CN220978808U - Template fixing device - Google Patents

Template fixing device Download PDF

Info

Publication number
CN220978808U
CN220978808U CN202322418620.4U CN202322418620U CN220978808U CN 220978808 U CN220978808 U CN 220978808U CN 202322418620 U CN202322418620 U CN 202322418620U CN 220978808 U CN220978808 U CN 220978808U
Authority
CN
China
Prior art keywords
upright post
template
cross rod
fixing
fixing member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322418620.4U
Other languages
Chinese (zh)
Inventor
王树森
朱坤银
衣洪珊
王浩杨
周杨
范瑞涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority to CN202322418620.4U priority Critical patent/CN220978808U/en
Application granted granted Critical
Publication of CN220978808U publication Critical patent/CN220978808U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a template fixing device, which comprises a template fixture and a plurality of fixing members, wherein the template fixture comprises: the first transverse rod is transversely and fixedly arranged at the top end of the second upright post; the free ends of the first cross rod and the second cross rod are mutually sleeved; the bottoms of the first upright post and the second upright post are respectively connected with the fixing component; the fixing member is used for fixing bottoms of the first upright post and the second upright post; an inner template is arranged between the first upright post and the second upright post. According to the template fixing device provided by the utility model, the template clamp is fixed through the fixing component, and the template is fixed through the first upright post and the second upright post of the template clamp, so that the phenomenon of template expansion of concrete is avoided.

Description

Template fixing device
Technical Field
The utility model relates to the technical field of building construction, in particular to a template fixing device.
Background
In order to ensure the construction safety, quality and progress requirements of projects, according to the requirements of technology and technology promotion, according to the practical characteristics of the projects, concrete flanging water stop walls with the height not less than 200mm are generally manufactured upwards from floors at the positions of the wall bodies around the water-involved rooms such as toilets, kitchens and the like, the water stop walls are constructed by adopting a secondary formwork supporting and concrete pouring method, and the water stop effect is not ideal. Therefore, in construction, a one-time integral pouring method is adopted through repeated practice. In the one-time integral pouring process, floor slab concrete and inverse bank concrete are poured at one time by placing the inverse bank template, and in the concrete pouring process, the template is insufficient in rigidity or insufficient in reinforcing support, local template deformation is easy to occur, so that a template expansion phenomenon is formed, the problem of section size defect after the concrete is removed, and particularly, the template reinforcing difficulty of a small-sized member is high, so that the construction problem which is common and difficult to solve is solved.
Disclosure of utility model
The present utility model aims to solve at least one of the above problems by providing a template chuck.
The embodiment of the utility model provides a template fixing device, which comprises: a template fixture and a plurality of fixing members;
The template fixture includes: the first transverse rod is transversely and fixedly arranged at the top end of the second upright post, and the second transverse rod is transversely and fixedly arranged at the top end of the second upright post, and a plurality of fixing members are arranged on the first transverse rod;
the free ends of the first cross rod and the second cross rod are mutually sleeved;
The bottoms of the first upright post and the second upright post are respectively connected with the fixing component; the fixing member is used for fixing bottoms of the first upright post and the second upright post;
An inner template is arranged between the first upright post and the second upright post.
Preferably, the first cross bar is provided with more than one bolt hole penetrating through the cross section along the vertical direction, an adjusting bolt is arranged in the bolt hole, and the second cross bar is provided with a groove for sliding of the adjusting bolt along the vertical direction.
Preferably, the fixing member is buried in the floor to be poured, vertically protrudes out of the floor to be poured, and the first upright post and the second upright post are respectively abutted to the fixing member through bolts.
Preferably, the fixing member includes:
The first steel bars are vertically embedded in the floor slab to be poured, and the second steel bars and the third steel bars are vertically welded with the first steel bars;
And the vertical distance between the second steel bar and the third steel bar is equal to the thickness of the floor slab to be poured.
Preferably, the first upright is abutted to the fixing member through a fixing bolt, the second upright is abutted to the fixing member through an adjusting bolt, and the distance between the first upright and the second upright is further adjusted through the adjusting bolt.
Preferably, the formwork fixing device further comprises an inner bracket;
The inner sides of the first upright post and the second upright post, which are opposite, are respectively and tightly attached to two inner templates, and two ends of the inner bracket are abutted to the two inner templates, which are opposite.
Preferably, the first upright, the second upright, the first cross bar and the second cross bar are made of rectangular steel pipes;
The fixing member is made of steel bars.
Preferably, the specifications of rectangular steel pipes used by the first upright post, the second upright post and the second cross rod are 30mm by 2.5mm;
The specification of the rectangular steel pipe used by the first cross rod is 50mm by 3mm;
The diameter of the reinforcing steel bar used by the fixing member is 10mm.
Preferably, the template chuck further comprises: a wooden wedge; when the sleeving length of the first cross rod and the second cross rod is determined, the wooden wedge is plugged into the sleeving joint; the wooden wedge is used for reinforcing the connection between the first transverse rod and the second transverse rod.
The utility model has the beneficial effects that:
According to the formwork fixing device provided by the utility model, the first upright post and the second upright post are fixed through the fixing member, and the formwork is fixed in the fixture through the first upright post and the second upright post, so that the phenomenon of formwork expansion of concrete is avoided.
The template fixing device provided by the utility model can realize stepless adjustment of the size of the template clamp by adjusting the sleeving length of the first cross rod and the second cross rod, has the structural characteristics of being detachable and adjustable according to the width of a wall body, can be applied to different construction scenes, and has the advantage of high turnover rate.
The template fixing device provided by the utility model is manufactured by using the common rectangular steel pipes and the waste steel bars in construction, has a simple manufacturing mode and low material cost, and can effectively reduce the construction cost. After the template fixture provided by the utility model is manufactured and molded, the template fixture can be repeatedly turned over, the finished product is free from loss, and the template fixture can be reused after being simply welded if damaged.
Drawings
In order to more clearly illustrate the embodiments of the application or the technical solutions in the prior art, the drawings that are needed in the detailed description of the embodiments and the prior art will be briefly described below, it being obvious that the drawings in the following description are some embodiments of the application and that other drawings may be obtained from these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic side elevation view of a formwork holding apparatus according to an embodiment of the present utility model;
FIG. 2 is a top view of a formwork holding apparatus according to one embodiment of the present utility model;
Fig. 3 is a bottom view of a fixing member according to an embodiment of the present utility model.
In the figure: 1. the wood wedge comprises a first upright post, 2, a second upright post, 3, a first cross bar, 4, a second cross bar, 5, a fixing member, 6, an inner template, 7, a fixing bolt, 8, an adjusting bolt, 9, an inner support, 10, a groove, 11 and a wood wedge.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
FIG. 1 is a schematic side elevational view of a template chuck according to an embodiment of the present utility model; fig. 2 is a top view of a template chuck according to an embodiment of the present utility model. As shown in fig. 1-2, according to one embodiment of the present utility model, a formwork fixing apparatus includes a formwork clamp and a plurality of fixing members 5;
The template fixture includes: the first vertical column 1 and the second vertical column 2 are longitudinally arranged, a first cross rod 3 is transversely and fixedly arranged at the top end of the first vertical column 1, and a second cross rod 4 is transversely and fixedly arranged at the top end of the second vertical column 2;
The free ends of the first cross rod 3 and the second cross rod 4 are sleeved with each other;
The first cross rod 3 is in a hollow design, and the cross section size of the cavity in the first cross rod 3 is not smaller than that of the second cross rod 4, so that the free ends of the first cross rod 3 and the second cross rod 4 can be flexibly sleeved; the cross sections of the first cross rod 3 and the second cross rod 4 can be round or square according to different materials, so that the sleeving function can be mainly realized, and the specific form is not limited;
The bottoms of the first upright 1 and the second upright 2 are respectively connected with a fixed component 5; the fixing member 5 is used for fixing the bottoms of the first upright 1 and the second upright 2;
An inner template 6 is arranged between the first upright 1 and the second upright 2.
In construction, a bathroom water stop wall template is designed according to the drawing size requirement, and the inner template 6 is preferably a plastic template; in this embodiment, the inner form 6 is formed by shaping a 12mm thick multilayer board.
The heights of the inner formwork 6, the first upright post 1 and the second upright post 2 are 200-500mm, the heights of the first upright post 1 and the second upright post 2 are not lower than the height of the inner formwork 6, the height of the inner formwork 6 is not lower than the height of the water stop wall, and the specific height is determined according to actual construction requirements.
According to the template fixing device provided by the utility model, the template clamp is fixed through the fixing component, and the template is fixed through the first upright post and the second upright post of the template clamp, so that the phenomenon of template expansion of concrete is avoided.
According to one embodiment of the utility model, the first cross bar 3 is provided with more than one bolt hole penetrating through the cross section along the vertical direction, an adjusting bolt 8 is arranged in the bolt hole, and the second cross bar 4 is provided with a groove 10 for sliding the adjusting bolt along the vertical direction.
The adjusting bolt 8 on the first cross rod 3 can be matched with a nut to fix the relative positions of the first cross rod 3 and the second cross rod 4; for example, nuts are welded to the bottom of the bolt holes of the first cross bar 3.
In some alternative embodiments provided in the embodiments of the present utility model, the movable bolt 8 on the first cross bar 3 and the first cross bar 3 may also be directly connected by adopting a welding manner, that is, the movable bolt 8 is directly welded to the first cross bar 3, and the socket depth of the first cross bar 3 and the second cross bar 4 is changed by adjusting the second cross bar 4.
According to the template fixing device provided by the utility model, the first cross rod is provided with the plurality of bolt holes, and the second cross rod is provided with the grooves, so that stepless regulation and control of the relative positions of the first cross rod and the second cross rod can be realized, and the width of the template clamp can be better regulated according to actual requirements.
According to one embodiment of the utility model, the fixing member 5 is buried in the floor slab to be poured, vertically protrudes from the floor slab to be poured, and the first upright 1 and the second upright 2 are respectively abutted with the fixing member 5 through bolts.
According to the template fixing device provided by the utility model, the fixing member 5 is buried in the floor slab to be poured, so that a better template fixing effect is achieved.
According to one embodiment of the present utility model, the fixing member 5 includes:
The first steel bars are vertically embedded in the floor slab to be poured, and the second steel bars and the third steel bars are vertically welded with the first steel bars;
The vertical distance between the second steel bar and the third steel bar is equal to the thickness of the floor slab to be poured.
The fixing member 5 is formed by welding waste steel bars, and is shaped like a Chinese character 'tu', the lengths of the second steel bars and the third steel bars in the transverse direction are not less than 200mm, the lengths of the second steel bars and the third steel bars in the embodiment are 200mm, and the vertical distance between the second steel bars and the first steel bars is equal to the thickness of a floor slab to be poured; the length of the first steel bar perpendicular to the second steel bar and the third steel bar is not less than +150mm of the thickness of the floor to be poured, and the length of the first steel bar exposed out of the floor is not greater than the lengths of the first upright 1 and the second upright 2; to ensure that the fixing member 5 can better fix the position of the template chuck; in the embodiment, the length of the first steel bar is +150mm of the thickness of the floor slab to be poured; the second bar (top bar) in the fixing member is the bottom bracket of the inner form 6.
The template fixing device provided by the utility model adopts engineering waste steel bars to manufacture the fixing member according to actual construction requirements, and has the advantages of easy acquisition of manufacturing materials, low manufacturing cost, energy conservation and environmental protection.
According to one embodiment of the utility model, the first upright 1 is in abutment with the fixing member 5 by means of the fixing bolt 7, the second upright 2 is in abutment with the fixing member 5 by means of the adjusting bolt 8, and the distance between the first upright 1 and the second upright 2 is further adjusted by means of the adjusting bolt 8.
The fixing bolt 7 is fixedly connected with the first upright 1 in a welding mode, and the relative position between the first upright 1 and the fixing member 5 is fixed; the distance between the first upright 1 and the second upright 2 is adjusted by rotating the adjusting bolt 8 positioned on the second upright 2, so that the adjusting bolt 8 on the second upright 2 is abutted with the first reinforcing steel bar of the fixing member 5.
According to the template fixing device provided by the utility model, the adjustable U-shaped section limiting card is adopted, and the characteristics that one side template is fixed and cannot be shifted are utilized, so that the other side template is only regulated, the difficulty of template installation and reinforcement is reduced, and the operation is more convenient. On the basis that first horizontal pole and second horizontal pole cup jointed, further adjust adjusting bolt on the second stand for the interior template has better straightness that hangs down.
According to one embodiment of the utility model, the formwork fixing means further comprise an inner bracket 9;
The inner sides of the first upright post 1 and the second upright post 2 which are opposite are respectively and tightly attached to two inner templates 6, and two ends of an inner bracket 9 are abutted to the two inner templates 6 which are opposite.
The length of the inner bracket 9 is equal to the thickness of the wall body; the inner bracket can be made of materials such as waste battens, waste steel bars, waste steel pipes and the like, and is not limited on the premise of energy conservation and environmental protection, the field waste materials are fully utilized, and the specific use materials are determined according to the field construction condition.
Optionally, the inner support 9 is a concrete a local bully support, and after the concrete is poured inside the inner formwork 6, the inner support 9 is poured inside the concrete.
According to the template fixing device provided by the utility model, the inner support is arranged in the inner template to reinforce the inner template, so that the template clamp is ensured not to shift, and the perpendicularity of the inner template can be better ensured. Meanwhile, the inner bracket is manufactured by using waste materials in a construction site, and has the advantages of easy acquisition of manufacturing materials, low manufacturing cost, energy conservation and environmental protection.
According to one embodiment of the utility model, the first upright 1, the second upright 2, the first cross bar 3 and the second cross bar 4 are made of rectangular steel pipes;
the fixing member 5 is made of steel bars.
The template fixing device provided by the utility model is formed by welding galvanized square steel pipes, waste steel bars, bolts and the like, and has the advantages of simple manufacturing method, low manufacturing cost, reusability, low cost, energy conservation and environmental protection.
According to one embodiment of the utility model, the first upright 1, the second upright 2 and the second cross bar 4 use rectangular steel pipes with the specification of 30mm by 2.5mm;
The specification of the rectangular steel pipe used by the first cross rod 3 is 50mm by 3mm;
the fixing member 5 uses a reinforcing bar having a diameter of 10mm.
According to the template fixing device, the common steel pipe size in engineering and the engineering waste steel bars are adopted to manufacture the template fixture, the telescopic width of the template fixture is manufactured according to the thickness of the wall body, special customization in factories is not needed, and the manufacturing cost is saved.
According to one embodiment of the present utility model, the template chuck further includes: a wooden wedge; when the sleeving length of the first cross rod 3 and the second cross rod 4 is determined, the wooden wedge is plugged into the sleeving joint; the wooden wedge is used for reinforcing the connection of the first cross bar 3 and the second cross bar 4.
According to the template fixing device provided by the utility model, the connection between the first cross rod and the second cross rod can be further reinforced by inserting the practical wooden wedge into the sleeve joint of the first cross rod and the second cross rod, so that vertical shaking between the first cross rod and the second cross rod is avoided.
The specific process of using the template fixture of the utility model is as follows:
(1) Welding the fixing member 5 according to the thickness of the floor slab to be poured; the inner bracket 9 is manufactured according to the thickness of the wall body.
The fixing member 5 is formed by welding waste steel bars with the diameter of 10mm, and is shaped like a Chinese character 'tu', the lengths of the second steel bars and the third steel bars in the transverse direction are not less than 200mm, the lengths of the second steel bars and the third steel bars in the embodiment are 200mm, and the vertical distance between the second steel bars and the first steel bars is equal to the thickness of a floor slab to be poured; the length of the first steel bar perpendicular to the second steel bar and the third steel bar is not less than +150mm of the thickness of the floor to be poured, and in the embodiment, the length of the first steel bar is +150mm of the thickness of the floor to be poured;
The length of the inner bracket 9 is equal to the thickness of the wall body; the thickness of the wall body is usually 100-350mm, and the actual size is determined according to a construction drawing; the inner bracket can be made of materials such as waste battens, waste steel bars, waste steel pipes and the like, and is not limited on the premise of energy conservation and environmental protection, the field waste materials are fully utilized, and the specific use materials are determined according to the field construction condition.
(2) The fixing member 5 is fixed according to the thickness and width of the wall.
In the process of fixing the fixing members 5, a set of fixing members are placed at intervals of 1-1.5 meters according to the width of the wall, each set of fixing members comprises two fixing members 5, a horizontal connecting line between the two fixing members 5 in each set of fixing members is perpendicular to the wall, and the distance between the two fixing members 5 is set according to the width of the wall; the fixing component 5 is used for fixing the first upright 1 and the second upright 2 of the template clamp, and an inner template 6 is arranged between the first upright 1 and the second upright 2;
Because the first upright post 1 and the second upright post respectively have a certain horizontal width, the inner template 6 has a certain thickness, and the horizontal width of the first upright post 1 and the second upright post and the thickness of the inner template are fully considered when the fixing member 5 is fixed, so that the distance between the two opposite inner templates is equal to the thickness of the wall body; the fixing means 5 may be specifically configured to: vertically limiting the first steel bars to the upper and lower layer plate bars by binding wires; at least four vertical limiting fixing points of each first reinforcing steel bar are arranged, so that accurate and firm limiting positions are ensured. After the first steel bar is vertically limited, welding the second steel bar and the third steel bar to the upper and lower layer plate bars; the welding points of the second reinforcing steel bar, the third reinforcing steel bar and the upper and lower layer plate reinforcing steel bars are in a cross shape as shown in figure 3.
(3) An inner template 6 is laid, and template clamps are respectively installed on each set of fixing members 5.
The inner templates 6 on two sides are respectively erected at the inner ends of the opposite first reinforcing steel bars. In this embodiment, the first upright 1 and the second upright 2 are rectangular steel pipes with a specification of 30mm by 2.5mm, and the first upright 1 and the second upright 2 are respectively sleeved on the first steel bars of the corresponding fixing members 5, so that the fixing bolts 7 on the first upright 1 are abutted with the first steel bars on the fixing members 5.
The width of the adjustable template clamp can be set according to the design requirement or the fixed component 5 which is installed, the adjustable template clamp is clamped in from the upper part of the inner template 6 which is installed, and the inner template 6 is clamped by the template clamp.
(4) And adjusting the template clamp according to the thickness of the wall body.
And rotating the adjusting bolt 8 on the second upright post, so that the adjusting bolt 8 is abutted with the first steel bar. The first cross rod 3 is provided with more than one bolt hole penetrating through the cross section along the vertical direction, an adjusting bolt 8 is arranged in the bolt hole, and a groove for the sliding of the adjusting bolt 8 is arranged in the vertical direction of the second cross rod 4. As shown in fig. 2, in this embodiment, two bolt holes are provided on the first cross bar 3, and two adjusting bolts are provided on the first cross bar 3 correspondingly. An inner bracket 9 is supported between the two inner templates 6, and the sleeving depth of the first cross rod 3 and the second cross rod 4 is adjusted according to the thickness of the wall body. Rotating the adjusting bolt 8 on the first cross rod to fix the horizontal positions of the first cross rod 3 and the second cross rod 4; a wooden wedge is inserted into the first rail 3 such that the vertical position of the first rail 3 and the second rail 4 is fixed. The nut on the template fixture is locked, so that the slip and displacement are prevented.
And retest is carried out on the elevation of the installed water stop wall template and the elevations of the floorslab at the two sides of the water stop wall, so that the elevations are ensured to be consistent with the design.
(5) Pouring concrete in the template, and dismantling the template clamp when the hardness of the concrete meets the construction requirement;
And the construction process of combining and controlling the vertical and horizontal limiting positions is adopted, so that the water stop wall concrete and the floor slab concrete are constructed simultaneously, and the integrity of the water stop wall and the floor slab concrete member is ensured.
Loosening the adjusting bolts 8 on the first cross bar 3 and/or the adjusting bolts 8 on the second upright 2; so that the first and second columns 1 and 2 are separated from the first reinforcing bars of the fixing member 5, the inner bracket 9 is removed.
(6) And (6) removing the inner template, and turning over the inner template and the template clamp.
The template fixture is formed by welding galvanized square steel pipes, waste steel bars, bolts and the like, is detachable and can be adjusted according to the width of a wall, and can be used for turnover of a plurality of projects at one time through reliable connection of the template fixture and the template, so that the cost is saved, and the turnover utilization rate is improved; the method has the advantages of simple and flexible operation, accords with the concept of sustainable development of modern green construction, reduces the cost and increases the efficiency, and has remarkable economic benefit.
The template fixture disclosed by the utility model is convenient to process and good in construction effect, can avoid the phenomenon that a structural construction joint is formed by secondary pouring, can effectively enhance the self-waterproof capability of a bathroom structure, and reduces the phenomenon of water channeling to a waterless room. The turnover and use are convenient, the construction speed is high, the occupied space is small, the safety operation is guaranteed, the installation and operation are simple and convenient, the practicability is high, and the like. Because the structure adopts the shaping component, the utility model can be used for a plurality of times, and the effects of green construction, cost reduction and synergy are achieved.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (8)

1. A template fixing device, characterized in that: comprises a template fixture and a plurality of fixing members,
The template fixture includes: the first transverse rod is transversely and fixedly arranged at the top end of the second upright post;
the free ends of the first cross rod and the second cross rod are mutually sleeved;
The bottoms of the first upright post and the second upright post are respectively connected with the fixing component; the fixing member is used for fixing bottoms of the first upright post and the second upright post;
An inner template is arranged between the first upright post and the second upright post;
The fixing member includes: the first steel bars are vertically embedded in the floor slab to be poured, and the second steel bars and the third steel bars are vertically welded with the first steel bars;
And the vertical distance between the second steel bar and the third steel bar is equal to the thickness of the floor slab to be poured.
2. The formwork fastening device of claim 1, wherein:
The first cross rod is provided with more than one bolt hole penetrating through the cross section along the vertical direction, an adjusting bolt is arranged in the bolt hole, and a groove allowing the adjusting bolt to slide is formed in the vertical direction of the second cross rod.
3. The formwork fastening device of claim 1, wherein:
The fixing member is buried in the floor to be poured, vertically protrudes out of the floor to be poured, and the first upright post and the second upright post are respectively abutted to the fixing member through bolts.
4. A formwork fastening device as claimed in claim 3, wherein:
The first stand column is abutted with the fixing member through a fixing bolt, the second stand column is abutted with the fixing member through an adjusting bolt, and the distance between the first stand column and the second stand column is further adjusted through the adjusting bolt.
5. The formwork fastening device of claim 1, wherein: the template fixing device also comprises an inner bracket;
The inner sides of the first upright post and the second upright post, which are opposite, are respectively and tightly attached to two inner templates, and two ends of the inner bracket are abutted to the two inner templates, which are opposite.
6. The formwork fastening device of claim 1, wherein:
The first upright post, the second upright post, the first cross rod and the second cross rod are made of rectangular steel pipes;
The fixing member is made of steel bars.
7. The formwork fastening device of claim 6, wherein: the specifications of rectangular steel pipes used by the first upright post, the second upright post and the second cross rod are 30mm x 2.5mm;
The specification of the rectangular steel pipe used by the first cross rod is 50mm by 3mm;
The diameter of the reinforcing steel bar used by the fixing member is 10mm.
8. The template securing device of claim 1, wherein the template chuck further comprises: a wooden wedge; when the sleeving length of the first cross rod and the second cross rod is determined, the wooden wedge is plugged into the sleeving joint; the wooden wedge is used for reinforcing the connection between the first transverse rod and the second transverse rod.
CN202322418620.4U 2023-09-06 2023-09-06 Template fixing device Active CN220978808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322418620.4U CN220978808U (en) 2023-09-06 2023-09-06 Template fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322418620.4U CN220978808U (en) 2023-09-06 2023-09-06 Template fixing device

Publications (1)

Publication Number Publication Date
CN220978808U true CN220978808U (en) 2024-05-17

Family

ID=91056231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322418620.4U Active CN220978808U (en) 2023-09-06 2023-09-06 Template fixing device

Country Status (1)

Country Link
CN (1) CN220978808U (en)

Similar Documents

Publication Publication Date Title
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN104196055B (en) Outer wall of basement lower die board construction method
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN106121225B (en) Suspension active erecting device is chosen outside cast-in-place concrete eaves
CN111472537A (en) Construction method for single-side formwork erection of external wall of basement with super-large floor height
CN111364508A (en) Method for reinforcing inner support of large underground comprehensive pipe gallery without external formwork wall plate
CN112709430A (en) Template device based on BIM
CN210177940U (en) Adjustable support for assembled steel structure building floor support system
CN209958206U (en) Cast-in-situ box girder template
CN220978808U (en) Template fixing device
CN212642115U (en) Clear water concrete indent arc roofing inner side roof beam hangs mould system
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN104831832A (en) Assembly type shearing wall structure and mounting method thereof
CN109024685B (en) Large-volume concrete bottom plate steel bar supporting system and construction method thereof
CN108930406B (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN114427295B (en) Pre-buried ground anchor pulling connection and holding column combined ultrahigh and ultralimit formwork system and construction method thereof
CN214658863U (en) Long inclined plane fair-faced concrete formwork support system with inclination angle larger than 45 degrees
CN216616835U (en) Ultrahigh ultralimit combined formwork system
CN109629447B (en) Variable cross-section cast-in-situ box girder construction and concrete pouring method
CN113073841A (en) Modular assembly type post-cast strip independent supporting device and using method thereof
CN112746628A (en) Cast-in-place comprehensive pipe gallery formwork supporting structure and cast-in-place comprehensive pipe gallery construction method
CN112627510A (en) Structural deformation joint synchronous construction formwork reinforcing device and construction method
CN215715445U (en) Aerated concrete precast slab template butt joint buckle
CN215803196U (en) Building structure corner concrete cast-in-place formwork fixed knot constructs
CN218668511U (en) Primary forming template clamp for return table of plain concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant