CN2208972Y - Wet desulfidation, dedusting and spray swirl tower - Google Patents

Wet desulfidation, dedusting and spray swirl tower Download PDF

Info

Publication number
CN2208972Y
CN2208972Y CN 94237242 CN94237242U CN2208972Y CN 2208972 Y CN2208972 Y CN 2208972Y CN 94237242 CN94237242 CN 94237242 CN 94237242 U CN94237242 U CN 94237242U CN 2208972 Y CN2208972 Y CN 2208972Y
Authority
CN
China
Prior art keywords
tower
granite
nozzle
millimeters
dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94237242
Other languages
Chinese (zh)
Inventor
孙建民
刘文英
孙仲慧
孙树人
廖东菊
孙建国
孙海山
Original Assignee
孙建民
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孙建民 filed Critical 孙建民
Priority to CN 94237242 priority Critical patent/CN2208972Y/en
Application granted granted Critical
Publication of CN2208972Y publication Critical patent/CN2208972Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Cyclones (AREA)
  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model relates to a spray swirl tower having dual cleaning action for particles such as smoke and dust and harmful gases such as fume and sulphur dioxide, comprising a tower body made of granite, a core body, a refined swirl slice made of granite, a defogging slice, a plastic spray nozzle and a spraying system. Spray velocity is high, fume is pushed to rotate and move forward, and the pressure drop of the spraying system is reduced. Three times of spraying and humidification are provided, turbulent flow is formed around seams, distance is long, a swirl slice is used for contact, mass transfer is favorable, and dust removing and desulfurizing efficiency is high. A defogging slice is used for dewatering via centrifugal force, and fume at an outlet has no water. The utility model having granite structure, corrosion resistance, abrasion resistance and long service life is mainly used for purifying harmful gases such as smoke, powdery dust, sulphur dioxide, etc.

Description

Wet desulfidation, dedusting and spray swirl tower
It is a kind of to flue dust dust and SO 2 from fume and other pernicious gas tools spray cyclone tower with the double purified effect that the utility model belongs to.(desulfurizing dust-collector)
At present, known desulfurizing dust-collector has the crack impact type, inside and outside two cyclone type is arranged, spraying auto-excitation type and pure rotating stream tray scrubber formula etc. is arranged.Have plenty of metal material and add coating; Have plenty of stainless steel part, all can not be corrosion-resistant for a long time; Though what have is made by corrosion resistant granite or pottery, general resistance height, gross efficiency is low or desulfuration efficiency is low.Especially ubiquitous defective is that gas-water separation is bad, and the outlet flue gas with water influences the life-span of pipeline and air-introduced machine thereafter, increases maintenance capacity and operational and administrative expenses.
The utility model is the patent inventor after analyzing, studying various desulfurizing dust-collectors, the own former patent No. be 86210154.9 and application number be on the 92217191.2 utility model desulfurizing dust-collector patent bases, through improving the regeneration product of raising.
The purpose of this utility model provides a kind of spray cyclone tower.The principle that integrates spraying, whirlwind, eddy flow, make its innovation simple and reasonable for structure, occupation of land is little, resistance is low, less energy consumption, the outlet flue gas is not with water, to flue dust, dust and sulfur dioxide and other cleaning harmful gas efficient height, full granite is made, long service life, the desulfurization and dedusting spray cyclone tower that operating cost is low.
The purpose of this utility model is achieved in that the granite process processing with anticorrosive anti-wear, builds conglobate tower body shell and core body by laying bricks or stones.In the circumferential weld between tower body and core body, two-layer granite spinning disk and one deck demist sheet through correct grinding is installed.Lift angle α=25 of spinning disk °~30 °, efficiency factor F 0=8~9.Demist sheet lift angle α=25 0=8.Tangential direction is consistent rotates by entering the mouth.Below the ground floor spinning disk, be on the tangential direction of granite tower body bottom, have the rectangle entrance seat, its width is equal to or less than the circumferential weld width between tower body and the core body, its width is during greater than 400 millimeters, and the center installs a granite abrasive disc dividing plate contour with inlet additional.Go into tower with 13~15 meter per second tangent lines, the seat bilateral symmetry that entered the mouth is installed 2~12 spraying humidifications of 55~60 degree angle nozzles.When flue gas enters ground floor second layer spinning disk, be installed in the nozzle spraying humidification on the tower body shell.Small particle (dirt) is through turbulent flow, and cohesion is captured down.Pernicious gases such as sulfur dioxide, through absorption, absorb, neutralization reaction etc. and removing.Nozzle is the straight nozzle of two one.Nozzle processes with raw materials such as plastics king, propylene plastics, copper or alloyed copper, is installed in every layer of spinning disk top, presses 10~15 ° of sprayings of air-flow direction of rotation angle.Nozzle quantity is consistent with the every disc floret of spray cyclone tower hilllock sillar number, adorns a nozzle sleeve pipe and nozzle in the every granite vertical masonry joint.Sleeve pipe does not exceed the tower body inwall, but exceeds tower body outer wall 10~20mm.Nozzle does not exceed the sleeve pipe inner face.All nozzles are by D In=20mm rubber tube and plastic annular header are connected.Seal with asbestos cord between rubber tube and the sleeve pipe.About spraying air velocity 26 meter per seconds,, promote the power that dust-contained airflow rotates, advances so have greater than air velocity in the circumferential weld and between the spinning disk.With the electric energy of atomizing pump, change into the kinetic energy of air-flow, the pressure loss of Gu Penwuxuanliuta is corresponding to be reduced, only 600~800 Pa Sika.Be processed with convex-concave step, collecting tank and overflow secret tunnel on granite tower body inwall and the core body outer wall respectively, the convex-concave step supports spinning disk and demist sheet, collecting tank collect water that the demist sheet throws away and the isolated water of tower body top centrifugal force and by three to eight in the secret tunnel of sump bottom to lower floor spinning disk top.And unlikelyly taken out of by flue gas.Flue-gas temperature makes the outlet flue gas not be with water below 8%.A treadle-operated tilt hammer for hulling rice body is built in the core body top, has both increased the intensity of core body, can avoid vortex flow again.Purify the back dry flue gas and drain into atmosphere through air-introduced machine and chimney; Small particle (dirt) is at tower, and inwall flows into the bottom water seal tank, effluxes or the two alkaline process processing of warp the circulating and recovering of purifying waste water through sedimentation basin.
The utility model can according to initial dust content height and emission request, can add and join vertical venturi tower or horizontal Venturi tube according to service condition, with raising system dust removing desulfuration efficiency, but the corresponding resistance that improved.The water seal tank water seal height exceeds at the bottom of the tower on the manhole 200~300 millimeters on plane, can not find time to guarantee water seal.
The utility model can be made into D In=0.8m~5.6m all size, handle less than 1 ton/up to 200 tons/time boiler smoke.The tower wall thickness can be processed into 150~250 millimeters, purify flue gas and draw from the cat head center according to tower height, can connect the spiral case outlet, also can connect straight curved outlet, can addition granite, and pay the also available steel smoke pipe of tower and directly be connected to the air-introduced machine inlet from cat head.
Owing to adopt such scheme, make spray cyclone tower structure compactness, general desulfurizing dust-collector takes up an area of half as large, highly short half, invest for a short time more than 1/3rd, and resistance is low, the efficient height especially exports flue gas and is not with water, has saved operational and administrative expenses greatly.
Below in conjunction with accompanying drawing the utility model is further specified:
Fig. 1 is a structure chart of the present utility model.
Fig. 2 is I-I cutaway view of Fig. 1.
As shown in FIG., ash-laden gas is accepted the spraying humidification of nozzle (2) through tangent line inlet seat (1) with the speed of 13~15 meter per seconds, rise around core body (3) rotation, pass the spinning disk (4) that ground floor is formed by the granite correct grinding, be subjected to from of the propelling of the interior a plurality of nozzles (6) installed of granite tower (5) wall with 26 meter per second left and right sides high velocity fog air-flows, turbulent flow, continue rotation, enter the spinning disk (7) of second layer granite correct grinding, continue to accept the propelling of a plurality of nozzles of tower body inwall (8) jet-stream wind, turbulent flow continues rotation and rises, and enters the demist sheet (9) of granite correct grinding, air communication is crossed speed 8~9 meter per seconds in the demist sheet slit, demist sheet lift angle 25 degree are subjected to action of centrifugal force, and the water droplet in the flue gas gets rid of to the collecting tank (10) between demist sheet and the tower body.Catchment and give the secret tunnel that stays flow to lower floor spinning disk top in the tower body wall, continue rotation at the upper space air-flow of tower and rise, the water droplet in the air-flow continues to get rid of to the tower wall, flow to collecting tank.Purge gas, draw the pit of the stomach from cat head (11), pays tower or metal tube through granite again, is pulled out by air-introduced machine, sends chimney to and drain into atmosphere outward.
Nozzle (2) is pressed 55 °~60 ° angle solid weldings on inlet smoke pipe (12) by nozzle block, and nozzle is by D In=20 millimeters rubber tubes are connected annular header tube (13), and header tube and water circulating pump outlet are connected.Nozzle (8) structure is identical with nozzle (2), is plastics king, propylene plastics, copper or alloy copper coin rod and processes.When installing in tower body, lay a sleeve pipe for 10 °~15 ° by the downstream direction angle earlier in the tower wall, each nozzle is by D In=20 millimeters rubber tubes are connected polyethylene annular header tube (14), and header tube and water circulating pump outlet or other alkalies or running water are connected.Sulfur dioxide in flue gas needs the alkalies neutralization, can be with slag water, and the boiler blowdown water comprehensive utilization.There is a manhole (15) tower body (5) below, and its periphery has been built water seal tank (16) by laying bricks or stones and guaranteed 200~300 millimeters height of manhole top water seal, and spilling water is taken the grit that captures and the reaction product of pernicious gas out of, flow to the sedimentation basin system.

Claims (6)

1, a kind of to flue dust, dust and SO 2 from fume and other pernicious gases have the spray cyclone tower of double purified effect, it is characterized in that: the granite workpiece of abrasion-proof corrosion-proof is built tower body, core body and water seal tank, the granite precise abrasive plate is formed eddy flow lamella and demist lamella, plastics king nozzle and polyethylene annular header tube are formed spraying system.
2, according to claims 1 described spray cyclone tower, it is characterized in that: granite tower body bottom, granite inlet seat is set on the tangential direction, its width is during greater than 400 millimeters, the center installs a granite abrasive disc dividing plate contour with inlet additional, 2~8 of the nozzles of the equipped 55 °~60 ° of angles of inlet seat bilateral symmetry.
3, according to claims 1 described spray cyclone tower, it is characterized in that: on granite tower body inwall and the core body outer wall, process convex-concave step and collecting tank respectively, support two-layer spinning disk and one deck demist sheet and collect the liquid of centrifugal force dehydration, there is 3~8 in secret tunnel to pass to lower floor spinning disk top at the bottom of the collecting tank, a cone, spinning disk lift angle α=25~30 °, efficiency factor F are built in the core body top 0=8~9, demist sheet lift angle α=25 °, efficiency factor F 0=8, tangential direction is consistent rotates by entering the mouth.
4, according to claims 1 described spray cyclone tower, it is characterized in that: nozzle is the straight nozzle of two one, use the propylene plastics, the plastics king, copper or alloyed copper processing, every layer of spinning disk top, press 10~15 ° of sprayings of air-flow direction of rotation angle, nozzle quantity is consistent with the every disc floret of spray cyclone tower hilllock sillar number, nozzle sleeve pipe of peace and nozzle in the every granite vertical masonry joint, sleeve pipe does not exceed the tower body inwall, but exceed 10~20 millimeters of tower body outer walls, nozzle does not exceed the sleeve pipe inner face, all nozzles by in the D=20 millimeters rubber tubes and plastic annular header connect, between rubber tube and the sleeve pipe, seal with asbestos cord.
5, according to claims 1 described spray cyclone tower, it is characterized in that: according to initial dust content height, can add and join vertical venturi tower or horizontal Venturi tube, the water seal tank water seal height exceeds at the bottom of the tower on the manhole 200~300 millimeters of levels.
6, according to claims 1, described spray cyclone tower, it is characterized in that: the tower internal diameter can be designed to 0.8 meter to 5.6 meters according to the smoke treatment amount, the tower wall thickness is according to tower height, can be processed into 150 millimeters~250 millimeters, purify flue gas and draw from the cat head center, can pay tower by addition granite, also available steel smoke pipe directly is connected to the air-introduced machine inlet from cat head.
CN 94237242 1994-04-28 1994-04-28 Wet desulfidation, dedusting and spray swirl tower Expired - Fee Related CN2208972Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94237242 CN2208972Y (en) 1994-04-28 1994-04-28 Wet desulfidation, dedusting and spray swirl tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94237242 CN2208972Y (en) 1994-04-28 1994-04-28 Wet desulfidation, dedusting and spray swirl tower

Publications (1)

Publication Number Publication Date
CN2208972Y true CN2208972Y (en) 1995-10-04

Family

ID=33845009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94237242 Expired - Fee Related CN2208972Y (en) 1994-04-28 1994-04-28 Wet desulfidation, dedusting and spray swirl tower

Country Status (1)

Country Link
CN (1) CN2208972Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1063094C (en) * 1996-07-27 2001-03-14 张延民 Desulfurizer for eliminating smoke and dust by multilayer-tower with wet granules
CN100368666C (en) * 2006-04-13 2008-02-13 中国科学院工程热物理研究所 Humidification method of eddy flow spray and humidification tower
CN102218262A (en) * 2011-04-15 2011-10-19 肖柏圣 Resin-cast desulphurization nozzle and manufacturing method thereof
CN109718635A (en) * 2017-10-31 2019-05-07 中国石油化工股份有限公司 A kind of process of flue gas desulfurization and denitrification
CN114146522A (en) * 2021-11-30 2022-03-08 华能吉林发电有限公司长春热电厂 Venturi wet dust removal device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1063094C (en) * 1996-07-27 2001-03-14 张延民 Desulfurizer for eliminating smoke and dust by multilayer-tower with wet granules
CN100368666C (en) * 2006-04-13 2008-02-13 中国科学院工程热物理研究所 Humidification method of eddy flow spray and humidification tower
CN102218262A (en) * 2011-04-15 2011-10-19 肖柏圣 Resin-cast desulphurization nozzle and manufacturing method thereof
CN109718635A (en) * 2017-10-31 2019-05-07 中国石油化工股份有限公司 A kind of process of flue gas desulfurization and denitrification
CN114146522A (en) * 2021-11-30 2022-03-08 华能吉林发电有限公司长春热电厂 Venturi wet dust removal device

Similar Documents

Publication Publication Date Title
CN205275632U (en) Primary smoke of converter is based on evaporation cooling's low energy consumption semidry method dust pelletizing system
CN201101941Y (en) Desulfurization and dust removal integrated device of fiberglass of industry coal-fired boiler
CN2765660Y (en) Multi-stage adjustable desulfurization dust collector
CN107224828B (en) High speed smoke processing system
CN206881489U (en) A kind of boiler desulfurization absorption plant of flue gas deep purifying
CN2208972Y (en) Wet desulfidation, dedusting and spray swirl tower
CN214680873U (en) Inverted wet dust-removing air washer
CN2444140Y (en) Wet three efficient duster
CN212999014U (en) Matte granulation steam collection device
CN2298055Y (en) Wet desulfurization cyclone dust collectors
CN201692760U (en) Gas-liquid swirling-flow desulfuration dust cleaner of efficient desulfuration dust-cleaning device
CN219722365U (en) Water film dust remover
CN2503367Y (en) Granite wet-type five-grade desulfurization dust control device
CN2384119Y (en) Venturi tube cyclone water dust scrubber
CN216259843U (en) Quicklime slaking and dust removing system
CN2386874Y (en) High efficiency desulfurization duster
CN2157830Y (en) Duster
CN208824151U (en) Improved high-efficiency rotating stream tray scrubber
CN2448439Y (en) Vortex flow-guiding desulfurization dust remover
CN107961664A (en) A kind of multistage tank type waste gas purification recovery device
CN214209940U (en) Arrange flue gas dust removal defogging device at desulfurizing tower top
CN211274045U (en) Diffusion type cyclone boiler flue gas dust removal device
CN2254006Y (en) Wet 999 desulfuration dust-remover
CN2295916Y (en) Vertical desulfurizing dust collector
CN215654464U (en) Spray tower with internal and external double circulation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee