CN221095552U CN202322940801.3U CN202322940801U CN221095552U CN 221095552 U CN221095552 U CN 221095552U CN 202322940801 U CN202322940801 U CN 202322940801U CN 221095552 U CN221095552 U CN 221095552U
Authority
CN
China
Prior art keywords
curtain wall
limiting
positioning mechanism
spring
outer frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322940801.3U
Other languages
Chinese (zh)
Inventor
薛松池
李金燕
陆玮
顾佳艳
杨佳杰
张磊剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Liheng Intelligent Manufacturing Technology Co., Ltd.
Original Assignee
Jiangsu Liheng Curtain Wall Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Liheng Curtain Wall Technology Co ltd filed Critical Jiangsu Liheng Curtain Wall Technology Co ltd
Priority to CN202322940801.3U priority Critical patent/CN221095552U/en
Application granted granted Critical
Publication of CN221095552U publication Critical patent/CN221095552U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本实用新型涉及幕墙安装技术领域,具体公开了一种干挂幕墙板快速连接定位机构,包括:横梁的前表面设置有第一限位固件和第二限位固件,横梁的后表面设置有安装座,第一限位件的表面设有衔接区和卡槽,衔接区安装有限位凸块;幕墙外框设置在幕墙板本体的外侧,幕墙外框的四个端点处设置有卡块,幕墙外框的侧面开设有限位凹槽,幕墙外框的上下端面设置有插合件;有益效果为:在需要进行安装幕墙时,首先将组装好的横梁安装在墙体表面,再将组装好的幕墙外框推动进入第一限位固件和第二限位固件内,实现对幕墙外框的限位,由此完成幕墙板的安装,因此操作简单,能够实现幕墙板的快速定位安装。

The utility model relates to the technical field of curtain wall installation, and specifically discloses a dry-hanging curtain wall panel quick connection and positioning mechanism, comprising: a first limiting fixture and a second limiting fixture are arranged on the front surface of a crossbeam, a mounting seat is arranged on the rear surface of the crossbeam, a connection area and a clamping groove are arranged on the surface of the first limiting fixture, and a limiting protrusion is arranged on the connection area; a curtain wall outer frame is arranged on the outer side of a curtain wall panel body, clamping blocks are arranged at four end points of the curtain wall outer frame, a limiting groove is arranged on the side surface of the curtain wall outer frame, and an insert is arranged on the upper and lower end surfaces of the curtain wall outer frame; the beneficial effect is that when it is necessary to install the curtain wall, the assembled crossbeam is first installed on the wall surface, and then the assembled curtain wall outer frame is pushed into the first limiting fixture and the second limiting fixture to realize the limiting of the curtain wall outer frame, thereby completing the installation of the curtain wall panel, so the operation is simple, and the rapid positioning and installation of the curtain wall panel can be realized.

Description

一种干挂幕墙板快速连接定位机构A quick connection and positioning mechanism for dry-hanging curtain wall panels

技术领域Technical Field

本实用新型涉及幕墙安装技术领域,具体为一种干挂幕墙板快速连接定位机构。The utility model relates to the technical field of curtain wall installation, in particular to a quick connection and positioning mechanism for dry-hanging curtain wall panels.

背景技术Background technique

装饰(幕)墙板干挂是建筑外墙的一种施工工艺,通过耐腐蚀的螺栓和耐腐蚀的柔性连接件,将墙板直接挂在建筑结构的外表面,墙板与建筑结构之间留出40~50mm的空腔。Dry hanging of decorative (curtain) wall panels is a construction technology for building exterior walls. The wall panels are directly hung on the outer surface of the building structure through corrosion-resistant bolts and corrosion-resistant flexible connectors, leaving a cavity of 40 to 50 mm between the wall panels and the building structure.

现有技术中,干挂施工以预制组装的方式取代了传统的湿作业施工,可避免墙板表面产生污染,有利于保持幕墙清洁美观;可防止墙板脱落,提高了建筑物的安全性和耐久性;还减轻了构筑物自重并预留保温空间。In the existing technology, dry hanging construction replaces the traditional wet construction with prefabricated assembly, which can avoid pollution on the surface of wall panels and help keep the curtain wall clean and beautiful; it can prevent wall panels from falling off, improve the safety and durability of the building; it also reduces the deadweight of the structure and reserves insulation space.

但是,传统的幕墙大多采用焊接工艺焊接成具有多个安装区的安装骨架结构,然后采用螺栓将幕墙板逐个安装到安装区中,对于高空作业,这样的安装方式较为繁琐,为此,本实用新型提出一种干挂幕墙板快速连接定位机构来解决上述问题。However, most traditional curtain walls are welded into an installation skeleton structure with multiple installation areas by welding technology, and then the curtain wall panels are installed one by one into the installation areas by bolts. For high-altitude operations, such installation method is relatively cumbersome. Therefore, the utility model proposes a dry-hanging curtain wall panel quick connection and positioning mechanism to solve the above problem.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种干挂幕墙板快速连接定位机构,以解决上述背景技术中提出的问题。The utility model aims to provide a quick connection and positioning mechanism for dry-hanging curtain wall panels to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种干挂幕墙板快速连接定位机构,所述干挂幕墙板快速连接定位机构包括:横梁,横梁的前表面设置有第一限位固件和第二限位固件,横梁的后表面设置有安装座,第一限位件的表面设有衔接区和卡槽,衔接区安装有限位凸块;To achieve the above object, the utility model provides the following technical solutions: a dry-hang curtain wall panel quick connection and positioning mechanism, the dry-hang curtain wall panel quick connection and positioning mechanism comprising: a crossbeam, a first limiter and a second limiter are arranged on the front surface of the crossbeam, a mounting seat is arranged on the rear surface of the crossbeam, a connection area and a card slot are arranged on the surface of the first limiter, and a limiter protrusion is arranged on the connection area;

幕墙外框,幕墙外框设置在幕墙板本体的外侧,幕墙外框的四个端点处设置有卡块,幕墙外框的侧面开设有限位凹槽,幕墙外框的上下端面设置有插合件。The curtain wall outer frame is arranged on the outside of the curtain wall panel body, the four end points of the curtain wall outer frame are provided with clamping blocks, the side of the curtain wall outer frame is provided with limiting grooves, and the upper and lower end faces of the curtain wall outer frame are provided with plug-in parts.

优选的,所述安装座的表面开设有螺纹安装孔。Preferably, a threaded mounting hole is provided on the surface of the mounting seat.

优选的,所述衔接区开设有圆形凹槽和十字凹槽,圆形凹槽内设有第一弹簧,第一弹簧的一端固定连接衔接区,第一弹簧的另一端固定连接限位圆柱,限位圆柱固定连接限位凸块,十字凹槽内设有十字滑块,十字滑块和十字凹槽为滑动连接,十字滑块固定连接于限位凸块。Preferably, the connection area is provided with a circular groove and a cross groove, a first spring is provided in the circular groove, one end of the first spring is fixedly connected to the connection area, the other end of the first spring is fixedly connected to the limiting cylinder, the limiting cylinder is fixedly connected to the limiting protrusion, a cross slider is provided in the cross groove, the cross slider and the cross groove are slidably connected, and the cross slider is fixedly connected to the limiting protrusion.

优选的,所述卡槽和卡块相适配,限位凹槽和限位凸块相适配,限位凹槽开口处经过倒角处理,第一限位固件和第二限位固件通过焊接固定连接于横梁。Preferably, the card slot and the card block are matched, the limiting groove and the limiting protrusion are matched, the opening of the limiting groove is chamfered, and the first limiting fixture and the second limiting fixture are fixedly connected to the crossbeam by welding.

优选的,所述第二限位固件的表面开设有插合槽和第二通孔,第二通孔内插入立柱,立柱的端面固定连接立板。Preferably, an insertion groove and a second through hole are provided on the surface of the second limiting fixture, a column is inserted into the second through hole, and an end surface of the column is fixedly connected to the vertical plate.

优选的,所述立柱的表面套设有第二弹簧,第二弹簧的一端固定连接第二限位固件,第二弹簧的另一端固定连接立板,立板的表面固定有把手,把手的内表面固定有防滑垫。Preferably, a second spring is sleeved on the surface of the column, one end of the second spring is fixedly connected to the second limiting fixture, the other end of the second spring is fixedly connected to the vertical plate, a handle is fixed to the surface of the vertical plate, and an anti-slip pad is fixed to the inner surface of the handle.

优选的,所述立柱的表面套设有第二弹簧,第二弹簧的一端固定连接第二限位固件,第二弹簧的另一端固定连接立板,立板的表面固定有把手,把手的内表面固定有防滑垫。Preferably, a second spring is sleeved on the surface of the column, one end of the second spring is fixedly connected to the second limiting fixture, the other end of the second spring is fixedly connected to the vertical plate, a handle is fixed to the surface of the vertical plate, and an anti-slip pad is fixed to the inner surface of the handle.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型提出的一种干挂幕墙板快速连接定位机构,在需要进行安装幕墙时,首先将组装好的横梁安装在墙体表面,再手动拨动把手,将立柱脱离第二通孔,再将组装好的幕墙外框推动进入第一限位固件和第二限位固件内,其中限位凸块嵌入限位凹槽内、卡块嵌入卡槽内插合件嵌入插合槽中,再松开把手,此时立柱在第二弹簧的回弹作用下自动插入第二通孔和第一通孔内,由此实现对幕墙外框的限位,由此完成幕墙板的安装,因此操作简单,能够实现幕墙板的快速定位安装,这样避免了传统的幕墙大多采用焊接工艺焊接成具有多个安装区的安装骨架结构,然后采用螺栓将幕墙板逐个安装到安装区中,对于高空作业,这样的安装方式较为繁琐的问题。The utility model provides a quick connection and positioning mechanism for dry-hanging curtain wall panels. When the curtain wall needs to be installed, the assembled crossbeam is first installed on the wall surface, and then the handle is manually toggled to disengage the column from the second through hole, and then the assembled curtain wall outer frame is pushed into the first limiting fixture and the second limiting fixture, wherein the limiting protrusion is embedded in the limiting groove, the clamping block is embedded in the clamping groove, and the plug-in piece is embedded in the plug-in groove, and then the handle is released. At this time, the column is automatically inserted into the second through hole and the first through hole under the rebound action of the second spring, thereby realizing the limiting of the curtain wall outer frame and completing the installation of the curtain wall panel. Therefore, the operation is simple and the quick positioning and installation of the curtain wall panel can be realized. This avoids the problem that most traditional curtain walls are welded into an installation skeleton structure with multiple installation areas by welding technology, and then the curtain wall panels are installed one by one in the installation area by bolts. For high-altitude operations, such an installation method is relatively cumbersome.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;

图2为本实用新型结构正常使用时的安装示意图;FIG2 is a schematic diagram of the installation of the utility model structure during normal use;

图3为本实用新型结构后视示意图;Figure 3 is a rear view schematic diagram of the structure of the utility model;

图4为本实用新型幕墙外框结构示意图;Figure 4 is a schematic diagram of the outer frame structure of the curtain wall of the utility model;

图5为本实用新型第一限位固件结构示意图;FIG5 is a schematic diagram of the structure of a first position limiting fixture of the present invention;

图6为本实用新型第二限位固件结构示意图。FIG. 6 is a schematic diagram of the structure of the second position limiting fixture of the present invention.

图中:1、横梁;2、第一限位固件;3、第二限位固件;4、幕墙外框;5、幕墙板本体;6、安装座;7、螺纹安装孔;8、卡块;9、插合件;10、第一通孔;11、限位凹槽;12、衔接区;13、卡槽;14、十字滑块;15、限位圆柱;16、限位凸块;17、圆形凹槽;18、第一弹簧;19、十字凹槽;20、立柱;21、把手;22、防滑垫;23、立板;24、第二弹簧;25、第二通孔;26、插合槽。In the figure: 1. cross beam; 2. first limiting fixture; 3. second limiting fixture; 4. curtain wall outer frame; 5. curtain wall panel body; 6. mounting seat; 7. threaded mounting hole; 8. clamping block; 9. plug-in piece; 10. first through hole; 11. limiting groove; 12. connection area; 13. clamping groove; 14. cross slider; 15. limiting cylinder; 16. limiting protrusion; 17. circular groove; 18. first spring; 19. cross groove; 20. column; 21. handle; 22. anti-slip pad; 23. vertical plate; 24. second spring; 25. second through hole; 26. plug-in groove.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案进行清楚、完整地描述,及优点更加清楚明白,以下结合附图对本实用新型实施例进行进一步详细说明。应当理解,此处所描述的具体实施例是本实用新型一部分实施例,而不是全部的实施例,仅仅用以解释本实用新型实施例,并不用于限定本实用新型实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

实施例一Embodiment 1

请参阅图1-图6,本实用新型提供一种技术方案:一种干挂幕墙板快速连接定位机构,所述干挂幕墙板快速连接定位机构包括:横梁1,横梁1的前表面设置有第一限位固件2和第二限位固件3,横梁1的后表面设置有安装座6,第一限位件的表面设有衔接区12和卡槽13,衔接区12安装有限位凸块16;幕墙外框4设置在幕墙板本体5的外侧,幕墙外框4的四个端点处设置有卡块8,幕墙外框4的侧面开设有限位凹槽11,幕墙外框4的上下端面设置有插合件9,安装座6的表面开设有螺纹安装孔7,第二限位固件3的表面开设有插合槽26和第二通孔25,第二通孔25内插入立柱20,立柱20的端面固定连接立板23,插合件9的表面开设有第一通孔10,插合件9和插合槽26相适配,立柱20可插入第一通孔10;Please refer to Figures 1 to 6. The utility model provides a technical solution: a dry-hanging curtain wall panel quick connection and positioning mechanism, the dry-hanging curtain wall panel quick connection and positioning mechanism comprises: a beam 1, the front surface of the beam 1 is provided with a first limiter 2 and a second limiter 3, the rear surface of the beam 1 is provided with a mounting seat 6, the surface of the first limiter is provided with a connection area 12 and a slot 13, the connection area 12 is provided with a limiter convex block 16; the curtain wall outer frame 4 is arranged on the outside of the curtain wall panel body 5, and the four ends of the curtain wall outer frame 4 are provided with a plurality of A clamping block 8 is provided at the end point, a limiting groove 11 is provided on the side of the curtain wall outer frame 4, an inserting piece 9 is provided on the upper and lower end surfaces of the curtain wall outer frame 4, a threaded mounting hole 7 is provided on the surface of the mounting seat 6, an inserting groove 26 and a second through hole 25 are provided on the surface of the second limiting fixture 3, a column 20 is inserted into the second through hole 25, an end surface of the column 20 is fixedly connected to the vertical plate 23, a first through hole 10 is provided on the surface of the inserting piece 9, the inserting piece 9 and the inserting groove 26 are adapted, and the column 20 can be inserted into the first through hole 10;

使用时,在需要进行安装幕墙时,首先将组装好的横梁1通过螺栓安装孔安装在墙体表面,再手动拨动把手21,将立柱20脱离第二通孔25,再将组装好的幕墙外框4推动进入第一限位固件2和第二限位固件3内,其中限位凸块16嵌入限位凹槽11内、卡块8嵌入卡槽13内插合件9嵌入插合槽26中,再松开把手21,此时立柱20在第二弹簧24的回弹作用下自动插入第二通孔25和第一通孔10内,由此实现对幕墙外框4的限位,由此完成幕墙板的安装,因此操作简单,能够实现幕墙板的快速定位安装。During use, when it is necessary to install the curtain wall, first install the assembled crossbeam 1 on the wall surface through the bolt mounting hole, then manually turn the handle 21 to disengage the column 20 from the second through hole 25, and then push the assembled curtain wall outer frame 4 into the first limiting fixture 2 and the second limiting fixture 3, wherein the limiting protrusion 16 is embedded in the limiting groove 11, the clamping block 8 is embedded in the clamping groove 13, and the plug-in piece 9 is embedded in the plug-in groove 26, and then release the handle 21. At this time, the column 20 is automatically inserted into the second through hole 25 and the first through hole 10 under the rebound action of the second spring 24, thereby realizing the limitation of the curtain wall outer frame 4, thereby completing the installation of the curtain wall panel. Therefore, the operation is simple and can realize the rapid positioning and installation of the curtain wall panel.

实施例二Embodiment 2

在实施例一的基础上为了实现限位凸块16对幕墙外框4的限位,在衔接区12开设有圆形凹槽17和十字凹槽19,圆形凹槽17内设有第一弹簧18,第一弹簧18的一端固定连接衔接区12,第一弹簧18的另一端固定连接限位圆柱15,限位圆柱15固定连接限位凸块16,十字凹槽19内设有十字滑块14,十字滑块14和十字凹槽19为滑动连接,十字滑块14固定连接于限位凸块16,卡槽13和卡块8相适配,限位凹槽11和限位凸块16相适配,限位凹槽11开口处经过倒角处理;On the basis of the first embodiment, in order to realize the limiting of the curtain wall outer frame 4 by the limiting protrusion 16, a circular groove 17 and a cross groove 19 are provided in the connection area 12, a first spring 18 is provided in the circular groove 17, one end of the first spring 18 is fixedly connected to the connection area 12, the other end of the first spring 18 is fixedly connected to the limiting cylinder 15, the limiting cylinder 15 is fixedly connected to the limiting protrusion 16, a cross slider 14 is provided in the cross groove 19, the cross slider 14 and the cross groove 19 are slidably connected, the cross slider 14 is fixedly connected to the limiting protrusion 16, the card slot 13 and the card block 8 are adapted, the limiting groove 11 and the limiting protrusion 16 are adapted, and the opening of the limiting groove 11 is chamfered;

使用时,限位凸块16的表面和限位凹槽11开口处均经过倒角处理,这样方便幕墙外框4的推动,设置的十字滑块14可以在十字凹槽19内滑动,由此可以为限位凸块16提供支撑和导向作用;在进行推动幕墙外框4时,限位凸块16受力进行移动,进而第一弹簧18受力压缩,当限位凸块16位于限位凹槽11处时,限位凸块16在第一弹簧18的回弹作用下自动插入限位凹槽11中,由此实现对幕墙外框4的限位,且通过设置多组限位凸块16,提高了幕墙外框4的稳定性。When in use, the surface of the limiting protrusion 16 and the opening of the limiting groove 11 are chamfered, which facilitates the pushing of the curtain wall outer frame 4. The cross slider 14 can slide in the cross groove 19, thereby providing support and guidance for the limiting protrusion 16; when pushing the curtain wall outer frame 4, the limiting protrusion 16 is forced to move, and then the first spring 18 is compressed. When the limiting protrusion 16 is located at the limiting groove 11, the limiting protrusion 16 is automatically inserted into the limiting groove 11 under the rebound action of the first spring 18, thereby realizing the limitation of the curtain wall outer frame 4, and by setting multiple groups of limiting protrusions 16, the stability of the curtain wall outer frame 4 is improved.

实施例三Embodiment 3

在实施例二的基础上为了提高幕墙外框4连接的稳定性,在幕墙外框4的四个端点处设置有卡块8,卡槽13和卡块8相适配,立板23的表面固定有把手21,把手21的内表面固定有防滑垫22;On the basis of the second embodiment, in order to improve the stability of the connection of the curtain wall outer frame 4, a clamping block 8 is provided at the four end points of the curtain wall outer frame 4, the clamping slot 13 is adapted to the clamping block 8, a handle 21 is fixed on the surface of the vertical plate 23, and an anti-slip pad 22 is fixed on the inner surface of the handle 21;

使用时,在进行推动幕墙外框4时,同步的卡块8对应嵌入卡槽13中,进一步提高幕墙外框4安装的稳定性,把手21呈弧形,把手21的弧形内表面固定有防滑垫22,防滑垫22的表面设有防滑纹路,这样可以避免手动拨动把手21时出现滑脱,提高安装操作的安全性。During use, when pushing the curtain wall outer frame 4, the synchronous card block 8 is correspondingly embedded in the card slot 13, further improving the stability of the installation of the curtain wall outer frame 4. The handle 21 is arc-shaped, and an anti-slip pad 22 is fixed to the arc-shaped inner surface of the handle 21. The surface of the anti-slip pad 22 is provided with anti-slip texture, which can avoid slipping when manually turning the handle 21, thereby improving the safety of the installation operation.

实际使用时,在需要进行安装幕墙时,首先将组装好的横梁1安装在墙体表面,再将组装好的幕墙外框4推动进入第一限位固件2和第二限位固件3内,实现对幕墙外框4的限位,由此完成幕墙板的安装,因此操作简单,能够实现幕墙板的快速定位安装,这样避免了传统的幕墙大多采用焊接工艺焊接成具有多个安装区的安装骨架结构,然后采用螺栓将幕墙板逐个安装到安装区中,对于高空作业,这样的安装方式较为繁琐的问题。In actual use, when it is necessary to install the curtain wall, first install the assembled crossbeam 1 on the wall surface, and then push the assembled curtain wall outer frame 4 into the first limiting fixture 2 and the second limiting fixture 3 to limit the curtain wall outer frame 4, thereby completing the installation of the curtain wall panel. Therefore, the operation is simple, and the curtain wall panel can be quickly positioned and installed. This avoids the problem that most traditional curtain walls are welded into an installation skeleton structure with multiple installation areas using welding technology, and then the curtain wall panels are installed one by one in the installation area using bolts. For high-altitude operations, this installation method is relatively cumbersome.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. A hang curtain wallboard quick connect positioning mechanism futilely which characterized in that: the quick connecting and positioning mechanism for the dry hanging curtain wall plate comprises: the novel energy-saving device comprises a cross beam (1), wherein a first limiting firmware (2) and a second limiting firmware (3) are arranged on the front surface of the cross beam (1), an installation seat (6) is arranged on the rear surface of the cross beam (1), a connecting area (12) and a clamping groove (13) are arranged on the surface of the first limiting part, and a limiting protruding block (16) is arranged on the connecting area (12);
Curtain frame (4), curtain frame (4) set up in the outside of curtain board body (5), and four extreme point departments of curtain frame (4) are provided with fixture block (8), and spacing recess (11) have been seted up to the side of curtain frame (4), and the up-and-down terminal surface of curtain frame (4) is provided with plug-in components (9).
2. The quick connect positioning mechanism for dry wall panels as claimed in claim 1, wherein: a threaded mounting hole (7) is formed in the surface of the mounting seat (6).
3. The quick connect positioning mechanism for dry wall panels as claimed in claim 1, wherein: circular recess (17) and cross recess (19) have been seted up in linking district (12), be equipped with first spring (18) in circular recess (17), the one end fixed connection linking district (12) of first spring (18), the spacing cylinder (15) of the other end fixed connection of first spring (18), spacing cylinder (15) fixed connection spacing lug (16), be equipped with cross slider (14) in cross recess (19), cross slider (14) and cross recess (19) are sliding connection, cross slider (14) fixed connection in spacing lug (16).
4. The quick connect positioning mechanism for dry wall panels as claimed in claim 1, wherein: the clamping groove (13) is matched with the clamping block (8), the limiting groove (11) is matched with the limiting protruding block (16), the opening of the limiting groove (11) is subjected to chamfering treatment, and the first limiting fixing piece (2) and the second limiting fixing piece (3) are fixedly connected to the cross beam (1) through welding.
5. The quick connect positioning mechanism for dry wall panels as claimed in claim 1, wherein: an inserting groove (26) and a second through hole (25) are formed in the surface of the second limiting fixing piece (3), the upright post (20) is inserted into the second through hole (25), and the end face of the upright post (20) is fixedly connected with the upright plate (23).
6. The quick connect positioning mechanism for dry wall panels as claimed in claim 5, wherein: the surface cover of stand (20) is equipped with second spring (24), and the one end fixed connection second spacing firmware (3) of second spring (24), the other end fixed connection riser (23) of second spring (24), the surface mounting of riser (23) has handle (21), the internal surface mounting of handle (21) has slipmat (22).
7. The quick connect positioning mechanism for dry wall panels as claimed in claim 1, wherein: the surface of the inserting piece (9) is provided with a first through hole (10), the inserting piece (9) is matched with the inserting groove (26), and the upright post (20) can be inserted into the first through hole (10).
CN202322940801.3U 2023-10-31 2023-10-31 Quick connecting and positioning mechanism for dry hanging curtain wall board Active CN221095552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322940801.3U CN221095552U (en) 2023-10-31 2023-10-31 Quick connecting and positioning mechanism for dry hanging curtain wall board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322940801.3U CN221095552U (en) 2023-10-31 2023-10-31 Quick connecting and positioning mechanism for dry hanging curtain wall board

Publications (1)

Publication Number Publication Date
CN221095552U true CN221095552U (en) 2024-06-07

Family

ID=91317865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322940801.3U Active CN221095552U (en) 2023-10-31 2023-10-31 Quick connecting and positioning mechanism for dry hanging curtain wall board

Country Status (1)

Country Link
CN (1) CN221095552U (en)

Similar Documents

Publication Publication Date Title
CN209941986U (en) Curtain wall construction convenient to installation
CN216616323U (en) A kind of external wall thermal insulation device for green building
CN107119876A (en) A kind of flush type wallboard
CN211286230U (en) A quick installation and disassembly of the ceiling installation structure
CN202202455U (en) Improved exposed-frame and concealed-frame combined multifunctional curtain wall system
CN207582871U (en) Outdoor heat-preserving decorative wall board mounting structure
CN217150872U (en) A combined keel ceiling structure for green and environmental protection decoration
CN200985577Y (en) Horizontal inserted type panel installation beam
CN209568650U (en) A plug-in pendant for fixing the upper hook head by buckle
CN205053363U (en) Embedded portable buckle device
CN110725499B (en) A detachable pendant structure with limit function
CN210597970U (en) Dado erection joint device
CN220184490U (en) A kind of medical engineering building exterior wall decoration structure
CN219471427U (en) Dry-hanging outer wall decorative plate connecting structure
CN221865412U (en) Assembled type combined fast-assembling curtain box structure
CN218970736U (en) Wall decoration device for old house reconstruction
CN114687489B (en) A kind of prefabricated building curtain wall installation structure
CN114232854A (en) Noise-reduction dry-hanging stone curtain wall
CN221956998U (en) Concrete partition plate fixing assembly
CN215858472U (en) Compound floor board convenient to installation
CN209082885U (en) A kind of installation fitting of composition metal wallboard
CN211200894U (en) Ready-package aluminium veneer
CN218508899U (en) Assembly type wallboard mounting structure at internal corner position
CN213539344U (en) Heat preservation rock wool board convenient to wall body installation
CN220247313U (en) Novel toughened glass building curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226200 Jiangsu Province Nantong City High-tech Development Zone Binjiang Avenue 88#

Patentee after: Jiangsu Liheng Intelligent Manufacturing Technology Co., Ltd.

Country or region after: China

Address before: 226200 Jiangsu Province Nantong City High-tech Development Zone Binjiang Avenue 88#

Patentee before: Jiangsu Liheng Curtain Wall Technology Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address