CN220889504U - Double-F-clamp positioning die with water stop ring - Google Patents

Double-F-clamp positioning die with water stop ring Download PDF

Info

Publication number
CN220889504U
CN220889504U CN202322451906.2U CN202322451906U CN220889504U CN 220889504 U CN220889504 U CN 220889504U CN 202322451906 U CN202322451906 U CN 202322451906U CN 220889504 U CN220889504 U CN 220889504U
Authority
CN
China
Prior art keywords
stop ring
water
positioning die
muscle
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322451906.2U
Other languages
Chinese (zh)
Inventor
孟凡伟
蔡昭辉
卢斌
袁兵
曹健
许安
魏旭
廉凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC City Construction Development Co Ltd
Original Assignee
CSCEC City Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC City Construction Development Co Ltd filed Critical CSCEC City Construction Development Co Ltd
Priority to CN202322451906.2U priority Critical patent/CN220889504U/en
Application granted granted Critical
Publication of CN220889504U publication Critical patent/CN220889504U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a take two F card positioning die of water-stop ring, includes main muscle, card muscle and water-stop ring, and the water-stop ring welds the intermediate position at the main muscle, respectively welds two card muscle in the both ends bottom of main muscle, two the card muscle between the distance with wall structure horizontal steel bar diameter size the same. The mold disclosed by the utility model has the advantages of simple structure, simplicity in manufacture, accuracy in control of the cross section size, good anti-seepage effect, wide application range, no need of mechanical equipment for auxiliary construction, and no influence of weather in the installation and use processes.

Description

Double-F-clamp positioning die with water stop ring
Technical Field
The utility model relates to the technical field of construction engineering structure quality and safety, in particular to a double-F-clamp positioning die with a water stop ring.
Background
When a building house is built by adopting a cast-in-situ reinforced concrete structure, the cross section size of the wall body is an important index in structure inspection, so that a positioning die such as a cement rod and a reinforcing steel bar is required to be placed in the die plate to support the die plate when the wall body die plate is erected, the concrete wall body after forming can be ensured to have accurate cross section size, but the traditional positioning die is easy to cause a groundwater infiltration path, so that the concrete outer wall of the underground structure leaks.
Disclosure of Invention
The utility model provides the double-F-clamp positioning die with the water stop ring, which solves the problem of poor water leakage of the outer wall of the structure in the existing building engineering and simultaneously solves the problem of influence of different personnel quality on the quality of a finished product in the construction process.
The utility model adopts the technical scheme that:
the utility model provides a take two F card positioning die of water-stop ring, includes main muscle, card muscle and water-stop ring, and the water-stop ring welds the intermediate position at the main muscle, and two card muscle of both ends bottom welding respectively of main muscle.
The distance between the two clamping ribs is the same as the diameter of the horizontal steel bar of the wall structure.
The water stop ring is a steel plate with the size of 60 multiplied by 60mm and the thickness of 3 mm.
The main reinforcement is a reinforcing steel bar with phi 8-12 mm.
The distance between the main rib end and the clamping rib near the outer end is the thickness of the wall protection layer.
The length of the main rib is determined according to the section size of the concrete wall body.
The utility model has the beneficial effects that: the mold disclosed by the utility model has the advantages of simple structure, simplicity in manufacture, accuracy in control of the cross section size, good anti-seepage effect, wide application range, no need of mechanical equipment for auxiliary construction, and no influence of weather in the installation and use processes.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
FIG. 2 is a schematic view of a water stop ring according to the present utility model.
Wherein: 1-a main rib; 2-clamping ribs; 3-water stop ring.
Detailed Description
The utility model provides a take two F card positioning die of water-stop ring, includes main muscle 1, card muscle 2 and water-stop ring 3, and water-stop ring 3 welding is in the intermediate position of main muscle 1, and two card muscle 2 of respectively welding in the both ends bottom of main muscle 1.
The distance between the two clamping ribs 2 is the same as the diameter of the horizontal steel bar of the wall structure.
The water stop ring 3 is a steel plate with the size of 60 multiplied by 60mm and the thickness of 3 mm.
The main reinforcement 1 is a reinforcement with phi 8-12 mm.
The spacing between the end head of the main rib 1 and the clamping rib 2 close to the outer end is the thickness of the wall protection layer.
The length of the main rib 1 is determined according to the section size of the concrete wall.
When the method is applied, the first step is as follows: firstly, checking a drawing related to a building structure, determining the section size of an implemented wall body, secondly, determining the diameter sizes of longitudinal ribs and horizontal ribs of the wall body structure, and processing reinforcing steel bars for a die into proper sizes after determining the sizes.
Step two: cutting the water stop ring 3 into the size required by the drawing by using a steel plate, and manufacturing a round hole at the center according to the diameter of the main rib 1.
Step three: the main rib 1, the clamping rib 2 and the water stop ring 3 are welded into a whole, and the welding machine can be used for controlling the section size of a wall body.
Simple structure, easy operation, wall body specification control is accurate, makes wall body form's wholeness better, light in weight, intensity is big, and this mould possesses simple manufacture, convenient use, prevention of seepage effect are good to be used to different cross-section size walls according to the preparation of requirement, intensity is high, transport convenience, former with low costs, the whole characteristics such as recoverable of accessory after abandoning. The later detection of the size of the wall body is ensured to meet the anti-seepage quality requirement.
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the device or element being referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present utility model.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the present utility model, the meaning of "plurality" means at least two, for example, two, three, etc., unless specifically defined otherwise.
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally formed; may be mechanically connected, may be electrically connected or may be in communication with each other; either directly or indirectly, through intermediaries, or both, may be in communication with each other or in interaction with each other, unless expressly defined otherwise. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
The foregoing describes the embodiments of the present utility model in detail, but the description is only a preferred embodiment of the present utility model and should not be construed as limiting the scope of the utility model. All equivalent changes and modifications within the scope of the present utility model are intended to be covered by the present utility model.

Claims (6)

1. The utility model provides a take two F card positioning die of water-stop ring, its characterized in that includes main muscle (1), card muscle (2) and water-stop ring (3), and water-stop ring (3) welding is in the intermediate position of main muscle (1), and two card muscle (2) are respectively welded at the both ends bottom of main muscle (1).
2. The double-F-clamp positioning die with the water stop ring according to claim 1, wherein the distance between two clamping ribs (2) is the same as the diameter of a horizontal reinforcing steel bar of a wall structure.
3. The double-F-clamp positioning die with the water stop ring according to claim 1, wherein the water stop ring (3) is a steel plate with the size of 60 multiplied by 60mm and the thickness of 3 mm.
4. The double-F-clamp positioning die with the water stop ring according to claim 1, wherein the main rib (1) is a reinforcing steel bar with phi 8-12 mm.
5. The double-F-clamp positioning die with the water stop ring according to claim 4, wherein the distance between the end head of the main rib (1) and the clamping rib (2) close to the outer end is the thickness of a wall protection layer.
6. The double-F-clamp positioning die with the water stop ring according to claim 5, wherein the length of the main rib (1) is determined according to the cross-sectional dimension of the concrete wall body.
CN202322451906.2U 2023-09-11 2023-09-11 Double-F-clamp positioning die with water stop ring Active CN220889504U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322451906.2U CN220889504U (en) 2023-09-11 2023-09-11 Double-F-clamp positioning die with water stop ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322451906.2U CN220889504U (en) 2023-09-11 2023-09-11 Double-F-clamp positioning die with water stop ring

Publications (1)

Publication Number Publication Date
CN220889504U true CN220889504U (en) 2024-05-03

Family

ID=90844165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322451906.2U Active CN220889504U (en) 2023-09-11 2023-09-11 Double-F-clamp positioning die with water stop ring

Country Status (1)

Country Link
CN (1) CN220889504U (en)

Similar Documents

Publication Publication Date Title
CN103089014A (en) Construction method of through floor pipe
CN220889504U (en) Double-F-clamp positioning die with water stop ring
CN210917458U (en) City utility tunnel unilateral side mould frock subassembly
CN109853523B (en) Adjustable secant pile guide groove die
CN201908439U (en) Reserved embedded grouting die for floor sleeve holes
CN217400338U (en) Tool type die device for reserving air conditioner hole
CN215241723U (en) Prefabricated wallboard preformed hole frock
CN210766783U (en) Cut-off wall grooving mold and high polymer cut-off wall grouting equipment
CN212223542U (en) Steel mould supporting structure for highway base course construction edge supporting
CN110093988B (en) Concrete prefabricated part assembling process
CN113236295A (en) Construction method of intensive tunnel embedded channel
CN112832864A (en) Electric power tunnel pipe culvert
CN113006345A (en) Steel plate wall and construction method thereof
CN212835923U (en) Connecting piece for steel bar passing through steel pipe concrete column
CN210066724U (en) Tool for temporarily fixing and controlling spacing between main bars of pile foundation reinforcement cage
CN110616669B (en) Construction method of high polymer impervious wall
CN220398670U (en) Open-air vertical type water gauge
CN214033608U (en) Trapezoidal drainage ditch control ruler
CN111174672A (en) Concrete slab reinforcing steel bar spacing marking device
CN212271592U (en) Positioning device for installing arc-shaped wall formwork
CN218643883U (en) Pre-buried bearing diagonal fixing device
CN216208363U (en) Hydraulic engineering supervises with portable concrete slump testing arrangement
CN211776005U (en) Grouting repair system for repairing concrete damage
CN219931610U (en) Device for installing embedded sleeve in large-size concrete structure
KR101071360B1 (en) Upright type underground storage tank and method for building it

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant