CN220929318U - Novel catwalk drilling tool is right device - Google Patents

Novel catwalk drilling tool is right device Download PDF

Info

Publication number
CN220929318U
CN220929318U CN202322827904.9U CN202322827904U CN220929318U CN 220929318 U CN220929318 U CN 220929318U CN 202322827904 U CN202322827904 U CN 202322827904U CN 220929318 U CN220929318 U CN 220929318U
Authority
CN
China
Prior art keywords
arm
righting
hydraulic cylinder
drilling tool
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322827904.9U
Other languages
Chinese (zh)
Inventor
潘晓亮
侯月宽
高猛
董珍书
荆彤
张兴旺
王建兵
温凯月
刘智慧
赵景赛
陈为鹏
李英翔
刘文浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Kerui Oil And Gas Equipment Co ltd
Original Assignee
Shandong Kerui Oil And Gas Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Kerui Oil And Gas Equipment Co ltd filed Critical Shandong Kerui Oil And Gas Equipment Co ltd
Priority to CN202322827904.9U priority Critical patent/CN220929318U/en
Application granted granted Critical
Publication of CN220929318U publication Critical patent/CN220929318U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of material transportation, in particular to a novel catwalk drilling tool righting device, which comprises a righting arm, wherein the righting arm is hinged with a baffle lever arm and a second swinging shaft, the baffle lever arm is also hinged with the righting arm through a first hydraulic cylinder, one side of the baffle lever arm is hinged with a first swinging shaft, the first hydraulic cylinder, the baffle lever arm and the righting arm are always positioned in the same plane, the first swinging shaft is connected with a first baffle lever, and one side of the second swinging shaft is fixedly provided with a righting wheel. This device is through setting up first pneumatic cylinder, shelves lever arm and the righting arm that are located the coplanar throughout, makes this device improve the drilling tool of different diameters and adds the stability when holding, makes the centre gripping more firm, and the drilling tool is difficult for dropping.

Description

Novel catwalk drilling tool is right device
Technical Field
The utility model relates to the technical field of petroleum drilling and production, in particular to a novel catwalk drilling tool righting device.
Background
As in CN 108533195A, a catwalk is disclosed that is required to transport tubulars to and from the drill floor during the drilling process or when the drill pipe is being pulled out of the drill rig. After the pipe is fed into the drill floor, it is connected to the pipe by other equipment, etc., and at this time, the pipe needs to be straightened. At present, the catwalk is only responsible for conveying the pipe tools, the pipe tools are straightened by independent righting equipment or manually, the time required by the operation mode is more, and the efficiency is lower.
In implementing this patent, it was found that the technique had the following problems: when the device works, because different types of drilling tools have different diameters, when the device is used for clamping the drilling tools with larger diameters or smaller diameters, splayed shapes are often formed between the righting wheel and the gear lever, so that the device has the problems of poor stability, insufficient clamping and easiness in falling of the drilling tools when clamping the drilling tools with larger diameters or smaller diameters.
Accordingly, there is a need for an improvement that overcomes the shortcomings of the prior art.
Disclosure of utility model
The utility model aims to solve the problems of poor stability, insufficient firm clamping and easiness in falling of drilling tools when the drilling tools with larger diameters or smaller diameters are clamped in the prior art.
In order to achieve the above purpose, the technical scheme of the utility model provides a novel catwalk drilling tool righting device, which comprises a righting arm, wherein the righting arm is hinged with a baffle lever arm and a second swinging shaft, the baffle lever arm is hinged with a first hydraulic cylinder, the first hydraulic cylinder is hinged with the righting arm, one side of the baffle lever arm is hinged with a first swinging shaft, the first hydraulic cylinder, the baffle lever arm and the righting arm are always positioned in the same plane, the first swinging shaft is connected with a first baffle lever, and one side of the second swinging shaft is fixedly provided with a righting wheel.
As a preferable technical scheme, the first swing shaft is also hinged with a second hydraulic cylinder, and the second hydraulic cylinder is hinged with the righting arm; the second hydraulic cylinder can drive the first swing shaft to rotate through expansion and contraction.
As a preferable technical scheme, the second swinging shaft is also hinged with a third hydraulic cylinder, and the third hydraulic cylinder is hinged with the righting arm; the third hydraulic cylinder can drive the second swing shaft to rotate through expansion and contraction.
As a preferable technical scheme, one side of the righting wheel is connected with a second gear lever; the righting wheel and the second gear rod jointly play a role in preventing the drilling tool from tilting and falling.
The beneficial effects of the utility model are as follows: according to the novel catwalk drilling tool righting device, the first hydraulic cylinder, the baffle lever arm and the righting arm which are always positioned in the same plane are arranged, so that the stability of drilling tools with different diameters is improved when the drilling tools are held, the clamping is firmer, and the drilling tools are not easy to fall.
Drawings
FIG. 1 is a schematic structural view of a centralizer according to an embodiment of the utility model;
FIG. 2 is a front view of a centralizer according to an embodiment of the utility model;
Fig. 3 is a rear view of a centralizer according to an embodiment of the utility model.
Wherein, 1-righting arm, 2-first pneumatic cylinder, 3-shelves lever arm, 4-second pneumatic cylinder, 5-first oscillating axle, 6-first shelves pole, 7-third pneumatic cylinder, 8-second oscillating axle, 9-righting wheel, 10-second shelves pole.
Detailed Description
In order to make the technical means, technical features, objects and technical effects of the present utility model easy to understand, the present utility model will be further described with reference to the specific drawings. It will be apparent that the described embodiments are merely some, but not all embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present utility model without making any inventive effort, shall fall within the scope of the present utility model.
Example 1
1-3, A novel catwalk drilling tool righting device comprises a righting arm 1, wherein the righting arm 1 is hinged with a gear lever arm 3 and a second swinging shaft 8, the gear lever arm 3 is hinged with a first hydraulic cylinder 2, and the first hydraulic cylinder 2 is hinged with the righting arm 1; the first hydraulic cylinder 2 swings through the telescopic driving lever arm 3.
The first hydraulic cylinder 2, the gear lever arm 3 and the righting arm 1 are always positioned in the same plane, so that the device can clamp drilling tools with different diameters, stability in clamping is improved, the drilling tools are prevented from falling, and potential safety hazards are reduced.
The gear lever arm 3 one side articulates there is first oscillating axle 5, first oscillating axle 5 articulates with second pneumatic cylinder 4, second pneumatic cylinder 4 articulates with righting arm 1, first oscillating axle 5 is connected with first gear lever 6, second pneumatic cylinder 4 swings through flexible drive first oscillating axle 5, first gear lever 6, one side of second oscillating axle 8 is fixed with righting wheel 9, second oscillating axle 8 opposite side articulates with third pneumatic cylinder 7, third pneumatic cylinder 7 swings through flexible drive second oscillating axle 8, righting wheel 9, third pneumatic cylinder 7 articulates with righting arm 1.
A second gear lever 10 is connected to one side of the righting wheel 9.
Working principle: when a drilling tool is put on, a conveying arm (not shown in the drawing) drives a centralizing arm 1 to retract to a minimum position, then a first hydraulic cylinder 2 retracts to enable the angle between a gear lever arm 3 and the centralizing arm 1 to be maximum, and a second hydraulic cylinder 4 retracts to enable a first gear lever 6 to rotate through a first swinging shaft 5, so that the first gear lever 6 and the gear lever arm 3 are in a parallel state; the third hydraulic cylinder 7 also retracts, so that the second swinging shaft 8 drives the righting wheel 9 to be parallel to the righting arm 1, and the drilling tool is connected with a traveling crane system (not shown in the figure). The hanging elevator hung below the drilling machine floating system descends to lock the front end joint of the drilling machine and then ascends along with the floating system to drive the drilling machine to move upwards, and when the drilling machine moves to a proper position, the second hydraulic cylinder 4 stretches out to enable the first baffle rod 6 and the baffle rod arm 3 to be in a vertical state; the third hydraulic cylinder 7 also stretches out, so that the second swinging shaft 8 drives the righting wheel 9 to be in a vertical state with the righting arm 1, the drilling tool is contacted with the righting wheel 9 at the moment, then the first hydraulic cylinder 2 stretches out, the first gear lever 6 is pressed onto the drilling tool, the drilling tool is fixed and does not shake at the moment, and further under the protection of the second gear lever 10, the drilling tool can not turn over and fall. And then, the conveying arm (not shown in the figure) is operated to drive the centralizing arm 1 to turn to a working position, and the single pipe column is slowly centralized to the position above the wellhead by matching with the traveling crane system and is in a vertical state.
When a drilling tool is lowered, a conveying arm (not shown in the drawing) is lifted, at the moment, the first hydraulic cylinder 2 is retracted to enable the angle between the gear lever arm 3 and the centralizing arm 1 to be maximum, and meanwhile, the second hydraulic cylinder 4 is retracted to enable the first gear lever 6 and the gear lever arm 3 to be in a parallel state; the third hydraulic cylinder 7 also retracts, so that the second swinging shaft 8 drives the righting wheel 9 to be parallel to the righting arm 1. Then the conveying arm (not shown in the figure) drives the centralizing arm 1 to swing forwards to a proper position of a wellhead, and then the second hydraulic cylinder 4 stretches out to enable the first gear lever 6 and the gear lever arm 3 to be in a vertical state; the third hydraulic cylinder 7 also stretches out, make the second oscillating axle 8 drive righting wheel 9 and righting arm 1 be the vertical state, drilling tool and righting wheel 9 contact this moment, then first hydraulic cylinder 2 stretches out, make first shelves pole 6 press on the drilling tool, the drilling tool has been fixed no longer to rock this moment, and then under the protection of second shelves pole 10, the drilling tool also can not overturn and drop yet, the transport arm of the operation (not shown in the figure) drives righting arm 1 and drilling tool to the catwalk transport arm in, then drive the drilling tool by the shallow and transfer down, accomplish the drilling tool process.
The foregoing description is only of the preferred embodiments of the present utility model and is not intended to limit the scope of the present utility model. Equivalent changes and modifications of the utility model are intended to fall within the scope of the present utility model.

Claims (4)

1. The utility model provides a novel catwalk drilling tool is right device, includes righting arm (1), righting arm (1) articulates has shelves pole arm (3), second oscillating axle (8), its characterized in that: the gear lever arm (3) is hinged with the first hydraulic cylinder (2), the first hydraulic cylinder (2) is hinged with the righting arm (1), a first swinging shaft (5) is hinged on one side of the gear lever arm (3), the first hydraulic cylinder (2), the gear lever arm (3) and the righting arm (1) are always located in the same plane, the first swinging shaft (5) is connected with a first gear lever (6), and a righting wheel (9) is fixed on one side of the second swinging shaft (8).
2. The novel catwalk drilling tool righting device according to claim 1, wherein: the first swinging shaft (5) is also hinged with a second hydraulic cylinder (4), and the second hydraulic cylinder (4) is hinged with the righting arm (1).
3. The novel catwalk drilling tool righting device according to claim 2, wherein: the second swinging shaft (8) is also hinged with a third hydraulic cylinder (7), and the third hydraulic cylinder (7) is hinged with the righting arm (1).
4. The novel catwalk drilling tool righting device according to claim 1, wherein: one side of the righting wheel (9) is connected with a second gear lever (10).
CN202322827904.9U 2023-10-21 2023-10-21 Novel catwalk drilling tool is right device Active CN220929318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322827904.9U CN220929318U (en) 2023-10-21 2023-10-21 Novel catwalk drilling tool is right device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322827904.9U CN220929318U (en) 2023-10-21 2023-10-21 Novel catwalk drilling tool is right device

Publications (1)

Publication Number Publication Date
CN220929318U true CN220929318U (en) 2024-05-10

Family

ID=90935210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322827904.9U Active CN220929318U (en) 2023-10-21 2023-10-21 Novel catwalk drilling tool is right device

Country Status (1)

Country Link
CN (1) CN220929318U (en)

Similar Documents

Publication Publication Date Title
US3464507A (en) Portable rotary drilling pipe handling system
US6527493B1 (en) Handling of tube sections in a rig for subsoil drilling
US8186925B2 (en) Drill rod handler
CN110043203A (en) A kind of automated drilling rig and the method using automated drilling rig progress tubing string movement
CN105275415A (en) Full-automatic continuous drilling rig
CN111927347B (en) Wellhead positioning integrated guide type vertical operation well repairing catwalk and using method thereof
US20110103922A1 (en) Pipe stabilizer for pipe section guide system
WO1997021902A2 (en) Drilling rig
GB1467519A (en) Earth drilling a-paratus
CN206625782U (en) A kind of colliery automatic liquid drilol press
CN110454100A (en) A kind of super single operation industrial robot device of drilling and repairing well and method
CN107869315B (en) Automatic change workover rig
CN203614056U (en) Automatic operation system of drilling tubular column
CN112343525A (en) Compact type efficient operation drilling machine and method
CN106368629A (en) Automatic device for workover treatment
CN220929318U (en) Novel catwalk drilling tool is right device
CN112343524B (en) Efficient operation drilling machine and method
CN109973028B (en) Mechanical device for pulling oil pipe at wellhead
JPS61176788A (en) Drilling and/or lifting machine
CN213392038U (en) Drill rod conveying device
CN104179465A (en) Iron roughneck
CN206942696U (en) A kind of ground conveying oil pipe device of automatic workover rig
KR20170003233U (en) A handling system for drill pipe
CN113090203B (en) Rapid tripping device and rapid tripping method for coal mine underground drill rig
CN204200118U (en) A kind of hydraulic power slip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant