CN221034999U - Flood disaster monitoring and early warning display screen column - Google Patents

Flood disaster monitoring and early warning display screen column Download PDF

Info

Publication number
CN221034999U
CN221034999U CN202322631034.8U CN202322631034U CN221034999U CN 221034999 U CN221034999 U CN 221034999U CN 202322631034 U CN202322631034 U CN 202322631034U CN 221034999 U CN221034999 U CN 221034999U
Authority
CN
China
Prior art keywords
equipment
assembly
display screen
groove
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322631034.8U
Other languages
Chinese (zh)
Inventor
钟林大
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Qiaorui Electronic Technology Co ltd
Original Assignee
Shenzhen Qiaorui Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Qiaorui Electronic Technology Co ltd filed Critical Shenzhen Qiaorui Electronic Technology Co ltd
Priority to CN202322631034.8U priority Critical patent/CN221034999U/en
Application granted granted Critical
Publication of CN221034999U publication Critical patent/CN221034999U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses a flood disaster monitoring and early warning display screen column, which relates to the technical field of flood disaster monitoring and comprises a plurality of assembly columns, wherein the lower ends of the assembly columns are provided with sleeving grooves, the upper ends of the assembly columns are fixedly connected with sleeving columns, the left and right sides of the opposite ends of two adjacent assembly columns are provided with assembly grooves together, and the upper sides of the inner walls of the assembly grooves are connected with assembly rods through rotating shafts. According to the utility model, the basic use functions of the equipment are ensured by arranging the ultrasonic liquid level meter, the control box and the display screen, the assembly column body is initially installed through the sleeve joint groove and the sleeve joint column, and the assembly rod is clamped in the assembly groove through the clamping block and the clamping groove, so that the assembly column body is further conveniently fixed through the clamping band, and when the equipment is installed, the equipment can be assembled through the installation topography, thereby being more convenient for observing the equipment and improving the applicability of the equipment.

Description

Flood disaster monitoring and early warning display screen column
Technical Field
The utility model relates to the technical field of flood disaster monitoring, in particular to a flood disaster monitoring and early warning display screen column.
Background
Flood disasters comprise two types of flood disasters and waterlogging disasters, special monitoring and early warning display screen devices are needed when monitoring and early warning are carried out on the flood disasters, and the device is installed through special columns, so that urban waterlogging and ponding situations including water levels and ponding situations of places such as roads, underground passages, overpasses, tunnels and low-lying places are monitored conveniently in real time.
But traditional flood disaster monitoring early warning display screen post is the setting of integral type basically, and the cylinder needs to be installed on the topography of difference in height to can not carry out the adjustment of height to the cylinder according to the position of installation, and then make people be difficult to observe the display screen on the cylinder, influence the normal use of equipment, and inconvenient transportation to equipment.
Disclosure of utility model
The utility model aims to provide a flood disaster monitoring and early warning display screen column, which aims to solve the problems that the traditional flood disaster monitoring and early warning display screen column proposed in the background technology is basically integrally arranged, and the column body needs to be installed on different terrains, so that the height of the column body cannot be adjusted according to the installation position, and further, people are difficult to observe a display screen on the column body, the normal use of equipment is influenced, and the equipment is inconvenient to transport.
In order to achieve the above purpose, the present utility model provides the following technical solutions: flood disaster monitoring early warning display screen post, including a plurality of equipment cylinder, a plurality of correspondence the lower extreme of equipment cylinder has been seted up and has been cup jointed the groove, and a plurality of correspondence the upper end of equipment cylinder is equal fixedly connected with and has been cup jointed the post, and two adjacent the equipment groove has all been seted up jointly to the left and right sides of the relative one end of equipment cylinder, a plurality of the upside of equipment inslot wall all rotates through the pivot and is connected with the equipment pole, a plurality of the draw-in groove has all been seted up to the below of equipment inslot wall, a plurality of the equal fixedly connected with fixture block of downside of equipment pole wall, a plurality of the surface of fixture block respectively with the mutual joint of the inner wall of corresponding draw-in groove, a plurality of equipment pole all is equipped with the clamp with the upper end of corresponding equipment cylinder, the one side fixedly connected with support of the top equipment cylinder wall upside, the below of support is equipped with ultrasonic level gauge, the other party of top equipment cylinder wall upside is from last fixedly connected with control box, display screen in proper order down.
Preferably, the top end of the uppermost assembled column is fixedly connected with an alarm, the uppermost side of the uppermost assembled column is positioned on one side of the control box and the display screen and is fixedly connected with a loudspeaker, and the equipment has a warning function by arranging the alarm and the loudspeaker.
Preferably, the photovoltaic board is fixedly connected with above the support, the power storage device of photovoltaic board sets up in the control box, can make equipment generate electricity by oneself through setting up photovoltaic board and power storage device, is favorable to energy-concerving and environment-protective nature.
Preferably, a plurality of corresponding equal fixedly connected with spacing ring of upside of equipment cylinder pole wall is convenient to carry out spacingly to the clamp through the spacing ring, prevents that the clamp from dropping at the lower extreme of cylinder when the installation to can influence the efficiency of the installation of equipment.
Preferably, the cross section of cup jointing the groove is regular polygon, the cross section of cup jointing the post is regular polygon, cup jointing the groove and cup jointing the post assorted, the cross section through setting up the cup jointing the groove is regular polygon, cup jointing the cross section of post and be regular polygon to cup jointing the groove and cup jointing the post assorted and be favorable to the location between two equipment posts and splice the equipment groove, and then help the quick installation of equipment.
Preferably, a plurality of draw grooves are formed in one sides of the rod walls of the assembly rods, the assembly rods are conveniently pulled out of the assembly grooves through the draw grooves, and the equipment is convenient to detach.
Preferably, the lower end of the assembly column body at the lowest side is fixedly connected with a stable installation base for ensuring equipment installation through an installation base and a high-strength bolt, and the installation base is fixed on the ground through the high-strength bolt.
The utility model has the technical effects and advantages that:
1. Through setting up the basic service function of ultrasonic liquid level meter, control box, display screen assurance equipment, will assemble the cylinder through cup jointing the groove and cup jointing the post and preliminary installation to after will assembling the pole card in the equipment inslot through fixture block and draw-in groove, it is convenient further to fix the equipment cylinder through the clamp, thereby when installing this equipment, through the installation topography, can assemble equipment, thereby can conveniently survey equipment more, improve the suitability of equipment.
2. Through setting up alarm, loudspeaker messenger's equipment has warning function, can make equipment generate electricity by oneself through setting up photovoltaic board and power storage device, be favorable to energy-concerving and environment-protective, it is spacing to the clamp to make things convenient for through the spacing ring, prevent that the clamp from dropping at the lower extreme of cylinder when the installation, thereby can influence the efficiency of equipment's installation, the cross-section through setting up the socket is regular polygon, the cross-section of socket is regular polygon, and socket phase-match are favorable to the location between two equipment cylinders and splice to the equipment groove, and then help the quick installation of equipment, conveniently pull out the equipment pole from the equipment inslot through the draw-in groove, conveniently dismantle equipment, guarantee the steadiness of equipment installation through mounting base and high-strength bolt.
Drawings
Fig. 1 is a schematic diagram of the overall front cross-sectional structure of the present utility model.
Fig. 2 is a schematic top view of the elastic flap of the present utility model.
Fig. 3 is a schematic view of a part of a perspective structure of an assembled column according to the present utility model.
Fig. 4 is a schematic perspective view of a socket post according to the present utility model.
In the figure: 1. assembling a column; 2. a socket groove; 3. sleeving a column; 4. an assembly groove; 5. assembling a rod; 6. a clamping groove; 7. a clamping block; 8. a clamp; 9. a bracket; 10. an ultrasonic liquid level meter; 11. a control box; 12. a display screen; 13. an alarm; 14. a horn; 15. a photovoltaic panel; 16. a limiting ring; 17. drawing a groove; 18. and (5) installing a base.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides a flood disaster monitoring and early warning display screen column as shown in fig. 1-4, which comprises a plurality of assembly columns 1, wherein the lower ends of the plurality of corresponding assembly columns 1 are provided with sleeving grooves 2, the upper ends of the plurality of corresponding assembly columns 1 are fixedly connected with sleeving columns 3, the left and right sides of the opposite ends of two adjacent assembly columns 1 are provided with assembly grooves 4 together, the upper sides of the inner walls of the plurality of assembly grooves 4 are rotatably connected with assembly rods 5 through rotating shafts, the lower sides of the inner walls of the plurality of assembly grooves 4 are provided with clamping grooves 6, the lower sides of the rod walls of the plurality of assembly rods 5 are fixedly connected with clamping blocks 7, the surfaces of the plurality of clamping blocks 7 are respectively clamped with the inner walls of the corresponding clamping grooves 6, the upper ends of the plurality of assembly rods 5 and the corresponding assembly columns 1 are respectively provided with clamping clamps 8, one side of the upper side of the column wall of the uppermost assembly column 1 is fixedly connected with a bracket 9, the lower side of the bracket 9 is provided with an ultrasonic level meter column 10, the other side of the upper side of the column wall of the uppermost assembly column 1 is sequentially fixedly connected with a control box 11 and a display screen 12 from top to bottom.
As shown in fig. 1 and 3, the top fixedly connected with alarm 13 of the equipment cylinder 1 of the topside, the topside of the equipment cylinder 1 column wall of the topside is located control box 11, one side fixedly connected with loudspeaker 14 of display screen 12, the equal fixedly connected with spacing ring 16 of upside of the corresponding equipment cylinder 1 column wall of a plurality of, the cross-section of cup joint groove 2 is regular polygon, cup joint the cross-section of post 3 and be regular polygon, cup joint groove 2 and cup joint post 3 assorted, draw-in groove 17 has all been seted up to one side of the 5 column wall of a plurality of equipment poles, the lower extreme fixedly connected with installation base 18 of the equipment cylinder 1 of the downside, installation base 18 makes equipment have warning function through setting up alarm 13, loudspeaker 14, can make equipment generate electricity by oneself through setting up photovoltaic board 15 and power storage device, be favorable to energy-concerving and environment-protective, the clamp 8 is convenient to carry out spacing through spacing ring 16, prevent to drop at the lowermost end of cylinder, thereby can influence the efficiency of equipment's installation, cup joint groove 2 cross-section is regular polygon, 3 is regular polygon through setting up, install the convenience in the installation groove 3, and install the side of the equipment is equipped with the installation groove 3, install the equipment is connected with the installation groove through the installation groove is fast-match through the 5, the installation groove is guaranteed to the installation groove is 3, the equipment is connected with the installation groove is convenient from the installation groove is connected with the installation groove is 3, and is connected with the installation groove is equipped with the installation groove through the jack-up from the 5, and is connected through the high-to the installation base is 4, and has the equipment through the high-speed has through the high-tension groove has the equipment has a warning device.
The working principle of the utility model is as follows: when the equipment is installed, the whole length of the column is assembled according to the height of the installation topography, firstly, a sleeve joint column 3 positioned on an assembly column 1 at the lower side is inserted into a sleeve joint groove 2 positioned on an assembly column 1 at the upper side to connect the two assembly columns 1, at the moment, a clamping block 7 positioned on an assembly rod 5 is clamped into a clamping groove 6, so that the two assembly columns 1 are conveniently fixed, a clamp 8 is sleeved at the position positioned on the assembly column 1 at the lower side and connected with the assembly rod 5, the two assembly columns 1 are firmly connected together, and after the assembly of the assembly columns 1 is completed, the assembled column is fixed on the ground to be installed through a high-strength bolt positioned on an installation base 18;
When using this equipment, measure the distance with the surface of water through ultrasonic wave level gauge 10 to carry out real-time supervision to the water in the river, and show monitoring data through display screen 12, when monitoring can take place the flood disaster, remind and warn through alarm 13, loudspeaker 14, photovoltaic board 15 can provide the electric energy to the equipment, thereby make the equipment possess energy-concerving and environment-protective performance.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. Flood disaster monitoring early warning display screen post, including a plurality of equipment cylinder (1), its characterized in that: the lower extreme of a plurality of corresponding equipment cylinder (1) has been seted up and has been cup jointed groove (2), a plurality of corresponding the equal fixedly connected with of upper end of equipment cylinder (1) cup joints post (3), and two are adjacent the equipment groove (4) have all been seted up jointly in the left and right sides of the relative one end of equipment cylinder (1), a plurality of the upside of equipment groove (4) inner wall all is connected with equipment pole (5) through the pivot rotation, a plurality of draw-in groove (6) have all been seted up to the below of equipment groove (4) inner wall, a plurality of the equal fixedly connected with fixture block (7) of downside of equipment pole (5) pole wall, a plurality of the surface of fixture block (7) respectively with the inner wall looks joint of corresponding fixture groove (6), a plurality of equipment pole (5) all are equipped with clamp (8) with the upper end of corresponding equipment cylinder (1), the upside of equipment cylinder (1) pole wall upside one side fixedly connected with support (9), the below of support (9) is equipped with liquid level gauge (10), and the side of being connected with from the control box (12) on the control box side in proper order on the equipment cylinder (1).
2. The flood disaster monitoring and early warning display screen column according to claim 1, wherein: the top end of the uppermost assembly column body (1) is fixedly connected with an alarm (13), and the uppermost side of the column wall of the uppermost assembly column body (1) is positioned on the control box (11) and one side of the display screen (12) is fixedly connected with a loudspeaker (14).
3. The flood disaster monitoring and early warning display screen column according to claim 1, wherein: the photovoltaic panel (15) is fixedly connected to the upper portion of the support (9), and an electric storage device of the photovoltaic panel (15) is arranged in the control box (11).
4. The flood disaster monitoring and early warning display screen column according to claim 1, wherein: and limiting rings (16) are fixedly connected to the upper sides of the rod walls of the corresponding assembly columns (1).
5. The flood disaster monitoring and early warning display screen column according to claim 1, wherein: the section of the sleeve joint groove (2) is regular polygon, the section of the sleeve joint column (3) is regular polygon, and the sleeve joint groove (2) is matched with the sleeve joint column (3).
6. The flood disaster monitoring and early warning display screen column according to claim 1, wherein: pull grooves (17) are formed in one side of the rod walls of the assembling rods (5).
7. The flood disaster monitoring and early warning display screen column according to claim 1, wherein: the lower end of the lowest assembly column body (1) is fixedly connected with a mounting base (18), and the mounting base (18) is fixed on the ground through a high-strength bolt.
CN202322631034.8U 2023-09-26 2023-09-26 Flood disaster monitoring and early warning display screen column Active CN221034999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322631034.8U CN221034999U (en) 2023-09-26 2023-09-26 Flood disaster monitoring and early warning display screen column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322631034.8U CN221034999U (en) 2023-09-26 2023-09-26 Flood disaster monitoring and early warning display screen column

Publications (1)

Publication Number Publication Date
CN221034999U true CN221034999U (en) 2024-05-28

Family

ID=91166832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322631034.8U Active CN221034999U (en) 2023-09-26 2023-09-26 Flood disaster monitoring and early warning display screen column

Country Status (1)

Country Link
CN (1) CN221034999U (en)

Similar Documents

Publication Publication Date Title
CN221034999U (en) Flood disaster monitoring and early warning display screen column
CN211228049U (en) Aqueduct maintenance device
CN108678527B (en) Auxiliary supporting device
CN211017927U (en) Outdoor waterproof switch board base
CN215976945U (en) Road sign board of anti-wind function
CN209927190U (en) Electromagnetic flowmeter convenient to installation
CN108678528B (en) Auxiliary supporting device for preventing telegraph pole from toppling
CN212223937U (en) Pile foundation protection device for highway bridge
CN115077630A (en) Portable spring flow field investigation monitoring devices that rises
CN216283500U (en) Total powerstation system for land survey
CN218029350U (en) Connect convenient high strength reinforced concrete pole
CN208112585U (en) Photovoltaic cable protecting box and photovoltaic cable protect system
CN214195840U (en) Road construction rail equipment based on big dipper
CN212027354U (en) Wire pole for ultra-high voltage transmission line
CN214790174U (en) Sectional type combination monitoring rod
CN215948179U (en) Recoverable anchor cable
CN221668496U (en) Assembled material signboard
CN211398780U (en) Detachable water conservancy water and electricity buried pipe fixing device
CN214886006U (en) Sectional adjustable flagpole
CN219734427U (en) Protection structure for underground pipeline
CN213597011U (en) Interim drainage structures of construction are built in room
CN221859650U (en) Drainage water flow measuring device for rainwater pipeline
CN213420146U (en) Convenient fixed antidetonation piping lane gallows
CN211472263U (en) Warning device for outdoor building construction management
CN221277408U (en) Concrete pole with improved structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant