CN221047693U - Integral standard knot group Fang Gongzhuang - Google Patents

Integral standard knot group Fang Gongzhuang Download PDF

Info

Publication number
CN221047693U
CN221047693U CN202323020793.7U CN202323020793U CN221047693U CN 221047693 U CN221047693 U CN 221047693U CN 202323020793 U CN202323020793 U CN 202323020793U CN 221047693 U CN221047693 U CN 221047693U
Authority
CN
China
Prior art keywords
platform
fixedly connected
shaped steel
standard knot
bending plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323020793.7U
Other languages
Chinese (zh)
Inventor
杨宁
孙晓雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Sanyo Building Machinery Co ltd
Original Assignee
Shenyang Sanyo Building Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Sanyo Building Machinery Co ltd filed Critical Shenyang Sanyo Building Machinery Co ltd
Priority to CN202323020793.7U priority Critical patent/CN221047693U/en
Application granted granted Critical
Publication of CN221047693U publication Critical patent/CN221047693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to the technical field of assembly tools and discloses an integral standard joint formula tool which comprises a platform, wherein a first bending plate is fixedly connected to one side of the top of the platform, a second bending plate is fixedly connected to the other side of the top of the platform, a plurality of first hinge supports are fixedly connected to one inner side of the first bending plate, a plurality of second hinge supports are fixedly connected to one inner side of the second bending plate, a plurality of pads are fixedly mounted on the platform, a plurality of climbing grooves are formed in one side of each pad on the platform for positioning, and support plates are arranged on the plurality of climbing grooves for positioning. According to the integral standard knot formula tool, each main chord of the integral standard knot is positioned on the platform through the hinge support I and the hinge support II which are opposite to each other, play is prevented, and after the piece standard knot piece of the integral standard knot is fixed through the assembly tool, other web members are welded so as to achieve assembly welding of the integral standard knot, so that interchange precision of the integral standard knot is improved, and convenience is brought to production, installation, transportation and the like.

Description

Integral standard knot group Fang Gongzhuang
Technical Field
The utility model relates to the technical field of assembly tools, in particular to an integral standard festival formula tool.
Background
In recent years, with the increasing demand market of tower cranes, the types of tower cranes are also increased, and the standard section is taken as an important component of the tower crane, so that not only is the different types of products considered, but also the convenience of transportation and installation of the products is considered. The standard section is used as one of important parts of the tower crane, the efficiency can be improved, the installation and the disassembly can be fast and convenient, the problems are frequently considered and concerned, the conventional standard section is installed in a sheet-sheet connection mode, the safety and the rationality of packaging are required to be considered in the transportation process, and all sheets are required to be connected together to form a section before the standard section reaches the construction site to install the vertical tower additional section, so that the efficiency is low, the working strength is increased, and therefore, the integral standard section formula tool is provided.
Disclosure of utility model
(One) solving the technical problems
Aiming at the defects of the prior art, the utility model provides an integral standard festival formula tool which has the advantages of relieving packaging and transportation difficulties, meeting the requirements of time and labor saving of tower disassembly of a vertical tower on a construction site, and the like, and solves the problems of low installation efficiency and increased working strength.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an overall standard festival formula frock, includes the platform, one side fixedly connected with bent plate one of platform top, the opposite side fixedly connected with bent plate two of platform top, through the hinge hole bolt fixed platform of M20 and the connection between bent plate one and the bent plate two, these two parts assembly are fixed, need not dismantle the removal, and it is used for the overall standard festival of mating, is fixed with two standard festival pieces here, bent plate one lean on interior one side fixedly connected with a plurality of hinged supports one, through the hinge hole bolt of M20 with hinged support one fix on four angles of bent plate one, bent plate two lean on interior one side fixedly connected with a plurality of hinged supports two, through the hinge hole bolt of M20 with hinged support two fix on four angles of bent plate two, two relative hinged supports one and hinged support two, fix each main string of overall standard festival on this platform, prevent the drunkenness, fixed mounting has a plurality of pads on the platform, one side of pad is provided with a plurality of climbing grooves, a plurality of positioning slots on the platform, the accurate positioning rod is all provided with through the positioning slot on the M20, the accurate positioning rod is fixed on the positioning rod.
Preferably, the platform comprises a first H-shaped steel and a first steel plate, the two sides of the platform are provided with the first H-shaped steel, the tops of the first H-shaped steel are provided with a plurality of first steel plates, and the first H-shaped steel and the first steel plate are reinforced by using M20 reaming bolts, nuts and washers.
Preferably, the first bending plate comprises second H-shaped steel and second steel plates, the second H-shaped steel is arranged in the middle of the first bending plate, and the second steel plates are fixedly connected to the two sides of the second H-shaped steel.
Preferably, the second bending plate comprises third H-shaped steel and third steel plates, the third H-shaped steel is arranged in the middle of the second bending plate, and the third steel plates are fixedly connected to the two sides of the third H-shaped steel.
Compared with the prior art, the utility model provides an integral standard festival formula frock, which has the following beneficial effects:
According to the integral standard joint formula tool, the platform is fixed with the first bending plate and the second bending plate through the hinging hole bolts of the M20, the two parts are assembled and fixed well without disassembly and movement, the tool is used for assembling the integral standard joint, two standard joint sheets are fixed to the first bending plate, the first hinging seat is fixed to the four corners of the first bending plate through the hinging hole bolts of the M20, the second hinging seat is fixed to the four corners of the second bending plate through the hinging hole bolts of the M20, each main chord of the integral standard joint is positioned on the platform by the two opposite hinging seats, play is prevented, and other web members are welded after the standard joint sheets of the integral standard joint are fixed through the assembly tool, so that the assembly welding of the integral standard joint is achieved, the interchange precision of the integral standard joint is improved, convenience is provided for production, installation and transportation.
Drawings
FIG. 1 is a schematic illustration of the overall standard joint assembly of the present utility model;
FIG. 2 is a schematic diagram of the overall standard joint assembly of the present utility model;
FIG. 3 is a schematic view of a platform structure according to the present utility model;
FIG. 4 is a schematic view of a bending plate according to the present utility model;
FIG. 5 is a schematic view of a second embodiment of the bending plate of the present utility model.
Wherein: 1. a platform; 101. h-shaped steel; 102. a first steel plate; 2. a first bending plate; 201. h-shaped steel II; 202. a second steel plate; 3. a second bending plate; 301. h-shaped steel III; 302. a steel plate III; 4. a first hinged support; 5. a second hinged support; 6. a pad; 7. positioning a climbing groove; 8. and (5) supporting plates.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, the present utility model provides the following technical solutions: the utility model provides an integral standard knot formula frock, including platform 1, one side fixedly connected with bent plate one 2 at platform 1 top, the opposite side fixedly connected with bent plate two 3 at platform 1 top, through the connection between hinge hole bolt fixed platform 1 and bent plate one 2 and the bent plate two 3 of M20, these two parts assembly are fixed, do not need to dismantle the removal, it is used for the integral standard knot of mating, be fixed in with two standard knot piece, bent plate one 2 is close to interior one side fixedly connected with a plurality of hinged support one 4, hinge hole bolt fixed on bent plate one 2 four angles through M20, bent plate two 3 is close to interior one side fixedly connected with a plurality of hinged support two 5, hinge hole bolt fixed on bent plate two 3 four angles through M20, thus two opposite hinged support one and hinged support two, fix each main string of integral standard knot on this platform, prevent the drunkenness, fixedly install a plurality of pads 6 on platform 1, one side of pad 6 is provided with a plurality of locating grooves 7 on the support one side of platform 1, the locating rib 7 is provided with a plurality of locating grooves 7 on the support one side of pad 8, the locating rib position 8 is provided with accurate positioning groove 8 on the support groove, thereby fixing the position is provided with the locating groove 8 on the bridge groove on the support 8;
The platform 1 comprises first H-shaped steel 101 and first steel plates 102, wherein the first H-shaped steel 101 is arranged on two sides of the platform 1, a plurality of first steel plates 102 are arranged at the tops of the two first H-shaped steel 101, and the first H-shaped steel 101 and the first steel plates 102 are reinforced by using reaming bolts, nuts and washers of M20;
The first bending plate 2 comprises second H-shaped steel 201 and second steel plates 202, the middle part of the first bending plate 2 is provided with second H-shaped steel 201, and two sides of the second H-shaped steel 201 are fixedly connected with the second steel plates 202;
The second bending plate 3 comprises a third H-shaped steel 301 and a third steel plate 302, the middle of the second bending plate 3 is provided with the third H-shaped steel 301, and the two sides of the third H-shaped steel 301 are fixedly connected with the third steel plate 302.
When the bending plate I2 and the bending plate II 3 on the left side and the right side are respectively fixed on the platform 1 through the hinging hole bolts of the M20, the two parts are assembled and fixed well without disassembly and movement, and the bending plate I and the bending plate II are used for matching the integral standard joint and fixing the two standard joint pieces. Four hinged supports I4 are fixed on four corners of the first bending plate 2 through the hinging hole bolts of the M20, four hinged supports II 5 are fixed on four corners of the second bending plate 3 through the hinging hole bolts of the M20, and accordingly the hinged supports I4 and the hinged supports II 5 which are opposite to each other position each main chord of the integral standard section on the platform to prevent movement. The pad 6, the climbing groove positioning 7 and the support plate 8 are fixed on the platform 1 by using the reaming bolts of the M20, so that the positions of the climbing grooves on the main chord member are accurately positioned, and after two standard joint sheets of the integral standard joint are fixed by the splicing tool, other web members are welded so as to achieve splicing welding of the integral standard joint, and therefore, the interchange precision of the integral standard joint is improved, and convenience is brought to production, installation, transportation and the like.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. Integral standard festival formula frock, including platform (1), its characterized in that: one side fixedly connected with bent plate one (2) at platform (1) top, the opposite side fixedly connected with bent plate two (3) at platform (1) top, one side fixedly connected with a plurality of free bearing one (4) in the bent plate one (2), one side fixedly connected with a plurality of free bearing two (5) in the bent plate two (3), fixedly mounted with a plurality of pads (6) on platform (1), one side of pad (6) is provided with a plurality of groove location (7) on platform (1), a plurality of all be provided with extension board (8) on the groove location (7) are climbed.
2. The integral standard knot formula frock of claim 1, wherein: the platform (1) comprises a first H-shaped steel (101) and a first steel plate (102), the two sides of the platform (1) are provided with the first H-shaped steel (101), the tops of the first H-shaped steel (101) are provided with a plurality of first steel plates (102), and a reaming bolt, a reaming nut and a reaming washer of M20 are used between the first H-shaped steel (101) and the first steel plates (102) for reinforcement.
3. The integral standard knot formula frock of claim 1, wherein: the first bending plate (2) comprises second H-shaped steel (201) and second steel plates (202), the second H-shaped steel (201) is arranged in the middle of the first bending plate (2), and the second steel plates (202) are fixedly connected to the two sides of the second H-shaped steel (201).
4. The integral standard knot formula frock of claim 1, wherein: the second bending plate (3) comprises a third H-shaped steel (301) and a third steel plate (302), the third H-shaped steel (301) is arranged in the middle of the second bending plate (3), and the third steel plate (302) is fixedly connected to the two sides of the third H-shaped steel (301).
CN202323020793.7U 2023-11-09 2023-11-09 Integral standard knot group Fang Gongzhuang Active CN221047693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323020793.7U CN221047693U (en) 2023-11-09 2023-11-09 Integral standard knot group Fang Gongzhuang

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323020793.7U CN221047693U (en) 2023-11-09 2023-11-09 Integral standard knot group Fang Gongzhuang

Publications (1)

Publication Number Publication Date
CN221047693U true CN221047693U (en) 2024-05-31

Family

ID=91204003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323020793.7U Active CN221047693U (en) 2023-11-09 2023-11-09 Integral standard knot group Fang Gongzhuang

Country Status (1)

Country Link
CN (1) CN221047693U (en)

Similar Documents

Publication Publication Date Title
CN211774542U (en) Pipe truss and H shaped steel post bracket connection structure
CN221047693U (en) Integral standard knot group Fang Gongzhuang
CN201455605U (en) Assembled forming die of tower columns of communication tower
CN219863663U (en) Horizontal variable cross section special-shaped beam of frame structure
CN210395849U (en) Large-span high-section steel truss
CN212984189U (en) Steel structure beam column connecting structure
CN210342239U (en) Steel structure beam column connecting assembly
CN110315267B (en) Tower crane slice type standard knot assembly welding positioning tool
CN212426697U (en) Steel bridge integral node chord member
CN210032278U (en) Truss structure roof
CN113062456A (en) Steel construction assembled nodal connection device
CN219080583U (en) Welding-free steel column-steel beam connecting structure
CN201296995Y (en) Combined connecting structure of corrugated steel web plate in box beam bridge
CN111332902A (en) Derrick track for foundation-pit-free elevator
CN115353001B (en) Gantry crane walking turning device
CN219654280U (en) Combined concrete pouring template
CN212641215U (en) Variable cross-section polygonal steel arch internode positioning device
CN219909384U (en) Node structure of elevator well
CN219990948U (en) High-strength windproof main beam
CN216108118U (en) Assembling adjusting device capable of quickly assembling steel truss girder rod piece
CN221159181U (en) Radial steel gate assembly jig frame device
CN221052840U (en) Steel structure frame column
CN221095597U (en) Girder steel device convenient to dock
CN220515768U (en) Spliced lathe bed structure of oversized-format laser cutting machine
CN220336115U (en) H-shaped steel column and H-shaped steel beam end assembly type node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant