CN221075550U - Pipeline installation device for municipal construction - Google Patents
Pipeline installation device for municipal construction Download PDFInfo
- Publication number
- CN221075550U CN221075550U CN202420191695.5U CN202420191695U CN221075550U CN 221075550 U CN221075550 U CN 221075550U CN 202420191695 U CN202420191695 U CN 202420191695U CN 221075550 U CN221075550 U CN 221075550U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- double
- municipal construction
- liquid
- mounting bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 239000007788 liquid Substances 0.000 claims description 34
- 230000006978 adaptation Effects 0.000 claims description 5
- 230000002146 bilateral effect Effects 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 239000000314 lubricant Substances 0.000 description 8
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to the technical field of municipal engineering, in particular to a pipeline installation device for municipal construction. The utility model provides a pipeline installation device for municipal construction, which comprises an installation frame and an integrated controller, wherein the installation frame is fixedly provided with the integrated controller, and also comprises a support ring, a stepping motor and the like, the installation frame is fixedly provided with the support ring which is suitable for pipeline placement, and the installation frame is fixedly provided with the stepping motor which is electrically connected with the integrated controller. According to the utility model, the supporting ring is arranged on the mounting frame, and the supporting ring is utilized to directly support the hoisted pipeline, so that the operation difficulty of lifting the pipeline in the later period is reduced, and meanwhile, the double-head screw is driven by the stepping motor to clamp and fix the pipeline on the supporting ring by the limiting frame, so that the stability of the pipeline to be spliced is ensured, the pipeline to be spliced can be aligned with the last pipeline, and the construction efficiency of pipeline installation is improved.
Description
Technical Field
The utility model relates to the technical field of municipal engineering, in particular to a pipeline installation device for municipal construction.
Background
Municipal works generally belong to the national infrastructure, refer to the infrastructure construction of various public transportation facilities, water supply, water discharge, fuel gas, urban flood control, environmental sanitation, illumination and the like in urban construction, are essential material foundations for urban survival and development, and are basic conditions for improving the living standard of people.
According to the utility model, a first handle is rotated, and the first rotating shaft is driven to rotate when the first handle rotates, wherein a fixed rod and a telescopic column are respectively and fixedly arranged at the bottom of the supporting seat, and universal wheels are fixedly arranged at the bottom of the telescopic column.
The above-mentioned patent is although can carry out the auxiliary installation to the pipeline in municipal construction, but in the in-service use, the grip block of this patent need lift the pipeline to the height that is parallel and level mutually with the grip block earlier when carrying out the centre gripping is fixed to still need manual interval to the grip block to waste time and energy, this efficiency of construction that will restrict the pipeline installation.
Disclosure of utility model
In order to overcome the above-mentioned drawbacks of the prior art, the present utility model is to provide a pipe installation device for municipal construction, which solves the above-mentioned problems.
The technical proposal is as follows: the utility model provides a pipeline installation device for municipal construction, including mounting bracket and integrated control ware, fixed mounting has integrated control ware on the mounting bracket, still including supporting ring, step motor, double-end screw rod, guide bar and spacing, fixed mounting has the supporting ring that the adaptation pipeline was placed on the mounting bracket, fixed mounting has the step motor with integrated control ware electric connection on the mounting bracket, rotary type installs the double-end screw rod with step motor output shaft fixed connection in the mounting bracket, symmetrical threaded connection has the spacing that the adaptation is pressed from both sides tightly fixedly to the pipeline on the double-end screw rod, bilateral symmetry fixed mounting has the guide bar in the mounting bracket, two spacing and two guide bar sliding connection.
As a further preferred scheme, the liquid pump fixing device further comprises fixing blocks, extension rods, return springs, connecting rings, liquid tanks, liquid pumps and guide pipes, wherein the fixing blocks are respectively fixedly installed on the two limiting frames, the extension rods are respectively connected with the two fixing blocks in a sliding mode, the return springs are respectively arranged between the two extension rods and the connecting positions corresponding to the fixing blocks, the connecting rings are respectively fixedly connected with the two extension rods, a plurality of liquid leakage holes are respectively formed in one sides, close to each other, of the two connecting rings, the liquid tanks are fixedly installed in the mounting frames, the liquid pumps are fixedly installed in the liquid tanks and are electrically connected with the integrated controller, and the guide pipes are respectively fixedly connected between the liquid outlet ends of the liquid pumps and the two connecting rings.
As a further preferred embodiment, both conduits are hose material.
As a further preferable scheme, the novel connecting device further comprises a sponge block, and the sponge block is arranged on one side, close to each other, of the two connecting rings.
As a further preferable scheme, a plurality of diversion trenches are respectively arranged on the two sponge blocks.
As a further preferable scheme, the multifunctional electric vehicle comprises rollers and double-headed motors, wherein a plurality of rollers are rotatably arranged on the bottom surface of the mounting frame, the double-headed motors electrically connected with the integrated controller are fixedly arranged in the mounting frame, and output shafts of the double-headed motors are fixedly connected with the rollers on the same side respectively.
The utility model has the following advantages: 1. according to the utility model, the supporting ring is arranged on the mounting frame, and the supporting ring is utilized to directly support the hoisted pipeline, so that the operation difficulty of lifting the pipeline in the later period is reduced, and meanwhile, the double-head screw is driven by the stepping motor to clamp and fix the pipeline on the supporting ring by the limiting frame, so that the stability of the pipeline to be spliced is ensured, the pipeline to be spliced can be aligned with the last pipeline, and the construction efficiency of pipeline installation is improved.
2. According to the utility model, the connecting ring synchronously moves while the pipeline is clamped and fixed by the limiting frame, so that the sponge block is attached to the outer side wall of the pipeline, and the connecting end of the pipeline is smeared with lubricant by the sponge block, thereby improving the smoothness of butt joint of the two pipelines and further improving the construction efficiency of pipeline installation.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present utility model.
Fig. 2 is a schematic cross-sectional view of the mounting frame of the present utility model.
FIG. 3 is a schematic cross-sectional view of the mounting bracket and the liquid tank of the present utility model.
Fig. 4 is a schematic cross-sectional structure of the fixing block of the present utility model.
Wherein: the device comprises a 1-mounting frame, a 2-integrated controller, a 3-supporting ring, a 4-stepping motor, a 5-double-ended screw rod, a 6-guiding rod, a 7-limiting frame, an 8-fixing block, an 801-extending rod, an 802-return spring, a 9-connecting ring, a 10-sponge block, an 11-guiding groove, a 12-liquid tank, a 1201-liquid pump, a 13-guiding pipe, a 14-roller and a 15-double-ended motor.
Detailed Description
The utility model will be further illustrated by the following description of specific examples, which are given by the terms such as: setting, mounting, connecting are to be construed broadly, and may be, for example, fixed, removable, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Examples: the utility model provides a pipeline installation device for municipal construction, as shown in fig. 1 and 2, including mounting bracket 1, integrated control ware 2, supporting ring 3, step motor 4, stud 5, guide bar 6 and spacing 7, integrated control ware 2 is installed through the bolt to the preceding right part of mounting bracket 1, the supporting ring 3 that adapter pipeline was placed is installed through the bolt in the middle part of mounting bracket 1, step motor 4 with integrated control ware 2 electric connection is installed through the bolt in the preceding middle part of mounting bracket 1, stud 5 that is connected through the shaft coupling with step motor 4 output shaft is installed to the interior middle part rotation formula of mounting bracket 1, stud 5 is gone up the fore-and-aft symmetry threaded connection and is had the adaptation to carry out clamping fixed spacing 7 to the pipeline, will drive two spacing 7 through the screw thread when stud 5 is rotatory and be close to each other or keep away from each other, guide bar 6 is installed through the bolt to bilateral symmetry in the mounting bracket 1, two spacing 7 are connected with two guide bar 6 slidingtype.
As shown in fig. 1-4, the device further comprises a fixed block 8, an extension rod 801, a return spring 802, a connecting ring 9, a liquid tank 12, a liquid pump 1201 and a conduit 13, wherein the upper parts on the right sides of the two limiting frames 7 are respectively provided with the fixed block 8 through bolts, the right sides of the two fixed blocks 8 are respectively connected with the extension rod 801 in a sliding manner, the return spring 802 is respectively arranged between the connection positions of the two extension rods 801 and the corresponding fixed blocks 8, the right ends of the two extension rods 801 are respectively connected with the connecting rings 9 through bolts, five liquid leakage holes are respectively arranged on one sides of the two connecting rings 9, which are close to each other, the liquid tank 12 is arranged on the inner right part of the mounting frame 1 through bolts, the lubricant is temporarily stored in the liquid tank 12, the liquid pump 1201 which is electrically connected with the integrated controller 2 is arranged on the middle part of the inner bottom surface of the liquid tank 12 through bolts, the conduit 13 is respectively connected with the liquid outlet ends of the liquid pump 1201 in a sealing manner with the two connecting rings 9, and the conduit 13 is respectively used for transmitting the lubricant to the corresponding connecting rings 9, and the conduit 13 is made of hose materials.
As shown in fig. 2 and 4, the device further comprises a sponge block 10, wherein the sponge block 10 is arranged at one side of the two connecting rings 9, which is close to each other, and the lubricant flows out of the corresponding sponge block 10 from the liquid leakage holes of the connecting rings 9, and a plurality of diversion trenches 11 are respectively arranged on the two sponge blocks 10.
As shown in fig. 1 and 2, the device further comprises rollers 14 and a double-headed motor 15, wherein two rollers 14 are respectively rotatably mounted on the bottom surface of the mounting frame 1 in bilateral symmetry, the double-headed motor 15 electrically connected with the integrated controller 2 is mounted on the inner left part of the mounting frame 1 through bolts, and two output shafts of the double-headed motor 15 are respectively connected with the two rollers 14 on the same side through couplings.
When the pipeline is required to be installed in municipal construction, the pipeline to be spliced is firstly placed on the supporting ring 3 through hoisting, then the stepping motor 4 is started through the integrated controller 2, the output shaft of the stepping motor 4 drives the double-head screw 5 to rotate, the double-head screw 5 drives the two limiting frames 7 to move along the guide rod 6 towards the direction approaching to each other through threads, so as to clamp and fix the pipeline on the supporting ring 3, the pipeline to be spliced can be ensured to be aligned with the tail end of the last section of pipeline, the condition that the mounting frame 1 shifts in the moving process is prevented, meanwhile, the two limiting frames 7 drive the two connecting rings 9 to synchronously move towards the direction approaching to each other through the fixed block 8 and the extension rod 801, so that the sponge block 10 is attached to the outer side wall of the pipeline, then the liquid pump 1201 is started through the integrated controller 2, the liquid pump 1201 pumps lubricant in the liquid extracting box 12, the lubricant is then transmitted to the corresponding connecting ring 9 through the two guide pipes 13, the lubricant seeps out from the liquid leakage holes on the connecting ring 9, so that the corresponding sponge block 10 is infiltrated, the connecting ends of the pipelines are lubricated by the sponge block 10, the lubricant also directly flows on the outer side wall of the pipelines along the guide grooves 11 on the sponge block 10, the smearing effect of the connecting ends of the pipelines is ensured, then the double-headed motor 15 is started through the integrated controller 2, the output shaft of the double-headed motor 15 drives the roller 14 on the left side to drive the mounting frame 1 to drive the pipelines to be spliced to move towards the tail end of one section of pipeline, the splicing construction between the two pipelines is started, the upper section of pipeline is driven to move the jacking connecting ring 9 leftwards along with the continuous approach of the two pipelines, the extension rod 801 is driven into the corresponding fixed block 8, the return spring 802 is compressed, thereby, the lubrication of the pipelines is realized, and meanwhile, the connecting ring 9 is prevented from influencing the splicing construction between the two pipelines.
The technical principles of the embodiments of the present utility model are described above in connection with specific embodiments. The description is only intended to explain the principles of the embodiments of the utility model and should not be taken in any way as limiting the scope of the embodiments of the utility model. Based on the explanations herein, those skilled in the art will recognize other embodiments of the present utility model without undue burden, and those ways that are within the scope of the present utility model.
Claims (6)
1. The utility model provides a pipeline installation device for municipal construction, is including mounting bracket (1) and integrated controller (2), fixed mounting has integrated controller (2), its characterized in that on mounting bracket (1): still including support ring (3), step motor (4), double-end screw rod (5), guide bar (6) and spacing (7), fixed mounting has support ring (3) that the adaptation pipeline was placed on mounting bracket (1), fixed mounting has step motor (4) with integrated control ware (2) electric connection on mounting bracket (1), install double-end screw rod (5) with step motor (4) output shaft fixed connection in mounting bracket (1), symmetrical threaded connection has on double-end screw rod (5) adaptation to carry out clamping fixed spacing (7) to the pipeline, bilateral symmetry fixed mounting has guide bar (6) in mounting bracket (1), two spacing (7) are connected with two guide bar (6) slidingtype.
2. A pipe installation apparatus for municipal construction according to claim 1, wherein: the liquid pump is characterized by further comprising fixing blocks (8), extension rods (801), return springs (802), connecting rings (9), liquid tanks (12), liquid pumps (1201) and guide pipes (13), wherein the fixing blocks (8) are fixedly installed on the two limiting frames (7) respectively, the extension rods (801) are connected in the two fixing blocks (8) in a sliding mode, the return springs (802) are respectively arranged at the connecting positions of the two extension rods (801) and the corresponding fixing blocks (8), the connecting rings (9) are respectively fixedly connected on the two extension rods (801), a plurality of liquid leakage holes are respectively formed in one sides, close to each other, of the two connecting rings (9), the liquid tanks (12) are fixedly installed in the installation frame (1), the liquid pumps (1201) are electrically connected with the integrated controllers (2), and the guide pipes (13) are respectively and fixedly connected between the liquid outlet ends of the liquid pumps (1201) and the two connecting rings (9).
3. A pipe installation apparatus for municipal construction according to claim 2, wherein: both guide pipes (13) are made of hose materials.
4. A pipe installation apparatus for municipal construction according to claim 3, wherein: the utility model also comprises a sponge block (10), and a sponge block (10) is arranged at one side of the two connecting rings (9) which are close to each other.
5. The pipe installation apparatus for municipal construction of claim 4, wherein: a plurality of diversion trenches (11) are respectively arranged on the two sponge blocks (10).
6. The pipe installation apparatus for municipal construction according to claim 5, wherein: the automatic control device is characterized by further comprising rollers (14) and double-headed motors (15), wherein the plurality of rollers (14) are rotatably arranged on the bottom surface of the mounting frame (1), the double-headed motors (15) electrically connected with the integrated controller (2) are fixedly arranged in the mounting frame (1), and output shafts of the double-headed motors (15) are fixedly connected with the rollers (14) on the same side respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202420191695.5U CN221075550U (en) | 2024-01-26 | 2024-01-26 | Pipeline installation device for municipal construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202420191695.5U CN221075550U (en) | 2024-01-26 | 2024-01-26 | Pipeline installation device for municipal construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221075550U true CN221075550U (en) | 2024-06-04 |
Family
ID=91260826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202420191695.5U Active CN221075550U (en) | 2024-01-26 | 2024-01-26 | Pipeline installation device for municipal construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221075550U (en) |
-
2024
- 2024-01-26 CN CN202420191695.5U patent/CN221075550U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN221075550U (en) | Pipeline installation device for municipal construction | |
CN220348245U (en) | Butt joint appurtenance is used in plumbing installation | |
CN209873805U (en) | Concrete pouring device for ramp-free basement construction | |
CN217102428U (en) | Automatic folding and conveying device for lining hose of pipeline | |
CN213121237U (en) | A immersible pump for sewage treatment | |
CN111823416B (en) | Prestressed pipe pile cutting equipment | |
CN206916823U (en) | The four permanent building rain water collecting systems applied to desert | |
CN2653124Y (en) | Hydraulic force increasing and reducing balance weight mechanism for beam oil pumping unit | |
CN219842192U (en) | Pipeline sampling device that flexible turns round | |
CN219689174U (en) | Handling device that municipal works were used | |
CN219054235U (en) | Pipeline fixing device for water conservancy and hydropower construction | |
CN216552129U (en) | Piping lane inner wall crackle detects prosthetic devices | |
CN220747700U (en) | Cement pouring equipment | |
CN211422516U (en) | Well drilling machine power head stable in operation and stable type frame matched with well drilling machine power head | |
CN216764124U (en) | Municipal administration water supply and drainage pipeline construction equipment | |
CN219991290U (en) | Liftable suspension aeration device for sewage tank | |
CN214441557U (en) | Multifunctional drainage pipeline detection device | |
CN215563156U (en) | Drainage pipe of municipal works supports connecting device | |
CN220301491U (en) | Detection well for preventing groundwater pollution | |
CN218780926U (en) | Hydraulic pipeline for hydraulic engineering | |
CN215611083U (en) | Integral lifting type submersible mixer support | |
CN220478463U (en) | Mobilizable clean wind equipment | |
CN218326513U (en) | Pipe jacking construction device | |
CN216457082U (en) | Useless lubricating oil settling cask | |
CN220042821U (en) | Dredging device for cable laying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |