CN221052886U - Double-deck stagnant water piece fixing device - Google Patents

Double-deck stagnant water piece fixing device Download PDF

Info

Publication number
CN221052886U
CN221052886U CN202322587204.7U CN202322587204U CN221052886U CN 221052886 U CN221052886 U CN 221052886U CN 202322587204 U CN202322587204 U CN 202322587204U CN 221052886 U CN221052886 U CN 221052886U
Authority
CN
China
Prior art keywords
fixing
water stop
piece
fixed
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322587204.7U
Other languages
Chinese (zh)
Inventor
陈智
何英建
李万洲
周建
何鑫
万中礼
潘春强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Application granted granted Critical
Publication of CN221052886U publication Critical patent/CN221052886U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A double-layer water stop sheet fixing device consists of two fixing frames which are symmetrically arranged on the inner side and the outer side of a template respectively, wherein the two symmetrically arranged fixing frames are used in pairs and fixedly connected through a vertical enclosing purlin on the outer side of the template and an inner side pull rod; each fixing frame comprises a fixing bolt component, a fixing reinforcing steel bar and a U-shaped support, two U-shaped fixing water stop clamping pieces which are parallel up and down are arranged on the U-shaped support, the fixing bolt component and the fixing reinforcing steel bar are fixedly arranged on the U-shaped fixing water stop clamping pieces, the fixing bolt component is located above the fixing reinforcing steel bar, two ends of the width direction of the water stop piece are respectively arranged on the U-shaped fixing water stop clamping pieces which are correspondingly arranged on the two fixing frames on the inner side and the outer side of the template, and the water stop piece is fixed on the fixing reinforcing steel bar through the fixing bolt component. The device can firmly fix the water stop at the appointed position, and can avoid the water stop from bending down, deforming, displacing and damaging in the concrete pouring process, so that the stability of the water stop is improved, and the water stop effect of concrete is improved.

Description

Double-deck stagnant water piece fixing device
Technical field:
The utility model belongs to the technical field of building construction, and particularly relates to a fixing device suitable for a water stop sheet for concrete construction.
The background technology is as follows:
Before the concrete construction, when carrying out the pre-buried construction of stagnant water piece, need carry out stagnant water piece and consolidate, stagnant water piece is the important facility of guaranteeing hydraulic building expansion joint leak-free (ooze) water, and its installation quality is good or bad, is one of the important links of guaranteeing hydraulic building can safe operation, is the weak link of concrete construction, but utilizes traditional template to consolidate, appears deformation, phenomenon such as displacement easily when concrete placement vibrates. But with the following new problems: when pouring and vibrating concrete, the water stop sheet is likely to deform and displace due to disturbance, so that special personnel are required to be arranged to correct the water stop sheet during concrete construction, inconvenience is brought to the concrete construction, and meanwhile, the stability of the water stop sheet is low and the construction cost is high due to the mode of manual correction.
The utility model comprises the following steps:
The utility model provides a fixing frame clamping piece device technology capable of improving the stability of a water stop piece, which aims to solve the problems that the water stop effect is affected due to the fact that the position of the pre-buried water stop piece is deviated in the concrete pouring process.
The utility model adopts the following technical scheme to realize the aim:
The utility model provides a double-layer water stop sheet fixing device, which consists of two fixing frames, wherein the two fixing frames are symmetrically arranged on the inner side and the outer side of a template respectively, the fixing frames on the outer side of the template are tightly attached to the surface of the template, the two symmetrically arranged fixing frames are used in pairs, and the fixing frames are fixedly connected through a vertical enclosing purlin on the outer side of the template and an inner side pull rod; each fixing frame comprises a fixing bolt component, a fixing reinforcing steel bar and a U-shaped support, two U-shaped fixing water stop clamping pieces which are parallel up and down are arranged on the U-shaped support, the fixing bolt component and the fixing reinforcing steel bar are fixedly arranged on the U-shaped fixing water stop clamping pieces, the fixing bolt component is located above the fixing reinforcing steel bar, two ends of the width direction of the water stop piece are respectively arranged on the U-shaped fixing water stop clamping pieces which are correspondingly arranged on the two fixing frames on the inner side and the outer side of the template, and the water stop piece is fixed on the fixing reinforcing steel bar through the fixing bolt component.
The length of the bracket is 150cm, and the bracket is manufactured by splicing phi 28 deformed steel bars.
The U-shaped fixed water stop clamping piece is formed by processing phi 28 screw steel, and the size of the U-shaped fixed water stop clamping piece is 8cm x 20cm.
The fixing steel bars are screw-thread steel with phi 28, and the length of each fixing steel bar is 20cm.
Two fixing bolts are arranged on each of the U-shaped fixing water stop clamping pieces, each fixing bolt consists of a nut and a bolt, the nuts are fixedly arranged on the U-shaped fixing water stop clamping pieces, the bolts are M24 bolts, and the nuts are connected with the bolts in a threaded mode.
The fixing device is characterized in that the lower part of the inner part of the U-shaped fixing water stop clamping piece on the U-shaped support is horizontally and fixedly provided with fixing reinforcing steel bars in parallel, and the upper parts of the same sides of the fixing reinforcing steel bars are fixedly provided with fixing bolts.
The water stop sheet comprises a copper water stop sheet and a rubber water stop sheet, wherein the copper water stop sheet and the rubber water stop sheet are arranged in an upper and lower parallel mode, the copper water stop sheet is arranged in a U-shaped fixed water stop clamping piece on the upper portion of the U-shaped support, the rubber water stop sheet is arranged in a U-shaped fixed water stop clamping piece on the lower portion of the U-shaped support, and the copper water stop sheet and the rubber water stop sheet are perpendicular to the template and the fixing frame.
Compared with the prior art, the utility model has the following beneficial effects:
1. The utility model improves the traditional water stop fixing method, can firmly fix the water stop at the appointed position, can avoid the water stop from bending down, deforming, displacing and damaging in the concrete pouring process, effectively solves the phenomena of deformation, displacement and the like of the water stop, improves the stability of the water stop, ensures the stable effect of the water stop and improves the water stop effect of concrete.
2. By adopting the utility model, the water stop sheet is smoother, the pre-buried and exposed width of the water stop sheet meets the design requirement, the quality of concrete and the efficacy of the water stop sheet are ensured, the later leakage probability can be reduced, and the construction quality is improved.
3. The utility model has the advantages of simple processing procedure, convenient lengthening of materials, light and firm installation, stable reinforcement of the water stop sheet and difficult deformation.
4. The utility model can reduce the labor investment and greatly save the construction cost.
5. The utility model is manufactured by processing the reinforced bar waste and the surplus materials, and has low construction cost and less resource waste.
Description of the drawings:
FIG. 1 is a schematic view of the use state structure of the present utility model;
fig. 2 is a schematic perspective view of the fixing frame of the present utility model.
Reference numerals in the drawings:
1-fixing frame, 2-several style of calligraphy support, 3-several style of calligraphy fixed water stop clamping piece, 4-fixing bolt are constituteed, 5-fixed reinforcing bar, 6-template, 7-enclosing purlin, 8-pull rod, 9-copper water stop piece, 10-rubber water stop piece.
The specific embodiment is as follows:
The present utility model will be further described with reference to the following specific embodiments, which are intended to be illustrative of the principles of the present utility model and not in any way limiting, nor will the same or similar techniques be used in connection with the present utility model beyond the scope of the present utility model.
Referring to fig. 1-2, the utility model provides a double-layer water stop sheet fixing device, which consists of two fixing frames 1, wherein the two fixing frames 1 are symmetrically arranged on the inner side and the outer side of a template 6 respectively, the fixing frames 1 on the outer side of the template 6 are tightly attached to the surface of the template 6, the two symmetrically arranged fixing frames 1 are used in pairs, and the fixing frames are fixedly connected through a vertical enclosing purlin 7 on the outer side of the template 6 and an inner side pull rod 8. Each fixing frame 1 comprises a fixing bolt component 4, a fixing reinforcing steel bar 5 and a bracket 2 in a shape like a Chinese character 'ji'. The fixing reinforcing steel bars 5 are screw-thread steel with phi 28, and the length of each fixing reinforcing steel bar 5 is 20cm. The length of the bracket 2 in the shape of a Chinese character 'ji' is 150cm, the bracket is formed by splicing phi 28 screw steel, two fixed water stop clamping pieces 3 in the shape of a Chinese character 'ji' are arranged on the bracket 2 in the shape of a Chinese character 'ji' and are parallel up and down, the fixed water stop clamping pieces 3 in the shape of a Chinese character 'ji' are processed by adopting phi 28 screw steel, and the size is 8cm x 20cm. The fixing bolt assembly 4 and the fixing steel bars 5 are welded and installed on the U-shaped fixing water stop clamping piece 3, the fixing bolt assembly 4 is located above the fixing steel bars 5, two ends of the water stop sheet in the width direction are respectively arranged on the U-shaped fixing water stop clamping piece 3 which is correspondingly arranged on the two fixing frames 1 on the inner side and the outer side of the template 6, and the water stop sheet is fixed on the fixing steel bars 5 through the fixing bolt assembly 4 to play a role in protecting and fixing the water stop sheet. The lower part of the inner part of the U-shaped fixed water stop clamping piece 3 on the U-shaped bracket 2 is horizontally and parallelly welded and fixedly provided with a fixed reinforcing steel bar 5, and the upper part of the same side is welded and provided with a fixed bolt component 4. Two fixing bolt components 4 are arranged on each U-shaped fixing water stop clamping piece 3, each fixing bolt component 4 is composed of a nut and a bolt, the nuts are welded and arranged on the U-shaped fixing water stop clamping pieces 3, the bolts adopt M24 bolts, and the nuts are connected with the bolts in a threaded mode. The sealing-up piece includes copper sealing-up piece 9 and rubber sealing-up piece 10, and copper sealing-up piece 9 and rubber sealing-up piece 10 upper and lower parallel arrangement sets up copper sealing-up piece 9 in the fixed sealing-up clamping piece 3 of several font on several style of calligraphy support 2 upper portion, sets up rubber sealing-up piece 10 in the fixed sealing-up clamping piece 3 of several font of several style of calligraphy support 2 lower part, and copper sealing-up piece 9, rubber sealing-up piece 10 set up perpendicularly with template 6, mount 1.
The fixing device is simple and convenient to install, and comprises the following steps:
The template 6 is installed according to the design requirement, the design position of the water stop is determined, the red paint is used for marking, then the water stop is installed, the water stop of the embodiment is provided with an upper layer and a lower layer, the upper layer is the copper water stop 9, the lower layer is the rubber water stop 10, and the copper water stop 9 and the rubber water stop 10 are arranged in an up-down parallel mode. After the water stop sheet is installed, the fixing device is installed at the water stop sheet position, two fixing frames 1 of the fixing device are bilaterally symmetrical and perpendicular to the water stop sheet, the fixing frames 1 on the outer side of the template 6 are tightly attached to the surface of the template 6, the corresponding U-shaped fixing water stop clamping pieces 3 on the two fixing frames 1 are clamped on the upper layer of water stop sheet and the lower layer of water stop sheet, after the water stop sheet is centered and kept flat, the water stop sheet is fixed on the corresponding fixing steel bars 5 by rotating bolts of the fixing bolt component 4, the water stop sheet is clamped and fixed, and the two fixing frames 1 which are correspondingly arranged on the inner side and the outer side of the template 6 are fixedly connected through pull rods 8 on the inner side of the template 6. The fixing device is repeatedly arranged at equal intervals along the length direction of the water stop sheet, so that the double-layer water stop sheet is fixed. And (5) concrete pouring can be carried out after the whole water stop sheet is fixed.

Claims (7)

1. A double-layer water stop sheet fixing device is characterized in that: the fixing device consists of two fixing frames (1), wherein the fixing frames (1) are symmetrically arranged on the inner side and the outer side of a template (6) respectively, the fixing frames (1) on the outer side of the template (6) are tightly attached to the surface of the template (6), the two symmetrically arranged fixing frames (1) are used in pairs, and the fixing frames are fixedly connected through a vertical enclosing purlin (7) on the outer side of the template (6) and an inner side pull rod (8); every mount (1) is including fixing bolt constitution (4), fixed reinforcement (5) and several style of calligraphy support (2), be provided with two several font fixed water-stop clamping pieces (3) that are parallel from top to bottom on several style of calligraphy support (2), fixing bolt constitution (4) and fixed reinforcement (5) fixed mounting are on several font fixed water-stop clamping pieces (3), fixing bolt constitution (4) are located fixed reinforcement (5) top, water-stop piece width direction both ends are placed respectively on two mount (1) of the inside and outside both sides of template (6) correspond the several font fixed water-stop clamping pieces (3) that set up, fix the water-stop piece on fixed reinforcement (5) through fixing bolt constitution (4).
2. The double-layer water stop sheet fixing device according to claim 1, wherein: the length of the bracket (2) is 150cm, and the bracket is manufactured by splicing phi 28 deformed steel bars.
3. The double-layer water stop sheet fixing device according to claim 1, wherein: the U-shaped fixed water stop clamping piece (3) is formed by processing screw steel with the diameter of phi 28, and the size is 8cm x 20cm.
4. The double-layer water stop sheet fixing device according to claim 1, wherein: the fixing steel bars (5) are screw-thread steel with phi 28, and the length of each fixing steel bar (5) is 20cm.
5. The double-layer water stop sheet fixing device according to claim 1, wherein: the water stop clamping piece is characterized in that two fixing bolt assemblies (4) are arranged on the U-shaped fixing water stop clamping piece (3), each fixing bolt assembly (4) is composed of a nut and a bolt, the nut is fixedly arranged on the U-shaped fixing water stop clamping piece (3), the bolt is an M24 bolt, and the bolts are connected through screw threads.
6. The double-layer water stop sheet fixing device according to claim 1, wherein: the lower part of the inner part of the U-shaped fixed water stop clamping piece (3) on the U-shaped bracket (2) is horizontally and fixedly provided with a fixed reinforcing steel bar (5) in parallel, and the upper part of the same side is fixedly provided with a fixed bolt (4).
7. The double-layer water stop sheet fixing device according to claim 1, wherein: the sealing-up piece include copper sealing-up piece (9) and rubber sealing-up piece (10), parallel arrangement about copper sealing-up piece (9) and rubber sealing-up piece (10), set up copper sealing-up piece (9) in the fixed sealing-up clamping piece of several font (3) on several style of calligraphy support (2) upper portion, set up rubber sealing-up piece (10) in the fixed sealing-up clamping piece of several font (3) lower part of several style of calligraphy support (2), copper sealing-up piece (9), rubber sealing-up piece (10) set up perpendicularly with template (6), mount (1).
CN202322587204.7U 2023-09-22 Double-deck stagnant water piece fixing device Active CN221052886U (en)

Publications (1)

Publication Number Publication Date
CN221052886U true CN221052886U (en) 2024-05-31

Family

ID=

Similar Documents

Publication Publication Date Title
CN103760659B (en) A kind of cable truss type heliostat support device
CN221052886U (en) Double-deck stagnant water piece fixing device
CN209837676U (en) Building stand pours template with outside braced frame
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN206605172U (en) A kind of steel pipe butt welding of Elements of Space Grid Truss is with adjustable removable apparatus for correcting
CN217053764U (en) Foundation frame component of prefabricated building
CN112337997B (en) Integral bending forming device and method for cable tower reinforcing mesh with super-large arc section
CN211571407U (en) Pier rollover structure
CN220279954U (en) Pretensioned hollow slab template
CN217999620U (en) Locking leg device for steel arch frame
CN219471661U (en) Detachable equipment rainproof shed
CN211522836U (en) Steel trestle bailey piece fixing device
CN218375533U (en) Prefabricated floor bearing structure
CN215104710U (en) Strutting arrangement is used in continuous beam bridge construction
CN213562328U (en) Fastening tool for lead screw expansion bolt
CN219449139U (en) Tower machine bottom sprag frame structure
CN218175162U (en) Bilateral locking device of automobile assembly special-shaped piece electrophoresis production line
CN217051272U (en) Adjustable gallows suitable for prefabricated hollow mound steel reinforcement cage
CN219528395U (en) Truss support device and steel truss support system corresponding to same
CN217150998U (en) Closed glass railing
CN215943285U (en) Outer mold flange closure plate fixing and adjusting device
CN212837023U (en) Detachable buckling support mounting and positioning device
CN219686068U (en) Manual forming binding jig frame for reinforcing steel bar sheet
CN215561972U (en) Whole truss template reinforcing apparatus
CN210369925U (en) Tool type building structure hanging mold fixing device

Legal Events

Date Code Title Description
GR01 Patent grant