CN221117269U - Simple combined septic tank - Google Patents

Simple combined septic tank Download PDF

Info

Publication number
CN221117269U
CN221117269U CN202322889646.7U CN202322889646U CN221117269U CN 221117269 U CN221117269 U CN 221117269U CN 202322889646 U CN202322889646 U CN 202322889646U CN 221117269 U CN221117269 U CN 221117269U
Authority
CN
China
Prior art keywords
septic tank
tank
wall
primary
advanced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322889646.7U
Other languages
Chinese (zh)
Inventor
张丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Punem Plastics Co ltd
Original Assignee
Hubei Punem Plastics Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Punem Plastics Co ltd filed Critical Hubei Punem Plastics Co ltd
Priority to CN202322889646.7U priority Critical patent/CN221117269U/en
Application granted granted Critical
Publication of CN221117269U publication Critical patent/CN221117269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Biological Wastes In General (AREA)

Abstract

The utility model discloses a simple combined septic tank, which comprises a primary septic tank, a high-grade septic tank and a clarification tank, wherein the primary septic tank, the high-grade septic tank and the clarification tank are all connected through fixed components, and the bottoms of the primary septic tank, the high-grade septic tank and the clarification tank are all provided with the same supporting component; this simple and easy combination formula septic tank, through digging out suitable mounting hole, the bottom is spread through evenly pouring concrete and is leveled, guarantee the level of brace table, put into the standing groove with elementary septic tank, high-grade septic tank and clarification tank, and drive spacing entering into the draw-in groove in spacing, make through setting up the concrete terrace to the bottom of whole device, and through screw rod, sleeve mutually support down to making the state that whole device keeps horizontal, and fill concrete or earth in the periphery, keep whole device's stability, take place the condition of position slope when avoiding appearing geological settlement.

Description

Simple combined septic tank
Technical Field
The utility model relates to the technical field of septic tanks, in particular to a simple combined septic tank.
Background
The septic tank is a device for treating feces and filtering and precipitating, and the principle is that solidified matters are decomposed at the bottom of the tank, and hydrate bodies on the upper layer enter a pipeline to flow away, so that the pipeline is prevented from being blocked, the solidified matters (garbage such as feces) are hydrolyzed for a sufficient time, and the septic tank is a small treatment structure for dividing domestic sewage into grids and precipitating and anaerobically digesting sludge.
The utility model discloses a combined-type installed glass fiber reinforced plastic septic tank, which comprises a glass fiber reinforced plastic tank body, wherein the glass fiber reinforced plastic tank body comprises a primary septic tank, a deep septic tank and a clarification tank, a water inlet is formed in one side of the primary septic tank, a first-stage water outlet is formed in the other side of the primary septic tank, a second-stage water inlet is formed in one side of the deep septic tank, a second-stage water outlet is formed in the other side of the deep septic tank, and a third-stage water inlet is formed in one side of the clarification tank.
The device has certain disadvantages when in use: the whole smooth and horizontal position of putting in underground of above-mentioned device outer wall, and the bottom does not set up the reinforcement, when geological settlement appears in the bottom, probably can lead to whole septic tank to appear the problem of position slope.
Therefore, the utility model provides a simple combined septic tank to solve the problems.
Disclosure of utility model
Aiming at the defects of the prior art, the utility model provides a simple combined septic tank, which solves the problems.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the simple combined septic tank comprises a primary septic tank, a high-grade septic tank and a clarification tank, wherein the primary septic tank, the high-grade septic tank and the clarification tank are all connected through a fixed component, and the bottoms of the primary septic tank, the high-grade septic tank and the clarification tank are all provided with the same supporting component;
The supporting component comprises a supporting table, the standing groove has been seted up to supporting table roof, the draw-in groove has been seted up to the bottom wall in the standing groove, the equal fixedly connected with spacing of elementary septic tank, advanced septic tank and clarification tank diapire, the equal fixedly connected with screw rod in supporting table diapire four corners, the sleeve is installed to the equal spiro union of screw rod outer wall, sleeve bottom fixedly connected with support holds in the palm, the mounting bracket is installed to supporting table diapire spiro union, mounting bracket diapire fixedly connected with built-in fitting.
Further, the standing groove inner wall all with elementary septic tank, advanced septic tank and clarification Chi Waibi laminating, spacing outer wall all with draw-in groove inner wall laminating, the built-in fitting passes through the steel bar welding preparation.
Through the technical scheme, the embedded part is manufactured through steel bar welding, and when the roll concrete is poured, the stress at the bottom of the supporting table is kept stable.
Further, the fixed subassembly includes first baffle, first baffle and clarification tank inner wall left side fixed connection, advanced septic tank inner wall right side fixedly connected with second baffle.
Through above-mentioned technical scheme, the setting of first baffle and second baffle separates clarification tank and advanced septic tank, avoids direct mutual contact.
Further, the through holes are formed in one sides, adjacent to the tops of the first partition plate and the second partition plate, of the first partition plate, the outer pipe is arranged on the inner wall of the through hole of the first partition plate, and the inner pipe is arranged on the inner wall of the through hole of the second partition plate.
Through above-mentioned technical scheme, the intercommunication flow of main convenience filth of opening to keep the sealed effect of whole connection through the outer tube and the inner tube that set up.
Further, the outer wall of the inner pipe is attached to the inner wall of the outer pipe.
Through above-mentioned technical scheme to through the sealed effect that the outer tube and the inner tube that set up keep whole connection.
Further, the sealing groove is formed in the side wall of the advanced septic tank, the sealing ring is fixedly connected to the side wall of the clarification tank and corresponds to the position of the sealing groove, and the outer wall of the sealing ring is attached to the inner wall of the sealing groove.
Through above-mentioned technical scheme, under the mutually supporting installation of sealing washer and seal groove, can improve whole device and connect sealed effect.
Furthermore, a plurality of hangers are uniformly arranged on the outer walls of the primary septic tank, the advanced septic tank and the clarifying tank, and the hangers are mutually matched and arranged through bolts and nuts.
Through the technical scheme, the connection and fixation of each part are completed through the mutual matching of the bolts and the nuts by the hanging lugs.
Further, inspection pipes are arranged on the top walls of the primary septic tank, the advanced septic tank and the clarifying tank, through openings are arranged on the side walls of the clarifying tank, and the side walls of the primary septic tank are communicated with an injection opening.
Through above-mentioned technical scheme, the setting of inspection pipe is mainly to the inside of whole device conveniently inspect.
Advantageous effects
The utility model provides a simple combined septic tank. Compared with the prior art, the method has the following beneficial effects:
(1) This simple and easy combination formula septic tank, through digging out suitable mounting hole, the bottom is spread through evenly pouring concrete and is leveled, the brace table drives the screw rod, sleeve and built-in fitting and puts in the upper position of concrete, rotate the sleeve and drive the support and hold in the palm and rotate at the screw rod surface removal, guarantee the level of brace table, put into the standing groove with elementary septic tank, high-grade septic tank and clarification tank, and drive spacing in entering into the draw-in groove spacing, make through setting up the concrete terrace to the bottom of whole device, and through screw rod, sleeve mutually support down to making the state that whole device keeps the level, and fill concrete or earth in the periphery, keep the stability of whole device, take place the condition of position slope when avoiding appearing geological settlement.
(2) This simple and easy combination formula septic tank enters into in the seal groove inner wall through the sealing washer, first baffle drives between the outer pipe parcel inner tube outer wall opening intercommunication, mutual spiro union installation through bolt and nut is fixed to hangers interconnect, the inspection pipe can be to primary septic tank, the inside inspection of advanced septic tank and clarification tank, the filth carries out the corruption in the primary septic tank through the filling opening injection, then enter into advanced septic tank through the opening and carry out the degree of depth corruption, later enter into the clarification tank through the opening, make through the separation setting to whole device, and make up simply each other, convenient operation, it is short to take time at whole installation, the practicality of whole device is improved.
Drawings
FIG. 1 is a perspective view of the external structure of the present utility model;
FIG. 2 is a front view of the internal structure of the present utility model;
FIG. 3 is a top view of the external structure of the present utility model;
FIG. 4 is an exploded view of the support assembly of the present utility model;
Fig. 5 is an enlarged view of the present utility model a.
In the figure 1, a primary septic tank; 2. a high-grade septic tank; 3. a clarification tank; 4. an inspection tube; 5. a support assembly; 51. a screw; 52. a sleeve; 53. a support bracket; 54. a mounting frame; 55. an embedded part; 56. a limit bar; 57. a clamping groove; 58. a placement groove; 59. a support table; 6. a through hole; 7. a fixing assembly; 71. a first separator; 72. a second separator; 73. sealing grooves; 74. a seal ring; 75. an inner tube; 76. an outer tube; 77. a through port; 78. hanging lugs; 79. a bolt; 710. a nut; 8. an injection port.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
Referring to fig. 1-5, a simple combined septic tank comprises a primary septic tank 1, a high-grade septic tank 2 and a clarification tank 3, wherein the primary septic tank 1, the high-grade septic tank 2 and the clarification tank 3 are all connected through a fixing component 7, and the bottoms of the primary septic tank 1, the high-grade septic tank 2 and the clarification tank 3 are all provided with the same supporting component 5;
The supporting component 5 comprises a supporting table 59, a placing groove 58 is formed in the top wall of the supporting table 59, a clamping groove 57 is formed in the inner bottom wall of the placing groove 58, limiting strips 56 are fixedly connected to the bottom walls of the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3, screw rods 51 are fixedly connected to four corners of the bottom wall of the supporting table 59, a sleeve 52 is arranged on the outer wall of each screw rod 51 in a threaded connection mode, a supporting bracket 53 is fixedly connected to the bottom end of each sleeve 52, a mounting frame 54 is arranged on the bottom wall of the supporting table 59 in a threaded connection mode, and an embedded part 55 is fixedly connected to the bottom wall of the mounting frame 54;
In the embodiment of the present utility model, the purpose of this arrangement is that the supporting component 5 is arranged, so that when the supporting table 59 is installed and fixed, the overall height can be adjusted first, and the level of the supporting table 59 is maintained, the supporting frame 54 and the embedded part 55 are mutually matched, when concrete is poured into the installation pit or soil is filled into the installation pit, the stressed support is more stable, and the situation that the primary septic tank 1, the advanced septic tank 2 and the clarification tank 3 rotate is prevented under the mutual matching of the limiting strip 56 and the clamping groove 57.
Embodiment two:
Referring to fig. 1-5, the present embodiment provides a technical solution based on the first embodiment: the inner wall of the placing groove 58 is attached to the outer walls of the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3, the outer walls of the limiting strips 56 are attached to the inner wall of the clamping groove 57, the embedded part 55 is manufactured through steel bar welding, the fixing component 7 comprises a first partition plate 71, the first partition plate 71 is fixedly connected with the left side of the inner wall of the clarifying tank 3, the right side of the inner wall of the advanced septic tank 2 is fixedly connected with a second partition plate 72, through holes 77 are formed in the adjacent sides of the tops of the first partition plate 71 and the second partition plate 72, an outer pipe 76 is mounted on the inner wall of the through holes 77 of the first partition plate 71, an inner pipe 75 is mounted on the inner wall of the through holes 77 of the second partition plate 72, the outer wall of the inner pipe 75 is attached to the inner wall of the outer pipe 76, a sealing groove 73 is formed in the side wall of the advanced septic tank 2, a sealing ring 74 is attached to the inner wall of the sealing groove 73, a plurality of hanging lugs 78 are uniformly mounted on the outer walls of the side wall of the sealing groove 73, the primary septic tank 1, the outer walls of the advanced septic tank 2 and the clarifying tank 3 are mutually matched and mounted through bolts 79 and 710, inspection pipes 4 are mounted on the inner walls of the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are provided with an inspection pipe 6, and the primary side walls of the primary septic tank 6 are provided with an inspection pipe 6, and the primary side walls of the inspection pipe 8 are connected with the side walls of the clarifying tank 6;
In the embodiment of the utility model, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are conveniently combined with each other through the arrangement of the fixing component 7, and the hanging lugs 78 are mutually matched and installed through the bolts 79 and the nuts 710, so that the disassembling and assembling process is simple and quick, and the practicability of the whole device can be improved.
And all that is not described in detail in this specification is well known to those skilled in the art.
Firstly, when the whole septic tank is assembled and installed, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are sequentially transported to an installation site, then after an installation pit with proper size is dug, the bottom of the pit is firstly paved and leveled through evenly pouring concrete, then the supporting table 59 drives the screw rod 51, the sleeve 52 and the embedded part 55 to be placed on the upper position of the concrete, the supporting table 52 is rotated to drive the supporting bracket 53 to rotate on the surface of the screw rod 51 to linearly move, the heights of the screw rod 51 and the sleeve 52 are adjusted, so that the level of the supporting table 59 is ensured, then the bottom of the supporting table 59 can be poured and fixed through filling soil or concrete, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are sequentially placed in the placing groove 58 through hoisting equipment, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are driven to enter the clamping groove 57 to be limited while moving, then the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are assembled in turn, the sealing ring 74 enters the inner wall of the sealing groove 73, the first baffle plate 71 drives the outer pipe 76 to wrap the outer wall of the inner pipe 75, so that the through holes 77 are communicated with each other, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are communicated with each other entirely, and are fixedly arranged in a threaded manner through bolts 79 and nuts 710, so that the hanging lugs 78 are connected with each other, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 are arranged, the primary septic tank 1, the advanced septic tank 2 and the clarifying tank 3 can be inspected through the arranged inspection pipe 4, the problems of blockage and the like are prevented, dirt is injected into the primary septic tank 1 through the injection hole 8, then enters the advanced septic tank 2 through the through hole 77 for deep septic, and is clarified through the through hole 77, and stainless steel hoops are arranged in the primary septic tank 1, the advanced septic tank 2 and the clarifier 3 to improve the overall strength of the primary septic tank 1, the advanced septic tank 2 and the clarifier 3.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a simple and easy combination formula septic tank, includes elementary septic tank (1), senior septic tank (2) and clarification tank (3), its characterized in that: the primary septic tank (1), the advanced septic tank (2) and the clarifying tank (3) are all connected through a fixed component (7), and the same supporting component (5) is arranged at the bottoms of the primary septic tank (1), the advanced septic tank (2) and the clarifying tank (3);
Supporting component (5) are including supporting bench (59), standing groove (58) have been seted up to supporting bench (59) roof, draw-in groove (57) have been seted up to standing groove (58) interior bottom wall, equal fixedly connected with spacing (56) of elementary septic tank (1), senior septic tank (2) and clarification tank (3) diapire, equal fixedly connected with screw rod (51) in supporting bench (59) diapire four corners, sleeve (52) are installed to equal spiro union of screw rod (51) outer wall, sleeve (52) bottom fixedly connected with support holds in the palm (53), mounting bracket (54) are installed to supporting bench (59) diapire spiro union, mounting bracket (54) diapire fixedly connected with built-in fitting (55).
2. A simple combined septic tank according to claim 1, characterised in that: the inner wall of the placing groove (58) is attached to the outer walls of the primary septic tank (1), the advanced septic tank (2) and the clarifying tank (3), the outer walls of the limiting strips (56) are attached to the inner wall of the clamping groove (57), and the embedded part (55) is manufactured through steel bar welding.
3. A simple combined septic tank according to claim 1, characterised in that: the fixed assembly (7) comprises a first partition plate (71), the first partition plate (71) is fixedly connected with the left side of the inner wall of the clarification tank (3), and the right side of the inner wall of the advanced septic tank (2) is fixedly connected with a second partition plate (72).
4. A simple combined septic tank according to claim 3, characterised in that: the inner tube (75) is installed on the inner wall of the through hole (77) of the first partition plate (71), and the outer tube (76) is installed on the inner wall of the through hole (77) of the second partition plate (72).
5. The modular septic tank of claim 4 wherein: the outer wall of the inner tube (75) is attached to the inner wall of the outer tube (76).
6. A simple combined septic tank according to claim 1, characterised in that: the side wall of the advanced septic tank (2) is provided with a sealing groove (73), a sealing ring (74) is fixedly connected to the side wall of the clarification tank (3) and corresponds to the position of the sealing groove (73), and the outer wall of the sealing ring (74) is attached to the inner wall of the sealing groove (73).
7. A simple combined septic tank according to claim 1, characterised in that: a plurality of lugs (78) are uniformly arranged on the outer walls of the primary septic tank (1), the advanced septic tank (2) and the clarifying tank (3), and the lugs (78) are mutually matched and arranged through bolts (79) and nuts (710).
8. A simple combined septic tank according to claim 1, characterised in that: the device is characterized in that the top walls of the primary septic tank (1), the advanced septic tank (2) and the clarifying tank (3) are provided with inspection pipes (4), the side wall of the clarifying tank (3) is provided with a through hole (6), and the side wall of the primary septic tank (1) is communicated with an injection opening (8).
CN202322889646.7U 2023-10-26 2023-10-26 Simple combined septic tank Active CN221117269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322889646.7U CN221117269U (en) 2023-10-26 2023-10-26 Simple combined septic tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322889646.7U CN221117269U (en) 2023-10-26 2023-10-26 Simple combined septic tank

Publications (1)

Publication Number Publication Date
CN221117269U true CN221117269U (en) 2024-06-11

Family

ID=91368272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322889646.7U Active CN221117269U (en) 2023-10-26 2023-10-26 Simple combined septic tank

Country Status (1)

Country Link
CN (1) CN221117269U (en)

Similar Documents

Publication Publication Date Title
CN107012936A (en) A kind of rainwater-collecting reclaiming system and its construction method
CN206941746U (en) A kind of rainwater-collecting reclaiming system
CN221117269U (en) Simple combined septic tank
CN208402936U (en) A kind of aquaculture hydrocone type blowdown apparatus
KR20100049265A (en) Car cleaning apparatus capable of movable means
CN106869301B (en) Old residential quarters septic tank cleaning method
CN214279626U (en) Novel radioactive sewage decay pond of intermittent type formula medical treatment
CN210874250U (en) Muddy water recovery unit that system concrete was used
CN204251479U (en) A kind of high-order storage mud is dissolved pond
CN209721898U (en) A kind of high-strength composite glass toughening manure pit
CN202609988U (en) Double-layer flat membrane sewage treatment equipment
CN207793008U (en) A kind of prefabricated reinforced concrete module combined type environmental protection septic tank
CN221412354U (en) Municipal works road drainage impurity preprocessing device
CN216106555U (en) Glass tempering manure pit storage tank with filtering capability
CN217232043U (en) Coal dust pollution place initial stage rainwater collection distribution well
CN220443249U (en) Seepage-proofing sewage sedimentation tank
CN220999484U (en) Sealing cover special for concrete and brick type septic tank
CN218323101U (en) PP (polypropylene) water storage module pool
CN2460612Y (en) Combined digestion tank
CN103866824A (en) Water-saving reclaimed water circulation system
CN112081223B (en) Rainwater toilet flushing recycling system and construction method thereof
CN203821511U (en) Recycled water circulating saving system
CN217068037U (en) Construction is with filter equipment of tertiary sedimentation tank
CN215367714U (en) Sump pit convenient to clearance is maintained
CN210315775U (en) Integrated rainwater collecting and utilizing complete equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant