CN221133428U - Dust dissipation wind ring is prevented in reaction furnace clearance - Google Patents

Dust dissipation wind ring is prevented in reaction furnace clearance Download PDF

Info

Publication number
CN221133428U
CN221133428U CN202322755793.5U CN202322755793U CN221133428U CN 221133428 U CN221133428 U CN 221133428U CN 202322755793 U CN202322755793 U CN 202322755793U CN 221133428 U CN221133428 U CN 221133428U
Authority
CN
China
Prior art keywords
dust
wind
wind ring
reaction furnace
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322755793.5U
Other languages
Chinese (zh)
Inventor
柴永林
夏威伟
朱爱军
鲍士东
曾冠达
叶枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Weiyu Electronic System Engineering Co ltd
TSMC China Co Ltd
Original Assignee
Nanjing Weiyu Electronic System Engineering Co ltd
TSMC China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Weiyu Electronic System Engineering Co ltd, TSMC China Co Ltd filed Critical Nanjing Weiyu Electronic System Engineering Co ltd
Priority to CN202322755793.5U priority Critical patent/CN221133428U/en
Application granted granted Critical
Publication of CN221133428U publication Critical patent/CN221133428U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses a reaction furnace cleaning dust dissipation prevention wind ring, which comprises a handle, an inner ring bracket, a wind ring main body and a dust collection pipeline connector, wherein the handle and the dust collection pipeline connector which are distributed relatively are arranged on the wind ring main body, the inside of the wind ring main body is hollow, a plurality of ventilation grooves are formed in the inner side wall at equal angles, three inner ring brackets are arranged on the wind ring main body, the inner ring brackets consist of bolts, a frame body, movable blocks and nuts, the cross section of the frame body is L-shaped, one side surface of the frame body is provided with the ventilation grooves, and the movable blocks are arranged on the other side surface of the frame body through the bolts and are limited through the nuts. The wind ring can adsorb dust on the top cover, avoids harmful dust dissipation to human bodies, and is simple in structure, practical, convenient and quick.

Description

Dust dissipation wind ring is prevented in reaction furnace clearance
Technical Field
The utility model relates to the technical field of wind rings, in particular to a wind ring for preventing dust from escaping during cleaning a reaction furnace of tail gas treatment equipment.
Background
In the maintenance step of the reaction furnace cleaning machine of the tail gas treatment equipment, a reaction furnace top cover is required to be opened to clean the reaction furnace, and in the process, although a dust collection pipeline is used for adsorbing, the process is limited to the atmosphere dust collection in the adjacent area and cannot be completely attached, so that harmful gas and dust can be overflowed.
Disclosure of Invention
Aiming at the technical defects, the utility model aims to provide a reaction furnace cleaning dust dissipation prevention wind ring of a process tail gas treatment device, and solves the problem of dust dissipation in the existing cleaning process.
In order to solve the technical problems, the utility model adopts the following technical scheme:
The utility model provides a reaction furnace cleaning dust dissipation prevention wind ring, which comprises a handle, an inner ring bracket, a wind ring main body and a dust collection pipeline connector, wherein the handle and the dust collection pipeline connector are oppositely distributed on the wind ring main body, the inside of the wind ring main body is hollow, a plurality of ventilation grooves are formed in the inner side wall at equal angles, three inner ring brackets are arranged on the wind ring main body, the inner ring brackets consist of bolts, a frame body, movable blocks and nuts, the cross section of the frame body is L-shaped, one side surface is provided with the ventilation grooves, and the movable blocks are arranged on the other side surface through the bolts and limited through the nuts.
Preferably, the dust collection pipeline interface is manufactured by selecting a proper pipe diameter according to the size of a field dust collection pipeline.
The utility model has the beneficial effects that: the wind ring can adsorb dust on the top cover, avoids harmful gas and dust from escaping, and has simple structure, practicality, convenience and rapidness.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a perspective structure diagram of a reaction furnace cleaning dust-escape-preventing wind ring provided by an embodiment of the utility model;
FIG. 2 is a top view of a reaction furnace cleaning dust-escape-preventing wind ring provided by an embodiment of the utility model;
FIG. 3 is a perspective structure diagram of an inner ring bracket of a reaction furnace cleaning dust-escape-preventing wind ring provided by the embodiment of the utility model;
FIG. 4 is an exploded view of an inner ring bracket of a reaction furnace cleaning dust-escape-preventing wind ring provided by the embodiment of the utility model.
Reference numerals illustrate: 1. a handle; 2. an inner ring bracket; 21. a bolt; 22. a frame body; 23. a movable block; 24. a screw cap; 3. a wind ring main body; 4. a dust collection pipeline interface.
Description of the embodiments
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1 as shown in fig. 1 to 4, the reactor cleaning dust-escape-preventing wind ring comprises a handle: 1. the dust collection device comprises an inner ring bracket 2, a wind ring main body 3 and a dust collection pipeline interface 4, wherein handles which are distributed relatively are arranged on the wind ring main body 3: 1 and dust absorption pipeline interface 4, the inside cavity that is of wind ring main part 3, the equiangular being provided with a plurality of ventilation slots on the inside wall, be provided with three inner circle bracket 2 on the wind ring main part 3, inner circle bracket 2 comprises bolt 21, support body 22, movable block 23, nut 24, support body 22 cross-section is L type, and it has logical groove to open on the side, and movable block 23 passes through bolt 21 to set up on the other side to it is spacing through nut 24.
Furthermore, the dust collection pipeline interface 4 is manufactured by selecting a proper pipe diameter according to the size of a field dust collection pipeline.
When in use, an adsorption ring (using a dust collection pipeline) is erected on the outer ring of the top cover of the reaction furnace, and three brackets are erected on the adsorption ring. After the top cover is opened, the top cover is erected on the inner ring bracket 2, dust which is possibly scattered is removed after the top cover is adsorbed for 1-2 minutes, and then the top cover is lifted upwards from the upper part of the reaction furnace and separated from the reaction furnace.
After the adsorption ring is used, the dust overflow can be reduced with high probability.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present utility model without departing from the spirit or scope of the utility model. Thus, it is intended that the present utility model also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.

Claims (2)

1. The utility model provides a reaction furnace clearance dust escape wind circle of preventing, its characterized in that, including handle, inner circle bracket, wind circle main part, dust absorption pipeline pipe connection, be provided with handle and dust absorption pipeline connection of relative distribution in the wind circle main part, the inside cavity that is of wind circle main part, the equiangle is provided with a plurality of ventilation slots on the inside wall, be provided with three inner circle bracket in the wind circle main part, the inner circle bracket comprises bolt, support body, movable block, nut, the support body cross-section is the L type, and it has the logical groove that is used for the movable block to pass through to open on the side, and the movable block passes through the bolt setting on the another side to it is spacing through the nut.
2. The reactor cleaning dust-escaping prevention wind ring according to claim 1, wherein the dust collection pipeline interface is manufactured by selecting a proper pipe diameter according to the size of a field dust collection pipeline.
CN202322755793.5U 2023-10-14 2023-10-14 Dust dissipation wind ring is prevented in reaction furnace clearance Active CN221133428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322755793.5U CN221133428U (en) 2023-10-14 2023-10-14 Dust dissipation wind ring is prevented in reaction furnace clearance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322755793.5U CN221133428U (en) 2023-10-14 2023-10-14 Dust dissipation wind ring is prevented in reaction furnace clearance

Publications (1)

Publication Number Publication Date
CN221133428U true CN221133428U (en) 2024-06-14

Family

ID=91386322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322755793.5U Active CN221133428U (en) 2023-10-14 2023-10-14 Dust dissipation wind ring is prevented in reaction furnace clearance

Country Status (1)

Country Link
CN (1) CN221133428U (en)

Similar Documents

Publication Publication Date Title
CN221133428U (en) Dust dissipation wind ring is prevented in reaction furnace clearance
CN204134424U (en) A kind of for graphite guide hotting mask process gas gathering-device
CN102580672A (en) Active carbon for normal-temperature deferred treatment of highly-active waste gas of pressurized water reactor nuclear power station
CN212222892U (en) Natural gas demercuration agent charge device
CN107327159A (en) A kind of pneumatic pick dolly
CN214793922U (en) Sampling device for soil remediation
CN208729022U (en) A kind of fixture for opposite welding for welding battery
CN206426041U (en) A kind of five pawls draw horse
CN215236668U (en) Flue gas collecting and treating device
CN206698954U (en) A kind of Chinese garden planting sapling suspension device
CN109012602A (en) A kind of preparation method of cocoanut active charcoal
CN209322432U (en) Climbing frame is used in a kind of construction of illuminating engineering
CN214570898U (en) Drawer type active carbon adsorber
CN208041572U (en) A kind of more specification valve body inner edge oiling stations
CN220851040U (en) Adjustable ventilating duct mounting bracket
CN215742734U (en) Tar-containing flue gas purification pretreatment device
CN215409685U (en) Locking nut for automobile damping system
CN218107234U (en) Chemical industry workshop harmful gas active carbon adsorption device
CN213775506U (en) Automobile exhaust gas exhaust pipe sleeve
CN217829466U (en) Activated carbon adsorption box operating independently or in groups
CN217119354U (en) Pretreatment equipment for camphene production
CN212790385U (en) Filtering adsorber for repairing polluted soil
CN215810257U (en) Exhaust structure of low-temperature sintering furnace for producing hard alloy cutter
CN204601945U (en) Cremation Machine gas cleaning adsorbent equipment
CN214185593U (en) Machining device for automobile seat angle adjuster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant