CN220915723U - Highway greening construction device - Google Patents

Highway greening construction device Download PDF

Info

Publication number
CN220915723U
CN220915723U CN202323021370.7U CN202323021370U CN220915723U CN 220915723 U CN220915723 U CN 220915723U CN 202323021370 U CN202323021370 U CN 202323021370U CN 220915723 U CN220915723 U CN 220915723U
Authority
CN
China
Prior art keywords
fixedly connected
driver
construction device
greening construction
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323021370.7U
Other languages
Chinese (zh)
Inventor
谢明军
刘辉
陈坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202323021370.7U priority Critical patent/CN220915723U/en
Application granted granted Critical
Publication of CN220915723U publication Critical patent/CN220915723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of road greening construction, in particular to a road greening construction device which comprises a mounting seat, wherein the top end of the mounting seat is fixedly connected with a driver, the driver adopts a double-shaft motor, the bottom end of the driver is fixedly connected with a drill rod, the bottom end of the drill rod is fixedly connected with a drilling piece, and the outside of the mounting seat is provided with a protection assembly; according to the utility model, the driver drives the drilling bit to rotate, and meanwhile, the driver drives the driving rod to rotate so as to enable the drilling bit to lift, so that the drilling bit can be rotated to descend for digging pits, sputtered soil can be intercepted through the transparent protective cylinder, the situation that the soil is sputtered off and sputtered on an operator at will is avoided, the situation of digging pits is convenient to observe, and the drilling bit can lift through automatic rotation of the drilling bit without the need of the operator to bend and support, so that the drilling bit is more comfortable to use compared with the prior art.

Description

Highway greening construction device
Technical Field
The utility model relates to the technical field of road greening construction, in particular to a road greening construction device.
Background
Modern urban construction has higher requirements on roads, besides the addition of lanes, greening work is needed to be carried out at two sides of the roads, the greening work mainly comprises tree planting and lawn laying, and the road greening work can beautify the roads and can also play a role in preventing sand and dust. The road greening work is the last procedure of road paving operation, firstly, the land is flattened, and tree planting and lawn paving are carried out on the flattened land, wherein the tree planting process is time-consuming and labor-consuming. At present, a plurality of constructors are required to uniformly excavate the planting pits in order to improve the working efficiency, and the planting pits are uniformly planted after the whole digging is finished, so that the construction period of road greening construction can be effectively shortened, and the construction cost can be effectively reduced. The earth that digs out scatters around planting hole, when meetting windy weather, the earth that scatters can form the sand and dust to blow all around, can cause local sand and dust pollution. Because the current manpower is adopted to excavate the planting pit, the working efficiency of simultaneously excavating and planting trees is lower.
The prior Chinese patent with publication number of CN219741197U discloses a highway greening construction device, which comprises a gasoline engine, a speed reducer and a drill rod, wherein a drill sheet with a spiral structure is arranged on the drill rod, and a drill bit is connected with the drill rod along the bottom end. The drill rod is provided with a top cylinder along the top end, and the speed reducer is connected with the drill rod and extends into the top cylinder. The gasoline engine is installed along the bottom and is supported the board, and the backup pad extends outward along both sides and has the handle, and the reduction gear is installed on the bottom surface of backup pad and is connected with the gasoline engine drive. The outer end of the connecting plate hinged on the supporting plate extends to the outer side of the drill bit, the outer end of the connecting plate is movably connected with a side guard plate, and the connecting plate can move up and down along the side guard plate.
With respect to the above and related art, the inventors believe that there are often the following drawbacks: the device holds the gasoline engine to move up and down to dig a pit, an operator stands on one side of the side guard plates, so that the soil can be prevented from splashing on the body, the side guard plates are positioned between the gasoline engines of the operator, the operator can be prevented from bending the body along with the descending of the gasoline engine to a certain extent, the use effect is poor, and improvement is needed; therefore, a road greening construction device is proposed to solve the above problems.
Disclosure of utility model
In order to overcome the defects of the prior art and solve the technical problems, the utility model provides a highway greening construction device.
The technical scheme adopted for solving the technical problems is as follows: the utility model discloses a highway greening construction device, which comprises a mounting seat, wherein a driver is fixedly connected to the top end of the mounting seat, a double-shaft motor is adopted by the driver, a drill rod is fixedly connected to the bottom end of the driver, a drill plate is fixedly connected to the bottom end of the drill rod, a protection component is arranged outside the mounting seat, the protection component comprises a transparent protection cylinder and a gear, the mounting seat is slidably arranged inside the transparent protection cylinder, a plurality of lead screws are rotatably connected to the inside of the transparent protection cylinder, the gear is rotatably arranged inside the transparent protection cylinder, a driving rod is arranged at the upper end of the driver, the driving rod comprises a lower rod body, the lower rod body and the upper end of the driver sequentially penetrate through the gear and the transparent protection cylinder, when the highway greening pit is dug, the transparent protection cylinder is aligned with a pit digging point, the driver is operated, the driver drives the drill plate to rotate, and simultaneously, the driver drives the driving rod to rotate through the cooperation of the gear and the toothed ring to enable the drill plate to lift, the drill plate can be rotatably lowered, a driving rod is rotatably to be connected with a plurality of lead screws, the driving rod is rotatably to be conveniently and a hole is required to be moved out of the pit hole, and the hole is more conveniently and can be conveniently and automatically splashed by a person when the personnel is in a hole.
Preferably, the lead screw is in threaded connection with the mounting seat.
Preferably, the top end of the screw rod is fixedly connected with a toothed ring, and the toothed ring is meshed with the gear.
Preferably, an upper rod body is installed above the lower rod body, and a plurality of positioning columns are fixedly connected to the bottom end of the upper rod body.
Preferably, a plurality of positioning grooves are formed in the position, corresponding to the positioning columns, of the top end of the lower rod body.
Preferably, a mounting channel is formed in the center of the upper rod body, and a threaded column is rotatably connected in the mounting channel.
Preferably, the screw thread groove has been seted up in the top center department tapping of lower body of rod, and the driver drives the actuating lever and rotates, rotates through the actuating lever and can drive gear synchronous rotation, and during the installation actuating lever, inserts the inside of constant head tank with the reference column, and the screw thread post is connected with the screw thread groove, and then is connected with the lower body of rod with last body of rod, uses the back of accomplishing, and reverse rotation screw thread post can dismantle the upper body of rod, avoids actuating lever overlength inconvenient carrying transportation.
Preferably, the upper side wall of the transparent protective cylinder is fixedly connected with a plurality of handles.
Preferably, the lower side wall of the transparent protective cylinder is fixedly connected with a pedal.
Preferably, the bottom fixedly connected with of footboard falls into the ground nail by a plurality of, and operating personnel makes the ground nail that falls into through stepping on the footboard insert ground, holds the grab handle simultaneously, rocks when avoiding transparent protective cylinder to dig the hole.
The utility model has the advantages that:
1. According to the utility model, the driver drives the drilling bit to rotate, and meanwhile, the driver drives the driving rod to rotate so as to enable the drilling bit to lift, so that the drilling bit can be rotated to descend for digging pits, sputtered soil can be intercepted through the transparent protective cylinder, the situation that the soil is sputtered off and sputtered on an operator at will is avoided, the situation of digging pits is convenient to observe, and the drilling bit can lift through automatic rotation of the drilling bit without the need of the operator to bend and support, so that the drilling bit is more comfortable to use compared with the prior art.
2. According to the utility model, the positioning column is inserted into the positioning groove, the threaded column is rotated to be connected with the threaded groove, and then the upper rod body is connected with the lower rod body, after the use is completed, the upper rod body can be disassembled by rotating the threaded column, so that the overlong driving rod is avoided, and the carrying and the transportation are inconvenient.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained from these drawings without inventive faculty for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a cross-sectional view of a transparent protective sleeve of the present utility model;
FIG. 3 is a schematic view of a protective assembly according to the present utility model;
FIG. 4 is a bottom view of FIG. 3 in accordance with the present utility model;
FIG. 5 is a schematic view of the drive rod of the present utility model in an expanded configuration.
In the figure: 1. a mounting base; 2. a driver; 3. a drill rod; 4. drilling; 5. a protective assembly; 51. a transparent protective cylinder; 52. a gear; 53. a toothed ring; 54. a screw rod; 6. a driving rod; 61. a lower rod body; 62. an upper rod body; 63. positioning columns; 64. a positioning groove; 65. a threaded column; 66. a thread groove; 7. a pedal; 8. ground sinking nails; 9. a grab handle.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, a highway greening construction device, including mount pad 1, the top fixedly connected with driver 2 of mount pad 1, driver 2 adopts biax motor, the bottom fixedly connected with drilling rod 3 of driver 2, the bottom fixedly connected with brill piece 4 of drilling rod 3, the externally mounted of mount pad 1 has protective component 5, protective component 5 includes transparent protection section of thick bamboo 51 and gear 52, mount pad 1 slidable mounting is in the inside of transparent protection section of thick bamboo 51, the inside rotation of transparent protection section of thick bamboo 51 is connected with a plurality of lead screw 54, gear 52 rotates the inside of installing at transparent protection section of thick bamboo 51, the actuating lever 6 is installed to the upper end of driver 2, actuating lever 6 includes down body of rod 61, down body of rod 61 and the upper end of driver 2, actuating lever 6 runs through gear 52 and transparent protection section of thick bamboo 51 in proper order, during highway greening hole digging, with transparent protection section of thick bamboo 51 aim at the hole point, operate driver 2, driver 2 drives piece 4 rotation, simultaneously, driver 2 drives actuating lever 6 rotation, and drive piece 4 through the cooperation of gear 52 and drive tooth ring 53 rotates and be connected with a plurality of lead screw 54, the piece 4 can be moved out in order to the hole 4 through the rotation of the hole, and the hole 4 is realized in order to the hole 4 is realized to the hole, the hole is realized in order to the hole 4 is rotated, the hole is avoided to the hole is rotated to the hole 4, the hole is more clearly to the hole is avoided to the hole by the people to be rotated and the hole 4, the hole is rotated and the hole-boring hole is easy to the hole and the hole is rotated.
The screw 54 is screwed with the mount 1.
The top of the screw 54 is fixedly connected with a toothed ring 53, and the toothed ring 53 is meshed with the gear 52.
An upper rod body 62 is installed above the lower rod body 61, and a plurality of positioning columns 63 are fixedly connected to the bottom end of the upper rod body 62.
A plurality of positioning grooves 64 are formed at the top end of the lower rod body 61 corresponding to the positioning columns 63.
The center of the upper rod 62 is provided with a mounting channel, and the inside of the mounting channel is rotatably connected with a threaded column 65.
The screw thread groove 66 has been seted up to the top center department tapping of lower body of rod 61, and driver 2 drives actuating lever 6 and rotates, rotates through actuating lever 6 and can drive gear 52 synchronous rotation, and during installation actuating lever 6, inserts the inside of constant head tank 64 with reference column 63, and rotate screw thread post 65 and be connected with screw thread groove 66, and then be connected upper rod body 62 and lower rod body 61, after using, reverse rotation screw thread post 65 can dismantle upper rod body 62, avoids actuating lever 6 overlength inconvenient carrying transportation.
The upper side wall of the transparent protective cylinder 51 is fixedly connected with a plurality of handles 9.
The lower side wall of the transparent protective cylinder 51 is fixedly connected with a pedal 7.
The bottom fixedly connected with of footboard 7 falls into ground nail 8 a plurality of, and operating personnel makes the falling into ground nail 8 insert ground through stepping on footboard 7, holds grab handle 9 simultaneously, avoids transparent protective tube 51 to dig the time skew.
All electric components in the scheme are connected with an adaptive power supply through wires by a person skilled in the art, and an appropriate controller is selected according to actual conditions so as to meet control requirements, specific connection and control sequences, and the electric connection is completed by referring to the following working principles in the working sequence among the electric components, wherein the detailed connection means are known in the art, and the following main description of the working principles and processes is omitted from the description of electric control.
None of the parts of the device are the same as or can be implemented using prior art.
When the highway is greened and excavated, the transparent protective cylinder 51 is aligned with the pit, an operator can insert the pit sinking nails 8 into the ground by stepping the pedal 7, meanwhile, the grab handle 9 is held, the deviation of the transparent protective cylinder 51 during hole digging is avoided, the driver 2 is operated, the driver 2 drives the drill 4 to rotate, meanwhile, the driver 2 drives the driving rod 6 to rotate, the screw rod 54 is driven to rotate through the cooperation of the gear 52 and the toothed ring 53, the drill 4 is enabled to rise and fall in a rotating mode, pit digging is carried out, after pit digging is completed, the driver 2 drives the drill 4 to reversely rotate with the screw rod 54, pit digging is carried out after pit digging is carried out, sputtered soil can be intercepted through the transparent protective cylinder 51, the situation that the soil is sputtered off at will and sputtered onto the body of the operator is avoided, the situation of pit digging is convenient to observe, the operator is not required to bend over, and the operator is more comfortable to use;
When the driving rod 6 is installed, the positioning column 63 is inserted into the positioning groove 64, the threaded column 65 is rotated to be connected with the threaded groove 66, then the upper rod body 62 is connected with the lower rod body 61, after the driving rod 6 is used, the threaded column 65 is rotated reversely, the upper rod body 62 can be detached, and the driving rod 6 is prevented from being excessively long and inconvenient to carry.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims.

Claims (10)

1. The utility model provides a highway greening construction device, includes mount pad (1), its characterized in that: the utility model provides a protection device for a motor vehicle, includes mount pad (1), top fixedly connected with driver (2), biax motor is adopted in driver (2), the bottom fixedly connected with drilling rod (3) of driver (2), the bottom fixedly connected with drilling plate (4) of drilling rod (3), the externally mounted of mount pad (1) has protection subassembly (5), protection subassembly (5) include transparent protection section of thick bamboo (51) and gear (52), the inside of mount pad (1) slidable mounting at transparent protection section of thick bamboo (51), the inside rotation of transparent protection section of thick bamboo (51) is connected with a plurality of lead screw (54), the inside at transparent protection section of thick bamboo (51) is installed in the rotation of gear (52), actuating lever (6) are installed to the upper end of driver (2), actuating lever (6) are including down body of rod (61), the upper end of lower body of rod (61) and driver (2), actuating lever (6) run through gear (52) and transparent protection section of thick bamboo (51) in proper order.
2. The road greening construction device according to claim 1, wherein: the lead screw (54) is in threaded connection with the mounting seat (1).
3. The road greening construction device according to claim 1, wherein: the top end of the screw rod (54) is fixedly connected with a toothed ring (53), and the toothed ring (53) is meshed with the gear (52).
4. The road greening construction device according to claim 1, wherein: an upper rod body (62) is arranged above the lower rod body (61), and a plurality of positioning columns (63) are fixedly connected to the bottom end of the upper rod body (62).
5. The highway greening construction device according to claim 4, wherein: a plurality of positioning grooves (64) are formed in the position, corresponding to the positioning columns (63), of the top end of the lower rod body (61).
6. The highway greening construction device according to claim 4, wherein: the center of the upper rod body (62) is provided with a mounting channel, and the inside of the mounting channel is rotationally connected with a threaded column (65).
7. The highway greening construction device according to claim 4, wherein: a thread groove (66) is formed in the center of the top end of the lower rod body (61) in a tapping mode.
8. The road greening construction device according to claim 1, wherein: the upper side wall of the transparent protective cylinder (51) is fixedly connected with a plurality of grab handles (9).
9. The road greening construction device according to claim 1, wherein: the lower side wall of the transparent protective cylinder (51) is fixedly connected with a pedal (7).
10. The highway greening construction device according to claim 9, wherein: the bottom end of the pedal (7) is fixedly connected with a plurality of ground sinking nails (8).
CN202323021370.7U 2023-11-09 2023-11-09 Highway greening construction device Active CN220915723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323021370.7U CN220915723U (en) 2023-11-09 2023-11-09 Highway greening construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323021370.7U CN220915723U (en) 2023-11-09 2023-11-09 Highway greening construction device

Publications (1)

Publication Number Publication Date
CN220915723U true CN220915723U (en) 2024-05-10

Family

ID=90935248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323021370.7U Active CN220915723U (en) 2023-11-09 2023-11-09 Highway greening construction device

Country Status (1)

Country Link
CN (1) CN220915723U (en)

Similar Documents

Publication Publication Date Title
CN111527832B (en) Hand-push type tree planting earth boring machine for forestry planting
CN201567959U (en) Boring machine for embedding electric column
CN220915723U (en) Highway greening construction device
CN208047230U (en) A kind of passion fruit plantation digging apparatus
CN218417732U (en) Auxiliary planting device for tree seedlings
CN217241350U (en) Garden tree plants with digging device
CN201517367U (en) Vehicle-mounted hole boring machine
CN213121198U (en) Soil sampling device for foundation detection
CN109538212A (en) A kind of rotary reducing envelope forming tunneling boring drilling tool
CN210626982U (en) Automatic light filling controlling means of agricultural facility
CN209105601U (en) A kind of municipal administration greening pit-picker
CN208763081U (en) Digging machine for deep pit digging
CN215011493U (en) A device of digging earth for farming
CN211457954U (en) Digging device for garden civil engineering
CN111928180A (en) But solar panel automatically regulated's street lamp
CN219741197U (en) Highway greening construction device
CN101705786B (en) Pot hole drilling machine carried on vehicle
CN220667448U (en) Manual portable drill rod
CN220441256U (en) Soil pit excavating device for nursery stock planting
CN220173758U (en) Pit digging device for planting sapling
CN219732028U (en) Foundation pit compacting and filling structure
CN219569015U (en) Construction is with device of digging
CN217081980U (en) Measuring instrument for earthwork construction
CN2351898Y (en) Device for automatic laying cable
CN211509774U (en) Trees planting equipment of digging pit for architectural decoration

Legal Events

Date Code Title Description