CN220928985U - Temporary enclosure for construction engineering - Google Patents
Temporary enclosure for construction engineering Download PDFInfo
- Publication number
- CN220928985U CN220928985U CN202322823046.0U CN202322823046U CN220928985U CN 220928985 U CN220928985 U CN 220928985U CN 202322823046 U CN202322823046 U CN 202322823046U CN 220928985 U CN220928985 U CN 220928985U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- temporary enclosure
- spacing
- block
- locating rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 230000001105 regulatory effect Effects 0.000 claims abstract description 7
- 230000004888 barrier function Effects 0.000 abstract 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to the technical field of temporary surrounding barriers, in particular to a temporary surrounding barrier for construction engineering, which comprises a positioning frame which is connected to the side surface of a body through a bolt and used for limiting, wherein an adjusting block used for adjusting is inserted into the inner wall of the positioning frame, a supporting rod used for bearing is fixedly connected to the side surface of the adjusting block, a bearing block used for increasing contact surface connection is fixedly connected to the lower end of the body, a limiting rod used for positioning is fixedly connected to the upper end of the bearing block, and a pressure block used for increasing weight is sleeved on the outer surface of the limiting rod. This construction engineering is temporarily enclosed and is kept off, through the cooperation setting of body, bracing piece and regulating block to can make things convenient for the staff to adjust the position of bracing piece, make it reach suitable position, and then conveniently support the body, after using, with the help of the setting of locating rack, make things convenient for the staff to fix the bracing piece at the rear end of body, and then be convenient for the staff to transport it, further promoted the practicality of device.
Description
Technical Field
The utility model relates to the technical field of temporary fences, in particular to a temporary fence for construction engineering.
Background
Along with the rapid development of national economy, the engineering construction industry becomes the post industry of the national economy, under the guidance of the national advanced green development concept, the engineering construction continuously promotes the safety ring civilization and the green construction standard, roads, bridges, landscaping, industrial buildings and residential building sites are spread over various places, and in order to maintain the environmental sanitation requirements of towns, beautify the construction environment, ensure the construction safety and isolate the construction area from personnel active areas and pedestrian areas by placing a fence on the construction site.
Chinese patent publication No. CN216043073U discloses a temporary enclosure for engineering construction, belongs to the field of enclosure, including the bottom sprag seat, the upper surface of bottom sprag seat is provided with the baffle, the right surface of baffle is provided with first stopper, the internal surface of first stopper is provided with the bracing piece, the right surface fixedly connected with second stopper of bracing piece, the internal thread connection of bottom sprag seat has the threaded rod, the lower fixed surface of threaded rod is connected with the supporting shoe. According to the utility model, the phenomenon that mud water on a construction site overflows after the enclosure is built is realized by designing the bottom supporting seat and the water retaining bar, so that pedestrians can walk conveniently, the supporting bar plays a supporting role in fixing by designing the roller, the threaded rod, the second limiting block and the supporting bar, and can move quickly by being matched with the roller in the transferring process, and the phenomenon that the bottom supporting seat is quickly detached and tightly connected by designing the sliding block, the hook and the fixing hole, so that water seepage is avoided.
However, the utility model has the following problems in actual use;
1. when the existing device is used by a worker, the fixing device of the existing device is inconvenient to adjust according to different terrains so that the existing device reaches a proper position;
2. the existing device is easy to blow down and damage when encountering severe weather because the body is lighter after the installation is completed.
Disclosure of utility model
(One) solving the technical problems
In order to overcome the defects of the prior art, the utility model provides a temporary enclosure for construction engineering, which solves the problems that the prior device is inconvenient to adjust the fixing device according to different terrains to a proper position when a worker uses the device in the prior art, and the prior device is easy to blow down and damage when encountering severe weather due to lighter body after being installed.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a temporary enclosure of construction engineering, includes the locating rack that is used for spacing through bolted connection in the body side, the inner wall grafting of locating rack has the regulating block that is used for adjusting, the side fixedly connected with of regulating block is used for the bracing piece of bearing, the lower extreme fixedly connected with of body is used for increasing the bearing block that the contact surface connects, the upper end fixedly connected with of bearing block is used for the gag lever post of location, the surface of gag lever post has cup jointed the pressure block that is used for increasing weight.
Optionally, the recess that is used for the drainage has been seted up to the side of body, the upper end fixedly connected with of body is used for luminous warning light.
Optionally, the side of locating rack is pegged graft and is used for the pivot of regulation, the one end threaded connection of pivot has the lid that is used for spacing.
Optionally, the side of locating rack has seted up the card hole that is used for spacing, the inner wall threaded connection in card hole has the spacing post that is used for fixed.
Optionally, one end fixedly connected with of bracing piece is used for fixed connecting plate, the upper end grafting of connecting plate has the locating pin that is used for fixed.
Optionally, the upper end threaded connection of gag lever post has the locating cover that is used for spacing, the surface of locating cover has seted up the antiskid line that is used for skid-proof.
(III) beneficial effects
The utility model provides a temporary enclosure for construction engineering, which has the following beneficial effects:
1. this construction engineering is temporarily enclosed and is kept off, through the cooperation setting of body, bracing piece and regulating block to can make things convenient for the staff to adjust the position of bracing piece, make it reach suitable position, and then conveniently support the body, after using, with the help of the setting of locating rack, make things convenient for the staff to fix the bracing piece at the rear end of body, and then be convenient for the staff to transport it, further promoted the practicality of device.
2. This construction engineering is temporarily enclosed and is kept off, through the cooperation setting of gag lever post and pressure piece, after the staff accomplishes the body installation, conveniently aggravate the body, with the help of the setting of bearing block, and then can increase body area of contact, makes it install subaerial more stable, has avoided the body to be blown down easily when bad weather, causes inconvenient problem to the construction.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a support bar according to the present utility model;
FIG. 3 is a schematic view of a stop lever according to the present utility model;
Fig. 4 is an enlarged schematic view of the structure of fig. 2a according to the present utility model.
In the figure: 1. a body; 2. a positioning frame; 3. an adjusting block; 4. a support rod; 5. a bearing block; 6. a limit rod; 7. a pressure block; 8. a groove; 9. a warning light; 10. a rotating shaft; 11. a cover; 12. a clamping hole; 13. a limit column; 14. a connecting plate; 15. a positioning pin; 16. and positioning the cover.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one;
for the convenience of the staff to adjust the position of the adjusting block 3;
Referring to fig. 1 to 4, the present utility model provides a technical solution: the utility model provides a temporary enclosure of construction engineering, including being used for spacing locating rack 2 through bolted connection in body 1 side, the recess 8 that is used for the drainage has been seted up to body 1's side, body 1's upper end fixedly connected with is used for luminous warning light 9, locating rack 2's inner wall grafting has the regulating block 3 that is used for adjusting, locating rack 2's side grafting has the pivot 10 that is used for adjusting, the one end threaded connection of pivot 10 has the lid 11 that is used for spacing, by means of recess 8's setting, and then can discharge the rainwater of body 1 side, by means of warning light 9's setting, and then can warn its pedestrian in darker environment, by means of pivot 10's setting, thereby can make things convenient for the staff to adjust the position of regulating block 3, after adjusting, through lid 11 and then can carry out spacing fixed to it;
embodiment two;
Referring to fig. 2 to 4, the support bar 4 is installed and removed for convenience of a worker;
The side of the locating rack 2 is provided with a clamping hole 12 for limiting, the inner wall of the clamping hole 12 is in threaded connection with a limiting column 13 for fixing, the side of the adjusting block 3 is fixedly connected with a supporting rod 4 for bearing, one end of the supporting rod 4 is fixedly connected with a connecting plate 14 for fixing, the upper end of the connecting plate 14 is inserted with a locating pin 15 for fixing, the locating rack 2 can be fixed on the side of the body 1 more conveniently by workers through the matching arrangement of the clamping hole 12 and the limiting column 13, and the supporting rod 4 can be fixed on the upper end of the ground conveniently by workers through the matching arrangement of the connecting plate 14 and the locating pin 15, so that the supporting rod 4 is more stable;
embodiment three;
Referring to fig. 1 to 3, for convenience, the pressure block 7 sleeved on the outer surface of the stop lever 6 is positioned;
The lower extreme fixedly connected with of body 1 is used for increasing the bearing block 5 that the contact surface connects, the upper end fixedly connected with of bearing block 5 is used for the gag lever post 6 of location, the upper end threaded connection of gag lever post 6 has the locating cover 16 that is used for spacing, the antiskid line that is used for skid resistance is offered to the surface of locating cover 16, the pressure piece 7 that is used for increasing weight has been cup jointed to the surface of gag lever post 6, through the setting of locating cover 16, and then can fix gag lever post 6, the pressure piece 7 that has avoided the outer surface of gag lever post 6 cup joints drops, cause inconveniently, through the setting of bearing block 5, and then can increase the area of contact of body 1 and ground, make it install behind the ground, can be more stable.
In the utility model, the working steps of the device are as follows:
Firstly, the staff adjusts the angle of the support rod 4 inserted into the side face of the body 1 to enable the support rod to reach a proper position, the support rod 4 is fixed on the ground through the connecting plate 14 and the locating pin 15, the support rod is used for supporting and limiting the body 1, after the fixing is completed, the outer surface of the limiting rod 6 is weighted, the body 1 can be stably installed on the ground, and the phenomenon that the body 1 is too light to enable the body to fall easily is avoided.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a temporary enclosure of construction engineering, includes locating rack (2) that are used for spacing in body (1) side through bolted connection, its characterized in that: the inner wall of locating rack (2) is pegged graft and is used for regulating adjusting block (3), the side fixedly connected with of adjusting block (3) is used for bracing piece (4) of bearing, the lower extreme fixedly connected with of body (1) is used for increasing bearing block (5) that the contact surface connects, the upper end fixedly connected with of bearing block (5) is used for gag lever post (6) of location, the surface of gag lever post (6) has cup jointed pressure block (7) that are used for increasing weight.
2. A temporary enclosure for construction projects according to claim 1, wherein: the side of body (1) has offered recess (8) that are used for the drainage, the upper end fixedly connected with of body (1) is used for luminous warning light (9).
3. A temporary enclosure for construction projects according to claim 1, wherein: the side of locating rack (2) is pegged graft and is used for pivot (10) of regulation, the one end threaded connection of pivot (10) has lid (11) that are used for spacing.
4. A temporary enclosure for construction projects according to claim 1, wherein: the side of locating rack (2) has offered and is used for spacing card hole (12), the inner wall threaded connection of card hole (12) has spacing post (13) that are used for fixed.
5. A temporary enclosure for construction projects according to claim 1, wherein: one end of the supporting rod (4) is fixedly connected with a connecting plate (14) for fixing, and the upper end of the connecting plate (14) is inserted with a positioning pin (15) for fixing.
6. A temporary enclosure for construction projects according to claim 1, wherein: the upper end threaded connection of gag lever post (6) has locating cover (16) that are used for spacing, the antiskid line that is used for antiskid has been seted up to the surface of locating cover (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322823046.0U CN220928985U (en) | 2023-10-20 | 2023-10-20 | Temporary enclosure for construction engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322823046.0U CN220928985U (en) | 2023-10-20 | 2023-10-20 | Temporary enclosure for construction engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220928985U true CN220928985U (en) | 2024-05-10 |
Family
ID=90964252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322823046.0U Active CN220928985U (en) | 2023-10-20 | 2023-10-20 | Temporary enclosure for construction engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220928985U (en) |
-
2023
- 2023-10-20 CN CN202322823046.0U patent/CN220928985U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111676978B (en) | Foundation pit supporting structure with tunnel on side wall of foundation pit and method | |
CN220928985U (en) | Temporary enclosure for construction engineering | |
CN206695050U (en) | One kind can Implant solar street light | |
CN215173404U (en) | Equipment for detecting tunnel quality safety | |
CN207796872U (en) | A kind of solar street lamp structure | |
CN208501549U (en) | A kind of cable tubing construction warning signs | |
CN214497302U (en) | Road guardrail | |
CN112431222B (en) | Municipal underground pipe gallery | |
CN210421167U (en) | Installation translation device of large-scale prefabricated piping lane | |
CN206722473U (en) | A kind of pavilion for traffic polic | |
CN108518119B (en) | Portable power transmission pole maintenance tool and construction method | |
CN212841431U (en) | Street lamp anti-falling device | |
CN105805659A (en) | Fixing device for municipal garden street lamp | |
CN205564126U (en) | Stable safe bus stop borad | |
CN205541450U (en) | Installation pole of connecting a plurality of intelligent transportation diversing flow systems | |
CN218233222U (en) | Traffic sign pole suitable for roads with different topography | |
CN205743151U (en) | A kind of vertical and horizontal greenery patches parking platform | |
CN217795248U (en) | Dust device is used in road bridge construction | |
CN216046643U (en) | Novel monitoring support widely applied to operation construction site | |
CN220057995U (en) | Foundation pit protection frame for municipal building construction | |
CN215445949U (en) | Foundation ditch monitoring sensing equipment protection device | |
CN209836867U (en) | Municipal administration guardrail convenient to installation is dismantled | |
CN210315903U (en) | Quick jacking device for drain pipe fitting | |
CN216405221U (en) | Road isolation device for urban updating | |
CN212377882U (en) | Novel multi-functional high low arm street lamp of unification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |