CN220896254U - Novel cable bridge clamp - Google Patents

Novel cable bridge clamp Download PDF

Info

Publication number
CN220896254U
CN220896254U CN202322426260.2U CN202322426260U CN220896254U CN 220896254 U CN220896254 U CN 220896254U CN 202322426260 U CN202322426260 U CN 202322426260U CN 220896254 U CN220896254 U CN 220896254U
Authority
CN
China
Prior art keywords
mounting
arc
bolt
novel cable
shaped groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322426260.2U
Other languages
Chinese (zh)
Inventor
王国祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiuhui Electric Co ltd
Original Assignee
Jiangsu Jiuhui Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jiuhui Electric Co ltd filed Critical Jiangsu Jiuhui Electric Co ltd
Priority to CN202322426260.2U priority Critical patent/CN220896254U/en
Application granted granted Critical
Publication of CN220896254U publication Critical patent/CN220896254U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a novel cable bridge clamp which is applied to the field of cable bridge installation.

Description

Novel cable bridge clamp
Technical Field
The utility model belongs to the field of cable bridge installation, and particularly relates to a novel cable bridge clamp.
Background
At present, the electric power bridge frame is mainly made of steel, namely hot-dip zinc-aluminum alloy, and is mainly made of stainless steel, and the cable bridge frame is divided into a groove type structure, a tray type structure, a ladder frame type structure, a grid type structure and the like, and is composed of a support, a bracket arm, an installation accessory and the like, wherein the bridge frame in a building can be independently erected, and also can be additionally arranged on various building and pipe gallery supports.
Currently, the bulletin number is: the utility model discloses a novel cable bridge clamp, belonging to the technical field of power bridge clamps. The bridge clamp is provided with two groups and is respectively and fixedly arranged on the spandrel girders on two sides of the bridge, the bridge clamp mainly comprises an upper half clamp and a lower half clamp, a connecting plate is arranged between the upper half clamp and the lower half clamp, the upper half clamp, the lower half clamp and the connecting plate are fixedly connected through bolts, the bridge clamp is fixedly arranged on the spandrel girders on two sides of the bridge, and simultaneously, two sides of the bridge cover plate clamp are fixedly arranged on the spandrel girders on two sides of the bridge through bolts, so that the bridge and the spandrel girders form a stable structure.
The bridge clamp has the beneficial effects that the length can be adjusted, but in actual use, the length of the connecting plate is fixed, the condition that the width of the connecting plate is insufficient can appear for a wider bridge, and the condition that two sides of the bridge are open and loose appears can appear for a narrower bridge, so that the flexibility and the stability of the bridge clamp are not high.
Disclosure of utility model
The utility model aims to provide a novel cable bridge clamp which has the advantages of increasing the mounting flexibility and increasing the mounting stability of a bridge.
The technical aim of the utility model is realized by the following technical scheme: the utility model provides a novel cable bridge clamp, includes mounting one, one side of mounting one is equipped with mounting two, arc wall first and arc wall second have been seted up respectively to the top of mounting one and mounting two, arc wall fourth and arc wall third have been seted up respectively to the bottom of mounting one and mounting two, mounting groove first has been seted up to the one end at mounting two tops and be located arc wall second bottom, mounting groove second has been seted up at the one end of mounting one bottom and be located arc wall four tops, one side of mounting one and mounting two all is equipped with the adjusting bolt who runs through to inboard, adjusting bolt's one end fixed mounting has the bearing block, one side fixed mounting of bearing block has the contact plate, adjusting bolt's other end fixed mounting has adjust knob.
The technical scheme is adopted: when using novel cable testing bridge anchor clamps, when installing between the required bearing steel, through placing mounting first and mounting second in the bearing steel top, this cable testing bridge anchor clamps accessible arc wall first, arc wall second, arc wall third and arc wall fourth's setting, adjust the interval between mounting first and the mounting second, be convenient for realize the firm installation effect of pressing from both sides tight simultaneously to the bearing steel, this anchor clamps use in a flexible way, be convenient for cooperate the use according to the bearing steel of different width, when using novel cable testing bridge anchor clamps, the setting of the accessible adjust knob of mounting first and mounting second, further realize the fixed effect of extrusion to the testing bridge both sides, through rotating adjust knob, realize the rotation to adjusting bolt, thereby drive the contact plate and be close to testing bridge one side, after the contact of contact plate and testing bridge, through the setting of bearing block, will avoid adjusting bolt's rotation to drive the contact plate and rotate, thereby bring the influence to the cable testing bridge anchor clamps use in the installation steadiness to the testing bridge is further increased to this structure.
The utility model is further arranged that the two ends of the top of the first mounting piece are respectively provided with a first mounting bolt penetrating through the first arc-shaped groove, the second arc-shaped groove and the first mounting groove.
The technical scheme is adopted: the first mounting bolt is matched with the first mounting piece and the top of the second mounting piece for mounting, and the first arc-shaped groove, the second arc-shaped groove and the third mounting groove are matched with the first mounting bolt for penetrating and mounting.
The utility model further provides that the surface of the first mounting bolt is connected with the first mounting nut in a threaded manner.
The technical scheme is adopted: the first mounting nut is matched with the first mounting bolt for mounting and connecting.
The utility model is further arranged that the two ends of the bottom of the second mounting piece are respectively provided with a second mounting bolt penetrating through the third arc-shaped groove, the fourth arc-shaped groove and the second mounting groove.
The technical scheme is adopted: the first installation piece is matched with the second installation piece through the second installation bolt, the arc-shaped groove III, the arc-shaped groove IV and the second installation groove II are matched with the second installation bolt for penetrating installation.
The utility model further provides that the surface of the second mounting bolt is connected with the second mounting nut in a threaded manner.
The technical scheme is adopted: and the second mounting nut is matched with the second mounting bolt for mounting and connecting.
The utility model is further arranged that the contact pads I are fixedly adhered to the top of the second mounting piece and positioned on two sides of the second arc-shaped groove.
The technical scheme is adopted: the contact between the first mounting piece and the second top of the mounting piece is used for protection interval through the contact pad pair.
The utility model is further arranged that the bottom of the inner side of the second mounting piece is fixedly adhered with the second contact pad at the two sides of the third arc-shaped groove.
The technical scheme is adopted: the contact pad II is used for protecting the contact between the first mounting piece and the bottom of the second mounting piece.
The utility model is further characterized in that the inside of the first mounting piece and the inside of the second mounting piece are respectively provided with a mounting hole, and the mounting holes are connected with the adjusting bolts through bolts.
The technical scheme is adopted: the installation is carried out progressively through the installation hole and the adjusting bolt.
In summary, the utility model has the following beneficial effects:
1. When the novel cable bridge clamp is used, the installation position of the bridge is preferentially determined, and when the novel cable bridge clamp is required to be installed between bearing steels, the cable bridge clamp can adjust the interval between the first installation part and the second installation part through the arrangement of the first arc-shaped groove, the second arc-shaped groove, the third arc-shaped groove and the fourth arc-shaped groove by placing the first installation part and the second installation part on the top of the bearing steels, and meanwhile, the clamp is convenient to realize the firm installation effect of clamping the bearing steels, is flexible to use and is convenient to be matched with the bearing steels with different widths;
2. When the novel cable bridge clamp is used, the bridge between the first mounting piece and the second mounting piece can further achieve the extrusion fixing effect on two sides of the bridge through the arrangement of the adjusting knob, the adjusting knob is rotated to achieve rotation of the adjusting bolt, so that the contact plate is driven to approach one side of the bridge, after the contact plate is contacted with the bridge, the contact plate is prevented from being rotated through the arrangement of the bearing block, the influence on the bridge is brought, and the structure further increases the installation stability of the cable bridge clamp in use.
Drawings
FIG. 1 is a schematic view of the overall structure of the present utility model;
FIG. 2 is a schematic illustration of the present utility model in use with a load bearing steel;
FIG. 3 is a schematic view of an arcuate slot I, an arcuate slot II, an arcuate slot III and an arcuate slot IV of the present utility model;
fig. 4 is a schematic elevational cross-sectional view of the present utility model.
Reference numerals: 1. a first mounting piece; 2. a second mounting piece; 3. an arc-shaped groove I; 4. an arc-shaped groove II; 5. a first mounting groove; 6. an arc-shaped groove III; 7. an arc-shaped groove IV; 8. a second mounting groove; 9. installing a first bolt; 10. installing a first nut; 11. installing a second bolt; 12. installing a second nut; 13. a first contact pad; 14. a second contact pad; 15. a contact plate; 16. an adjusting bolt; 17. a bearing block; 18. an adjustment knob; 19. and (5) mounting holes.
Detailed Description
The present utility model will be described in further detail with reference to the accompanying drawings.
Example 1:
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, a novel cable bridge clamp comprises a first mounting piece 1, one side of the first mounting piece 1 is provided with a second mounting piece 2, arc grooves I3 and second arc grooves 4 are respectively formed in the tops of the first mounting piece 1 and the second mounting piece 2, arc grooves IV 7 and third arc grooves 6 are respectively formed in the bottoms of the first mounting piece 1 and the second mounting piece 2, one end of the top of the second mounting piece 2 is located at the bottom of the second arc grooves 4, one end of the bottom of the first mounting piece 1 is located at the top of the fourth arc grooves IV 7, and a second mounting groove 8 is formed in the top of the fourth arc grooves.
Referring to fig. 1, two ends of the top of the first mounting piece 1 are respectively provided with a first mounting bolt 9 penetrating through the first arc-shaped groove 3, the second arc-shaped groove 4 and the first mounting groove 5, the first mounting bolt 9 is matched with the top of the first mounting piece 1 and the top of the second mounting piece 2 for mounting, and the first arc-shaped groove 3, the second arc-shaped groove 4 and the third mounting groove are matched with the first mounting bolt 9 for penetrating and mounting.
Referring to the reference, 4, a first mounting nut 10 is connected to the surface of a first mounting bolt 9 in a threaded manner, and the first mounting nut 10 is matched with the first mounting bolt 9 to be used for mounting connection.
Referring to fig. 1, two ends of the bottom of the second mounting piece 2 are respectively provided with a second mounting bolt 11 penetrating through the third arc-shaped groove 6, the fourth arc-shaped groove 7 and the second mounting groove 8, the second mounting bolt 11 is matched with the bottoms of the first mounting piece 1 and the second mounting piece 2 for mounting, and the third arc-shaped groove 6, the fourth arc-shaped groove 7 and the second mounting groove 8 are matched with the second mounting bolt 11 for penetrating and mounting.
Referring to fig. 4, a second mounting nut 12 is screwed on the surface of the second mounting bolt 11, and the second mounting nut 12 is matched with the second mounting bolt 11 to perform mounting connection.
Referring to fig. 1, a first contact pad 13 is fixedly adhered to the top of a second mounting piece 2 and positioned on two sides of a second arc-shaped groove 4, and the first contact pad 13 is used for protecting the contact between the tops of the first mounting piece 1 and the second mounting piece 2.
Referring to fig. 3, a second contact pad 14 is fixedly adhered to the bottom of the inner side of the second mounting piece 2 and positioned on two sides of the third arc-shaped groove 6, and the contact between the bottoms of the first mounting piece 1 and the second mounting piece 2 is used at a protection interval through the second contact pad 14.
The use process is briefly described: when using novel cable testing bridge anchor clamps, when installing between the bearing steel of needs, the priority determines the mounted position of crane span structure, through placing mounting 1 and mounting 2 in the bearing steel top, preferentially utilize mounting groove one 5 to hold mounting bolt one 9, do not have the protruding interval of mounting bolt one 9 between mounting 2 and the bearing steel, then available arc wall one 3 and arc wall two 4 between adjustment mounting bolt one 9's position, adjustable mounting 1 simultaneously with the interval between mounting 2, can adjust according to the bearing steel width of installing between mounting 1 and the mounting 2, the bottom accessible mounting bolt two 11 and the use of mounting groove two 8 of mounting 1 and mounting 2 simultaneously, hide the tip of mounting bolt two 11, avoid the protruding cable testing bridge of mounting bolt two 11 to influence mounting 1 and mounting 2 inboard, the setting of arc wall one 3, arc wall three 6 and arc wall four 7, adjust mounting 1 and mounting 2 simultaneously, the interval between mounting 2 is convenient for use of mounting 1 and mounting 2, use of two is convenient for use of two to install the bearing pad two, and the contact pad is carried out to the bottom contact between the mounting 2 and the mounting pad is used to the mounting 1, contact pad is used to the bottom contact between the mounting 2 is convenient for the mounting 1 and the mounting pad is used to the mounting 2, contact pad is used to the contact between the mounting pad is used to the mounting 1.
Example 2:
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, a novel cable bridge clamp comprises a first mounting member 1, one side of the first mounting member 1 and one side of the second mounting member 2 are respectively provided with an adjusting bolt 16 penetrating through the inner side, one end of each adjusting bolt 16 is fixedly provided with a bearing block 17, one side of each bearing block 17 is fixedly provided with a contact plate 15, the other end of each adjusting bolt 16 is fixedly provided with an adjusting knob 18, when the novel cable bridge clamp is used, a bridge between the first mounting member 1 and the second mounting member 2 can be arranged through the adjusting knobs 18, the extrusion fixing effect on two sides of the bridge is further achieved, the adjusting knobs 18 are rotated, the adjusting bolts 16 are rotated, so that the contact plates 15 are driven to approach one side of the bridge, after the contact plates 15 are contacted with the bridge, the contact plates 15 are prevented from rotating through the arrangement of the bearing blocks 17, the contact plates 15 are prevented from rotating, and accordingly influence is brought to the bridge, and the mounting stability of the bridge is further increased in the use of the cable bridge clamp.
Referring to fig. 4, the first and second mounting members 1 and 2 are provided with mounting holes 19, the mounting holes 19 are connected with the adjusting bolts 16 by bolts, and the mounting holes 19 are matched with the adjusting bolts 16 for progressive use.
The use process is briefly described: when using novel cable testing bridge anchor clamps, the setting of the bridge accessible adjust knob 18 between mounting 1 and the mounting 2, further realize the fixed effect of extrusion to the bridge both sides, through rotating adjust knob 18, realize the rotation of adjusting bolt 16, adjusting bolt 16 realizes rotating and progressive through bolted connection in mounting hole 19, thereby it is close to bridge one side to drive contact plate 15, after the contact of contact plate 15 and bridge, through the setting of bearing block 17, will avoid the rotation of adjusting bolt 16 to drive contact plate 15 and rotate, thereby bring the influence to the bridge, this structure further increases the installation steadiness to the bridge in the cable testing bridge anchor clamps use.
The present embodiment is only for explanation of the present utility model and is not to be construed as limiting the present utility model, and modifications to the present embodiment, which may not creatively contribute to the present utility model as required by those skilled in the art after reading the present specification, are all protected by patent laws within the scope of claims of the present utility model.

Claims (8)

1. The utility model provides a novel cable testing bridge anchor clamps, includes mounting one (1), its characterized in that: one side of installed part one (1) is equipped with installed part two (2), arc wall one (3) and arc wall two (4) have been seted up respectively to the top of installed part one (1) and installed part two (2), arc wall four (7) and arc wall three (6) have been seted up respectively to the bottom of installed part one (1) and installed part two (2), install groove one (5) have been seted up to the one end at installed part two (2) top and be located arc wall two (4) bottom, install groove two (8) have been seted up to the one end at installed part one (1) bottom and be located arc wall four (7) top, one side of installed part one (1) and installed part two (2) all is equipped with and runs through to inboard adjusting bolt (16), one end fixed mounting of adjusting bolt (16) has bearing block (17), one side fixed mounting of bearing block (17) has contact plate (15), the other end fixed mounting of adjusting bolt (16) has adjusting knob (18).
2. The novel cable tray clamp as claimed in claim 1, wherein: and the two ends of the top of the first mounting piece (1) are respectively provided with a first mounting bolt (9) penetrating through the first arc-shaped groove (3), the second arc-shaped groove (4) and the first mounting groove (5).
3. The novel cable tray clamp as claimed in claim 2, wherein: and a first mounting nut (10) is connected with the surface of the first mounting bolt (9) in a threaded manner.
4. The novel cable tray clamp as claimed in claim 1, wherein: and two ends of the bottom of the second mounting piece (2) are respectively provided with a second mounting bolt (11) penetrating through the third arc-shaped groove (6), the fourth arc-shaped groove (7) and the second mounting groove (8).
5. The novel cable tray clamp as set forth in claim 4, wherein: and a second mounting nut (12) is connected with the surface of the second mounting bolt (11) in a threaded manner.
6. The novel cable tray clamp as claimed in claim 1, wherein: the top of the second mounting piece (2) is fixedly adhered with the first contact pad (13) at two sides of the second arc-shaped groove (4).
7. The novel cable tray clamp as claimed in claim 1, wherein: and the bottom of the inner side of the second mounting part (2) is positioned on the two sides of the third arc-shaped groove (6), and the second contact pad (14) is fixedly adhered.
8. The novel cable tray clamp as claimed in claim 1, wherein: the installation device comprises a first installation piece (1) and a second installation piece (2), wherein installation holes (19) are formed in the first installation piece and the second installation piece, and the installation holes (19) are connected with the adjusting bolts (16) through bolts.
CN202322426260.2U 2023-09-06 2023-09-06 Novel cable bridge clamp Active CN220896254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322426260.2U CN220896254U (en) 2023-09-06 2023-09-06 Novel cable bridge clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322426260.2U CN220896254U (en) 2023-09-06 2023-09-06 Novel cable bridge clamp

Publications (1)

Publication Number Publication Date
CN220896254U true CN220896254U (en) 2024-05-03

Family

ID=90866641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322426260.2U Active CN220896254U (en) 2023-09-06 2023-09-06 Novel cable bridge clamp

Country Status (1)

Country Link
CN (1) CN220896254U (en)

Similar Documents

Publication Publication Date Title
CN219678031U (en) Angle-adjustable cable support
CN220896254U (en) Novel cable bridge clamp
CN209375531U (en) A kind of roof photovoltaic bracket component
CN216075546U (en) ETFE membrane side seal membrane frame connection structure
CN213710432U (en) Adjustable and detachable steel beam hoisting and positioning device
CN219885469U (en) Hoisting device for water heating pipeline construction
CN217087836U (en) Take angle photovoltaic support crossbeam structure
CN213988442U (en) Composite insulator structure with positioning mechanism
CN219086752U (en) Cable bridge fastening device
CN211720237U (en) Low-voltage split-phase outgoing type lightning arrester mounting bracket
CN220798175U (en) Angle is moved anchor clamps connecting piece
CN219677996U (en) Corrosion-resistant galvanized bridge rack hanger
CN213653932U (en) Steel structure mounting device for environmental protection curtain wall engineering
CN220544632U (en) Straight-through bridge cover plate
CN214756398U (en) Industrial grade 5G router
CN217362481U (en) Electric bridge frame fixing device
CN211880051U (en) Adjustable electric wire buckle plate iron accessory
CN220672304U (en) Parallel insulator device with supporting structure
CN215402409U (en) Automatic adhesive tape winding machine with wire harness right-angle bending part capable of being infinitely close to winding
CN213094155U (en) Photovoltaic direct current electric wire netting cable installation device
CN220382997U (en) Photovoltaic module installing support installed on building outer wall
CN220066760U (en) Wiring supporting device of steel structure house
CN220184441U (en) Prestressed anchorage device connecting device
CN218124622U (en) Angle-adjustable solar panel mounting bracket of line arrester monitoring device
CN217282813U (en) Adjustable photovoltaic energy storage mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant