CN221105165U - Building budget drawing support for building engineering - Google Patents

Building budget drawing support for building engineering Download PDF

Info

Publication number
CN221105165U
CN221105165U CN202323113909.1U CN202323113909U CN221105165U CN 221105165 U CN221105165 U CN 221105165U CN 202323113909 U CN202323113909 U CN 202323113909U CN 221105165 U CN221105165 U CN 221105165U
Authority
CN
China
Prior art keywords
frame
support
drawing board
construction
storage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323113909.1U
Other languages
Chinese (zh)
Inventor
王丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Zhuli Engineering Consulting Co ltd
Original Assignee
Heilongjiang Zhuli Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Zhuli Engineering Consulting Co ltd filed Critical Heilongjiang Zhuli Engineering Consulting Co ltd
Priority to CN202323113909.1U priority Critical patent/CN221105165U/en
Application granted granted Critical
Publication of CN221105165U publication Critical patent/CN221105165U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drawing Aids And Blackboards (AREA)

Abstract

The utility model relates to the field of drawing supports, in particular to a building budget drawing support for a building engineering, which comprises the following components: the drawing board is arranged above the frame; the support mechanism is arranged on the surface of the frame, and the drawing board is arranged on the surface of the support mechanism; the support mechanism comprises a support frame assembly for supporting the frame, and the support frame assembly is arranged at the lower end of the frame; under the effect of holding frame subassembly, to can be in daily show state, with the on-the-spot drawing record state make up and the separation operation, curved frame cooperation reset torsion spring can carry out Du Wei operations, keep the drawing briquetting to laminate the surface of drawing board all the time to when working on site to messy engineering, the device has reached convenient to carry and has accomodate the neat effect of drawing, can fix a position the drawing when drawing, keeps the drawing to expand the effect of straightness, and then ensured the data collection work to the construction budget.

Description

Building budget drawing support for building engineering
Technical Field
The utility model relates to the field of drawing supports, in particular to a building budget drawing support for building engineering.
Background
The building engineering is the engineering entity and the installation engineering of the line, pipeline and equipment matched with the building engineering of the present generation, which are all technical works and completed such as planning, investigation, design and construction, completion, etc. carried out for newly-built, reconstructed or expanded building construction and auxiliary structure facilities. The construction budget is a general term of basic construction project design overview and construction drawing budget, and refers to a technical and economic file for pre-calculating and determining all the cost required by each new building, expanding, reconstructing and reconstructing project, wherein the building constructed for meeting the production and living needs is called a building project;
Through retrieving "a building engineering budget drawing support" in the prior art, the bulletin number is "CN213550432U", and this file has reached the effect that makes things convenient for the drawing board to be convenient for remove through universal wheel, fixed brake block, handrail, bottom plate, but when some high-rise buildings are carrying out data collection record work, because in the engineering scene of construction, be difficult to carry the device to reach the survey and drawing place, will influence the data collection of building budget.
Therefore, a construction budget drawing bracket for construction engineering is proposed to solve the above problems.
Disclosure of utility model
The utility model aims to solve the problems, and provides a construction budget drawing bracket for construction engineering, which solves the problems that when data collection and recording work is carried out on some high-rise buildings, the device is difficult to carry to a mapping site in a construction site, and the collection of construction budget data is influenced.
The utility model realizes the aim through the following technical scheme, and the building budget drawing bracket for the building engineering comprises the following components: the drawing board is arranged above the frame; the support mechanism is arranged on the surface of the frame, and the drawing board is arranged on the surface of the support mechanism; the support mechanism comprises a support frame assembly used for supporting the frame, the support frame assembly is arranged at the lower end of the frame, a supporting frame assembly is arranged on the inner side of the frame and arranged at the lower end of the drawing board, the support frame assembly is used for adjusting the support effect of the frame on the drawing board, and drawing operations are carried out on the drawing board by the supporting frame assembly in a manner of being convenient for carrying drawings.
Preferably, the support frame subassembly is including setting up in the inboard receiver of frame, the inner wall fixedly connected with of receiver supports and moves the shell fragment, the fixed surface of receiver is connected with the filter screen, the equal fixedly connected with connecting seat in both sides of receiver and drawing board, the inner wall rotation of connecting seat is connected with curved frame, carries out good centre gripping location effect to the paper through two curved frames, and the receiver can accomodate the drawing, and the receiver passes through filter screen discharge inside impurity, cooperates to support and moves the bullet piece and keep the drawing neat.
Preferably, the support frame assembly includes the L type link that articulates in the frame surface, the lower extreme of L type link articulates there is the bottom articulated lever, the other end of bottom articulated lever articulates there is vertical articulated lever, vertical articulated lever articulates in the lower extreme of frame, the inner wall sliding connection of vertical articulated lever has the sliding rod, the spout has been seted up on the surface of vertical articulated lever, and L type link is L type, and { wherein L type link carries out welding combination shaping for two rectangular tube cooperation angle bars } under the articulated lever of bottom is the horizontality, can cooperate vertical articulated lever to form steady rest for the frame keeps the horizontality.
Preferably, the surface rotation of curved frame is connected with the drawing briquetting, the surface of drawing briquetting and the surface contact of drawing board, the drawing briquetting is square, can carry out good location effect to the paper.
Preferably, the end part of the curved frame is fixedly connected with a reset torsion spring, the other end of the reset torsion spring is in contact with the surface of the storage box, and the curved frame can be driven to act under the reset action of the reset torsion spring.
Preferably, the surface fixedly connected with of sliding rod is protruding to stir the piece, protruding surface of stirring the piece runs through out the spout, can manually stir protruding stirring the piece and drive the sliding rod and slide to the inside of bottom articulated rod when support frame subassembly warp.
The beneficial effects of the utility model are as follows:
1. Under the effect of holding frame subassembly, to can be in daily show state, with the on-the-spot drawing record state make up and the separation operation, when carrying out data collection record work in the high-rise building in for the contrast file, because in the engineering scene of construction, be difficult to carry the device and reach the survey and drawing place, will influence the data collection of building budget, the device is through setting up holding frame subassembly to the state of detachable use, when carrying out on-the-spot data survey and drawing work, can directly remove holding frame subassembly and drawing board through the braces, and the receiver can reach the drawing effect of accomodating, utilize the filter screen to arrange the inside impurity of receiver outward, the cooperation supports and moves the shell fragment and can form the arrangement effect to accomodating drawing, curved frame cooperation drawing briquetting can be fixed a position the expansion simultaneously, curved frame cooperation reset torsional spring can carry out Du Wei operation, keep the drawing briquetting laminating the surface of drawing board all the time, thereby when working in the scene to the mixed engineering, the device has reached the effect that convenient storage drawing was neat of carrying, can be to carrying out the drawing, keep drawing to the drawing, keep drawing flat effect, and further guarantee the data collection work to the building budget.
2. Under the effect of support frame subassembly, support the operation to the frame, the device can carry out different supporting effect to the frame through the cooperation of bottom articulated lever and vertical articulated lever, and the cooperation sliding rod has reached the frame and can switch in horizontal drawing state and slope show state to make the device convenient when drawing operation, and satisfy the demand of show drawing, and then ensured the work of peering to building budget data core.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a supporting mechanism according to the present utility model;
FIG. 3 is a schematic diagram illustrating a deformation explosion of the support frame assembly of the present utility model;
FIG. 4 is a schematic diagram of the position of a briquette of the drawing of the present utility model;
FIG. 5 is a schematic view of the position of the moving spring plate according to the present utility model;
fig. 6 is a schematic view of a partial explosion of the holder assembly of the present utility model.
In the figure: 1. a frame; 2. drawing board; 3. a support mechanism; 31. a support frame assembly; 311. an L-shaped connecting frame; 312. a bottom hinge rod; 313. a vertical hinge rod; 314. a chute; 315. a sliding rod; 316. a convex poking block; 32. a holder assembly; 321. a storage box; 322. a filter screen; 323. a connecting seat; 324. a curved frame; 325. a pushing spring plate; 326. a reset torsion spring; 327. and pressing the drawing into blocks.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The specific implementation method comprises the following steps: as shown in fig. 1 to 6, a construction budget drawing support for construction engineering includes: the drawing board 2 is arranged above the frame 1; the support mechanism 3, the support mechanism 3 is set up on the surface of the frame 1, the drawing board 2 is set up on the surface of the support mechanism 3; the supporting mechanism 3 comprises a supporting frame assembly 31 for supporting the frame 1, the supporting frame assembly 31 is arranged at the lower end of the frame 1, a supporting frame assembly 32 is arranged at the inner side of the frame 1, the supporting frame assembly 32 is arranged at the lower end of the drawing board 2, the supporting frame assembly 31 is used for adjusting the supporting effect of the frame 1 on the drawing board 2, and the supporting frame assembly 32 is convenient for carrying a drawing to carry out drawing operation on the drawing board 2;
As shown in fig. 1, fig. 2, fig. 4, fig. 5, fig. 6, the bracket assembly 32 comprises a storage box 321 arranged at the inner side of the frame 1, an abutting spring piece 325 is fixedly connected to the inner wall of the storage box 321, a filter screen 322 is fixedly connected to the surface of the storage box 321, the storage box 321 is fixedly connected to the surface of the drawing board 2, connecting seats 323 are fixedly connected to the two sides of the storage box 321, a curved bracket 324 is rotatably connected to the inner wall of the connecting seats 323, a drawing press block 327 is rotatably connected to the surface of the curved bracket 324, the surface of the drawing press block 327 is contacted with the surface of the drawing board 2, a reset torsion spring 326 is fixedly connected to the end of the curved bracket 324, the other end of the reset torsion spring 326 is contacted with the surface of the storage box 321, and when the bracket assembly 32 is used, the bracket assembly 32 can be combined with the frame 1 and the support frame assembly 31 to form a stable supporting state, the support bracket component 32 can be taken down and the drawing board 2 is carried for drawing work on site, meanwhile, the storage box 321 can carry out storage operation on the drawing, and the surface of the storage box 321 on the construction site is provided with the braces which are convenient to carry, the dust on the engineering site is more, the filter screen 322 can conveniently discharge dust impurities stained on the surface of the drawing operated after internal drawing outwards, the pushing elastic sheet 325 can push the drawing inside the storage box 321, the drawing is kept relatively tidy, when drawing operation is carried out, the drawing briquetting 327 can be manually pushed to drive the curved frame 324 to rotate in the connecting seat 323, then, the curved frame 324 is driven to carry out reset operation under the action of the reset torsion spring 326 at the end part, then the curved frame 324 drives the drawing briquetting 327 to attach to the surface of the drawing board 2, the auxiliary positioning operation is carried out on the paper, the paper can be prevented from falling, the paper can be completely unfolded;
As shown in fig. 1, fig. 2 and fig. 3, the support frame assembly 31 includes the L-shaped link 311 hinged on the surface of the frame 1, the lower extreme of the L-shaped link 311 is hinged with the bottom hinge rod 312, the other end of the bottom hinge rod 312 is hinged with the vertical hinge rod 313, the vertical hinge rod 313 is hinged with the lower end of the frame 1, the inner wall sliding connection of the vertical hinge rod 313 has a sliding rod 315, the surface of the vertical hinge rod 313 has a chute 314, the surface of the sliding rod 315 is fixedly connected with a protruding stirring block 316, the surface of the protruding stirring block 316 penetrates out of the chute 314, when the drawing board 2 is used, the support frame assembly 31 can be matched with the frame 1 to hold, the support frame assembly 31 can keep the support effect of the horizontal state of the frame 1, and the like, when the drawing board 1 is required to be used for operation such as drawing, the vertical hinge rod 313 can be lifted up, the inner sliding rod 313 and the bottom hinge rod 312 are in a straight line state, the sliding rod 315 is positioned in the vertical hinge rod 313, the sliding rod 315 slides to the bottom under the action of gravity to the inner side of the sliding rod 312, the sliding rod 312 is inclined to the surface of the frame 312, and the support frame 2 can be well held on the support frame 2, and the support frame 32 is convenient to form the support frame 32.
When the drawing board is used for drawing above the drawing board 2, the support frame assembly 31 supports the frame 1 to keep the frame 1 horizontal, when drawing is needed to be displayed, the lifting vertical hinging rod 313 is lifted to drive the bottom hinging rod 312 to act in a linear state, the sliding rod 315 in the vertical hinging rod 313 slides into the bottom hinging rod 312 under the action of gravity, the surface convex poking block 316 of the sliding rod 315 is propped against the upper end of the bottom hinging rod 312 to form the inclined state of the frame 1, when the drawing board 2 is needed to go to a construction site to carry out drawing work, the support frame assembly 32 can be taken down to carry the drawing board 2 to the site for drawing, the drawing board is contained in the containing box 321, impurities stained on the surface of the drawing board are discharged outwards through the filter screen 322, the propping elastic sheet 325 is propped against the inside of the containing box 321, the drawing board 327 is manually poked to drive the drawing board 327 to rotate in the connecting seat 323, the curved board 324 drives the reset torsion spring 326 to deform under the reset action of the reset torsion spring 326, and the curved board 324 drives the drawing board 327 to attach the drawing board 327 to the surface of the drawing board 2 to the positioning paper.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (6)

1. The utility model provides a building budget drawing support for building engineering which characterized in that includes:
The drawing board (2) is arranged above the frame (1);
The support mechanism (3), the support mechanism (3) is arranged on the surface of the frame (1), and the drawing board (2) is arranged on the surface of the support mechanism (3);
Wherein, supporting mechanism (3) is including being used for supporting support frame subassembly (31) to frame (1), support frame subassembly (31) set up in the lower extreme of frame (1), frame (1) inboard is provided with holds in the palm frame subassembly (32), hold in the palm frame subassembly (32) and set up in the lower extreme of drawing board (2), support frame subassembly (31) are used for adjusting the supporting effect of frame (1) to drawing board (2), hold in the palm frame subassembly (32) portable drawing is drawn the operation on drawing board (2).
2. The construction budget drawing support for a construction project according to claim 1, wherein: the support frame assembly (32) comprises a storage box (321) arranged on the inner side of the frame (1), an abutting elastic sheet (325) is fixedly connected to the inner wall of the storage box (321), a filter screen (322) is fixedly connected to the surface of the storage box (321), the storage box (321) is fixedly connected with the surface of the drawing board (2), connecting bases (323) are fixedly connected to the two sides of the storage box (321), and a curved frame (324) is rotatably connected to the inner wall of the connecting base (323).
3. The construction budget drawing support for a construction project according to claim 1, wherein: the support frame subassembly (31) are including articulating in L type link (311) on frame (1) surface, the lower extreme of L type link (311) articulates there is bottom articulated rod (312), the other end of bottom articulated rod (312) articulates there is vertical articulated rod (313), vertical articulated rod (313) articulates in the lower extreme of frame (1), the inner wall sliding connection of vertical articulated rod (313) has slide rod (315), spout (314) have been seted up on the surface of vertical articulated rod (313).
4. A construction budget drawing bracket for a construction project according to claim 2, wherein: the surface rotation of curved frame (324) is connected with drawing briquetting (327), the surface of drawing briquetting (327) and the surface contact of drawing board (2).
5. A construction budget drawing bracket for a construction project according to claim 2, wherein: the end part of the curved frame (324) is fixedly connected with a reset torsion spring (326), and the other end of the reset torsion spring (326) is in contact with the surface of the storage box (321).
6. A construction budget drawing bracket for a construction project according to claim 3, wherein: the surface of the sliding rod (315) is fixedly connected with a convex poking block (316), and the surface of the convex poking block (316) penetrates through the sliding groove (314).
CN202323113909.1U 2023-11-18 2023-11-18 Building budget drawing support for building engineering Active CN221105165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323113909.1U CN221105165U (en) 2023-11-18 2023-11-18 Building budget drawing support for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323113909.1U CN221105165U (en) 2023-11-18 2023-11-18 Building budget drawing support for building engineering

Publications (1)

Publication Number Publication Date
CN221105165U true CN221105165U (en) 2024-06-11

Family

ID=91362276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323113909.1U Active CN221105165U (en) 2023-11-18 2023-11-18 Building budget drawing support for building engineering

Country Status (1)

Country Link
CN (1) CN221105165U (en)

Similar Documents

Publication Publication Date Title
CN221105165U (en) Building budget drawing support for building engineering
CN211106579U (en) Building engineering cost analytical equipment
CN215577547U (en) Enterprise party building education data display device
CN115157904A (en) Teaching is with accomodating formula multimedia teaching board
CN213420492U (en) Embedded industrial data acquisition equipment
CN217812559U (en) BIM-based supporting device for building structure
CN2606835Y (en) Linking rod type horizontal support frame
CN211294187U (en) Teaching board for teaching
CN216331098U (en) Dust type intelligence blackboard of education usefulness
CN219916259U (en) Hand drawing board
CN214963422U (en) Special table for mechanical drawing
CN219515677U (en) Movable file cabinet for advertisement production
CN214963426U (en) Art design is with multi-functional drawing platform
CN219110709U (en) Classified storage box convenient for storing fire-fighting first-aid tools
CN112220306B (en) Painting suspending device
CN214595255U (en) Multifunctional display device for exhibition service
CN215679831U (en) Tourism management teaching mode
CN114855665B (en) Warning device is used in construction engineering construction
CN215190401U (en) Building engineering cost budget rehearsal device
CN219306239U (en) Drawing supporting device for engineering design
CN215635911U (en) Intangible asset level database data display device
CN220778003U (en) Indoor decoration decorative effect diagram display device
CN221079466U (en) Foreign language teaching interactive board
CN211827774U (en) Sports english teaching panel device
CN214941720U (en) Exposed universal type vertical lock seam double-layer metal roof structure

Legal Events

Date Code Title Description
GR01 Patent grant