CN221030921U - Integrated furred ceiling with multistage decorative cover - Google Patents

Integrated furred ceiling with multistage decorative cover Download PDF

Info

Publication number
CN221030921U
CN221030921U CN202322794338.6U CN202322794338U CN221030921U CN 221030921 U CN221030921 U CN 221030921U CN 202322794338 U CN202322794338 U CN 202322794338U CN 221030921 U CN221030921 U CN 221030921U
Authority
CN
China
Prior art keywords
telescopic rod
rod
connecting rod
decorative surface
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322794338.6U
Other languages
Chinese (zh)
Inventor
吴丽霞
梁翰维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zhigao Yisheng Decoration Design Co ltd
Original Assignee
Guangzhou Zhigao Yisheng Decoration Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Zhigao Yisheng Decoration Design Co ltd filed Critical Guangzhou Zhigao Yisheng Decoration Design Co ltd
Priority to CN202322794338.6U priority Critical patent/CN221030921U/en
Application granted granted Critical
Publication of CN221030921U publication Critical patent/CN221030921U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses an integrated suspended ceiling with a multi-stage decorative surface, which comprises four main keels, wherein a mounting frame is fixedly arranged between the four main keels, and an adjusting structure is arranged at the joint of the four main keels; the adjusting structure comprises a second telescopic rod, the second telescopic rod is located at the lower portion of the joint of the four main keels, a first telescopic rod is slidably mounted in the second telescopic rod, and a fixing block is fixedly mounted outside the first telescopic rod. According to the integrated suspended ceiling with the multi-stage decorative surface, through the arrangement of the adjusting structure, when the height between the second-stage suspended plate and the first-stage suspended plate needs to be changed, the auxiliary keel can be pulled, so that the first telescopic rod is driven to slide in the second telescopic rod, and after the first telescopic rod is pulled to a proper height, the fixing block is clamped in the hole, so that the first telescopic rod and the second telescopic rod are connected more tightly, and the height between the second-stage suspended plate and the first-stage suspended plate is changed.

Description

Integrated furred ceiling with multistage decorative cover
Technical Field
The utility model relates to the field of integrated suspended ceilings, in particular to an integrated suspended ceiling with a multi-stage decorative surface.
Background
The integrated suspended ceiling is a combination of a metal square plate and an electric appliance, and is simple in installation, flexible in arrangement and convenient to maintain, and is generally used for a kitchen, a bathroom and a balcony, and is developed towards the whole-house integrated home suspended ceiling along with the continuous development of the industry;
However, when the existing integrated suspended ceiling with the multi-stage decoration surface is installed, the height between the two-stage suspended ceiling and the one-stage suspended ceiling is generally required to be measured in advance, then the installation is carried out, the installation can be carried out again only by dismantling after the measurement is carried out in error, time and labor are wasted, the size of the existing integrated suspended ceiling with the multi-stage decoration surface is generally fixed, and the installation can not be changed according to the actual situation.
Disclosure of utility model
The utility model mainly aims to provide an integrated suspended ceiling with a multi-stage decorative surface, which can effectively solve the technical problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
An integrated suspended ceiling with multi-stage decorative surfaces comprises four main keels, wherein an installation frame is fixedly installed between the four main keels, and an adjusting structure is arranged at the joint of the four main keels;
The adjusting structure comprises a second telescopic rod, the second telescopic rod is located at the lower portion of the joint of the four main keels, a first telescopic rod is slidably mounted in the second telescopic rod, and a fixing block is fixedly mounted outside the first telescopic rod.
As a further scheme of the utility model, a plurality of holes are formed in the outer portion of the second telescopic rod, and the fixing blocks are matched with the holes.
As a further scheme of the utility model, the lower part of the first telescopic rod is fixedly provided with the auxiliary keels, wherein the two auxiliary keels are provided with L-shaped grooves close to two sides, and the insides of the L-shaped grooves are respectively provided with a first sliding block in a sliding manner.
As a further scheme of the utility model, the upper parts of the two auxiliary keels are provided with stretching structures, each stretching structure comprises a screw rod and two mounting rods, the screw rods are fixedly arranged on the upper parts of the first sliding blocks, the two mounting rods are fixedly arranged on one sides of the first sliding blocks, and nuts are connected to the outer parts of the screw rods, which are positioned on the upper parts of the auxiliary keels, in a threaded manner.
As a further scheme of the utility model, one side of one mounting rod is fixedly provided with a first connecting rod, one side of the other mounting rod is fixedly provided with a second connecting rod, and the first connecting rod penetrates through the second connecting rod.
As a further scheme of the utility model, a through groove is formed in the upper portion of the second connecting rod, and a second sliding block is slidably arranged in the through groove at the upper portion of the first connecting rod.
The beneficial effects of the utility model are as follows:
Through setting up the regulation structure, when the height between second grade hanger plate and the one-level hanger plate needs to be changed, can stimulate the auxiliary joist to drive first telescopic link and slide in the second telescopic link, after pulling to suitable height, the fixed block card is in the hole, thereby makes the connection between first telescopic link and the second telescopic link more inseparable, makes the height between second grade hanger plate and the one-level hanger plate change;
Through setting up tensile structure, swivel nut makes it break away from the auxiliary joist, then promotes the installation pole to change the interval between two installation poles, after the regulation is accomplished, swivel nut makes it contact with the auxiliary joist, thereby can chucking installation pole, make the installation pole more stable when installing the second grade hanger plate, thereby can install the size of second grade hanger plate.
Drawings
FIG. 1 is a schematic view of the overall structure of an integrated ceiling with a multi-stage decoration surface according to the present utility model;
FIG. 2 is an enlarged view of an adjustment structure of an integrated ceiling having a multi-stage decorative surface in accordance with the present utility model;
FIG. 3 is a partial block diagram of an integrated ceiling having a multi-stage decorative surface in accordance with the present utility model;
FIG. 4 is an enlarged view of a stretched structure of an integrated ceiling with a multi-stage decorative surface in accordance with the present utility model;
Fig. 5 is an enlarged view of a portion of a tensile structure of an integrated ceiling having a multi-stage decorative surface according to the present utility model.
In the figure: 1. a main keel; 2. a mounting frame; 3. an adjustment structure; 4. a secondary keel; 5. a first telescopic rod; 6. a fixed block; 7. a second telescopic rod; 8. stretching the structure; 9. a screw; 10. a mounting rod; 11. a first connecting rod; 12. a second connecting rod; 13. a nut; 14. a first slider; 15. and a second slider.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-5, an integrated suspended ceiling with a multi-stage decorative surface comprises four main keels 1, wherein a mounting frame 2 is fixedly arranged between the four main keels 1, and an adjusting structure 3 is arranged at the joint of the four main keels 1;
the adjusting structure 3 comprises a second telescopic rod 7, the second telescopic rod 7 is positioned at the lower part of the joint of the four main keels 1, a first telescopic rod 5 is slidably arranged in the second telescopic rod 7, and a fixing block 6 is fixedly arranged outside the first telescopic rod 5.
In this embodiment, a plurality of holes are formed on the outer portion of the second telescopic rod 7, and the fixing block 6 is matched with the holes.
The fixing block 6 can be clamped in the hole, so that the second telescopic rod 7 is fixed more tightly.
In this embodiment, the lower portion of the first telescopic rod 5 is fixedly provided with the cross runners 4, wherein the positions of the two cross runners 4 close to two sides are provided with an L-shaped groove, and the inside of the L-shaped groove is provided with a first sliding block 14 in a sliding manner.
The first sliding block 14 can slide in the auxiliary keel 4, so that the rest work can be conveniently carried out.
In this embodiment, the upper parts of the two cross runners 4 are provided with a stretching structure 8, the stretching structure 8 comprises a screw rod 9 and two mounting rods 10, the screw rod 9 is fixedly mounted on the upper part of the first sliding block 14, the two mounting rods 10 are fixedly mounted on one side of the first sliding block 14, and nuts 13 are connected to the outer parts of the screw rods 9, which are located on the upper parts of the cross runners 4 in a threaded manner.
The stretching structure 8 is arranged, the nut 13 is rotated to be not contacted with the auxiliary keel 4 any more, so that the mounting rod 10 can slide, the position of the mounting rod 10 is adjusted, and the device is convenient to adapt to various different use conditions and use requirements.
In this embodiment, a first connecting rod 11 is fixedly installed at one side of one of the installation rods 10, a second connecting rod 12 is fixedly installed at one side of the other installation rod 10, and the first connecting rod 11 penetrates the second connecting rod 12.
The first connecting rod 11 can slide inside the second connecting rod 12, so that the stretching work can be effectively performed.
In this embodiment, the upper portion of the second connecting rod 12 is provided with a through slot, and the upper portion of the first connecting rod 11 is provided with a second slider 15 in a sliding manner inside the through slot.
When the first connecting rod 11 slides inside the second connecting rod 12, the second slider 15 slides on the upper portion of the second connecting rod 12, so that the first connecting rod 11 does not fall.
It should be noted that, when the integrated suspended ceiling with multi-stage decorative surfaces is used, the main keel 1 is firstly arranged on the roof, then the auxiliary keel 4 can be pulled as required to drive the first telescopic rod 5 to slide in the second telescopic rod 7, and in the process, the fixing block 6 can be clamped in the hole, so that the connection between the first telescopic rod 5 and the second telescopic rod 7 is tighter, and the suspended ceiling is more stable after being arranged;
when the installation size of the secondary hanger plate needs to be changed, the nut 13 can be manually rotated to be not contacted with the auxiliary keel 4 any more, and then the installation rod 10 is pushed, so that the position of the installation rod 10 is changed, in the process, the first connecting rod 11 can slide in the second connecting rod 12, when the installation size is adjusted to be required, the nut 13 is manually rotated to be contacted with the auxiliary keel 4, and therefore the installation rod 10 is fixed, and the installation rod 10 is more stable in the process of installing the hanger plate.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. An integrated furred ceiling with multistage decorative surface, its characterized in that: the novel main joist comprises four main joists (1), wherein an installation frame (2) is fixedly installed between the four main joists (1), and an adjusting structure (3) is arranged at the joint of the four main joists (1);
the adjusting structure (3) comprises a second telescopic rod (7), the second telescopic rod (7) is located at the lower portion of the joint of the four main keels (1), a first telescopic rod (5) is slidably installed in the second telescopic rod (7), and a fixing block (6) is fixedly installed outside the first telescopic rod (5).
2. An integrated ceiling having a multi-stage decorative surface according to claim 1, wherein: and a plurality of holes are formed in the outer part of the second telescopic rod (7), and the fixed block (6) is matched with the holes.
3. An integrated ceiling having a multi-stage decorative surface according to claim 1, wherein: the lower part fixed mounting of first telescopic link (5) has false keel (4), and wherein two the position that false keel (4) are close to both sides has seted up "L" type groove, the inside first slider (14) of all slidable mounting of "L" type groove.
4. An integrated ceiling having a multi-stage decorative surface according to claim 3, wherein: wherein two the upper portion of false keel (4) is equipped with tensile structure (8), tensile structure (8) include screw rod (9) and two installation pole (10), screw rod (9) fixed mounting is on the upper portion of first slider (14), two equal fixed mounting of installation pole (10) is in one side of first slider (14), the outside of screw rod (9) is located the upper portion threaded connection of false keel (4) has nut (13).
5. An integrated ceiling having a multi-stage decorative surface according to claim 4, wherein: one side of the installation rod (10) is fixedly provided with a first connecting rod (11), one side of the installation rod (10) is fixedly provided with a second connecting rod (12), and the first connecting rod (11) penetrates through the second connecting rod (12).
6. An integrated ceiling having a multi-stage decorative surface according to claim 5, wherein: the upper part of the second connecting rod (12) is provided with a through groove, and the upper part of the first connecting rod (11) is provided with a second sliding block (15) in a sliding manner in the through groove.
CN202322794338.6U 2023-10-18 2023-10-18 Integrated furred ceiling with multistage decorative cover Active CN221030921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322794338.6U CN221030921U (en) 2023-10-18 2023-10-18 Integrated furred ceiling with multistage decorative cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322794338.6U CN221030921U (en) 2023-10-18 2023-10-18 Integrated furred ceiling with multistage decorative cover

Publications (1)

Publication Number Publication Date
CN221030921U true CN221030921U (en) 2024-05-28

Family

ID=91137311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322794338.6U Active CN221030921U (en) 2023-10-18 2023-10-18 Integrated furred ceiling with multistage decorative cover

Country Status (1)

Country Link
CN (1) CN221030921U (en)

Similar Documents

Publication Publication Date Title
CN221030921U (en) Integrated furred ceiling with multistage decorative cover
CN205369954U (en) Positioner is assembled to truss steel pipe
CN219528464U (en) Butt heart type hole cover suite for hoisting prefabricated stairs
CN203022198U (en) Suspended ceiling structure
CN215334847U (en) Installing support that water and electricity pipeline engineering used
CN2793189Y (en) Hang Ceiling keel with stabilized structure and adjustable fixer therewith
CN214176824U (en) Stable form bus duct bearing structure
CN217128708U (en) Lifting point dislocation adjustment structure of keel
CN212670973U (en) Building light steel grid suspended ceiling
CN213682776U (en) Assembled furred ceiling mounting structure
CN209805353U (en) Fixing and supporting device for bus duct
CN212435302U (en) Dual thermal-insulated bus duct
CN210050689U (en) Clamping type lamp bracket ceiling lamp
CN219952406U (en) Construction furred ceiling structure is built to room
CN220285100U (en) Curtain wall convenient to dismantle
CN220225859U (en) Assembled aluminum plate curtain wall construction
CN221372640U (en) Decorative board linking bridge for house construction
CN220868537U (en) Water batch plate for metal curtain wall
CN213174594U (en) Novel wall dry-hanging ceramic tile structure
CN212715525U (en) Photovoltaic curtain wall connecting assembly
CN212336481U (en) Aluminum square tube suspended ceiling structure
CN216929318U (en) Strong and weak electronic box can have enough to meet need quick installation device
CN220353444U (en) Composite board curtain wall mounting system
CN221305456U (en) Hanging bracket for bus duct
CN214034332U (en) Suspended ceiling structure convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant