CN221001981U - Concrete form construction reinforcing apparatus - Google Patents
Concrete form construction reinforcing apparatus Download PDFInfo
- Publication number
- CN221001981U CN221001981U CN202323059434.2U CN202323059434U CN221001981U CN 221001981 U CN221001981 U CN 221001981U CN 202323059434 U CN202323059434 U CN 202323059434U CN 221001981 U CN221001981 U CN 221001981U
- Authority
- CN
- China
- Prior art keywords
- reinforcing plate
- concrete
- square
- reinforcing
- push rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 100
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000009415 formwork Methods 0.000 claims abstract description 16
- 230000002787 reinforcement Effects 0.000 abstract description 7
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The application discloses a concrete formwork construction reinforcing device, which belongs to the technical field of concrete formwork reinforcement, and comprises a reinforcing structure sleeved on the periphery of a concrete formwork, wherein the reinforcing structure comprises a rear reinforcing plate and a front reinforcing plate which are respectively attached to the front end face and the rear end face of the concrete formwork, a left reinforcing plate and a right reinforcing plate which are attached to the left end face and the right end face of the concrete formwork, a first traction piece is arranged at the position, corresponding to the position of two fixing sleeves A, of one side, close to the rear reinforcing plate, of the front reinforcing plate, and a second traction piece is arranged at the position, corresponding to the position of two fixing sleeves B, of one side, close to the right reinforcing plate, of the left reinforcing plate. According to the application, the reinforcing structure sleeved on the periphery of the concrete template can realize the reinforcing and fixing treatment of the concrete template which is convenient to detach and assemble at the transfer positions around before the concrete is poured into the concrete template, so that the condition that the transfer positions are subjected to mould bulging and mould expanding after the concrete is poured into the concrete template is effectively avoided, and the construction quality of the concrete column of a thermal power plant is ensured.
Description
Technical Field
The application relates to the technical field of concrete formwork reinforcement, in particular to a concrete formwork construction reinforcing device.
Background
A thermal power plant is a thermal power plant for short, and is a plant for producing electric energy by using combustible materials (such as coal) as fuel. In the construction process of the main plant concrete column of the unit of the thermal power plant, the concrete template is required to be reinforced in order to ensure the quality of the cast construction structure.
The document with the prior art bulletin number of CN218990926U provides a bare concrete formwork reinforcing device, the device can reinforce the top of the bare concrete formwork by arranging an adjustable top reinforcing unit, and simultaneously, the adjustable top reinforcing unit is adjusted, so that the device is suitable for the bare concrete formworks with different sizes; in addition, the lateral part of the bare concrete template is reinforced by the lateral part reinforcing unit, so that the stability of the bare concrete template is improved.
The above prior art solution, though realizing the beneficial effects related to the prior art by the structure of the prior art, still has the following drawbacks: the above-mentioned current reinforcing apparatus still can't realize carrying out the reinforcement intensity to the corner of concrete form when using, leads to above-mentioned current reinforcing apparatus to produce the mould rising mould in the corner of concrete form easily after having poured the concrete in inside to seriously influence the construction quality of thermal power plant's concrete column.
In view of this, we propose a concrete form construction reinforcing apparatus.
Disclosure of utility model
1. Technical problem to be solved
The application aims to provide a concrete template construction reinforcing device, which solves the technical problems in the background technology.
2. Technical proposal
The technical scheme of the application provides a concrete template construction reinforcing device, which comprises a reinforcing structure sleeved on the periphery of a concrete template;
The reinforcing structure comprises a rear reinforcing plate and a front reinforcing plate which are respectively attached to the front end face and the rear end face of the concrete formwork, and a left reinforcing plate and a right reinforcing plate which are attached to the left end face and the right end face of the concrete formwork;
Two fixing sleeves A are symmetrically connected to the rear reinforcing plate, the two fixing sleeves A are respectively arranged on the left side and the right side of the concrete template, and first traction pieces are arranged at positions corresponding to the two fixing sleeves A on one side, close to the rear reinforcing plate, of the front reinforcing plate;
the right reinforcing plate is symmetrically connected with fixing sleeves B, the two fixing sleeves B are respectively arranged on the front side and the rear side of the concrete template, and second traction pieces are respectively arranged at the positions corresponding to the two fixing sleeves B on one side, close to the right reinforcing plate, of the left reinforcing plate;
The top of the rear reinforcing plate and the top of the front reinforcing plate are respectively connected with an upper fixing frame, two upper fixing frames are respectively provided with a plate groove for the left reinforcing plate to pass through, two first elastic grooves are symmetrically formed in the left reinforcing plate, first clamping heads matched with the first elastic grooves are inserted into the openings of the first elastic grooves, the end parts of the first clamping heads are connected with first springs, and one ends of the first springs, far away from the first clamping heads, are fixedly connected to the bottom walls of the corresponding first elastic grooves;
the upper fixing frame is provided with a first clamping hole into which the first clamping head is buckled.
As an alternative scheme of the technical scheme of the application, the first traction piece comprises a first electric push rod, one end of the first electric push rod is connected with the side wall of the front reinforcing plate, and the other end of the first electric push rod is connected with a square plugboard A which is matched with the fixed sleeve A;
The square picture peg A is kept away from the left and right sides of first electric putter one end and has all been seted up the second bullet groove, and the opening of second bullet groove is interior to be movably to be inserted and is equipped with the second dop, and second dop end connection has the second spring, and the one end that the second dop was kept away from to the second spring is connected with the diapire of second bullet groove.
As an alternative scheme of the file technical scheme, a seat hole A which can be penetrated by the square plugboard A is formed in the position corresponding to the end part of the square plugboard A on the rear reinforcing plate, and one end of the square plugboard A, which is far away from the connected first electric push rod, penetrates through the seat hole A and is movably inserted into the corresponding fixed sleeve A;
Two third clamping holes for the second clamping head to be buckled into are symmetrically formed in the fixing sleeve A.
As an alternative scheme of the technical scheme of the application, the second traction piece comprises a second electric push rod, one end of the second electric push rod is connected with the side wall of the left reinforcing plate, and the other end of the second electric push rod is connected with a square plugboard B which is matched with the fixed sleeve B;
The square picture peg B is kept away from the left and right sides of second electric putter one end and has all been seted up the third bullet groove, and the opening of third bullet groove is interior to be movably to be inserted and is equipped with the third dop, and third dop end connection has the third spring, and the one end that the third spring kept away from the third dop is connected with the diapire of third bullet groove.
As an alternative scheme of the file technical scheme, a seat hole B which can be penetrated by the square plugboard B is formed in the position corresponding to the end part of the square plugboard B on the right reinforcing plate, and one end of the square plugboard B, which is far away from the connected second electric push rod, penetrates through the seat hole B and is movably inserted into the corresponding fixed sleeve B;
Two third clamping holes for the third clamping head to be buckled into are symmetrically formed in the fixing sleeve B.
3. Advantageous effects
One or more technical schemes provided in the technical scheme of the application at least have the following technical effects or advantages:
According to the application, the reinforcing structure sleeved on the periphery of the concrete template can realize the reinforcing and fixing treatment of the concrete template which is convenient to detach and assemble at the transfer positions around before the concrete is poured into the concrete template, so that the condition that the transfer positions are subjected to mould bulging and mould expanding after the concrete is poured into the concrete template is effectively avoided, and the construction quality of the concrete column of a thermal power plant is ensured.
Drawings
FIG. 1 is a schematic view showing the overall structure of a concrete form construction reinforcing apparatus according to a preferred embodiment of the present application;
FIG. 2 is an enlarged schematic view of a part of the construction reinforcing apparatus for concrete form shown in FIG. 1 according to a preferred embodiment of the present application;
FIG. 3 is an enlarged schematic view of a part of the construction reinforcing apparatus for concrete form shown in FIG. 1 according to a preferred embodiment of the present application;
Fig. 4 is an enlarged schematic view showing a partial structure of a portion C of fig. 1 of a concrete form construction reinforcing apparatus according to a preferred embodiment of the present application.
The reference numerals in the figures illustrate: 1. a concrete form; 2. a rear reinforcement plate; 3. a front reinforcement plate; 4. a first electric push rod; 5. square plugboard A; 6. a fixed sleeve A; 7. a left reinforcing plate; 8. a right reinforcing plate; 9. a second electric push rod; 10. square plugboard B; 11. a fixed sleeve B; 12. a second spring; 13. a second chuck; 14. an upper fixing frame; 16. a first chuck; 17. a first spring; 18. a third spring; 19. and a third chuck.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art without making any inventive effort, are intended to fall within the scope of the present application, based on the embodiments of the present application, which is further described in detail below with reference to the drawings.
Referring to fig. 1 to 4, the embodiment of the application provides a reinforcing device for concrete form construction, which comprises a reinforcing structure sleeved on the periphery of a concrete form 1, wherein the reinforcing structure comprises a rear reinforcing plate 2 and a front reinforcing plate 3 which are respectively attached to the front end face and the rear end face of the concrete form 1, a left reinforcing plate 7 and a right reinforcing plate 8 which are attached to the left end face and the right end face of the concrete form 1, two fixing sleeves A6 are symmetrically connected to the rear reinforcing plate 2, the two fixing sleeves A6 are respectively arranged on the left side and the right side of the concrete form 1, first traction members are respectively arranged on one side, close to the rear reinforcing plate 2, of the front reinforcing plate 3 corresponding to the two fixing sleeves A6, the right reinforcing plate 8 is symmetrically connected with a fixing sleeve B11, the two fixing sleeves B11 are respectively arranged on the front side, close to the right reinforcing plate 8, the positions corresponding to the two fixing sleeves B11 are respectively provided with second traction members, the tops of the rear reinforcing plate 2 and the front reinforcing plate 3 are respectively connected with an upper fixing frame 14, two upper fixing brackets 14 are respectively arranged on the left side, two upper fixing brackets 7 are respectively provided with a first clamping head 16 which are correspondingly provided with a first clamping head 16, and a first clamping head 16 which is far from a first clamping groove 16 is arranged on the first clamping groove 16, and a second clamping head 16 is correspondingly arranged on the first clamping groove 16, and a first clamping head 16 is correspondingly far from the first end 16 is connected to the first clamping groove, and the first clamping head 16 is correspondingly arranged. According to the application, the reinforcing structure sleeved on the periphery of the concrete template 1 can realize the reinforcing and fixing treatment of the transfer positions of the concrete template 1, which is convenient to detach and assemble, before the concrete is poured into the concrete template 1, so that the condition that the transfer positions of the concrete template 1 are subjected to mould bulging after the concrete is poured into the concrete template 1 is effectively avoided, and the construction quality of the concrete column of a thermal power plant is ensured.
The embodiment of the application provides a concrete formwork construction reinforcing device, a first traction piece comprises a first electric push rod 4, one end of the first electric push rod is connected with the side wall of a front reinforcing plate 3, a square inserting plate A5 matched with a fixing sleeve A6 is connected to the other end of the first electric push rod 4, the square inserting plate A5 is of a cuboid structure, second elastic grooves are formed in the left side and the right side of the square inserting plate A5, which are far away from one end of the first electric push rod 4, a second clamping head 13 is movably inserted into an opening of the second elastic groove, a second spring 12 is connected to the end of the second clamping head 13, and one end, which is far away from the second clamping head 13, of the second spring 12 is connected with the bottom wall of the second elastic groove. The seat hole A which can be penetrated by the square plugboard A5 is formed in the position corresponding to the end part of the square plugboard A5 on the rear reinforcing plate 2, one end of the square plugboard A5, which is far away from the connected first electric push rod 4, penetrates through the seat hole A and is movably inserted into the corresponding fixed sleeve A6, and two third clamping holes which can be used for the second clamping head 13 to be buckled into are symmetrically formed in the fixed sleeve A6.
The embodiment of the application provides a concrete formwork construction reinforcing device, a second traction piece comprises a second electric push rod 9, one end of the second electric push rod 9 is connected with the side wall of a left reinforcing plate 7, a square inserting plate B10 matched with a fixing sleeve B11 is connected to the other end of the second electric push rod 9, the square inserting plate B10 is of a cuboid structure, third elastic grooves are formed in the left side and the right side of the square inserting plate B10, which are far away from one end of the second electric push rod 9, a third clamping head 19 is movably inserted into an opening of each third elastic groove, a third spring 18 is connected to the end of each third clamping head 19, and one end, which is far away from each third clamping head 19, of each third spring 18 is connected with the bottom wall of each third elastic groove. The right reinforcing plate 8 is provided with a seat hole B which can be penetrated by the square plugboard B10 at the position corresponding to the end part of the square plugboard B10, one end of the square plugboard B10, which is far away from the connected second electric push rod 9, penetrates through the seat hole B and is movably inserted into the corresponding fixed sleeve B11, and the fixed sleeve B11 is symmetrically provided with two third clamping holes which can be used for clamping the third clamping head 19. The reinforced structure is sleeved on the periphery of the concrete template 1 before concrete is poured into the concrete template 1, the first electric push rod 4 and the second electric push rod 9 are started simultaneously, the rear reinforced plate 2 is pulled to move towards the front reinforced plate 3 by the first electric push rod 4, the right reinforced plate 8 is pulled to move towards the left reinforced plate 7 by the second electric push rod 9, the rear reinforced plate 2, the front reinforced plate 3, the left reinforced plate 7 and the right reinforced plate 8 are tightly clamped on the periphery of the concrete template 1, and reinforcement and fixation treatment are carried out on corners around the concrete template 1.
Working principle:
The reinforced structure is sleeved on the periphery of the concrete template 1 before concrete is poured into the concrete template 1, the first electric push rod 4 and the second electric push rod 9 are started simultaneously, the rear reinforced plate 2 is pulled to move towards the front reinforced plate 3 by the first electric push rod 4, the right reinforced plate 8 is pulled to move towards the left reinforced plate 7 by the second electric push rod 9, the rear reinforced plate 2, the front reinforced plate 3, the left reinforced plate 7 and the right reinforced plate 8 are tightly clamped on the periphery of the concrete template 1, and reinforcement and fixation treatment are carried out on corners around the concrete template 1.
Claims (5)
1. A concrete form construction reinforcing apparatus, its characterized in that: comprises a reinforcing structure sleeved on the periphery of a concrete template;
The reinforcing structure comprises a rear reinforcing plate and a front reinforcing plate which are respectively attached to the front end face and the rear end face of the concrete formwork, and a left reinforcing plate and a right reinforcing plate which are attached to the left end face and the right end face of the concrete formwork;
Two fixing sleeves A are symmetrically connected to the rear reinforcing plate, the two fixing sleeves A are respectively arranged on the left side and the right side of the concrete template, and first traction pieces are arranged at positions corresponding to the two fixing sleeves A on one side, close to the rear reinforcing plate, of the front reinforcing plate;
the right reinforcing plate is symmetrically connected with fixing sleeves B, the two fixing sleeves B are respectively arranged on the front side and the rear side of the concrete template, and second traction pieces are respectively arranged at the positions corresponding to the two fixing sleeves B on one side, close to the right reinforcing plate, of the left reinforcing plate;
The top of the rear reinforcing plate and the top of the front reinforcing plate are respectively connected with an upper fixing frame, two upper fixing frames are respectively provided with a plate groove for the left reinforcing plate to pass through, two first elastic grooves are symmetrically formed in the left reinforcing plate, first clamping heads matched with the first elastic grooves are inserted into the openings of the first elastic grooves, the end parts of the first clamping heads are connected with first springs, and one ends of the first springs, far away from the first clamping heads, are fixedly connected to the bottom walls of the corresponding first elastic grooves;
the upper fixing frame is provided with a first clamping hole into which the first clamping head is buckled.
2. The concrete form construction reinforcing apparatus according to claim 1, wherein: the first traction piece comprises a first electric push rod, one end of the first electric push rod is connected with the side wall of the front reinforcing plate, and the other end of the first electric push rod is connected with a square plugboard A which is matched with the fixed sleeve A;
The square picture peg A is kept away from the left and right sides of first electric putter one end and has all been seted up the second bullet groove, and the opening of second bullet groove is interior to be movably to be inserted and is equipped with the second dop, and second dop end connection has the second spring, and the one end that the second dop was kept away from to the second spring is connected with the diapire of second bullet groove.
3. The concrete form construction reinforcing apparatus according to claim 2, wherein: a seat hole A which can be penetrated by the square plugboard A is formed in the position corresponding to the end part of the square plugboard A on the rear reinforcing plate, and one end of the square plugboard A, which is far away from the connected first electric push rod, penetrates through the seat hole A and is movably inserted into the corresponding fixed sleeve A;
Two third clamping holes for the second clamping head to be buckled into are symmetrically formed in the fixing sleeve A.
4. The concrete form construction reinforcing apparatus according to claim 1, wherein: the second traction piece comprises a second electric push rod, one end of the second electric push rod is connected with the side wall of the left reinforcing plate, and the other end of the second electric push rod is connected with a square plugboard B which is matched with the fixed sleeve B;
The square picture peg B is kept away from the left and right sides of second electric putter one end and has all been seted up the third bullet groove, and the opening of third bullet groove is interior to be movably to be inserted and is equipped with the third dop, and third dop end connection has the third spring, and the one end that the third spring kept away from the third dop is connected with the diapire of third bullet groove.
5. The concrete form construction reinforcing apparatus according to claim 4, wherein: a seat hole B which can be penetrated by the square plugboard B is formed in the right reinforcing plate and corresponds to the end part of the square plugboard B, and one end of the square plugboard B, which is far away from the connected second electric push rod, penetrates through the seat hole B and is movably inserted into the corresponding fixed sleeve B;
Two third clamping holes for the third clamping head to be buckled into are symmetrically formed in the fixing sleeve B.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323059434.2U CN221001981U (en) | 2023-11-13 | 2023-11-13 | Concrete form construction reinforcing apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323059434.2U CN221001981U (en) | 2023-11-13 | 2023-11-13 | Concrete form construction reinforcing apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221001981U true CN221001981U (en) | 2024-05-24 |
Family
ID=91093306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202323059434.2U Active CN221001981U (en) | 2023-11-13 | 2023-11-13 | Concrete form construction reinforcing apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221001981U (en) |
-
2023
- 2023-11-13 CN CN202323059434.2U patent/CN221001981U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN221001981U (en) | Concrete form construction reinforcing apparatus | |
CN217734822U (en) | Novel quick detach type aluminum alloy template | |
CN217010520U (en) | Handle bar mounting structure and frame of small diesel silent generator | |
CN218494504U (en) | High-toughness large alloy base casting | |
CN219728432U (en) | Insulation monitoring device for power-assisted electric bicycle | |
CN220813700U (en) | Clamp module capable of quickly shaping large ditch template | |
CN218702786U (en) | New energy automobile charging control device | |
CN206335090U (en) | The special mould of linear structure | |
CN219938536U (en) | Magnesium aluminum alloy stamping forming vibrating diaphragm | |
CN219986092U (en) | Reinforcing steel bar framework forming device | |
CN215300819U (en) | Rack convenient to maintain network switch | |
CN220644655U (en) | Waterproof board structure for synchronous construction | |
CN217319130U (en) | Low-power-consumption energy-saving light guide plate forming die | |
CN220220657U (en) | Automobile bumper convenient to detach | |
CN216585562U (en) | Automatic template machine with adjustable plate area | |
CN210721868U (en) | English education teaching presentation device | |
CN220813304U (en) | Detachable shockproof water tank device of flat rammer | |
CN218622775U (en) | Restoration shear force single wall piece and vertical superimposed shear wall who constitutes thereof | |
CN214079953U (en) | Be used for reforming furnace changeover portion frame modularization welding set | |
CN214976280U (en) | Detachable defoaming structure for ultrasonic cleaning machine | |
CN220846951U (en) | Vibrating equipment for road and bridge construction | |
CN212022778U (en) | Efficient new energy automobile steering mechanism | |
CN220352858U (en) | Cofferdam connecting component | |
CN219627166U (en) | Fixing structure of box-type substation | |
CN217680465U (en) | Concatenation formula aluminium template structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |