CN220928608U - Steel construction installation construction table - Google Patents
Steel construction installation construction table Download PDFInfo
- Publication number
- CN220928608U CN220928608U CN202322319728.8U CN202322319728U CN220928608U CN 220928608 U CN220928608 U CN 220928608U CN 202322319728 U CN202322319728 U CN 202322319728U CN 220928608 U CN220928608 U CN 220928608U
- Authority
- CN
- China
- Prior art keywords
- frame
- joint
- fixedly connected
- supporting component
- stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 21
- 239000010959 steel Substances 0.000 title claims abstract description 21
- 238000009434 installation Methods 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 title abstract description 19
- 230000004224 protection Effects 0.000 claims abstract description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 238000012423 maintenance Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002146 bilateral effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000009979 protective mechanism Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a steel structure installation construction table, and relates to the technical field of steel structures. This steel construction installation construction table, including bearing frame, supporting component and protection machanism, the inboard bottom of bearing frame is provided with the header tank, and the inboard bottom fixedly connected with spacing of header tank, joint are connected with the hydraulic stem in the spacing, and supporting component is including setting up the C shape mount on the bearing frame and setting up the slide bar on the C shape mount. The device passes through supporting component and protection machanism joint, stand and rectangle joint frame joint, hasp rope and stand overlap joint, and the baffle is assembled through the fixed mode of plug and supporting component, and this kind of design is convenient for dismantle fast when the transport on the one hand, reduces area, and convenient transport, on the other hand when the loss appears in some parts, can change alone, has reduced cost of maintenance, and the device simple structure simultaneously, the simple operation does benefit to mass production and promotion.
Description
Technical Field
The utility model relates to the technical field of steel structures, in particular to a steel structure installation construction table.
Background
The utility model provides a simple steel structure construction steel plate mounting platform with a publication number of CN219175795U, and belongs to the technical field of steel plate mounting; the lifting device comprises a bearing pad, the bearing pad is fixedly arranged at the top of an elevator, the top of the bearing pad is fixedly connected with a fixing plate, the top of the fixing plate is fixedly connected with a plurality of rails, the top of the rails is fixedly connected with the same limiting rod, and one side of the rail is rotationally connected with a movable door. According to the utility model, through the movable door, an operator rotates and opens the movable door, the operator stands on the bearing pad, and then rotates and closes the movable door, when the movable door is closed, the attraction block has magnetic attraction to the sliding rod, so that the sliding rod stretches into the groove formed on the fixed block, the locking effect of the movable door is realized, and when the lifter is lifted, the periphery of the top of the bearing pad is completely shielded, thereby effectively avoiding the condition that the operator falls down due to misoperation, and reducing the occurrence of construction accidents.
The device is not detachable in connection mode, so that the device is difficult to operate due to the fact that the device is large in size and is not detachable during transportation or carrying, and the problems are corrected.
Disclosure of utility model
The utility model aims to at least solve one of the technical problems in the prior art, and provides a steel structure installation construction table which can solve the problems that the connection mode of the device is not detachable, so that the operation is difficult due to the fact that the device is large in size and is not detachable during transportation or carrying.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a steel construction installation construction table, including bearing frame, supporting component and protection machanism, the inboard bottom of bearing frame is provided with the header tank, the inboard bottom fixedly connected with spacing of header tank, joint is connected with the hydraulic stem in the spacing, supporting component is including setting up the C shape mount on the bearing frame and setting up the slide bar on the C shape mount, slide bar fixed connection is in the inboard bottom of C shape mount, protection machanism is including setting up the baffle on supporting component and setting up the plug on the baffle, plug and baffle all can dismantle from supporting component.
Preferably, the supporting component further comprises a sliding block, a C-shaped supporting frame, a standing plate and a clamping ring, the sliding block is connected to the outer wall of the sliding rod in a sliding manner, the C-shaped supporting frame is fixedly connected to one side of the sliding block, the standing plate is connected to the clamping connection in the C-shaped supporting frame in a clamping manner, the clamping connection of the water collecting tank and the bearing frame is performed before use, the hydraulic rod is clamped in the limiting frame, the standing plate is clamped in the C-shaped supporting frame, the free end of the hydraulic rod is clamped with the clamping connection ring, the device can limit the standing plate to move up and down only when the standing plate is lifted, the standing plate is prevented from tilting, the movement balance of the standing plate is kept, and an important effect is played on the safety of a guarantee worker.
Preferably, the protection machanism still includes the connecting block, insert the frame, rectangle joint frame, stand and hasp rope, the rear side fixedly connected with connecting block of baffle, the top fixedly connected with of standing board inserts the frame, the top fixedly connected with rectangle joint frame of standing board, the joint is connected with the stand in the rectangle joint frame, overlap joint is connected with the hasp rope on the stand, during the use, the staff stands on standing the board, insert the rectangle joint with the stand in the stand, overlap joint hasp rope and stand, pass through the plug with the baffle and stand board joint, control the slow start of hydraulic stem, the free end of hydraulic stem drives the board that stands and upwards moves, thereby accomplish the effect of rising, the device assembles with protection machanism joint through supporting component, stand and rectangle joint frame joint, hasp rope and stand overlap joint, the baffle is through the fixed mode of plug and supporting component, this kind of design is convenient for dismantle fast when carrying on the one hand, reduce area, convenient carrying, on the other hand when partial part loss appears, can carry out alone, maintenance cost has been reduced, simultaneously the device simple structure, the operation is favorable to mass production and push pin.
Preferably, the hydraulic rod is positioned below the standing plate, and the free end of the hydraulic rod is connected with the clamping ring in a clamping manner.
Preferably, the number of the bearing frames is two, and the bearing frames are symmetrically arranged left and right, and the number of the C-shaped fixing frames, the number of the sliding bars, the number of the sliding blocks and the number of the C-shaped supporting frames are two, and the bearing frames are symmetrically arranged front and back.
Preferably, the clamping groove is formed in the bearing frame, the inserting plate is fixedly connected to the bottom of the water collecting tank and is clamped with the clamping groove, the water collecting tank is clamped with the bearing frame, and the center points of the water collecting tank, the limiting frame, the hydraulic rod and the standing plate are all on the same straight line.
Compared with the prior art, the utility model has the beneficial effects that:
(1) This steel construction installation construction table uses through bearing frame, header tank, spacing, the hydraulic stem, supporting component, protection machanism, the baffle, the plug, the connecting block, insert the frame, rectangular joint frame, stand and hasp rope's cooperation, its connected mode is for non-detachable to above-mentioned device, consequently, when transportation or transport, because the great and non-detachable reason of self size, the comparatively difficult defect of operation, the device passes through supporting component and protection machanism joint, stand and rectangular joint frame joint, hasp rope and stand overlap joint, the baffle is assembled through the fixed mode of plug and supporting component, this kind of design is convenient for dismantle fast when carrying on the one hand, reduce area, convenient transport, on the other hand when partial part appears losing, maintenance cost has been reduced, simultaneously the device simple structure, the simple operation does benefit to mass production and push away from the pin.
(2) This steel construction installation construction bench through bearing frame, header tank, spacing, hydraulic stem, supporting component, C shape mount, slide bar, slider, C shape support frame, stand board, joint ring and protection machanism's cooperation use, and the device can be when standing the board and go up and down, and the restriction board of standing can only reciprocate, avoids standing the board to appear inclining, keeps standing the board motion balance, plays important role to guarantee staff's safety.
Drawings
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is a front view of the present utility model;
FIG. 2 is a rear view of the present utility model;
FIG. 3 is a top view of a standing board of the present utility model;
Fig. 4 is an enlarged view of the portion a of the present utility model.
Reference numerals: 1. a bearing frame; 2. a water collection tank; 3. a limiting frame; 4. a hydraulic rod; 5. a support assembly; 501. a C-shaped fixing frame; 502. a slide bar; 503. a slide block; 504. c-shaped supporting frames; 505. a standing board; 506. a clamping ring; 6. a protective mechanism; 601. a baffle; 602. a plug; 603. a connecting block; 604. a plug-in rack; 605. a rectangular clamping frame; 606. a column; 607. and (5) locking the rope.
Detailed Description
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a steel construction installation construction table, including bearing frame 1, supporting component 5 and protection machanism 6, the inboard bottom of bearing frame 1 is provided with header tank 2, the inboard bottom fixedly connected with spacing 3 of header tank 2, joint is connected with hydraulic stem 4 in the spacing 3, supporting component 5 is including setting up C shape mount 501 on bearing frame 1 and setting up slide bar 502 on C shape mount 501, slide bar 502 fixed connection is in the inboard bottom of C shape mount 501, protection machanism 6 is including setting up baffle 601 on supporting component 5 and setting up the plug 602 on baffle 601, plug 602 and baffle 601 all can dismantle from supporting component 5.
Further, the support assembly 5 further comprises a sliding block 503, a C-shaped support frame 504, a standing plate 505 and a clamping ring 506, the outer wall of the sliding rod 502 is slidably connected with the sliding block 503, one side of the sliding block 503 is fixedly connected with the C-shaped support frame 504, the standing plate 505 is connected in the C-shaped support frame 504 in a clamping manner, and the clamping ring 506 is fixedly connected with the bottom of the standing plate 505.
Still further, the protection mechanism 6 further comprises a connecting block 603, an inserting frame 604, a rectangular clamping frame 605, a stand column 606 and a locking rope 607, wherein the connecting block 603 is fixedly connected to the rear side of the baffle 601, the inserting frame 604 is fixedly connected to the top of the standing plate 505, the rectangular clamping frame 605 is fixedly connected to the top of the standing plate 505, the stand column 606 is connected to the inner clamping of the rectangular clamping frame 605, and the locking rope 607 is connected to the stand column 606 in a lap joint mode.
Secondly, hydraulic rod 4 is located the below of standing board 505, the free end and the joint ring 506 joint of hydraulic rod 4 have two sets of quantity of bearing frame 1, and be bilateral symmetry setting, the quantity of C shape mount 501, slide bar 502, slider 503 and C shape support frame 504 all has two sets of, and be the front and back symmetry setting, the draw-in groove has been seted up on the bearing frame 1, the bottom fixedly connected with picture peg of header tank 2, picture peg and draw-in groove joint, header tank 2 and bearing frame 1 joint, header tank 2, spacing 3, hydraulic rod 4 and the central point of standing board 505 all are on same straight line.
Working principle: before use, the water collection tank 2 is clamped with the bearing frame 1, the hydraulic rod 4 is clamped in the limiting frame 3, the standing plate 505 is clamped in the C-shaped supporting frame 504, the free end of the hydraulic rod 4 is clamped with the clamping ring 506, when in use, a worker stands on the standing plate 505, the upright column 606 is inserted into the rectangular clamping frame 605, the locking rope 607 is lapped with the upright column 606, the baffle 601 is clamped with the standing plate 505 through the plug 602, the hydraulic rod 4 is controlled to be slowly started, and the free end of the hydraulic rod 4 drives the standing plate 505 to move upwards, so that the lifting effect is completed.
The embodiments of the present utility model have been described in detail with reference to the accompanying drawings, but the present utility model is not limited to the above embodiments, and various changes can be made within the knowledge of one of ordinary skill in the art without departing from the spirit of the present utility model.
Claims (6)
1. A steel structure installation work platform, characterized by comprising:
The bearing frame (1), the inside bottom is provided with the header tank (2), the inside bottom of the header tank (2) is fixedly connected with the spacing frame (3), the clamping connection is connected with the hydraulic rod (4) in the spacing frame (3);
The support assembly (5) comprises a C-shaped fixing frame (501) arranged on the bearing frame (1) and a sliding rod (502) arranged on the C-shaped fixing frame (501), wherein the sliding rod (502) is fixedly connected to the bottom of the inner side of the C-shaped fixing frame (501);
The protection mechanism (6) comprises a baffle plate (601) arranged on the supporting component (5) and a plug (602) arranged on the baffle plate (601), wherein the plug (602) and the baffle plate (601) can be detached from the supporting component (5).
2. The steel structure installation work station of claim 1, wherein: the support assembly (5) further comprises a sliding block (503), a C-shaped support frame (504), a standing plate (505) and a clamping ring (506), the sliding block (503) is connected to the outer wall of the sliding rod (502) in a sliding mode, the C-shaped support frame (504) is fixedly connected to one side of the sliding block (503), the standing plate (505) is connected to the C-shaped support frame (504) in a clamping mode, and the clamping ring (506) is fixedly connected to the bottom of the standing plate (505).
3. A steel structure installation work station according to claim 2, wherein: protection machanism (6) still include connecting block (603), insert frame (604), rectangle joint frame (605), stand (606) and hasp rope (607), the rear side fixedly connected with connecting block (603) of baffle (601), the top fixedly connected with of standing board (505) inserts frame (604), the top fixedly connected with rectangle joint frame (605) of standing board (505), joint is connected with stand (606) in rectangle joint frame (605), overlap joint is connected with hasp rope (607) on stand (606).
4. A steel structure installation work station according to claim 3, wherein: the hydraulic rod (4) is positioned below the standing plate (505), and the free end of the hydraulic rod (4) is connected with the clamping ring (506) in a clamping way.
5. The steel structure installation work station of claim 4, wherein: the number of the bearing frames (1) is two, the bearing frames are symmetrically arranged left and right, and the numbers of the C-shaped fixing frames (501), the sliding rods (502), the sliding blocks (503) and the C-shaped supporting frames (504) are symmetrically arranged front and back.
6. The steel structure installation work station of claim 5, wherein: the clamping groove is formed in the bearing frame (1), the inserting plate is fixedly connected to the bottom of the water collecting tank (2) and is clamped with the clamping groove, the water collecting tank (2) is clamped with the bearing frame (1), and the center points of the water collecting tank (2), the limiting frame (3), the hydraulic rod (4) and the standing plate (505) are all on the same straight line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322319728.8U CN220928608U (en) | 2023-08-28 | 2023-08-28 | Steel construction installation construction table |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322319728.8U CN220928608U (en) | 2023-08-28 | 2023-08-28 | Steel construction installation construction table |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220928608U true CN220928608U (en) | 2024-05-10 |
Family
ID=90965676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322319728.8U Active CN220928608U (en) | 2023-08-28 | 2023-08-28 | Steel construction installation construction table |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220928608U (en) |
-
2023
- 2023-08-28 CN CN202322319728.8U patent/CN220928608U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111302238B (en) | Building material lifting machine | |
CN220928608U (en) | Steel construction installation construction table | |
CN219194053U (en) | Frame of pipe coiling machine | |
CN208929174U (en) | A kind of mounting bracket ejecting device for mold | |
CN212371151U (en) | Novel aluminum alloy die casting machine | |
CN216403762U (en) | High elevating gear is used in construction of engineering capital construction of security | |
CN216097335U (en) | Quick change mechanism for replacing breaking clamp of die-casting island breaking machine | |
CN114135038B (en) | Steel bar truss floor carrier plate with supporting seat | |
CN206901613U (en) | A kind of section bar special mobile formula gantry | |
CN213224284U (en) | Aluminum alloy slag hopper device | |
CN210260429U (en) | Coal leveling device for railway carriage | |
CN211866959U (en) | Straightway track positioning pneumatic equipment | |
CN208791790U (en) | A kind of automatic anode machine of starting sheet | |
CN219805246U (en) | Hardware mould frame structure | |
CN221943877U (en) | Assembled maintenance gallows | |
CN212076299U (en) | Lifting device for horizontal inspection table | |
CN211812143U (en) | Automatic tray filler for egg trays | |
CN221947599U (en) | Drawing type power distribution cabinet | |
CN221696843U (en) | Support device for die carrier processing | |
CN218809752U (en) | Deviation-preventing structure for chain of elevator | |
CN220351602U (en) | Height-adjustable electric bicycle maintenance device | |
CN209906286U (en) | Guide tracked lifting machine piston rod top cover device | |
CN218950812U (en) | Strip steel finished product coil unloading auxiliary device | |
CN215883682U (en) | Factory building equipment moves quick-witted device | |
CN215711805U (en) | Automatic opening and closing device for ear of electric stone pot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |