG. 1 is a schematic cross-sectional elevation view of the present utility model;
FIG. 2 is a schematic side view of the connection between the top block and the adjusting block;
FIG. 3 is a schematic top view of the connection between the movable block and the spring according to the present utility model;
Fig. 4 is a schematic structural diagram of a connection mode between a movable block and a first adjusting rod according to the present utility model.
In the figure: 1. a fixing plate; 2. a spring; 3.a reserved groove; 4. a fixed rod; 5. a first guide bar; 6. a fixing groove; 7. a first movable block; 8. a first adjusting lever; 9. a top block; 10. an adjusting block; 11. a second adjusting lever; 12. a handle; 13. a fixing frame; 14. a movable groove; 15. a top plate; 16. connecting sleeves; 17. a second movable block; 18. and a second guide bar.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1: referring to fig. 1-4, an assembly fixture for a broken bridge flange of an air duct of a double-layer color steel composite air conditioner comprises a fixed plate 1 and a spring 2, wherein one side of the fixed plate 1 is fixedly connected with a fixed groove 6, the top end of one side of the fixed plate 1 is fixedly connected with a top plate 15, one side of the bottom end of the top plate 15 is fixedly connected with a fixed frame 13, the inside of the fixed frame 13 transversely penetrates through and is provided with a first adjusting rod 8, one side of the first adjusting rod 8 is fixedly connected with a handle 12, one side of the fixed plate 1 is provided with a first movable block 7, one side of the first movable block 7 is fixedly connected with the spring 2, the inside of the spring 2 is provided with a fixed rod 4, one side of the fixed plate 1 is internally provided with a reserved groove 3, one side of the first movable block 7 is fixedly connected with a first guide rod 5, one side of the fixed frame 13 is provided with a movable groove 14, the outside of the first adjusting rod 8 is sleeved with a second movable block 17, the bottom end of the second movable block 17 is fixedly connected with a top block 9, the bottom end of the top block 9 is provided with an adjusting block 10, the inside of the adjusting block 10 longitudinally penetrates through and is provided with a second adjusting rod 11, and the top end of the second movable block 17 is fixedly connected with a connecting sleeve 16;
The connecting sleeve 16 is sleeved outside the first guide rod 5 and can move, external threads are arranged outside the first adjusting rod 8, and the first guide rod 5 is embedded inside the movable groove 14 and can move;
specifically, as shown in fig. 1 and 4, screwing the handle 12 can drive the second movable block 17 to move, and when the second movable block 17 moves, the connecting sleeve 16 at the top can be driven to move outside the first guide rod 5, so that the top block 9 and the adjusting block 10 at the bottom can be conveniently driven to move, and the position of the flange during installation is more guided and accurate.
Example 2: one side of the springs 2 is fixedly connected with one side of the fixed plate 1, the springs 2 are provided with four groups, and the springs 2 are distributed on one side of the fixed plate 1 at equal intervals;
The fixed rod 4 is embedded in the reserved groove 3 and can move, and the first movable block 7 is sleeved outside the first adjusting rod 8;
Specifically, as shown in fig. 1 and 3, during installation, the first movable block 7 is moved to one side according to the thickness of the air duct flange by using the elasticity of the spring 2, and at this time, the fixing rod 4 moves inside the reserve tank 3, so that the flange at the bottom can be clamped and fixed by using the first movable block 7.
Example 3: the top end of the adjusting block 10 is fixedly connected with a second guide rod 18, the top end of the second guide rod 18 longitudinally penetrates through the inside of the top block 9, and the second guide rod 18 is movable in the inside of the top block 9;
the top end of the second adjusting rod 11 is embedded in the bottom end of the top block 9 and can rotate, and external threads are arranged on the outer part of the second adjusting rod 11;
Specifically, as shown in fig. 1 and 2, the flange is placed between the top block 9 and the adjusting block 10, and the second adjusting rod 11 is screwed to drive the adjusting block 10 to move upwards, and meanwhile, the second guiding rod 18 moves inside the top block 9, so that the clamping is convenient and stable.
Working principle: when the air duct flange fixing device is used, firstly, the first movable block 7 is moved to one side according to the thickness of the air duct flange by utilizing the elasticity of the spring 2 during installation, at the moment, the fixed rod 4 can move in the reserved groove 3, so that the flange at the bottom can be clamped and fixed by utilizing the first movable block 7, then, the flange is placed between the top block 9 and the adjusting block 10, the second adjusting rod 11 is screwed, the adjusting block 10 can be driven to move upwards, meanwhile, the second guide rod 18 can move in the top block 9, so that the clamping is convenient and stable, and finally, the handle 12 is screwed, the second movable block 17 can be driven to move, and the connecting sleeve 16 at the top can be driven to move outside the first guide rod 5 when the second movable block 17 moves, so that the top block 9 and the adjusting block 10 at the bottom can be conveniently driven to move, and the position during installation between the flanges is more guided and accurate.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. Double-deck various steel complex air conditioner tuber pipe bridge cut-off flange assembly jig, including fixed plate (1) and spring (2), its characterized in that: one side fixedly connected with fixed slot (6) of fixed plate (1), the top fixedly connected with roof (15) of fixed plate (1) one side, one side fixedly connected with mount (13) of roof (15) bottom, the inside of mount (13) transversely runs through and is provided with first regulation pole (8), one side fixedly connected with handle (12) of first regulation pole (8), one side of fixed plate (1) is provided with first movable block (7), one side fixedly connected with spring (2) of first movable block (7), the inside of spring (2) is provided with dead lever (4), the inside of fixed plate (1) one side is provided with reservation groove (3), one side fixedly connected with first guide bar (5) of first movable block (7), one side of mount (13) is provided with movable groove (14), the outside of first regulation pole (8) has cup jointed second movable block (17), the bottom fixedly connected with kicking block (9) of second movable block (17), the inside of second movable block (9) is provided with connecting sleeve (10), the inside of regulation pole (10) is provided with vertical movable connection (17).
2. The double-layer color steel composite air conditioner air duct bridge-cut flange assembly fixture according to claim 1, wherein: the connecting sleeve (16) is sleeved outside the first guide rod (5) and movable, an external thread is arranged outside the first adjusting rod (8), and the first guide rod (5) is embedded inside the movable groove (14) and movable.
3. The double-layer color steel composite air conditioner air duct bridge-cut flange assembly fixture according to claim 1, wherein: one side of the spring (2) is fixedly connected with one side of the fixed plate (1), the springs (2) are provided with four groups, and the springs (2) are distributed on one side of the fixed plate (1) at equal intervals.
4. The double-layer color steel composite air conditioner air duct bridge-cut flange assembly fixture according to claim 1, wherein: the fixed rod (4) is embedded in the reserved groove (3) and is movable, and the first movable block (7) is sleeved outside the first adjusting rod (8).
5. The double-layer color steel composite air conditioner air duct bridge-cut flange assembly fixture according to claim 1, wherein: the top of the adjusting block (10) is fixedly connected with a second guide rod (18), the top of the second guide rod (18) longitudinally penetrates through the inside of the top block (9), and the second guide rod (18) is movable in the inside of the top block (9).
6. The double-layer color steel composite air conditioner air duct bridge-cut flange assembly fixture according to claim 1, wherein: the top end of the second adjusting rod (11) is embedded in the bottom end of the top block (9) and can rotate, and external threads are arranged on the outer portion of the second adjusting rod (11).
CN202322774853.8U 2023-10-17 Double-deck various steel composite air conditioner tuber pipe bridge cut-off flange assembly jig Active CN221338305U (en)

Publications (1)

Publication Number Publication Date
CN221338305U true CN221338305U (en) 2024-07-16

Family

ID=

Similar Documents

Publication Publication Date Title
CN221338305U (en) Double-deck various steel composite air conditioner tuber pipe bridge cut-off flange assembly jig
CN201649566U (en) Positioning device used during installation of frame body of door/window
CN220058675U (en) Auxiliary positioning assembly for door frame installation
CN219617231U (en) Machine tool fixture positioning device
CN209681561U (en) A kind of cross axle automatic assembling mechanism
CN213532350U (en) Prefabricated insulating tube positioning and connecting device
CN217159456U (en) Alternating current torque motor adjusting structure
CN208358644U (en) A kind of measuring clamping device of guide sleeve
CN219033873U (en) Connection structure of aluminium grid
CN215673951U (en) Boiler auxiliary engine steel member pipeline erection device
CN112217453A (en) Domestic solar panel linkage
CN210240217U (en) Lead screw fixing combination of anti-seismic bracket
CN219082447U (en) Water conservancy pipeline supports connecting device
CN214425630U (en) Projector is with gallows that has regional adjustment mechanism of projection
CN218845602U (en) Total powerstation chassis frame
CN216144417U (en) High-precision intelligent weighing controller
CN221279132U (en) Electromechanical engineering equipment installs positioner
CN219571104U (en) Pipeline fixing device
CN218727690U (en) Low-power test electrical appliance rack
CN204773539U (en) Automatic rotary fixture of group battery
CN208881966U (en) A kind of white body assembly precision adjustment tooling
CN105499996A (en) Device and method for pneumatically elastically assembling medical reducer multi-cavity tubes
CN221148718U (en) Wind vane zero-setting clamp of wind generating set
CN220249167U (en) Floor supporting bracket for pipeline in refrigerating machine room
CN216326366U (en) Automatic shaft rotating mechanism and automatic shaft rotating equipment

Legal Events

Date Code Title Description
GR01 Patent grant