CN221213227U - Drawing device for building engineering management engineering - Google Patents

Drawing device for building engineering management engineering Download PDF

Info

Publication number
CN221213227U
CN221213227U CN202323101809.7U CN202323101809U CN221213227U CN 221213227 U CN221213227 U CN 221213227U CN 202323101809 U CN202323101809 U CN 202323101809U CN 221213227 U CN221213227 U CN 221213227U
Authority
CN
China
Prior art keywords
drawing device
face
plate
engineering management
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323101809.7U
Other languages
Chinese (zh)
Inventor
胡长雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangrao Chunhui Construction Engineering Co ltd
Original Assignee
Shangrao Chunhui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shangrao Chunhui Construction Engineering Co ltd filed Critical Shangrao Chunhui Construction Engineering Co ltd
Priority to CN202323101809.7U priority Critical patent/CN221213227U/en
Application granted granted Critical
Publication of CN221213227U publication Critical patent/CN221213227U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a drawing device for building engineering management engineering, and relates to the field of drawing devices. The device includes the bottom plate and rotates the supporting box that sets up at bottom plate top terminal surface, and the top terminal surface of supporting box rotates and is connected with the connection frame, and spacing hole has been seted up to the side of connection frame, and the inside sliding connection in spacing hole has the instrument chi. This building engineering management engineering drawing device through set up the pinion rack in the inside of linking box, and the one end of instrument chi sets up the tooth piece with pinion rack looks joint, and the pinion rack can be under the elasticity effect of spring automatic re-setting to the state with tooth piece looks joint for no matter the instrument chi removes to the optional position of linking box, all can be fixed between instrument chi and the linking box, avoid instrument chi to remove at will in the drawing process, influence the precision of drawing.

Description

Drawing device for building engineering management engineering
Technical Field
The utility model relates to the technical field of drawing devices, in particular to a drawing device for building engineering management engineering.
Background
Chinese patent CN219288982U discloses a drawing device for construction engineering management, which proposes that the existing drawing device lacks a device for assisting in quantifying the drawing length, and a user needs to adjust the angle of a ruler according to the requirement.
The solution of above-mentioned patent is mainly through installing the movable scale, the spout is seted up to the inboard of carriage, through the displacement of spout guide movable wheel, the movable wheel is connected with the movable scale through the connecting axle, the manual pulling movable scale removes, remove the movable scale to the assigned position, carry out the drawing of building engineering drawing, the scale mark sets up the upper surface at the movable scale, the length of the accurate settlement circuit of convenient to use person, a horizontal put is vertically put to two sets of movable scales, the user only need adjust the position of movable scale, can carry out accurate drawing to the circuit, but this patent still has following defect at the practical application in-process:
In the above patent, no device for fixing the position of the movable ruler is arranged between the movable ruler and the supporting frame, so that the movable ruler can be moved randomly in the drawing process to influence the drawing precision, and aiming at the above problem, we propose a drawing device for building engineering management engineering.
Disclosure of utility model
Aiming at the defects of the prior art, the utility model provides a drawing device, which solves the problem that the drawing precision is affected because the moving ruler can be moved randomly in the drawing process because no device for fixing the position of the moving ruler is arranged between the moving ruler and the supporting frame.
Technical proposal
In order to achieve the above purpose, the utility model is realized by the following technical scheme that the drawing device for the construction engineering management engineering comprises a bottom plate and a supporting box rotatably arranged on the top end surface of the bottom plate, wherein the top end surface of the supporting box is rotatably connected with a connecting frame, the side surface of the connecting frame is provided with a limiting hole, the inside of the limiting hole is slidably connected with a tool ruler, and the inner top of the limiting hole is provided with a positioning mechanism for fixing the position of the tool ruler;
The positioning mechanism comprises a connecting groove formed in the inner top of the limiting hole, a toothed plate which is used for being clamped with the tool ruler is connected in a sliding mode in the connecting groove, and a spring which is used for driving the toothed plate to elastically reset is arranged on the top end face of the toothed plate.
Preferably, one end of the tool ruler is fixedly connected with a tooth block, and the outer wall of the tooth plate is clamped with the outer wall of the tooth block.
Preferably, the top end face of the toothed plate is fixedly connected with a pull rod, one end of the pull rod extends to the upper part of the connecting frame, and a spring is sleeved on the outer wall of one end of the pull rod, which is positioned in the connecting groove.
Preferably, one end of the tool ruler, which is close to the tooth block, is fixedly connected with a limiting block, and the limiting block is used for limiting connection between the tool ruler and the limiting hole.
Preferably, a magnetic plate is fixedly connected to the bottom end face of the connecting frame, and the magnetic plate magnetically attracts the top end face of the supporting box.
Preferably, an electric telescopic rod is arranged on the top end face of the bottom plate, and one end of the electric telescopic rod is rotatably connected with the bottom end face of the supporting box.
Preferably, one end of the supporting box far away from the electric telescopic rod is rotationally connected with the bottom plate.
The utility model discloses a construction engineering management engineering drawing device which has the beneficial effects that a toothed plate is arranged in a connecting frame, one end of a tool ruler is provided with a toothed block clamped with the toothed plate, and the toothed plate can be automatically reset to a state clamped with the toothed block under the action of the elasticity of a spring, so that no matter the tool ruler moves to any position of the connecting frame, the tool ruler and the connecting frame can be fixed, and the tool ruler is prevented from moving randomly in the drawing process, so that the drawing precision is prevented from being influenced.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the structure of the electric telescopic rod of the present utility model;
FIG. 3 is a schematic view of the support box and the connection frame of the present utility model in an expanded configuration;
FIG. 4 is a cross-sectional view of the internal structure of the limiting hole of the present utility model;
FIG. 5 is an exploded view of the tool ruler and toothed plate structure of the present utility model;
fig. 6 is an enlarged view of the structure of fig. 4 at a in accordance with the present utility model.
In the figure, 1, a bottom plate; 101. a supporting box; 102. an electric telescopic rod; 2. a connection frame; 201. a tool ruler; 202. a limiting hole; 203. a limiting block; 204. a magnetic plate; 3. a positioning mechanism; 301. a connecting groove; 302. a toothed plate; 303. a pull rod; 304. a spring; 305. tooth blocks.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions in the embodiments of the present utility model are clearly and completely described, and it is obvious that the described embodiments are some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The embodiment of the application solves the problem that the position of the tool ruler is fixed because no device for fixing the position of the moving ruler is arranged between the moving ruler and the supporting frame, so that the moving ruler can move randomly in the drawing process to influence the drawing precision by providing the drawing device.
In order to better understand the above technical solutions, the following detailed description will refer to the accompanying drawings and specific embodiments.
The embodiment of the utility model discloses a drawing device for building engineering management engineering.
According to the drawings 1-6, the support box comprises a bottom plate 1 and a support box 101 rotatably arranged on the top end face of the bottom plate 1, an electric telescopic rod 102 is arranged on the top end face of the bottom plate 1, one end of the electric telescopic rod 102 is rotatably connected with the bottom end face of the support box 101, the placement angle of the support box 101 and the placement angle of the connection frame 2 can be adjusted through the arranged electric telescopic rod 102, the top end face of the support box 101 are rotatably connected with the connection frame 2, the bottom end face of the connection frame 2 is fixedly connected with a magnetic plate 204, the magnetic plate 204 is magnetically attracted with the top end face of the support box 101, the top end face of the support box 101 is an iron plate, the magnetic plate 204 can magnetically attract with the iron plate, the connection frame 2 is rotated, the top end face of the support box 101 is exposed, a building work management drawing can be placed on the top end face of the support box 101, and then the connection frame 2 is rotated again, and the connection frame 2 is magnetically attracted with the top end face of the support box 101, and the drawing is fixed between the support box 101 and the connection frame 2.
Limiting holes 202 are formed in the side faces of the connecting frame 2, tool rules 201 are slidably connected in the limiting holes 202, limiting blocks 203 are fixedly connected to one ends, close to the tooth blocks 305, of the tool rules 201, limiting blocks 203 are used for limiting connection between the tool rules 201 and the limiting holes 202, and through the two groups of the tool rules 201, steps such as line drawing and the like can be facilitated to be assisted in drawing.
The inside top of spacing hole 202 is provided with the positioning mechanism 3 that is used for tool chi 201 fixed in position, namely after moving tool chi 201 to the inside optional position of connecting frame 2, the accessible positioning mechanism 3 is fixed between tool chi 201 and the connecting frame 2, avoid at the random removal of drawing in-process tool chi 201, influence the precision of drawing, positioning mechanism 3 is including seting up the spread groove 301 at the inside top of spacing hole 202, the inside sliding connection of spread groove 301 has the pinion rack 302 that is used for with tool chi 201 joint, the top terminal surface of pinion rack 302 is provided with the spring 304 that is used for driving pinion rack 302 elastic reset, the one end fixedly connected with tooth piece 305 of tool chi 201, the outer wall of pinion rack 302 and the outer wall looks joint of tooth piece 305, the top terminal surface fixedly connected with pull rod 303 of pinion rack 302, the one end of pull rod 303 extends to the upper portion of connecting frame 2, the activity cup joints in the pull rod 303 outside, the one end outer wall that the pull rod 303 is located the inside of spread groove 301 has cup jointed spring 304, the one end of spring 304 and the inside top of pinion rack 302, the other end of spring 304 offsets with the inside top of spread groove 301, the inside of spring 301 sets up inside the inside of the groove 301.
This building engineering management engineering drawing device sets up pinion rack 302 through the inside at connection frame 2, and the one end of tool chi 201 sets up the tooth piece 305 with pinion rack 302 looks joint, and pinion rack 302 can be under the elasticity effect of spring 304 automatic return to the state with tooth piece 305 looks joint for no matter tool chi 201 removes to the arbitrary position of connection frame 2, all can be fixed between tool chi 201 and the connection frame 2, avoid tool chi 201 to remove at will in the drawing process, influence the precision of drawing.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a building engineering management engineering drawing device, includes bottom plate (1) and rotates supporting box (101) of setting at bottom plate (1) top terminal surface, the top terminal surface of supporting box (101) rotates and is connected with connecting frame (2), spacing hole (202) have been seted up to the side of connecting frame (2), the inside sliding connection of spacing hole (202) has tool chi (201), its characterized in that, the interior top of spacing hole (202) is provided with positioning mechanism (3) that are used for tool chi (201) fixed in position;
The positioning mechanism (3) comprises a connecting groove (301) formed in the inner top of the limiting hole (202), a toothed plate (302) used for being clamped with the tool ruler (201) is slidably connected in the connecting groove (301), and a spring (304) used for driving the toothed plate (302) to reset is arranged on the top end face of the toothed plate (302).
2. The construction engineering management engineering drawing device according to claim 1, wherein one end of the tool ruler (201) is fixedly connected with a tooth block (305), and the outer wall of the tooth plate (302) is clamped with the outer wall of the tooth block (305).
3. The construction engineering management engineering drawing device according to claim 2, wherein a pull rod (303) is fixedly connected to the top end face of the toothed plate (302), one end of the pull rod (303) extends to the upper portion of the connecting frame (2), the spring (304) is movably sleeved outside the pull rod (303), and the spring (304) is located inside the connecting groove (301).
4. A construction engineering management drawing device according to claim 3, wherein a limiting block (203) is fixedly connected to one end of the tool ruler (201) close to the tooth block (305), and the limiting block (203) is used for limiting connection between the tool ruler (201) and the limiting hole (202).
5. The construction engineering management engineering drawing device according to claim 1, wherein a magnetic plate (204) is fixedly connected to the bottom end face of the connecting frame (2), and the magnetic plate (204) is magnetically attracted with the top end face of the supporting box (101).
6. The construction engineering management engineering drawing device according to claim 1, wherein an electric telescopic rod (102) is arranged on the top end face of the bottom plate (1), and one end of the electric telescopic rod (102) is rotatably connected with the bottom end face of the supporting box (101).
7. The construction engineering management drawing device according to claim 6, wherein the end of the supporting box (101) far away from the electric telescopic rod (102) is rotatably connected with the base plate (1).
CN202323101809.7U 2023-11-17 2023-11-17 Drawing device for building engineering management engineering Active CN221213227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323101809.7U CN221213227U (en) 2023-11-17 2023-11-17 Drawing device for building engineering management engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323101809.7U CN221213227U (en) 2023-11-17 2023-11-17 Drawing device for building engineering management engineering

Publications (1)

Publication Number Publication Date
CN221213227U true CN221213227U (en) 2024-06-25

Family

ID=91542795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323101809.7U Active CN221213227U (en) 2023-11-17 2023-11-17 Drawing device for building engineering management engineering

Country Status (1)

Country Link
CN (1) CN221213227U (en)

Similar Documents

Publication Publication Date Title
CN221213227U (en) Drawing device for building engineering management engineering
CN210800643U (en) Precise projector
CN219675118U (en) Multifunctional hand-push range finder
CN208568513U (en) A kind of data processing and analysis device of metal hardness measuring device
CN216423923U (en) Drawing device for building structure design
CN210208414U (en) Steel bar bending device for building engineering
CN106813553A (en) A kind of building lot length-measuring appliance
CN210165904U (en) Diameter measuring device
CN209817454U (en) Floor thickness measurement control gadget
CN221073547U (en) Auxiliary device for building wall
CN220587756U (en) Geographic information mapping device
CN215060998U (en) Distancer is used in monitoring is accepted to engineering
CN219736271U (en) Grinding wheel diameter measuring mechanism
CN221280262U (en) Constructional engineering perpendicularity detection device convenient to adjust
CN221280311U (en) Building indoor design measuring apparatu fixer
CN221145800U (en) Building engineering straightness detection device that hangs down
CN220670378U (en) Positioning equipment for multi-point temperature test
CN221147586U (en) Engineering quality plane detector
CN215524462U (en) Special ruler for measuring building opening
CN220912178U (en) Precision casting turbine casing measuring device
CN221228943U (en) Portable mapping tool
CN218942419U (en) Range finding drilling equipment is used in shoes manufacturing
CN220795640U (en) Mobile phone camera module lens resolving power testing device
CN220323388U (en) High-precision automatic ICT test fixture
CN218153390U (en) Municipal works measure and use electronic level

Legal Events

Date Code Title Description
GR01 Patent grant