CN221031325U - Steel column construction operation platform - Google Patents
Steel column construction operation platform Download PDFInfo
- Publication number
- CN221031325U CN221031325U CN202323078738.3U CN202323078738U CN221031325U CN 221031325 U CN221031325 U CN 221031325U CN 202323078738 U CN202323078738 U CN 202323078738U CN 221031325 U CN221031325 U CN 221031325U
- Authority
- CN
- China
- Prior art keywords
- steel column
- steel
- platform
- construction operation
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 110
- 239000010959 steel Substances 0.000 title claims abstract description 110
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 230000007246 mechanism Effects 0.000 claims abstract description 24
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 30
- 229910052742 iron Inorganic materials 0.000 claims description 15
- 230000001681 protective effect Effects 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 230000009471 action Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 210000001503 joint Anatomy 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The application relates to the technical field of steel column construction platforms, in particular to a steel column construction operation platform, which comprises two platform main bodies and a steel column main body, wherein a bearing mechanism is arranged below the right side of the platform main bodies, two sleeves are fixed on the upper surfaces of the two platform main bodies, steel rods are sleeved in the sleeves on the left side and the right side, and the same connecting mechanism is arranged above the two platform main bodies. This steel column construction operation platform passes through the bolt fastening with left and right sides platform main part in the left and right sides of steel column main part, passes through the bolt fastening with two connecting plates in the left and right sides of steel column main part, passes through the bolt fastening with left and right sides connecting block respectively with left and right sides connecting block, and is fixed spacing with a plurality of bolts between with rail and the billet through a plurality of fixed orificess afterwards, reaches the purpose of fixing two platform main parts, has solved and has constantly carried out welded mounting for the comparatively loaded down with trivial details problem of follow-up dismantlement work.
Description
Technical Field
The utility model relates to the technical field of steel column construction platforms, in particular to a steel column construction operation platform.
Background
The steel structure building has been widely used in high-rise buildings, large-scale factories, large-span space structures, traffic energy engineering and residential buildings because of its short construction period, high strength, good shock resistance and repeated use.
Chinese patent CN211691387U discloses an assembled operation platform for steel column butt joint construction, which comprises a triangular support frame, a platform plate and a protective railing, wherein: a plurality of triangular supports are mounted on each side wall of the steel column, the triangular supports are detachably overhanging and inserted on steel sockets fixedly mounted on the side wall of the steel column, a platform plate is placed on a lap joint plane formed by all the triangular supports, and a circle of protective railing is detachably mounted on the periphery of the platform plate.
The assembled operating platform for the steel column butt joint construction has the advantages that although the assembled operating platform is in an integral frame form, the entrance and the exit are arranged to form a notch on the steel plate of the bearing platform plate, and the openable flip cover is installed, the assembled operating platform is used for supporting the platform by installing a plurality of triangular supports, and the assembled operating platform is required to be continuously welded and installed, so that subsequent disassembly work is complicated, and the application provides the steel column construction operating platform for solving the problems.
Disclosure of utility model
Aiming at the defects of the prior art, the utility model provides a steel column construction operation platform which has the advantages of being convenient to install and disassemble and the like, and solves the problem that the follow-up disassembly work is complicated due to the fact that the welding installation is required continuously.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the steel column construction operation platform comprises two platform main bodies and a steel column main body, wherein a bearing mechanism is arranged below the right side platform main bodies, two sleeves are fixed on the upper surfaces of the two platform main bodies, steel rods are sleeved in the sleeves on the left side and the right side, and the same connecting mechanism is arranged above the two platform main bodies;
The bearing mechanism comprises a connecting plate fixed on the right side of the steel column main body through a plurality of bolts, the right side of the connecting plate is slidingly connected with two connecting blocks, the right sides of the two connecting blocks are hinged with steel rails through hinge shafts, and steel bars are slidingly connected inside the two steel rails;
The connecting mechanism comprises two supporting plates movably attached to the upper surfaces of the two platform main bodies, a plurality of mounting holes are formed in the upper surfaces of the supporting plates, and screws are connected to the inner portions of the mounting holes in a threaded mode.
Further, the left side of platform main part has welded the mounting panel, the mounting panel passes through a plurality of bolts to be fixed in the right side of steel column main part.
The beneficial effects of adopting the further scheme are as follows: the left and right side platform main bodies can be fixed on the left and right sides of the steel column main body through bolts.
Further, a protective iron net is fixed between every two adjacent steel bars through bolts, and a construction opening is formed in the front of the protective iron net.
The beneficial effects of adopting the further scheme are as follows: a plurality of protection iron nets are fixed between two adjacent steel bars for protection, so that constructors are prevented from carelessly dropping the platform main body.
Further, the left side and the right side are both in threaded connection with bolts outside the sleeve, and the left side and the right side are both provided with screw holes in threaded connection with the bolts outside the steel rod.
The beneficial effects of adopting the further scheme are as follows: the four steel bars are fixed with the four sleeves through bolts.
Further, the number of the bearing mechanisms is two, and the two bearing mechanisms are symmetrically distributed left and right by taking the central axis of the steel column main body as a symmetry line.
Further, two connecting plates are fixed with slide ways on one side opposite to each other, and the two connecting blocks are respectively connected in a sliding mode in the two slide ways.
The beneficial effects of adopting the further scheme are as follows: the positions of the two connecting blocks can be adjusted by utilizing the slide way, so that the steel rail and the steel bar for supporting can be folded, and the folding type folding steel rail is convenient to carry.
Further, the outer sides of the steel rail and the steel bars on the left side and the right side are respectively provided with a plurality of fixing holes, and the steel bars on the left side and the right side are respectively hinged to the lower surfaces of the platform main bodies on the left side and the right side through hinge shafts.
The beneficial effects of adopting the further scheme are as follows: and fixing and limiting the steel rail and the steel bar through a plurality of fixing holes by a plurality of bolts.
Further, two locating holes in threaded connection with a plurality of screws are formed in the upper surfaces of the platform main bodies, and two construction doors are mounted on the front face of the protection iron net through hinges.
The beneficial effects of adopting the further scheme are as follows: a plurality of protection iron nets are fixed between two adjacent steel bars for protection, so that constructors are prevented from carelessly dropping the platform main body.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. This steel column construction operation platform passes through the bolt fastening with left and right sides platform main part in the left and right sides of steel column main part, passes through the bolt fastening with two connecting plates in the left and right sides of steel column main part, passes through the bolt fastening with left and right sides connecting block respectively with left and right sides connecting block, and is fixed spacing between steel rail and the billet through a plurality of fixed orifices with a plurality of bolts afterwards, reaches the purpose of fixing two platform main parts.
2. This steel column construction operation platform passes through a plurality of screw fixation with two backup pads at the upper surface of two platform main parts, and is fixed with the sleeve through bolt with four steel poles afterwards, fixes a plurality of guard iron nets between two adjacent steel poles, protects, avoids constructor carelessly to drop the platform main part.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a top view of the structure of the present utility model;
FIG. 3 is a schematic view of a load bearing mechanism according to the present utility model;
FIG. 4 is a schematic view of the connecting mechanism of the present utility model.
In the figure: 1. a platform body; 2. a bearing mechanism; 201. a connecting plate; 202. a connecting block; 203. a steel rail; 204. a steel bar; 3. a sleeve; 4. a connecting mechanism; 401. a support plate; 402. a mounting hole; 403. a screw; 5. a steel column body; 6. a steel rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-2, the steel column construction operation platform in this embodiment includes two platform main bodies 1 and a steel column main body 5, a bearing mechanism 2 is disposed below the right side platform main body 1, two sleeves 3 are fixed on the upper surfaces of the two platform main bodies 1, steel rods 6 are sleeved in the sleeves 3 on the left and right sides, and the same connecting mechanism 4 is disposed above the two platform main bodies 1.
In this embodiment, the mounting panel has been welded on the left side of platform main part 1, the mounting panel passes through a plurality of bolts to be fixed on the right side of steel column main part 5, with left and right sides platform main part 1 through bolt fastening in the left and right sides of steel column main part 5, all have the protection iron net through bolt fastening between two adjacent steel poles 6, the construction mouth has been seted up in the front of openly protecting iron net, the equal threaded connection in the outside of left and right sides sleeve 3 has the bolt, the screw with bolt threaded connection has all been seted up in the outside of left and right sides steel pole 6.
Referring to fig. 3, in order to fix two platform bodies 1, the load-bearing mechanism 2 in this embodiment includes a connecting plate 201 fixed on the right side of the steel column body 5 by a plurality of bolts, the two connecting plates 201 are respectively fixed on the left and right sides of the steel column body 5 by bolts, the two connecting blocks 202 are connected to the right side of the connecting plate 201 in sliding manner, the steel rails 203 are hinged to the right sides of the two connecting blocks 202 by hinge shafts, and the steel bars 204 are connected to the inner parts of the two steel rails 203 in sliding manner.
In this embodiment, the number of the bearing mechanisms 2 is two, the two bearing mechanisms 2 use the central axis of the steel column main body 5 as the symmetry line and are symmetrically distributed, one sides of the two connecting plates 201 opposite to each other are all fixed with slide ways, the slide ways are vertically arranged, the two connecting blocks 202 are respectively and slidably connected in the two slide ways, a plurality of fixing holes are respectively formed in the outer sides of the steel rails 203 and the steel bars 204 on the left side and the right side, the connecting blocks 202 on the left side and the right side slide on one sides of the connecting plates 201 opposite to each other, after the angle is adjusted, the connecting blocks 202 on the left side and the right side are respectively fixed with the connecting plates 201 on the left side and the right side through bolts, the steel bars 204 on the left side and the right side are respectively hinged on the lower surface of the platform main body 1 on the left side and the right side through hinge shafts, and the bolts are fixedly limited between the steel rails 203 and the steel bars 204 through the plurality of fixing holes.
The left and right platform bodies 1 are fixed to the left and right sides of the steel column body 5 by bolts, the two connecting plates 201 are fixed to the left and right sides of the steel column body 5 by bolts, the left and right connecting blocks 202 are fixed to the left and right connecting plates 201 by bolts, and then the plurality of bolts fix and limit the position between the steel rail 203 and the steel bar 204 by a plurality of fixing holes, so that the purpose of fixing the two platform bodies 1 is achieved.
Referring to fig. 4, in order to avoid a constructor from carelessly dropping the platform body 1, the connection mechanism 4 in this embodiment includes two support plates 401 movably attached to the upper surfaces of the two platform bodies 1, a plurality of mounting holes 402 are formed on the upper surfaces of the two support plates 401, and screws 403 are screwed into the inner portions of the plurality of mounting holes 402.
In this embodiment, the locating holes that are screwed with a plurality of screws 403 are all set on the upper surfaces of two platform main bodies 1, two backup pads 401 are fixed on the upper surfaces of two platform main bodies 1 through a plurality of screws 403, two construction doors are installed on the front of the front protection iron net through hinges, four steel bars 6 are respectively placed in the four sleeves 3, then the four steel bars 6 are fixed through bolts, a plurality of protection iron nets are fixed between two adjacent steel bars 6, and protection is carried out, so that constructors are prevented from carelessly falling down the platform main bodies 1.
It should be noted that, the two support plates 401 are fixed on the upper surfaces of the two platform bodies 1 by a plurality of screws 403, then the four steel bars 6 are fixed with the sleeve 3 by bolts, and a plurality of protection iron nets are fixed between the two adjacent steel bars 6 to protect the platform bodies 1 from being dropped carelessly by constructors.
It will be appreciated that in the description of the utility model, unless specifically stated and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the terms in the present utility model can be understood by those skilled in the art in specific cases, and the details of the present utility model are not described in detail, which are known to those skilled in the art.
The working principle of the embodiment is as follows:
(1) When the steel column main body 5 needs to be constructed, the left and right side platform main bodies 1 are fixed on the left and right sides of the steel column main body 5 through bolts, then the two connecting plates 201 are fixed on the left and right sides of the steel column main body 5 through bolts respectively, then the left and right side connecting plates 202 slide on the back sides of the left and right side connecting plates 201, after the angle is adjusted, the left and right side connecting plates 202 are fixed with the left and right side connecting plates 201 through bolts respectively, and then a plurality of bolts are used for fixing and limiting between the steel rail 203 and the steel bar 204 through a plurality of fixing holes.
(2) Two backup pads 401 are fixed on the upper surface of two platform main bodies 1 through a plurality of screws 403 afterwards, and then place four steel poles 6 respectively in the inside of four sleeves 3, and then fix four steel poles 6 through the bolt, fix a plurality of guard iron nets between two adjacent steel poles 6, protect, avoid constructor carelessly to drop platform main body 1.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made hereto without departing from the spirit and principles of the present utility model.
Claims (8)
1. Steel column construction operation platform, including two platform main part (1) and steel column main part (5), its characterized in that: the lower part of the right side platform main body (1) is provided with a bearing mechanism (2), the upper surfaces of the two platform main bodies (1) are respectively fixed with two sleeves (3), the inner parts of the sleeves (3) at the left side and the right side are respectively sleeved with a steel rod (6), and the upper parts of the two platform main bodies (1) are provided with the same connecting mechanism (4);
The bearing mechanism (2) comprises a connecting plate (201) fixed on the right side of the steel column main body (5) through a plurality of bolts, two connecting blocks (202) are connected to the right side of the connecting plate (201) in a sliding mode, steel rails (203) are hinged to the right sides of the two connecting blocks (202) through hinge shafts, and steel bars (204) are connected to the inner parts of the two steel rails (203) in a sliding mode;
The connecting mechanism (4) comprises two supporting plates (401) movably attached to the upper surfaces of the two platform main bodies (1), a plurality of mounting holes (402) are formed in the upper surfaces of the two supporting plates (401), and screws (403) are connected to the inner portions of the mounting holes (402) in a threaded mode.
2. The steel column construction operation platform of claim 1, wherein: the left side welding of platform main part (1) has the mounting panel, the mounting panel passes through a plurality of bolts to be fixed on the right side of steel column main part (5).
3. The steel column construction operation platform of claim 1, wherein: and a protective iron net is fixed between every two adjacent steel rods (6) through bolts, and a construction opening is formed in the front of the protective iron net.
4. The steel column construction operation platform of claim 1, wherein: the left side and the right side of the sleeve (3) are both in threaded connection with bolts, and the left side and the right side of the steel rod (6) are both provided with screw holes in threaded connection with the bolts.
5. The steel column construction operation platform of claim 1, wherein: the number of the bearing mechanisms (2) is two, and the two bearing mechanisms (2) are symmetrically distributed left and right by taking the central axis of the steel column main body (5) as a symmetry line.
6. The steel column construction operation platform of claim 5, wherein: the two connecting plates (201) are fixed with slide ways on opposite sides, and the two connecting blocks (202) are respectively and slidably connected in the two slide ways.
7. The steel column construction operation platform of claim 6, wherein: the outer sides of the steel rail (203) and the steel bar (204) on the left side and the right side are respectively provided with a plurality of fixing holes, and the steel bar (204) on the left side and the right side is hinged to the lower surfaces of the platform main bodies (1) on the left side and the right side through hinge shafts.
8. A steel column construction operation platform according to claim 3, wherein: the upper surfaces of the two platform main bodies (1) are provided with positioning holes in threaded connection with a plurality of screws (403), and two construction doors are mounted on the front surface of the protective iron net through hinges.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323078738.3U CN221031325U (en) | 2023-11-15 | 2023-11-15 | Steel column construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323078738.3U CN221031325U (en) | 2023-11-15 | 2023-11-15 | Steel column construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221031325U true CN221031325U (en) | 2024-05-28 |
Family
ID=91131411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202323078738.3U Active CN221031325U (en) | 2023-11-15 | 2023-11-15 | Steel column construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221031325U (en) |
-
2023
- 2023-11-15 CN CN202323078738.3U patent/CN221031325U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211110946U (en) | Aerial work platform | |
CN221031325U (en) | Steel column construction operation platform | |
CN215212255U (en) | Suspension type frame combined high-altitude operation platform | |
CN211499182U (en) | Reinforced steel structure at joint of steel structure | |
CN212078601U (en) | Scaffold with safety device | |
CN215167851U (en) | Aluminum alloy attached lifting scaffold | |
CN209368685U (en) | Construction safety assembled ladder cage module | |
CN215331309U (en) | Firm type scaffold frame for building engineering | |
CN221194376U (en) | Combined type adjustable balcony safety protection plate | |
CN215760943U (en) | Protection frame is used in real estate development | |
CN220014697U (en) | Rail guard for building engineering | |
CN215631529U (en) | Building engineering construction scaffold protective structure | |
CN214273189U (en) | Road construction is with protection isolation barrier convenient to loading and unloading | |
CN110847352A (en) | Bolt ball net rack purline assembling construction method | |
CN217419981U (en) | Steel construction rack support with high stability | |
CN219411757U (en) | Attached lifting scaffold | |
CN216117076U (en) | Universal material testing machine with protective cover | |
CN211473352U (en) | Anti-falling device for steel structure engineering construction | |
CN216428972U (en) | Scaffold for building electromechanical installation engineering | |
CN211596520U (en) | Anti-climbing structure of ETC portal frame | |
CN211949927U (en) | Fender is enclosed in construction | |
CN214935138U (en) | Fabricated elevator hoistway frame | |
CN216380669U (en) | Elevator shaft door opening edge protection device | |
CN221255717U (en) | High bearing capacity steel structure | |
CN221799063U (en) | High-protection construction mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |